Systems and methods for stormwater detention
11155988 · 2021-10-26
Assignee
Inventors
Cpc classification
E03F5/101
FIXED CONSTRUCTIONS
International classification
E01F5/00
FIXED CONSTRUCTIONS
E03F5/10
FIXED CONSTRUCTIONS
Abstract
Systems and methods for stormwater detention. An outer wall comprising L-wall members arranged side by side, each comprising a vertical stem having a height h and a width w, and a base of width w connected to the stem and extending outward therefrom at a horizontal angle. At least a first portion of the L-wall member stems having a pocket extending a distance d from a top surface of the stem towards the base, where d<h. The pockets may be positioned midway of the stem width. At least a second portion of the L-wall member stems devoid of a pocket. Optionally, support walls also having a pocket. A roof of double-T roof members each having a span, a flange, and two webs, the webs having first and second ends engaged with one of the pockets of the stems of the L-wall members.
Claims
1. A system for stormwater detention, the system comprising: an outer wall comprising a first plurality of L-wall members, a second plurality of L-wall members, and a third plurality of L-wall members arranged side by side and connected, the L-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase extending longer than the hindbase, at least a portion of the first and second plurality of L-wall member stems having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width, and the third plurality of L-wall member stems devoid of a pocket, the forebases facing inward of the outer wall and the hindbases facing outward of the outer wall; a plurality of T-wall members arranged side by side and connected to form an inner support wall, the T-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase and the hindbase extending substantially equidistant from the stem, the stems of the plurality of T-wall members having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width; a roof comprising a first plurality of double-T roof members and a second plurality of double-T members, each having a span, a flange, and two webs, the webs having first and second ends engaged with one of the pockets of the stems of the first and second plurality of L-wall members; and at least one stormwater inlet and at least one stormwater outlet.
2. The system of claim 1 wherein the first, second, and third pluralities of L-wall members comprise a plurality of precast cantilever L-wall members with at least the hindbases of each L-wall member positioned under reinforced backfill mass.
3. The system of claim 1 wherein each of the plurality of L-wall members, T-wall members, and double-T roof members comprise precast and prestress concrete elements.
4. The system of claim 1 devoid of one or more support members.
5. The system of claim 1 wherein one or more of the L-wall members is configured with a camera to provide live visual inspection feed to one or more user interfaces remote from the L-wall members.
6. The system of claim 1 comprising one or more manways for accessing an interior space of the system.
7. The system of claim 1 comprising a concrete floor.
8. The system of claim 7 comprising at least one outlet conduit in the concrete floor.
9. The system of claim 1 comprising one or more stormwater inlet filters and/or one or more pumps for pumping stormwater out of the system.
10. A system for stormwater detention, the system comprising: an outer wall comprising a first plurality of L-wall members, a second plurality of L-wall members, and a third plurality of L-wall members arranged side by side and connected, the L-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase extending longer than the hindbase, at least a portion of the first and second plurality of L-wall member stems having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width, and the third plurality of L-wall member stems devoid of a pocket; the system devoid of T-wall members arranged side by side and connected to form an inner support wall; a roof comprising a plurality of double-T roof members, each having a span, a flange, and two webs, the webs having first and second ends engaged with one of the pockets of the stems of the plurality of L-wall members; and at least one stormwater inlet and at least one stormwater outlet.
11. The system of claim 10 wherein the first, second, and third pluralities of L-wall members comprise a plurality of precast cantilever L-wall members with at least the hindbases of each L-wall member positioned under reinforced backfill mass.
12. The system of claim 10 wherein each of the plurality of L-wall members and double-T roof members comprise precast and prestress concrete elements.
13. The system of claim 10 devoid of the one or more support members.
14. The system of claim 10 wherein at least one of the L-wall members is configured with a camera to provide live visual inspection feed to the one or more user interfaces remote from the L-wall members.
15. The system of claim 10 comprising one or more manways for accessing an interior space of the system.
16. The system of claim 10 comprising a concrete floor.
17. The system of claim 16 comprising at least one outlet conduit.
18. The system of claim 10 comprising one or more stormwater inlet filters and/or one or more pumps for pumping stormwater out of the system.
