Bedload transport methodology and method of use
11067475 · 2021-07-20
Assignee
Inventors
- Tate O McAlpin (Magee, MS, US)
- David Abraham (Vicksburg, MS, US)
- John Shelley (Independence, MO, US)
- Thad C Pratt (Vicksburg, MS, US)
Cpc classification
International classification
Abstract
A method for determining an estimate of an overall bedload transport rate by using bedload transport rates for a plurality of subswaths involves, generally, performing a bathymetry survey in areas at multiple times, calculating an amount of erosion and deposition and their ratio, and calculating an erosion and a deposition transport rate using the provided equations.
Claims
1. A method for determining an estimate of an overall bedload transport rate by using bedload transport rates for a plurality of subswaths and using relationships incorporated on a non-transitory computer readable storage media for use with a specially configured computer to operate survey equipment; the method comprising the steps of: (a) operating the survey equipment to perform bathymetry surveys in a surveyed area and obtain a resolution of nodal spacing of bathymetry survey data values by collecting a plurality of survey data values for points X.sub.n, Y.sub.n and Z.sub.n@T1 at time T.sub.1, and subsequently obtaining a second plurality of survey data values for points X.sub.n, Y.sub.n and Z.sub.n@T2 at time T.sub.2, said time T.sub.1 and said time T.sub.2 establishing a first time interval, (b) combining said plurality of survey data values at time T.sub.1 and said second plurality of survey data values at time T.sub.2 to obtain a set of X.sub.n, Y.sub.n, Z.sub.n@T1 and Z.sub.n@T2 values, (c) calculating an amount of erosion and an amount of deposition occurring in said first time interval, and calculating an erosion to deposition ratio by computing a volume under each erosion or deposition computational cell as established by the set of X.sub.n, Y.sub.n, Z.sub.n@T1 and Z.sub.n@T2 values, and summing corresponding volumes, (d) separating a swath into the plurality of subswaths based upon a distance between X.sub.n and Y.sub.n corresponding to the resolution of the nodal spacing of the bathymetry survey data values, (e) determining, for each of said plurality of subswaths, an erosion volume E, a deposition volume D and a number of waves NW determined by counting a number of times a Δz value of the bathymetry survey data values crosses a 0.0 y-value and dividing by two, and (f) calculating for each of said plurality of subswaths, an erosion T.sub.e and a deposition T.sub.d transport rate using
2. The method of claim 1 wherein the surveyed area is rectangular.
3. The method of claim 1 further comprising a step of summing the transport rate for said plurality of subswaths to obtain a total transport rate for the swath.
4. The method of claim 1 wherein said points are spaced in an orthogonal configuration.
5. The method of claim 1 wherein said bedload transport rate for erosion is T.sub.e and said bedload transport rate for deposition is T.sub.d, and a bedload transfer rate ratio T.sub.e/T.sub.d is from 0.8 to 1.2.
6. The method of claim 1 wherein n≤100.
7. The method of claim 1 wherein n≤1,000.
8. The method or claim 1 wherein n≤10,000.
9. The method of claim 1 wherein Δt is from 20 minutes to 120 minutes.
10. The method of claim 1 wherein the number of waves for each subswath is determined by applying a wavelength filter.
11. The method according to claim 1 further comprising a step of improving an accuracy of the calculations of the bedload transport rate as a value of Δt increases by calculating values for the bedload transport rate for multiple time intervals (Δt), and utilizing a linear regression with said values for the transport rate for the multiple time intervals.
12. A method for determining an estimate of bedload transport in near real time comprising operating survey equipment to collect bathymetry survey data values including a resolution of nodal spacing, and using relationships incorporated on a non-transitory computer readable storage media for use with a specially configured computer to apply the bathymetry survey data values using the relationships:
13. The method of claim 12 wherein the surveyed area is rectangular.
14. The method of claim 13 wherein measured points in said surveyed area are spaced in an orthogonal configuration.
15. The method of claim 12 wherein said bedload transport rate for erosion is T.sub.e and said bedload transport rate for deposition is T.sub.d, and a bedload transfer rate ratio T.sub.e/T.sub.d is from 0.8 to 1.2.
