Rapid construction method for flush assembly of the prefabricated steel beam and the floor slab
11072925 · 2021-07-27
Assignee
Inventors
- Yonghui An (Dalian, CN)
- Weilong Huai (Dalian, CN)
- Feng Pan (Dalian, CN)
- Da Lv (Dalian, CN)
- Jinping Ou (Dalian, CN)
Cpc classification
E04B5/023
FIXED CONSTRUCTIONS
E04B5/10
FIXED CONSTRUCTIONS
E04B5/19
FIXED CONSTRUCTIONS
International classification
Abstract
A new design and rapid construction method for flush assembly of prefabricated steel beams and floor slabs is disclosed. The upper flange of prefabricated steel beams is “” shaped, which consists of horizontal flange, vertical flange and top flange. Both beam stiffeners and studs are set on the horizontal flange, in which the former can strengthen the bearing capacity of the beam and avoid its local deformation, and the latter can fix the floor slab; prefabricated studs and precast concrete inside the vertical flange in the factory are used to constrain the deformation of upper flange. There is no limitation with respect to the form of floor slab, which is connected with the prefabricated steel beam by hitching the prefabricated rebar ring of the floor slab to the welded studs of the upper flange of the prefabricated steel beam.
Claims
1. A flush assembly of prefabricated steel beams and floor slabs, wherein the prefabricated assembly beam-slab substructure comprises a reinforced concrete floor slab, a prefabricated steel beam and cast-in-place concrete between beams and slabs; numerous prefabricated rebar rings are arranged at the end of the reinforced concrete floor slab, which are used to connect vertical pre-welded studs of the prefabricated steel beam; an upper flange of the prefabricated steel beam is hat channel shaped and consists of two horizontal flanges, two vertical flanges and a top flange; a height of the vertical flanges is the same as a thickness of the reinforced concrete floor slab; numerous beam stiffeners are arranged on the horizontal flanges to improve the stiffness and bearing capacity of the horizontal flanges and prevent the horizontal flanges from local deformation; at the same time, the vertical pre-welded studs are welded on the horizontal flange; the position of the vertical pre-welded studs correspond to the prefabricated rebar rings at the end of the reinforced concrete floor slab; an inner space bordered by the vertical flange and the top flange is filled with beam flange inner side concrete to prevent the flanges from deformation under compression; horizontal pre-welded studs are set inside the vertical flange to fix the beam flange inner side concrete to prevent its falling off.
2. A fast construction method for the flush assembly of prefabricated steel beams and floor slabs, wherein, the floor slabs are is a reinforced concrete floor slabs, the steps comprising: (i) prefabricating the reinforced concrete floor slabs in the factory and setting prefabricated rebar rings at the ends of the reinforced concrete floor slabs; (ii) prefabricating steel beams in the factory: positioning vertical pre-welded studs and stiffeners on a horizontal flange; of the beam corresponding to the prefabricated rebar rings at the end the of reinforced concrete floor slabs; positioning horizontal pre-welded studs inside a vertical flange of the beam; (iii) inverting prefabricated steel beam and using the vertical flange and top flange as a formwork, then pouring beam flange inner side concrete in the factory, and the horizontal pre-welded studs set to fix the beam flange inner side concrete; (iv) assembling: the reinforced concrete floor slabs on the horizontal flanges of prefabricated steel beams and hitching the prefabricated rebar rings of the reinforced concrete floor slabs to the vertical pre-welded bolts one by one; (v) using the horizontal flanges, and, vertical flanges of the prefabricated steel beams and the side of reinforced concrete floor slabs as the formwork, pouring concrete in the gap between each prefabricated steel beam and reinforced concrete floor slab to complete the construction of a beam-slab structure on site.
Description
DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7) Where: 1 reinforced concrete floor slab; 2 prefabricated steel beam; 3 concrete; 4 prefabricated rebar rings; 5 vertical pre-welded stud; 6 horizontal flange; 7 vertical flange; 8 top flange; 9 beam stiffener; 10 beam flange inner side concrete; 11 horizontal pre-welded stud; 12 bottom steel plate when the floor slab is steel plate concrete composite slab.
DETAILED DESCRIPTION
(8) In order to make the above features and advantages of the invention more understandable, in conjunction with the attached drawings, the technical solution of the invention is described in detail below through taking the prefabricated reinforced concrete floor as an example.
(9) As shown in ” shaped, which consists of horizontal flange 6, vertical flange 7 and top flange 8, wherein the height of the vertical flange 7 is the same as the thickness of the reinforced concrete floor slab 1; beam stiffener 9 is arranged on the horizontal flange 6 to improve the stiffness and bearing capacity as well as prevent it from local deformation; at the same time, vertical pre-welded studs 5 are set on the horizontal flange 6, whose position corresponds to the prefabricated rebar ring 4 of the reinforced concrete floor slab 1; the inner space composed of the vertical flange 7 and the top flange 8 is cast with the beam flange inner side concrete 10 to prevent the flange from deformation under compression; the horizontal pre-welded studs 11 are arranged at the inner side of the vertical flange 7 to fix the beam flange inner side concrete 10 to prevent it from falling off.
(10) The construction is carried out as follows:
(11) 1) Prefabricate the reinforced concrete floor slab 1 in the factory and set the prefabricated rebar ring 4 at the end of the reinforced concrete floor slab.
(12) 2) Prefabricate steel beam 2 in the factory: Set vertical pre-welded studs 5 and stiffener 9 on horizontal flange 6; the position of vertical pre-welded studs 5 corresponds to the prefabricated rebar ring 4 at the end of reinforced concrete floor slab 1; set horizontal pre-welded studs 11 inside vertical flange 7.
(13) 3) Invert prefabricated steel beam 2 and taking its vertical flange 7 and top flange 8 as formwork, then complete pouring the beam flange inner side concrete 10 in the factory, and the horizontal pre-welded bolt 11 is set to fix beam flange inner side concrete 10.
(14) 4) On-site assembling: Put the reinforced concrete floor slab 1 on the horizontal flange 6 of prefabricated steel beam 2 and hitch the prefabricated rebar ring 4 of the reinforced concrete floor slab 1 to the vertical pre-welded bolt 5 one by one.
(15) 5) Taking the horizontal flange 6, vertical flange 7 of prefabricated steel beam 2 and the side of reinforced concrete floor slab 1 as the formwork, pour concrete 3 in the gap between prefabricated steel beam 2 and reinforced concrete floor slab 1 to complete the construction of beam-slab substructure on site.