19. A system for stormwater detention, the system defining a stormwater detention volume, the system comprising: an outer wall comprising a first plurality of L-wall members, a second plurality of L-wall members, and a third plurality of L-wall members arranged side by side and connected, the L-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase extending longer than the hindbase, at least a portion of the first and second plurality of L-wall member stems having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width, and the third plurality of L-wall member stems devoid of a pocket, the forebases facing outward of the outer wall and the hindbases facing inward of the outer wall; a plurality of T-wall members arranged side by side and connected to form an inner support wall, the T-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase and the hindbase extending substantially equidistant from the stem, the stems of the plurality of T-wall members having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width; a roof comprising a first plurality of double-T roof members and a second plurality of double-T members, each having a span, a flange, and two webs, the webs having first and second ends engaged with one of the pockets of the stems of the first and second plurality of L-wall members; and at least one stormwater inlet and at least one stormwater outlet.
20. The system of claim 19 wherein the first, second, and third pluralities of L-wall members comprise a plurality of precast cantilever L-wall members with at least the forebases of each L-wall member positioned under reinforced backfill mass.
21. The system of claim 19 wherein each of the first plurality of T-wall members, each of the first plurality of L-wall members, and each of the double-T roof members comprise precast and prestress concrete elements.
22. The system of claim 19 devoid of the one or more support members.
23. The system of claim 19 wherein at least one of the plurality of T-wall members, the first, second, and third plurality of L-wall members, and the double-T roof members is configured with a camera to provide live visual inspection feed to one or more user interfaces remote from the system.
24. The system of claim 19 comprising one or more manways for accessing an interior space of the system.
25. The system of claim 19 comprising a concrete floor.
26. The system of claim 25 comprising at least one outlet conduit.
27. The system of claim 26 comprising one or more stormwater inlet filters and/or one or more pumps for pumping stormwater out of the system.
28. A method of installing a stormwater detention system of claim 1, the method comprising: a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, a plurality of pocketed T-wall members, a first plurality of double-T members, and a second plurality of double-T members to an installation site, each of the L-wall members having a forebase and a hindbase; b) positioning and connecting the first, second, and third pluralities of L-wall members to form an outer wall, with all of the L-wall members positioned with their forebases facing inward of the outer wall, and their hindbases facing outward of the outer wall; c) positioning and connecting the T-wall members to form one or more support inner walls; and d) positioning and connecting the first plurality of T-wall members and the second plurality of double-T roof members to form a roof.
29. A method of installing a stormwater detention system of claim 10, the method comprising: a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, and a plurality of double-T members, each of the L-wall members having a forebase and a hindbase; b) positioning and connecting the first, second, and third pluralities of L-wall members to form the outer wall, with their forebases facing inward of the outer wall, and their hindbases facing outward of the outer wall; and c) positioning and connecting the plurality of double T roof members to form a roof.
30. A method of installing a stormwater detention system of claim 1, the method comprising: a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, a plurality of pocketed T-wall members, a first plurality of double-T members, and a second plurality of double-T members to an installation site, each of the L-wall members having a forebase and a hindbase; b) positioning and connecting the first, second, and third pluralities of L-wall members to form an outer wall, with all of the L-wall members positioned with their forebases facing inward of the outer wall, and their hindbases facing outward of the outer wall; c) positioning and connecting the T-wall members to form one or more support inner walls, and positioning and connecting the plurality of support members to support the first plurality of double-T members; and d) positioning and connecting the first plurality of T-wall members and the second plurality of double-T roof members to form a roof.