16. The method of claim 12 wherein n≤100.
17. The method of claim 12 wherein n≤1,000.
18. The method of claim 12 wherein n≤10.000.
19. The method of claim 12 wherein Δt is from 20 minutes to 120 minutes.
20. The method of claim 12 wherein the number of waves is determined by applying a wavelength filter.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
DETAILED DESCRIPTION
(16) In select embodiments of the present invention, bathymetric data are used to compute bedload transport, employing both the underlying theoretical concept to produce a numerical value for bedload transport and using data collected from actual field conditions.
Theory
(17) Select embodiments of the present invention employ a method in which the bedload transport is calculated directly from measurements of the bedform movement. Consider the movement of a dune in the downstream (x) direction as shown schematically in
(18) Simons, D. B., et al., Bedload Equation for Ripples and Dunes, U.S. Geological Survey Professional Paper 462-H, 1965. In this case, the continuity equation for the bed form movement developed by Exner (1925) is
(19)
where: ρ=porosity of sediment bed y=bed elevation t=time q.sub.v=volume rate of bedload transport per unit width of channel
(20) Note that Eqn. (1) applies to any bed profile and not just a triangle as shown in
q.sub.v=β(1−ρ)V.sub.sη (2)
where: η=height of the dune crest measured from the dune trough β=shape factor or bedload discharge coefficient. Wilbers, A., The Development and Hydraulic Roughness of Subaqueous Dunes, Netherlands Geographical Studies 323, The Royal Dutch Geographical Society, Utrecht, Netherlands, 227 pages, 2004. See Simons et al. (1965) and Engel, P. and Y. L. Lau, Computation of Bed Load Using Bathymetric Data, Journal of the Hydraulics Division, ASCE, Vol. 106, and No. HY3, 1980.
(21) Thus, volumetric bedload transport is obtained from measurements of V.sub.s and η. In this integration it is assumed that there is no bedload movement in the dune trough. When the shape of a dune is approximated by a triangle (
(22) The method tested in Abraham et al. (2011) is based on a modification of Eqn. (2). If the crest moves an average distance of Δx during time interval Δt, Eqn. (2) reads
(23)
(24) In Eqn. (3), the product of η and Δx is the volume of sand per unit width, ΔV, that is moved during time interval Δt, i.e.,
ΔV=ηΔx (4)
(25) In
(26)
(27) This equation allows bedload transport to be measured based on sequential measurements (measurements taken Δt apart) of elevations of the surfaces of the upstream face of dunes, rather than measurements based on dune height and speed from Eqn. (2). The method, however, requires that dune speed be estimated with some accuracy so that an appropriate time step Δt is selected to complement the resolution of the measuring equipment.
(28) Three main assumptions include: (1) each dune moves with relatively constant speed and shape, (2) the measured “slice” is two-dimensional, and (3) there is little or no suspended sediment. If the bed forms were three-dimensional, as is often the case in field conditions, one would need to account for the lateral sediment flux. In the flume used in validating the above method, there was very little lateral movement of the dunes, justifying a 2D assumption. An additional limitation with the method is that the sediment volumes represented by ABGA and FHEF in
Validation
(29) The above method is validated with the data from a laboratory test series conducted at the USDA Agricultural Research Service-National Sedimentation Laboratory (ARS-NSL). Kuhnle, R., and R. Derrow, Using the SedBed Monitor to Measure Bed Load, Proceedings of Symposium on: Fundamentals and Advancements in Hydraulic Measurements and Experimentation, Buffalo, N.Y., Aug. 1-5, 1994. A re-circulating sediment flume was used measuring 30.5 m long, 1.22 m wide and 0.61 m deep. Flow depth d was about 0.365 m in all tests. The sand bed occupied approximately 0.15 m of the flume depth. The bed was composed of quartz sand with a median diameter of 0.8 mm and a standard deviation (sd) of 0.45φ(φ=−log.sub.2D, where D is grain diameter in mm). The size and sd of the sand assured that transport would be predominantly as bed load, simplifying a comparison to total sediment load measurements. The slope of the flume was adjustable using gear-driven jacks located upstream and downstream from a center pivot. Water flow rate was set by a variable-speed pump and measured using a Venturi meter in the 0.41 m diameter flow return pipe. Total sediment load was measured using a calibrated density cell that determined the density of the sediment water mixture in the return pipe of the flume. The calibration of the density cell is described in Kuhnle and Derrow (1994).
