ZERO-GANGUE-DISCHARGE SHORT-WALL FACE PILLAR-FREE MINING METHOD

20210310356 · 2021-10-07

    Inventors

    Cpc classification

    International classification

    Abstract

    The present invention discloses a zero-gangue-discharge short-wall face pillar-free mining method, which is applicable to zero-gangue-discharge disposal in the mining operation in a mine shaft. A short-wall face is arranged in a selected area near a mine shaft according to the actual conditions of the mine shaft, the short-wall face is mined in a fully mining and fully back-filling mode, the gangues produced at other mining faces of the mine shaft are filled into the short-wall face, the short-wall face is supported with anchor rods along the edge of the filling face and the solid coal side to form an entry, and the entry is utilized to mine an adjacent working face. The method in the present invention mainly displaces the coal mass with gangues and thereby maximizes the utilization of the resources; in addition, the method can fully control the roof and realize mining without damage to the rock formation. Therefore, the method is of great value for wide application.

    Claims

    1. A zero-gangue-discharge short-wall face pillar-free mining method, comprising the following steps: a) arranging a short-wall face in an area near a shaft station of a mine shaft according to actual conditions of the mine shaft, a mining starting position of the short-wall face is 500 m˜1,000 m away from the shaft station, and the short-wall face is mined in a direction away from the shaft station; b) transporting all gangues produced at other mining faces of the mine shaft to the short-wall face, mining the short-wall face in a fully mining and fully back-filling mode, and filling the short-wall face with the gangues; at the same time, supporting a roof and side walls of a roadway in the milling process with anchor rods, including supporting the roadway along an edge of a filling face and a solid coal side of the short-wall face; forming an entry at an outer side of the short-wall face after supporting, and excavating a roadway at an outer side of a short-wall face adjacent to the current short-wall face at the same time; c) excavating an open-off cut from the roadway to the current short-wall face after the roadway is excavated; utilizing the entry and the adjacent excavated roadway to form a backfill-mining working face at an adjacent short-wall face, continuing the mining in a fully mining and fully back-filling mode and filling the adjacent short-wall face with gangues; at the same time, transferring excavating equipment to excavate adjacent roadway and open-off cut of a next short-wall face to prepare for the follow-up mining of the next short-wall face; d) repeating the steps b and c and thereby realizing continuous mining of the short-wall face, with the gangues disposed in the mine shaft, until all gangues produced in the downhole operation are disposed in the mine shaft; thus, zero downhole gangue discharge is realized.

    2. The zero-gangue-discharge short-wall face pillar-free mining method according to claim 1, wherein, the short-wall face is used to dispose gangues underground, and the short-wall face is 30˜50 m in width, in height equal to a height of the coal seam, and 1,000 m˜3,000 m in length.

    3. The zero-gangue-discharge short-wall face pillar-free mining method according to claim 1, wherein, the entry is 3˜6 m in width.

    4. The zero-gangue-discharge short-wall face pillar-free mining method according to claim 1, wherein, the short-wall face is mined in a mining sequence of alternating forward mining and backward mining, and the roadway is excavated always by forward excavation.

    Description

    BRIEF DESCRIPTION OF DRAWINGS

    [0016] FIG. 1 shows forward mining of a short-wall face in the zero-gangue-discharge short-wall face pillar-free mining method according to the present invention;

    [0017] FIG. 2 shows backward mining of the short-wall face in the zero-gangue-discharge short-wall face pillar-free mining method according to the present invention.

    [0018] In the figures: 1—short-wall face; 2—entry; 3—roadway; 4—open-off cut; 5—adjacent short-wall face; 6—adjacent roadway.

    EMBODIMENTS

    [0019] Hereunder the present invention will be further detailed in an embodiment with reference to the accompanying drawings.

    [0020] As shown in FIGS. 1 and 2, the zero-gangue-discharge short-wall face pillar-free mining method according to the present invention comprises the following steps:

    [0021] a. arranging a short-wall face 1 in an area near the shaft station of a mine shaft according to the actual conditions of the mine shaft, the short-wall face 1 is used to store gangues underground, and is in 30˜50 m width, in height equal to the height of the coal seam, and in 1,000 m˜3,000 m length; the mining starting position of the short-wall face 1 is 500 m˜1,000 m away from the shaft station, and the short-wall face 1 is mined in a direction away from the shaft station, in a mining sequence of alternating forward mining and backward mining; while excavating the short-wall face 1 always by forward excavation;

    [0022] b. transporting all gangues produced at other mining faces of the mine shaft to the short-wall face 1, mining the short-wall face 1 in a fully mining and fully back-filling mode, and filling the short-wall face 1 with the gangues; at the same time, supporting the roof and side walls of the roadway in the milling process with anchor rods, including supporting the roadway along the edge of a filling face and the solid coal side of the short-wall face 1; forming an entry 2 in 3˜6 m width at the outer side of the short-wall face 1 after the supporting, and excavating a roadway 3 at the outer side of a short-wall face 5 adjacent to the current short-wall face 1 at the same time;

    [0023] c. excavating a open-off cut 4 from the roadway 3 to the current short-wall face 1 after the roadway 3 is excavated; utilizing the entry 2 and the adjacent excavated roadway 3 to form a backfill-mining working face at an adjacent short-wall face 5, continuing the mining in a fully mining and fully back-filling mode and filling the adjacent short-wall face 5 with gangues; at the same time, transferring the excavating equipment to excavate adjacent roadway 6 and open-off cut 4 of a next short-wall face to prepare for the follow-up mining of the next short-wall face;

    [0024] e. repeating the steps b and c and thereby realizing continuous mining of the short-wall face 1, with the gangues disposed in the mine shaft, till all gangues produced in the downhole operation are disposed in the mine shaft; thus, zero downhole gangue discharge is realized.