31. A method of installing a stormwater detention system of claim 19, the method comprising: a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, a plurality of pocketed T-wall members, a first plurality of double-T members, and a second plurality of double-T members to an installation site, each of the L-wall members having a forebase and a hindbase; b) positioning and connecting the first, second, and third pluralities of L-wall members to form an outer wall, with all of the L-wall members positioned with their forebases facing outward of the outer wall, and their hindbases facing inward of the outer wall; c) positioning and connecting the T-wall members to form one or more support inner walls; and d) positioning and connecting the first plurality of T-wall members and the second plurality of double-T roof members to form a roof.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The manner in which the objectives of this disclosure and other desirable characteristics can be obtained is explained in the following description and attached drawings in which:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) It is to be noted, however, that the appended drawings may not be to scale and illustrate only typical embodiments of this disclosure. Furthermore,
DETAILED DESCRIPTION
(11) In the following description, numerous details are set forth to provide an understanding of the disclosed water detention systems and methods. However, it will be understood by those skilled in the art that the systems and methods disclosed herein may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible. All U.S. published patent applications and U.S. patents referenced herein are hereby explicitly incorporated herein by reference, irrespective of the page, paragraph, or section in which they are referenced. Where a range of values describes a parameter, all sub-ranges, point values and endpoints within that range are explicitly disclosed herein.
(12) The various embodiments of the present disclosure address the deficiencies in existing systems and methods and provide increased detention capacity and reduced cost and complexity in comparison to existing systems and methods. The various system embodiments of the present disclosure comprise of a system of concrete, in elements, in certain embodiments precast and/or prestressed concrete elements, for efficient collection and storage of rain water and water runoff detention. Systems and methods of the present disclosure introduce a new concept: use of large span roof members comprised of prestressed concrete members supported by load bearing retaining walls and optional support structures. This concept greatly increases the water detention per acre compared to existing systems in the marketplace. Some existing systems utilize many small precast concrete or polymeric elements. Others utilize galvanized piping chambers or plastic chambers. One common aspect of existing systems is that they have many pieces to install, the detention capacity is limited by the shapes and sizes of design limitations, and they are very expensive to manufacture, ship and install.
(13) Systems and methods of the present disclosure offer time saving on site for excavation, pad site, concrete work, foundations, assembly and backfill in an area that is commonly in a low-lying area for an extended amount of time. Systems and methods of the present disclosure may be installed on site in a much shorter time frame compared with conventional systems.
(14) Systems and methods of the present disclosure offer at least four options for the precast wall system depending on wall height and local soils conditions. Option 1: a precast outer L-Wall with the wall foundation under the reinforced backfill mass, covered by two sizes of prestressed concrete “double-T” roof members, using a plurality of T-wall members to form an inner wall supporting some of the double-T members. Option 2: like Option 1, but without the T-wall members, using only a set of single span size double-Ts. Option 3: like Option 1, but with extra interior supports (for example L-wall members, T-wall members, or columns). Option 4: like Options 1-3, but where the L-walls are “reversed” in position, as explained further herein.
(15) Systems and methods of the present disclosure offer considerable savings to the project owner by delivering greater stormwater detention capacity: for example, an existing system project design utilizes 15,500 square feet of land to deliver 75,250 cubic feet of storage. A system and method of the present disclosure may utilize 6480 square feet to deliver 77,750 cubic feet of storage. The savings to the owner in land utilization is an added benefit beyond the on-site construction costs. The additional cost savings to the owner increases using systems and methods of the present disclosure by utilizing the roof as a parking structure instead of a traditional concrete parking lot above a detention system currently in the marketplace that requires select backfill, stabilizing the sub base and pouring a thicker paving depth for the parking lot.
(16) Certain embodiments of systems and methods of the present disclosure may utilize heavy duty industrial grade top mounted trash pumps to drain the detention structure after a rain event. This feature greatly improves the efficiency of systems and methods of the present disclosure to allow design of deeper and higher volume structures with a smaller footprint. The existing systems rely on gravity flow to drain their structures after a rain event. This is a very inefficient design flaw controlled by external events and thus requires a much larger and costly footprint to accomplish proper rainwater detention. Certain systems and methods of the present disclosure may offer a hybrid option where a natural exit flow design drains the upper section of the detention structure down to the natural flow line by gravity flow and a pump system drains the area below the natural flow line. Certain embodiments may also include backup generators in the event public power is lost.
(17) The primary features of the systems and methods of the present disclosure will now be described with reference to the drawing figures, in which some of the construction and operational details, some of which are optional, will be further explained. The same reference numerals are used throughout to denote the same items in the figures. Those skilled in this art will know the basics of producing precast and prestressed concrete. Sources of background information include the Precast Concrete Institute (PCI); American Association of State Highway and Transportation Officials (AASHTO); National Precast Concrete Association (NPCA); and American Society of Testing materials (ASTM), to name a few.