(30) Refer to
(31) Bed measurements began about 5 m downstream from the head box for approximately 15 m. The bed forms were approximately two-dimensional (2D) in all tests. The average height and length of the bed forms ranged from 0.06 m to 0.09 m and 1.6 m to 2.4 m, respectively (0.16 to 0.22 times flow depth and 4.4 to 6.6 times flow depth, respectively).
(32) Bed measurements were made with two acoustic probes 204 mounted on the carriage 201 and separated by a longitudinal distance of 3.18 m. For the scour measurements, the carriage 201 was moved parallel with the flow Q, with the probes 204 following the centerline of the flume. The speed of the carriage 201. V.sub.p, was precisely controlled by a stepping motor (not shown separately) and ranged from 0.0126 m/s to 0.0379 m/s, depending on the migration speed of the dunes. The speed of the dunes was measured to allow accurate measurement of the rate of scour. Each probe 204 mapped the same wave offset in time by Δt. The time difference between the first 20 and second 206 mapping (Δt) ranged from 84 seconds to 252 seconds. Flow conditions are summarized in Table 1. The last column in Table 1 shows computed bedload from scour rates using Eqn. (5) with β=0.55. The Froude number ranged from 0.243 to 0.502. In each experiment, the bed was profiled several times. Individual, computed results for all six experiments are listed in Table 2.
(33) TABLE-US-00001 TABLE 1 Flow Conditions, Measured and Calculated Bed Load Transport Rates Bedload Calculated from Exper- Flow Flow Average Probe Measured Scour iment Rate Depth Velocity Water Velocity Bedload Rates No. (m.sup.3/s) (m) (m/s) Slope (m/s) (kg/s-m) (kg/s-m) TNP-1 0.203 0.362 0.459 0.34 0.0126 0.006 0.009 TNP-2 0.257 0.368 0.571 1.07 0.0126 0.029 0.026 TNP-3 0.302 0.366 0.678 1.90 0.0126 0.066 0.062 TNP-4 0.341 0.365 0.766 2.78 0.0252 0.118 0.134 TNP-5 0.387 0.363 0.874 3.13 0.0252 0.225 0.206 TNP-6 0.426 0.367 0.952 3.74 0.0379 0.317 0.334
(34) TABLE-US-00002 TABLE 2 Average Computed Bedload from Scour Rates for all Sweeps and Experiments. COMPUTED TRANSPORT (kg/s-m) FOR STATED EXPERIMENTS Sweep No. TNP-1 TNP-2 TNP-3 TNP-4 TNP-5 TNP-6 1 0.0063 0.0239 0.0549 0.1440 0.1541 0.2935 2 0.0121 0.0259 0.0581 0.1108 0.2529 0.3594 3 0.0118 0.0227 0.0718 0.1543 0.2695 0.3183 4 0.0078 0.0259 0.0558 0.1055 0.1790 0.3791 5 0.0084 0.0282 0.0878 0.1349 0.1742 0.2587 6 0.0055 0.0334 0.0472 0.1728 0.2402 0.2947 7 0.0089 0.0220 0.0630 0.1562 0.2152 0.3433 8 0.0272 0.0493 0.1196 0.1828 0.3845 9 0.0257 0.0568 0.1186 0.1851 0.4257 10 0.0713 0.1220 0.3372 11 0.2839 AVE. 0.0087 0.0261 0.0616 0.1339 0.2059 0.3344 SD 0.0025 0.0034 0.0123 0.0223 0.0401 0.0503
(35) Refer to
Discussion and Error Analysis
(36) There are several sources of uncertainty with a bed-form tracking technique, whether it is based on measuring rates of scour on the upstream face of the bed forms or whether it is based on measurements of bed-form amplitude and speed. The sources of uncertainty include defining the shape of actual dunes. The shape is not perfectly triangular. Moreover, there is a tendency of dunes to superimpose on one another as they migrate downstream. The superposition makes it difficult to calculate dune characteristics and dune migration speeds. There is also evidence (Crickmore 1970; Engel and Lau, 1980, 1981) that the point of zero bed load transport is not at the trough of dunes but a small distance up on the upstream face. Crickmore, M. J., Effect of Flume Width on Bed-Form Characteristics, Journal of the Hydraulics Division, ASCE, HY2, February, 1970; Engel, P. and Y. L. Lau, Computation of Bed Load Using Bathymetric Data, Journal of the Hydraulics Division, ASCE, Vol. 106, No. HY3. Therefore, the bed-form amplitude may not be exactly the distance from trough to crest. These uncertainties are characterized as random and are included in the standard deviations of the computed transport rates listed in Table 2 and shown graphically by the vertical error bars in
(37) The error, which is specific to the scour method, is the volume represented by ABGA and FHEF in
(38)
where Δη=vertical distance between the two surfaces represented by AF and BE. An error of, say, 10% (ε=0.1) would occur if Δx=V.sub.sΔt=0.1λ.
