SHEATH FOR A STRUCTURAL CABLE OF A CONSTRUCTION WORK, METHODS OF INSTALLATION AND MAINTENANCE
20210172116 · 2021-06-10
Inventors
- Gautier Aveline (Paris, FR)
- Matthieu Guesdon (Puteaux, FR)
- Nicolas Fabry (Antony, FR)
- Ivica ZIVANOVIC (GOUVIEUX, FR)
Cpc classification
D07B2201/2091
TEXTILES; PAPER
E04C5/08
FIXED CONSTRUCTIONS
E01D19/14
FIXED CONSTRUCTIONS
E01D19/16
FIXED CONSTRUCTIONS
International classification
Abstract
The proposed sheath is for a structural cable (10) having a path between an upper anchorage (16) and a lower anchorage (17). It comprises sheath segments (21) assembled along the path of the structural cable, at least one supporting rope (30) extending along the sheath segments and having an upper end connected to the construction work adjacent to the upper anchorage, and connectors (32) for connecting the sheath segments to the at least one supporting rope. The connectors (32) are configured to block relative upward movement of the supporting rope (30) with respect to the sheath segments (21) and to allow relative downward movement of the supporting rope with respect to the sheath segments.
Claims
1. A sheath for a structural cable of a construction work, the structural cable having a path between an upper anchorage and a lower anchorage, the sheath comprising: sheath segments assembled along the path of the structural cable; wherein the connectors are configured to block relative upward movement of the at least one supporting rope with respect to the sheath segments and to allow relative downward movement of the at least one supporting rope with respect to the sheath segments.
2. The sheath as claimed in claim 1, wherein the at least one supporting rope and the connectors are located inside the sheath segments.
3. The sheath as claimed in claim 1, wherein the sheath segments are connected to the at least one supporting rope independently of each other by the connectors.
4. The sheath as claimed in claim 3, wherein a telescopic coupling is provided between a first sheath segment and a second sheath segment assembled next to the first sheath segment along the path of the structural cable, wherein the telescopic coupling comprises a first sleeve portion belonging to the first sheath segment and a second sleeve portion belonging to the second sheath segment and inserted into the first sleeve portion, and wherein at least one of the connectors has a connector part secured to the first sheath segment at an inner surface of the first sleeve portion so as to receive a respective supporting rope.
5. The sheath as claimed in claim 4, wherein a plurality of the connectors have respective connector parts mounted on a collar fixed inside the first sleeve portion so as to receive a respective supporting rope extending through the first and second sheath segments.
6. The sheath as claimed in claim 4, wherein the first sleeve portion has a same outer cross-section as main portions of the first and second sheath segments.
7. The sheath as claimed in claim 1, wherein each of the sheath segments has a duct in which at least one longitudinal channel is formed for housing the at least one supporting rope, and wherein the channel is separated by a wall from a main space of the duct provided for receiving load-bearing tendons of the structural cable.
8. The sheath as claimed in claim 7, wherein at least one supporting rope housed in the channel has connector parts of the connectors secured thereto at discrete locations, and wherein the channel has a cross-section sufficient for allowing longitudinal movement of the connector parts secured to the supporting rope housed therein.
9. The sheath as claimed in claim 7, wherein a telescopic coupling is provided between a first sheath segment and a second sheath segment assembled next to the first sheath segment along the path of the structural cable, wherein the telescopic coupling comprises a first sleeve portion belonging to the first sheath segment as an extension of the duct of the first sheath segment and a second sleeve portion belonging to the second sheath segment as an extension of the duct of the second sheath segment and inserted into the first sleeve portion, and wherein the channel formed in the duct of the second sheath segment is extended in the second sleeve portion in alignment with the channel formed in the duct of the first sheath segment.
10. The sheath as claimed in claim 1, wherein each of the connectors has a first connector part secured to a supporting rope, a second connector part secured to a sheath segment and a third connector part configured to block relative upward movement of the first connector part with respect to the second connector part and to allow relative downward movement of the first connector part with respect to the second connector part.
11. A structural cable of a construction work, comprising: an upper anchorage; a lower anchorage; load-bearing tendons extending along a path of the structural cable between the upper and lower anchorages; and a sheath, in which the load-bearing tendons are housed, wherein the sheath comprises: sheath segments assembled along the path of the structural cable; at least one supporting rope extending along the sheath segments and having an upper end connected to the construction work adjacent to the upper anchorage; and connectors for connecting the sheath segments to the at least one supporting rope, wherein the connectors are configured to block relative upward movement of the at least one supporting rope with respect to the sheath segments and to allow relative downward movement of the at least one supporting rope with respect to the sheath segments.