(18) Certain stormwater detention system embodiments, such as embodiment 100 illustrated schematically in
(19)
(20)
(21) Referring now to the detailed schematics of
(22) Referring now briefly to
(23) TABLE-US-00001 TABLE 1 Dimensions for L-Wall members L-wall Broad Less broad Feature range (meters) range (meters) h 0.5-20 3-15 d 0.05-2 0.05-0.5 w 0.5-3 0.5-1 l.sub.1 0.1-1 0.5-1 l.sub.2 0.5-3 1-2 t.sub.1 0.01-0.2 0.01-0.1 t.sub.2 0.1-0.5 0.2-0.3
(24) Referring again to
(25) Certain system embodiments in accordance with the present disclosure may be constructed including corner pieces 50 (“corners”) such as illustrated in the schematic perspective view of
(26) Referring to
(27) TABLE-US-00002 TABLE 2 Dimensions for T-Wall members L-wall Broad Less broad Feature range (meters) range (meters) h 0.5-20 3-15 d 0.05-2 0.05-0.5 w 0.5-3 0.5-1 L 1-6 1-2 t 0.01-0.2 0.01-0.1
(28)
(29)
(30) Method embodiment 600 includes the steps of a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, and a plurality of double-T members, each of the L-wall members having a forebase and a hindbase (box 602); b) positioning and connecting the first, second, and third pluralities of L-wall members to form the outer wall, with their forebases facing inward of the outer wall, and their hindbases facing outward of the outer wall (box 604); c) optionally backfilling over the outward extending hindbases of the first, second, and third pluralities of L-wall members (box 606); and d) positioning and connecting the plurality of double-T roof members to form a roof (box 608).
(31) Method embodiment 700 includes the steps of a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, a plurality of pocketed T-wall members, a first plurality of double-T members, and a second plurality of double-T members to an installation site, each of the L-wall members having a forebase and a hindbase (box 702); b) positioning and connecting the first, second, and third pluralities of L-wall members to form an outer wall, with all of the L-wall members positioned with their forebases facing inward of the outer wall, and their hindbases facing outward of the outer wall (box 704); c) positioning and connecting the T-wall members to form one or more support inner walls, and positioning and connecting the plurality of support members to support the first plurality of double-T members (box 706); d) optionally backfilling over the outward extending hindbases of the first, second, and third pluralities of L-wall members (box 708); and e) positioning and connecting the first and second pluralities of double-T roof members to form a roof (box 710).
(32) Method embodiment 800 includes the steps of a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, a plurality of pocketed T-wall members, a first plurality of double-T members, and a second plurality of double-T members to an installation site, each of the L-wall members having a forebase and a hindbase (box 802); b) positioning and connecting the first, second, and third pluralities of L-wall members to form an outer wall, with all of the L-wall members positioned with their forebases facing outward of the outer wall, and their hindbases facing inward of the outer wall (box 804); c) positioning and connecting the T-wall members to form one or more support inner walls (box 806); d) optionally backfilling over the outward extending hindbases of the first, second, and third pluralities of L-wall members (box 808); and e) positioning and connecting the first and second pluralities of double-T roof members to form a roof (box 810).
(33) One or more pumps, in certain embodiments, may be powered for example using batteries, Li-ion or other type, or perhaps by a local generator, or grid power. A personal computer (PC) and graphical user interface (GUI) may allow an operator to interface with the stormwater detention system pumps, as well as any optional cameras, multipoint scanners, and the like. In certain embodiments the operator will be able to take stormwater detention measurements, view or read these measurements and reset the instrument for subsequent measurement taking. If the PC and GUI is connected to a power cable, then measurements may be taken remotely, stored and reset as necessary.