(39) In
(40)
a lower limit on ε and Δt. If probe speed is V.sub.p, and distance probes L, then Δt=L/V.sub.p, and a corresponding probe speed and associated error, ε, is given by knowledge of the average speed and length of the dunes is necessary. The length of the dunes in the flume ranged from roughly 1.6 m to 2.4 m corresponding to a λ/d range from roughly 4.4 to 6.6,
where: U=water-flow velocity
(41) To use this equation for setting probe speed or estimating an error, some knowledge of the average speed and length of the dunes is necessary. The length of the dunes in the flume ranged from roughly 1.6 m to 2.4 m corresponding to a λ/d range from roughly 4.4 to 6.6, with an average of about 5.4, where d is the depth of flow. This average is slightly less than that suggested by Julien and Klassen (1995) of 6.25, based on much laboratory and field data. Julien, P. Y., and G. J. Klaassen, Sand-Dune Geometry of Large Rivers During Floods, Journal of Hydraulic Engineering, ASCE, 121, 657-663, 1995. Dune speed in the flume ranged from about 1×10.sup.−4 m/s to about 4×10.sup.−3 m/s, depending on Froude number. The dependence on Froude number is similar to that proposed (empirically) by Kondap and Garde (1973),
(42)
where: F=Froude number, and K=constant of the order of 0.02 to 0.03
Kondap, D. M., and R. J. Garde, Velocity of Bed Forms in Alluvial Channels, Proceedings of the 15.sup.th Congress of International Association for Hydraulic Research, Vol. 5, Istanbul, Turkey, 1973.
(43) This relationship is based on data from laboratory experiments having depths of less than 1 m and grain sizes in the range between 0.18 mm and 2.28 mm. Dune tracking in the current flume study shows good agreement with Eqn. (7) when K=0.03. Thus, a reasonable guide for estimating the systematic error for this laboratory study would be
(44)
(45) Using Eqn. (8) and values from the different TNP runs, the percent error was 3, 6, 13, 10, 18 and 16% for TNP runs 1 through 6, respectively. A plot of the instrument error, systematic error epsilon, and the sum of the two as the total non-random error are shown in
(46) However, since field conditions seldom allow a priori information gathering on wave lengths and speeds, and since many dune fields are quite variable with respect to those same variables, Eqn. 6 is not readily usable for errors in field data. Also, because of the large areal extent of field sites, it often requires a longer period of time to return to a given location for the repeat surveys which leads to much larger than optimal time intervals (Δt). For these reasons, a more practical method of accounting for the systematic error due to ‘missed areas’ was determined. The correction technique makes use of the fact that as Δt□increases, the computed transport value decreases linearly. When a best fit line is plotted through the data points, the y-intercept of the line indicates the actual dune transport. Thus the systematic error due to ‘missed areas’ can be accounted for.
(47) In summary, by comparing rates of scour measured on the upstream face of dunes with directly measured bed load transport rates, for dunes traveling at nearly constant speed with nearly constant shape and with no suspended load present, Eqn. (5) provides a valid basis for the technique. The value of β (0.55 is used in Eqn. (5)) is in agreement with that found by Wilbers (2004), i.e., within the range of 0.5 to 0.63 with a best value of 0.57. For laboratory flumes, probe speed and error, ε, may be determined using Eqn. (8). The error for the transport computations using the scour method (ISSDOTv2) was a maximum of about 34% when wave movement was 1 to 2% of the wave length, a minimum of 15% when wave movement was 7 to 8% of the wave length and about 20% when wave movement was 15 to 16% of the wave length. Thus, under the given conditions, bed load transport determined from time sequenced bathymetric data is equally accurate to that determined from measurements of bed-form amplitude and speed. Obtaining bed load transport from time sequenced bathymetric data is also more expedient than traditional methods. Field applications will consider factors such as the systematic error correction mentioned above as well as translation and deformation of wave forms due to the nonlinear nature of the flow and the threedimensionality of bathymetric surfaces. McElroy, B., and D. Mohrig, Nature of Deformation of Sandy Bed Forms, Journal of Geophysical Research, Vol 114, FOOA04, doi:10.1029/2008JF001220, 2009; Shelley, J., Abraham, D., and McAlpin, T., Removing systemic bias in bed-load transport measurements in large sand-bed rivers. In publication ASCE, March 2013. Singh, A. et al, Experimental Evidence for Statistical Scaling and Intermittency in Sediment Transport Rates, Journal of Geophysical Research, Vol. 114, F01025, doi:10.1029/2007JF000963, 2009.
