Method and track-building machine for renewing sleepers of a track formed from rails and the sleepers

11124923 · 2021-09-21

Assignee

Inventors

Cpc classification

International classification

Abstract

In a method for renewing sleepers of a track formed of rails and the sleepers, the placement of skids, which support a machine frame of a track-building machine on the sleepers, is preceded by the machine frame being intermediately supported on the sleepers. The two rails are then distanced from one another, while avoiding a breakage separation, in a track section that includes both the region of the skids and the intermediate support. After supporting the machine frame on the skids, the intermediate support is lifted off the sleepers and work is begun.

Claims

1. A method for renewing sleepers of a track that is formed of rails and the sleepers, the method comprising: providing a track construction machine with a machine frame and a front pair of skids and a rear pair of skids configured to support the machine on the sleepers; prior to placing the front pair of skids and rear pair of skids on the sleepers, supporting the machine frame on the sleepers or on a track bed with a vertically adjustable intermediate support disposed between the rails with respect to a track transverse direction and extending between the front pair of skids and the rear pair of skids with respect to a track longitudinal direction; subsequently spacing the rails apart from one another in a track transverse direction extending perpendicular to a track longitudinal direction, while avoiding a separation of the rails, within a section of the track that includes both a region of the front pair of skids and rear pair of skids and of the intermediate support; and supporting the machine frame on the front pair of skids and rear pair of skids, subsequently removing the intermediate support from the sleepers or the track bed and starting a forward travel while renewing the sleepers of the track.

2. A track construction machine for renewing sleepers of a track having rails and sleepers, the machine comprising: a machine frame; a front pair of skids and a rear pair of skids configured to support said machine frame on the sleepers; and a vertically adjustable intermediate support connected to said machine frame between said front pair and said rear pair of skids with regard to a track longitudinal direction, said intermediate support being configured to support said machine frame directly on the sleepers or on a track bed independently of said front pair of skids and rear pair of skids said intermediate support having a supporting device for being lowered directly onto the sleepers or the track bed between the rails with respect to a track transverse direction.

Description

(1) Further advantages of the invention are additionally apparent from the description of the drawing.

BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWING

(2) The invention is described in more detail in the following text on the basis of an exemplary embodiment illustrated in the drawing, in which:

(3) FIG. 1 shows a side view of a section of a track construction machine configured according to the invention, and

(4) FIGS. 2a to 2d each show a schematic plan view of different phases of the work of the machine.

DESCRIPTION OF THE INVENTION

(5) A track construction machine 1 illustrated in FIG. 1 is part of a track renewal train 2 (known per se) which is composed of a plurality of vehicles coupled together and is configured to renew a track 5 formed from rails 3 and sleepers 4. The machine 1 has a machine frame 6 which is able to travel on the track 5 in a working direction 8 via rail bogies 7 and is connected at its ends to further vehicles (not shown) of the renewal train 2.

(6) Located at the rear end 9, with regard to the working direction 8, of the machine frame 6 are various working units in the form of a device 10 for picking up old sleepers 4, a ballast plow 11 for processing an exposed track bed 12, and a device 13 for laying new sleepers 14. Conveyor belts 15 are provided for sleeper transport from and to sleeper wagons (not illustrated) by means of a gantry crane 16. Rail guiding clamps 17 serve to lift the rails 3 from the old sleepers 4 and spread them or space them apart from one another in a track transverse direction 19 extending normally to a track longitudinal direction 18 (see FIG. 2).

(7) Provided in each of the regions—with regard to the working direction 8—immediately in front of and behind the rail bogie 7 arranged at the rear end 9 of the machine frame 6 is a pair of skids 20 which—as can be seen in FIG. 2—are each spaced apart from one another in the track transverse direction 19 at a spacing corresponding approximately to the spacing of the rails 3 and are configured in a vertically adjustable manner. Furthermore, located between the two pairs of skids 20 is a likewise vertically adjustable intermediate support 21 which is connected to the machine frame 6 and consists, in the example illustrated here, of a total of four supporting devices 22. These are arranged alongside one another, in the track transverse direction 19, in the region of the rail bogie 7 and distributed approximately uniformly along the length of a sleeper 4. (Embodiments with only one or a plurality of supporting devices are equally possible in the scope of the invention).

(8) FIGS. 2a to 2d now show the method sequence according to the invention during sleeper renewal without a rail change. The track renewal train 2 is driven into the site until the rail bogie 7 is located at the point where the sleeper change is intended to start (FIG. 2a). Then, the supporting devices 22 of the intermediate support 21 are lowered onto the old sleepers 4 or supported thereon and as a result the rail bogie 7 is lifted automatically off the rails 3 (FIG. 2b). Alternatively, the supporting devices 22 can also be supported on the track bed 12.

(9) Following removal of the rail fasteners, the two rails 2 are now spread apart in the track transverse direction 19 by means of the track guiding clamps 17, without being severed and thus with the rail tension being maintained. This takes place in a track section 23 which comprises both the region of the skids 20 in front of and behind the rail bogie 7 and the intermediate support 21, such that both pairs of skids 20 can be laid at the same time on the sleepers 4 freed of the rails 3 (FIG. 2c).

(10) Subsequently, the intermediate support 21 is taken out of operation again by vertical adjustment, such that the machine frame 6 of the track construction machine 1 now rests on the old sleepers 4 via the skids 20 and can be slid forward along said sleepers 4 in the working direction 8 in the context of working forward travel, while the removal of the old sleepers 4 and the installation of new sleepers 14 is carried out by way of the devices 10 and 13 as far as the end of the site. The disengagement operation of the track renewal train 2 at this point finally takes place in an analogously opposite manner to the engagement operation.