(34) In certain embodiments the L-wall members, T-wall members, and/or double-T roof members may be comprised of a suitable material or materials to withstand environmental conditions expected in the geographic region of installation. Such materials may be inert to human-hazardous vapors or gases, such as hydrogen sulfide (H.sub.2S). Suitable materials include various ceramic materials, such as concrete, metals and alloys, natural and man-made rubber compounds, elastomeric compounds, thermoplastic-elastomeric compounds, and the like, with or without fillers, additives, coupling agents, and other optional additives. L-wall members, T-wall members, and/or double-T roof members useful in the systems and methods of the present disclosure should have sufficient strength to withstand any mechanical stress (compression, tensile, shear) or other loads imposed by the items connected to them, and in the case of stormwater detention systems, stresses imposed by geologic faults in the region of installation and loads imposed by stormwater. This desire for sufficient strength is balanced by the need to maintain light-weight and balance. L-wall members, T-wall members, and double-T roof members should be capable of withstanding long term exposure to probable liquids and vapors, including hydrocarbons, solvents, brine, anti-freeze compositions, and the like, typically encountered in stormwater detention facilities. In certain embodiments, L-wall members, T-wall members, and double-T roof members may be corrosion-resistant, water-resistant, freeze-resistant, and heat-resistant. Such material properties may be supplied by one or more coatings.
(35) In certain other embodiments, the stormwater detention system, L-wall members, T-wall members, and double-T roof members need not take the shapes as illustrated schematically in the drawings. For example, there are many versions of L-wall members, T-wall member, and double-T roof members commercially available. Furthermore, the stormwater detention system could take any shape, such as rectangular, elliptical, triangular, rectilinear, curvilinear, or combination thereof and the like, and may take on one or more levels, as long as the stormwater detention system is able to carry out its intended stormwater detention function. It will be understood that such embodiments are part of this disclosure and deemed with in the claims.
(36) L-wall members, T-wall members, and double-T roof members and various components, such as corner members, and coatings for same, may be made using a variety of additive and/or subtractive processes, including molding, machining, and like subtractive processes, and/or subtractive processes such as net-shape casting (or near-net shape casting) using rapid prototype (RP) molds. Net-shape or near-net shape casting methods of making a variety of molds for producing a variety of complex products are summarized in patents assigned to 3D Systems, Inc., Rock Hill, S.C., U.S.A., for example U.S. Pat. No. 8,285,411. As summarized in the '411 patent, a number of technologies presently exist for the rapid creation of models, prototypes, and objects for limited run manufacturing. These technologies are generally called Solid Freeform Fabrication (“SFF”) techniques. Some SFF techniques include stereolithography, selective deposition modeling, laminated object manufacturing, selective phase area deposition, multi-phase jet solidification, ballistic particle manufacturing, fused deposition modeling, particle deposition, laser sintering, film transfer imaging, and the like. Generally in SFF, complex parts are produced from a build material in an additive fashion as opposed to conventional fabrication techniques, which are generally subtractive in nature. For example, in most conventional subtractive fabrication techniques material is removed by machining operations or shaped in a die or mold to near net shape and then trimmed. In contrast, additive fabrication techniques incrementally add portions of a build material to targeted locations, layer by layer, in order to build a complex part. SFF technologies typically utilize a computer graphic representation of a part and a supply of a build material to fabricate the part in successive layers. According to the '411 patent, SFF technologies may dramatically shorten the time to develop prototype parts, can produce limited numbers of parts in rapid manufacturing methods, and may eliminate the need for complex tooling and machining associated with conventional subtractive manufacturing methods, including the need to create molds for custom applications. In addition, customized parts can be directly produced from computer graphic data (e.g., computer-aided design (CAD) files) in SFF techniques. Generally, in most techniques of SFF, structures are formed in a layer by layer manner by solidifying or curing successive layers of a build material. In selective laser sintering, a tightly focused beam of energy, such as a laser beam, is scanned across sequential layers of powder material to selectively sinter or melt powder (such as a metal or ceramic powder) in each layer to form a multilayered part. In selective deposition modeling, a build material is jetted or dropped in discrete droplets, or extruded through a nozzle, such that the build material becomes relatively rigid upon a change in temperature and/or exposure to actinic radiation in order to build up a three-dimensional part in a layerwise fashion. In another technique, film transfer imaging (“FTI”), a film transfers a thin coat of resin to an image plane area where portions of the resin corresponding to the cross-sectional layer of the part are selectively cured with actinic radiation to form one layer of a multilayer part. Certain SFF techniques require the part be suspended from a supporting surface such as a build pad, a platform, or the like using supports that join the part to the supporting surface. Prior art methods for generating supports are described in U.S. Pat. Nos. 5,595,703; 6,558,606; and 6,797,351. The Internet website of Quickparts.com, Inc., Atlanta, Ga., a subsidiary of 3D Systems Inc., has more information on some of these techniques and materials that may be used.