(48) To implement this method in select embodiments of the present invention, the following tasks are performed.
Data Collection Methodology
(49) Multi-beam collection for Integrated Section Surface Distance Over Time Version 2 (ISSDOTv2) Bed Form Analysis. The survey equipment that may be used to implement select embodiments of the present invention includes: an Inertial Motion Unit (IMU), a multi-beam fathometer and a Real Time Kinematic (RTK) Global Positioning System (GPS). These components are integrated into a hydrographic survey package, such as a Hypack®. Multi-beam fathometers may be 250-KHz and 500-KHz Geoswath® Plus interferometric multi-beam sonar with an Applanix® PosMV IMU. Real-time GPS data are supplied by a Trimble® R8 GNSS and broadcast to the PosMV for positioning and time tagging of all instruments. It should be noted that the survey equipment is not limited to any particular hardware or software vendor.
Collection Method
(50) In select embodiments of the present invention the bathymetric data used in the ISSDOTv2 methodology is collected with attention to detail not needed during traditional multibeam survey methods. In example embodiments, the data am collected to provide a plurality of survey data values for n points, where n can satisfy various expressions including n≤10,000, n≤1,000, and n≤100. First, choose the area for surveying that has the best chance of having wave forms moving along the bottom. This can be known for a given reach of river through past experience. If such experience is not available, then a boat equipped with either a single or multi beam echo sounder must be used to make some trial runs in order to determine if waves are present, and their approximate rate of downstream migration. Data are collected over a length and width of channel to capture multiple waveforms in a short period of time. This ‘short’ period of time should be long enough so that average surface elevation changes are greater than the measuring instrument resolution (usually about 0.1 ft), but not longer than the time it takes for a sand wave of average length to move one-tenth of its length. In large sand-bed rivers like the Mississippi, Missouri. Snake and Columbia, this time interval has varied from about 20 to 120 minutes. Survey the channel width bank to bank (or as close as possible based on limitations of equipment and safety) to capture inherent variability of bed form migrations. Survey lines are run in a direction along the length of the channel with approximately 20% overlap with each successive line. Re-survey lines are run by logging the beginning survey time and using initial survey lines in the same direction and with the same boat speed to assure accurate data for comparison. Typical multi-beam collection ranges from 3-8 knots boat speed. Boat speed along each line needs to be noted during collection so that the same speed can be maintained for each line in the direction of travel. This assures the same time difference between all bathymetric points in each re-surveyed swath. In general, insuring that conditions are the same for line to line comparisons assures the most accurate results.
Processing Raw Field Data
(51) The processing of raw multi-beam data is not equipment or software specific. We used Hysweep® software as collection and processing software, but other software and processing packages are available that can collect and process multi-beam data to the required format for the present method to be applied. The multi-beam data must be processed according to instrument vendor specifications to produce the most accurate data possible for the instrument and conditions
(52) The software packages employed with select embodiments of the present invention allow the user to clean the data of outliers after all of the vendor specified corrections, for example heave, pitch, roll and GPS latency adjustments have been applied as specified by the hardware/software vendor for the equipment utilized in the multi-beam collection effort. Once the lines have been cleaned then each individual line is processed as an individual data set. The ISSDOTv2 computations are performed on a survey-line basis. Thus, the data need to be processed on a survey-line basis and output in a gridded format at a resolution that captures the sand wave geometry in sufficient detail to completely define the shape of the individual waves. In field applications this has usually been a five to ten foot uniform rectilinear grid. The grid size could be smaller if necessary for smaller wave forms. The output format from the processing software is a uniform rectilinear grid of XYZ elevation data for the bottom topography on a survey-line basis.