(37) Certain embodiments may include a precast inlet box and filter such as that known under the trade designation Grate Inlet Skimmer Box, or GISB, available from Suntree Technologies, Inc., Cocoa, Fla., USA. Such a precast inlet box and filter may be positioned to flow stormwater therethrough before it flows into an inlet on a double-T member, a L-wall member, or both of these options, and feature a specialized inlet filter specifically for use in grated catch basins. The unit is made of marine grade fiberglass and stainless steel to ensure longevity and durability. During a storm event, all incoming runoff passes through an internal skimmer tray and then optionally through and into contact with a hydrocarbon absorption media sock (known under the trade designation STORMBOOM, also available from Suntree Technologies, Inc.) used to remove chemicals and hydrocarbons from stormwater runoff. Stormwater and solid material then fall into the lower section of the skimmer box where small sieve sized filters capture and retain all solids. Turbulence deflectors within the filtration box act to calm the water and allow for a greater removal efficiency. Purified stormwater passes through the catch basin allowing the filtered materials to dry after each storm. After the storm event has subsided, the stormwater will drain from the filter box completely leaving all collected debris suspended in the screen system to dry until removed during routine service. The dry state storage contains the nutrient pollutant load while also working to prevent septic water, the breeding of mosquitoes and nutrient leaching. One embodiment of such a precast filter box is illustrated schematically in perspective exploded view in
(38) Thus systems and methods described herein provide a consistent, low-cost, and safe way of detaining stormwater employing one or more L-wall members, T-wall members, and double-T roof members without having to use multiple plastic conduits or specially shaped concrete elements. Some existing systems utilize many small precast elements. Others utilize galvanized piping chambers or plastic chambers. One common aspect of existing systems is that they have many pieces to install, the detention capacity is limited by the shapes and sizes of design limitations, and they are very expensive to manufacture, ship and install. Systems and methods of the present disclosure avoid some or all of these disadvantages of existing systems.
(39) Embodiments disclosed herein include:
(40) A and B: a system for stormwater detention comprising (or consisting essentially of, or consisting of):
(41) an outer wall comprising a first plurality of L-wall members, a second plurality of L-wall members, and a third plurality of L-wall members arranged side by side and connected, the L-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase extending longer than the hindbase, at least a portion of the first and second plurality of L-wall member stems having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width, and the third plurality of L-wall member stems devoid of a pocket, the forebases facing inward of the outer wall and the hindbases facing outward of the outer wall;
(42) a plurality of T-wall members arranged side by side and connected to form an inner support wall, the T-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase and the hindbase extending substantially equidistant from the stem, the stems of the plurality of T-wall members having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width;
(43) optionally, one or more support members positioned under the first plurality of double-T members, the one or more support members selected from the group consisting of L-wall members, T-wall members, columns, and combinations thereof;
(44) a roof comprising a first plurality of double-T roof members and a second plurality of double-T members, each having a span, a flange, and two webs, the webs having first and second ends engaged with one of the pockets of the stems of the first and second plurality of L-wall members; and at least one stormwater inlet and at least one stormwater outlet.
(45) C: A system for stormwater detention comprising (or consisting essentially of, or consisting of):
(46) an outer wall comprising a first plurality of L-wall members, a second plurality of L-wall members, and a third plurality of L-wall members arranged side by side and connected, the L-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase extending longer than the hindbase, at least a portion of the first and second plurality of L-wall member stems having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width, and the third plurality of L-wall member stems devoid of a pocket;
(47) the system devoid of T-wall members arranged side by side and connected to form an inner support wall;
(48) optionally, one or more support members positioned under the first plurality of double-T members, the one or more support members selected from the group consisting of L-wall members, T-wall members, columns, and combinations thereof;
(49) a roof comprising a plurality of double-T roof members, each having a span, a flange, and two webs, the webs having first and second ends engaged with one of the pockets of the stems of the plurality of L-wall members; and
(50) at least one stormwater inlet and at least one stormwater outlet.
(51) D: a system for stormwater detention comprising (or consisting essentially of, or consisting of):
(52) an outer wall comprising a first plurality of L-wall members, a second plurality of L-wall members, and a third plurality of L-wall members arranged side by side and connected, the L-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase extending longer than the hindbase, at least a portion of the first and second plurality of L-wall member stems having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width, and the third plurality of L-wall member stems devoid of a pocket, the forebases facing outward of the outer wall and the hindbases facing inward of the outer wall;
(53) a plurality of T-wall members arranged side by side and connected to form an inner support wall, the T-wall members each comprising a substantially vertical stem having a height h and a width w, and a base of width w connected to the stem and each having a forebase and a hindbase extending outward from the stem at a substantially horizontal angle, the forebase and the hindbase extending substantially equidistant from the stem, the stems of the plurality of T-wall members having a pocket extending a distance d from a top surface of the stem towards the base, where d<h, the pockets positioned substantially midway of the stem width;
(54) optionally, one or more support members positioned under the first plurality of double-T members, the one or more support members selected from the group consisting of L-wall members, T-wall members, columns, and combinations thereof;
(55) a roof comprising a first plurality of double-T roof members and a second plurality of double-T members, each having a span, a flange, and two webs, the webs having first and second ends engaged with one of the pockets of the stems of the first and second plurality of L-wall members; and
(56) at least one stormwater inlet and at least one stormwater outlet.
(57) E: a method for installing a stormwater detention system, the method comprising (or consisting essentially of, or consisting of):
(58) a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, a plurality of pocketed T-wall members, a first plurality of double-T members, and a second plurality of double-T members to an installation site, each of the L-wall members having a forebase and a hindbase;
(59) b) positioning and connecting the first, second, and third pluralities of L-wall members to form an outer wall, with all of the L-wall members positioned with their forebases facing inward of the outer wall, and their hindbases facing outward of the outer wall;
(60) c) positioning and connecting the T-wall members to form one or more support inner walls;
(61) d) optionally backfilling over the outward extending hindbases of the first, second, and third pluralities of L-wall members; and
(62) e) positioning and connecting the first and second pluralities of double-T roof members to form a roof.
(63) F: a method for installing a stormwater detention system, the method comprising (or consisting essentially of, or consisting of):
(64) a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, and a plurality of double-T members, each of the L-wall members having a forebase and a hindbase;
(65) b) positioning and connecting the first, second, and third pluralities of L-wall members to form the outer wall, with their forebases facing inward of the outer wall, and their hindbases facing outward of the outer wall;
(66) c) optionally backfilling over the outward extending hindbases of the first, second, and third pluralities of L-wall members; and
(67) d) positioning and connecting the plurality of double-T roof members to form a roof.
(68) G: a method for installing a stormwater detention system, the method comprising (or consisting essentially of, or consisting of):
(69) a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, a plurality of pocketed T-wall members, a first plurality of double-T members, and a second plurality of double-T members to an installation site, each of the L-wall members having a forebase and a hindbase;
(70) b) positioning and connecting the first, second, and third pluralities of L-wall members to form an outer wall, with all of the L-wall members positioned with their forebases facing inward of the outer wall, and their hindbases facing outward of the outer wall;
(71) c) positioning and connecting the T-wall members to form one or more support inner walls, and positioning and connecting the plurality of support members to support the first plurality of double-T members;
(72) d) optionally backfilling over the outward extending hindbases of the first, second, and third pluralities of L-wall members; and
(73) e) positioning and connecting the first and second pluralities of double-T roof members to form a roof.