Accounting for Deviations from the Theoretical Conditions
(53) In select embodiments of the present invention a technique accounts for actual sand waves deviating from ideal conditions of constant wave speed and shape with no bed-materialload going into suspension and no bed-material-load depositing. These ideal conditions were approximated in the flume study by which the theoretical underpinning of the method of select embodiments of the present invention was validated. However, in rivers, sand wave speeds are not constant and waves do change their shape. Additionally, some of the eroded bed-material-load on the scouring face of the wave does go into suspension, and some bed-material-load already in suspension does deposit on the waves. Therefore, some quantitative technique is required to qualify a data set as useable. An example of the eroding side of a typical sand wave is the surface of the wave in
Bedload Transport MATLAB® Code Methodology
(54) With select embodiments of the present invention, under the previously discussed conditions, bed load transport determined from time sequenced bathymetric data is equally accurate to that determined from measurements of bed-form amplitude and speed. Obtaining bed load transport from time sequenced bathymetric data is often more expedient than traditional methods. Select embodiments of the present invention utilize measured multi-beam bathymetric data and apply a modified version of Eqn. (5), subject to additional constraints and modifications arising from field data applications as described below.
(55) Although a theoretical method was developed to compute bedload in a single wave Eqn. (5) that may not be practical in field applications thus, modifications may be necessary. Instead of delineating each wave and the transport in each one, a more accurate, averaged transport rate is determined for an entire swath. In the field, a given wave may have numerous other waves spatially ahead and/or behind. Thus, the calculation of the bedload transport using only the information for a single wave could be misleading if all the waves are not homogeneous in size and speed. Therefore Eqn. (5) may be modified to determine the average transport over a given distance. Eqn. (5) can be modified by: 1) ΔV is defined as the total erosion for the entire swath as opposed to the erosion for a single wave. An alternative method using deposition is defined for comparison purposes. 2) The transport value is divided by the number of waves to convert the newly defined ΔV into a ΔV per wave resulting in an averaged transport rate. These alterations result in Eqn. (5) becoming:
(56)
where: T=Bedload Transport Rate E=Erosion—determined using the surveyed area and the difference in bathymetry survey values as further discussed below. Δt=Time Difference between bathymetry surveys (as noted during measurement and used as input to the code). SW=Swath Width—determined using the total swath area and the profile lengths. NW=Number of Waves—calculated by progressing along a longitudinal path from one end of the swath to the other as further discussed below. D=Deposition—determined using the surveyed area and the difference in bathymetry survey values as further discussed below.
Where the ΔV is specified as the total erosion in the swath for Eqn. (9) and as the total deposition in the swath for Eqn. (10).
(57)
(58) A method for applying select embodiments of the present invention is initiated by reading in the two survey datasets 701, 702. These are XYZ data files with regularly spaced points 800, 900. Schematized XYZ datasets as in
(59) For select embodiments of the present invention the MATLAB® Delaunay Triangulation is used to obtain the best triangulation 1100 of the xy dataset. This program removes thin triangles by eliminating any triangles 1101 possessing a side with a length longer than twice the point spacing as illustrated by the two bold squares in
(60) The erosion and deposition values are used to determine the erosion to deposition ratio 704. This ratio is total erosion divided by total deposition volumes (E/Dor ΔV.sub.e/ΔV.sub.d). If this ratio is equal to 1 then the sand waves are in an equilibrium state validating the usage of Eqns. (9) and (10). If an equilibrium transport condition exists, then any deposition is balanced by scoured material removed as suspended material. Extending this consideration to the entire bed, all scoured volume is compared to all deposition volume. If equal, then an equilibrium condition for material moving in the waves occurred during the measured time interval and either the scour or deposition volumes may be used in computing bedload (e.g., sand moving in the dune waves). Scour/deposition ratios between 0.8 and 1.2 are reasonable. Thus, ratios outside this range may not be used generally.