(74) H: a method for installing a stormwater detention system, the method comprising (or consisting essentially of, or consisting of):
(75) a) delivering a first plurality of pocketed L-wall members, a second plurality of pocketed L-wall members, a third plurality of non-pocketed L-wall members, a plurality of pocketed T-wall members, a first plurality of double-T members, and a second plurality of double-T members to an installation site, each of the L-wall members having a forebase and a hindbase;
(76) b) positioning and connecting the first, second, and third pluralities of L-wall members to form an outer wall, with all of the L-wall members positioned with their forebases facing outward of the outer wall, and their hindbases facing inward of the outer wall;
(77) c) positioning and connecting the T-wall members to form one or more support inner walls;
(78) d) optionally backfilling over the outward extending hindbases of the first, second, and third pluralities of L-wall members; and
(79) e) positioning and connecting the first and second pluralities of double-T roof members to form a roof.
(80) Each of the embodiments A, B, C, E, G, and H may have one of more of the following additional elements in any combination:
(81) Element 1: the stormwater detention system may be configurable wherein the outer wall comprising a plurality of L-wall members comprises a plurality of precast cantilever L-wall members with the base of each L-wall member positioned under reinforced backfill mass.
(82) Element 2: the plurality of L-wall members and double-T roof members comprise precast and prestress concrete elements.
(83) Element 3: an L-wall member is configured with a camera to provide live visual inspection feed to the one or more user interfaces remote from system.
(84) Element 4: systems comprising one or more manways for accessing an interior space of the system.
(85) Element 5: systems comprising a concrete floor.
(86) Element 6: systems comprising at least one outlet conduit.
(87) Element 7: systems comprising one or more inlet filters and/or one or more pumps for pumping water out of the system.
(88) Element 8: systems devoid of T-walls.
(89) Element 9: systems devoid of a second plurality of double-T members;
(90) Element 10: The stormwater detention system pumps may be operated locally via an on-board motor operated by batteries, solar power, permanent or leased generator, optionally with a programmable logic controller and stormwater level feedback controller.
(91) Element 11: providing live visual inspection feed images to one or more user interfaces remote from the stormwater detention site employing one or more cameras mounted to L-wall members, T-wall members, and/or double T roof members.
(92) Element 12: Methods where one or more pumps are delivered and installed.
(93) Element 13: Systems and methods using large span roof members comprised of prestressed concrete members supported by load bearing retaining walls and optional support structures.
(94) Element 14: Systems including a precast cantilever L-Wall with the wall foundation under the reinforced backfill mass, covered by a prestressed concrete “double tee” roof.
(95) Element 15: Systems and methods may utilize 6480 square feet to deliver 77,750 cubic feet of storage.
(96) Element 16: Systems and methods utilizing the roof as a parking structure instead of a traditional concrete parking lot above a detention system currently in the marketplace that requires select backfill, stabilizing the sub base and pouring a thicker paving depth for the parking lot.
(97) Element 17: systems and methods including one or more heavy duty industrial grade top mounted trash pumps to drain the detention structure after a rain event. This feature greatly improves the efficiency of systems and methods of the present disclosure to allow design of deeper and higher volume structures with a smaller footprint.
(98) Element 18: systems and methods that are a hybrid option where a natural exit flow design drains the upper section of the detention structure down to the natural flow line by gravity flow and one or more pumps drains the area below the natural flow line.
(99) Element 19: systems including backup generators in the event public power is lost.
(100) From the foregoing detailed description of specific embodiments, it should be apparent that patentable systems and methods have been described. Although specific embodiments of the disclosure have been described herein in some detail, this has been done solely for the purposes of describing various features and aspects of the systems and methods and is not intended to be limiting with respect to their scope. It is contemplated that various substitutions, alterations, and/or modifications, including but not limited to those implementation variations which may have been suggested herein, may be made to the described embodiments without departing from the scope of the appended claims. For example, one modification would be to take an existing stormwater detention system and modify it to remove existing features and install features described herein in accordance with the present disclosure. Another modification would be for T-wall member suppliers, L-wall member suppliers, and/or double-T roof member suppliers to supply these members with coatings or topping materials, for example suitable for parking lots. In other embodiments, the T-wall members, L-wall members, and/or double-T roof members may be mountable on trucks or other vehicles drivable by humans, or on self-driving trucks or autos.