(61) After calculating erosion and deposition values, the swath is subdivided into individual sub-swaths based on the resolution of the bathymetry data 705. As an example, a bathymetry dataset with 5 ft by 5 ft nodal spacing will be sub-divided into individual 5 ft wide swaths that run the length of the larger swath with a sufficient number of sub-swaths to extend across the entire width of the bathymetry data. This step is important to accurately capture the lateral variation in the transport across the global swath width. The transport rate is determined for each of these sub-swaths using Eqn. (9) and Eqn. (10). These equations require knowledge of the number of waves, the erosion volume, the deposition volume, and the time difference between surveys. The erosion and deposition volumes are determined on the individual sub-swaths 706 (first portion of block 706, see below for second portion) in an equivalent manners previously described for the global swath in the preceding paragraph and the time difference between surveys is also known (recorded during data collection). Therefore, the only remaining parameters to be determined is the number of waves.
(62) The sub-swaths consist of two lines of nodes or profiles (see
(63) For select embodiments of the present invention a check is performed for excessive missing data along a given profile. By using the total length of a profile and the spacing between xy points, an expected number of data entries are determined for a profile. Then a comparison is performed to determine if there are enough entries (xy points) to consider the profile valid (number of entries >0.50 times the expected number of entries are considered sufficient). If there are not enough data along a given swath profile, then the sub-swath is eliminated from use and the transport rates for adjacent sub-swaths are used to linearly interpolate to an appropriate transport rate for that particular sub-swath.
(64) For select embodiments of the present invention, the swath width, the total erosion (E), the total deposition (D), the time between surveys, and the number of waves (for erosion and deposition) are then used in Eqns. (9) and (10) to determine transport rates 707. The total transport for the entire swath can be obtained by summing the transport for each sub-swath (708).
(65) At this point in the computational procedure, linear plots can be made of the resulting transport values and their respective time intervals (Δt), in order to apply the correction for the previously discussed systematic error due to ‘missed areas’. This procedure can be incorporated into the Matlab code or performed independently in a spreadsheet or other computational tool.
(66) With these modifications to the original theoretical equation, and a methodology to perform the computations as embodied in select embodiments of the present invention, accurate estimates of bedload moving in sand waves can be obtained for measurements made in field conditions.
(67) Select embodiments of the present invention are used to compute a reliable value for the bed-material load moving in sand waves on the bottom of large sand bed rivers. Use of select embodiments of the present invention not only provides a bedload transport rate for a given river section, but also quantifies the lateral variation of the bedload transport. This information can be very important to know for areas around lock and dam entrances and exits, water intake structures and river port facilities. A bedload sediment rating curve may also be developed using select embodiments of the present invention. Bedload rating curves are an invaluable resource for river mangers as they address issues such as maintenance dredging requirements, sand mining, and the availability of sand to maintain ecological habitat features of rivers such as islands and bars. Select embodiments of the present invention provide a means of quickly determining the geometric extant of the raw data, the timing interval, data set average elevations, difference plots, scour and depositional volumes, scour/deposition ratios, wave number statistics, and several bedload transport values. Select embodiments of the present invention also have a missing data check loop to assure that data gaps in raw data, as noted above, do not adversely affect computations. With select embodiments of the present invention, bedload transport determination may be made during actual data collection in near real time. This allows decisions to be made on valid bedload transport data onsite and other benefits such as providing real-time results to river managers. For example, an evaluation team can immediately determine if adjustments are necessary to data collection procedures, when enough data has been collected, and the like.
(68) The abstract of the disclosure is provided to comply with the rules requiring an abstract that will allow a searcher to quickly ascertain the subject matter of the technical disclosure of any patent issued from this disclosure. (37 CFR 1.72(b)). Any advantages and benefits described may not apply to all embodiments of the invention.
(69) While select embodiments of the present invention have been described, those skilled in the art will recognize that the invention can be practiced with modifications within the spirit and scope of the appended claims. For example, although the system is described in specific examples for determining sand bedload, it may be used for other materials that may be useful in such diverse applications as structural, mechanical, geological, and architectural applications and the like. In the claims, means-plus-function clauses are intended to cover the structures described herein as performing the recited function and not only structural equivalents, but also equivalent structures. Thus, although a nail and a screw may not_be structural equivalents in that a nail employs a cylindrical surface to secure wooden parts together, whereas a screw employs a helical surface, in the environment of fastening wooden parts, a nail and a screw may be equivalent structures. Thus, it is intended that all matter contained in the foregoing description or shown in the accompanying drawings shall be interpreted as illustrative rather than limiting, and the invention shown be defined only in accordance with the following claims and their equivalents.