12. A method of installing a sheath for a structural cable of a construction work, the structural cable having a path between an upper anchorage and a lower anchorage, the sheath having a number N of sheath segments, the method comprising: mounting at least one supporting rope with an upper end adjacent to the upper anchorage; for each integer n such that 1≤n≤N: inserting the at least one supporting rope into the n-th sheath segment; connecting the n-th sheath segment to a supporting rope; and lifting the first to n-th sheath segments along the at least one supporting rope, wherein connectors are provided to block relative upward movement of the at least one supporting rope with respect to the sheath segments and to allow relative downward movement of the at least one supporting rope with respect to the sheath segments.
13. The method as claimed in claim 12, wherein each supporting rope has first connector parts secured thereto at discrete locations, wherein each sheath segment has at least one second connector part secured thereto, and wherein each of the connectors is formed by associating a first connector part secured to a supporting rope, a second connector part secured to a sheath segment and a third connector part configured to block relative upward movement of the first connector part with respect to the second connector part and to allow relative downward movement of the first connector part with respect to the second connector part.
14. The method as claimed in claim 13, wherein connecting the n-th first sheath segment to a supporting rope for an integer n such that 1≤n≤N comprises forming at least one connector by associating a first connector part secured at a lowermost discrete location of a respective supporting rope, a second connector part secured to the n-th sheath segment and a third connector part.
15. The method as claimed in claim 14, wherein lifting the sheath segments for an integer n such that 1<n≤N comprises forming at least n−1 connectors by associating, for each integer j such that 1<j<n, a first connector part secured to a supporting rope at a (n−j+1)-th discrete location, starting from the lowermost discrete location, a second connector part secured to the j-th sheath segment and a third connector part.
16. The method as claimed in claim 15, comprising, for an integer n such that 1<n≤N: lowering the supporting rope while preventing downward movement of at least the (n−1)-th sheath segment; inserting the at least one supporting rope into the n-th sheath segment; forming an n-th connector by associating the first connector part secured at the lowermost discrete location of the supporting rope, a second connector part secured to the n-th sheath segment and a third connector part; and pulling back up the supporting rope, thereby forming the at least n−1 connectors.
17. The method as claimed in claim 16, wherein supporting ropes mounted with respective upper ends adjacent to the upper anchorage comprise: an active rope that is lowered and pulled back up; and a static rope used to prevent downward movement of the sheath segments when the active rope is lowered and pulled back up, and wherein the sheath segments have second connector parts arranged to form connectors with first connector parts secured to the active rope and additional second connector parts arranged to form connectors with first connector parts secured to the static rope.
18. The method as claimed in claim 12, wherein the sheath segments are assembled before installation of load-bearing tendons of the structural cable.
19. The method as claimed in claim 18, wherein the sheath segments have an integral cross-section, and wherein, for each integer n such that 1<n≤N, the steps of inserting the at least one supporting rope into the n-th sheath segment and forming the n-th connector are performed while holding the (n−1)-th sheath segment to restrict lateral movements thereof.
20. The method as claimed in claim 19, wherein, for each integer n such that 1<n≤N, the step of lifting the first to n-th sheath segments is performed at least in part while tensioning at least one supporting rope OW to restrict lateral movements of the sheath segments.
21. A maintenance method for a structural cable of a construction work, the structural cable comprising: an upper anchorage; a lower anchorage; load-bearing tendons extending along a path of the structural cable between the upper and lower anchorages; and a sheath in which the load-bearing tendons are housed, wherein the sheath comprises: sheath segments assembled around the load-bearing tendons along the path of the structural cable; at least two supporting ropes extending along the sheath segments, each having an upper end connected to the construction work adjacent to the upper anchorage; and connectors for connecting the sheath segments to the at least one supporting rope, wherein the connectors are arranged to block relative upward movement of the at least one supporting rope with respect to the sheath segments and to allow relative downward movement of the at least one supporting rope with respect to the sheath segments, the maintenance method comprising replacing a first one of the supporting ropes by a second supporting rope while the assembled sheath segments are supported by at least another one of the supporting ropes, wherein replacing the first supporting rope by the second supporting rope comprises: disconnecting the upper end of the first supporting rope; coupling a lower end of the second supporting rope to the upper end of the first supporting rope; pulling a lower end the first supporting rope to remove the first supporting rope while installing the second supporting rope; and connecting an upper end of the second supporting rope adjacent to the upper anchorage.
22. The maintenance method as claimed in claim 21, wherein each of the first and second supporting ropes has first connector parts secured thereto at discrete locations, wherein each sheath segment has second connector parts secured thereto, and wherein before replacing the first supporting rope by the second supporting rope, connectors are formed by associating a first connector part secured to the first supporting rope, a second connector part secured to a sheath segment and a third connector part configured to block relative upward movement of the first connector part with respect to the second connector part and to allow relative downward movement of the first connector part with respect to the second connector part, wherein after replacing the first supporting rope by the second supporting rope, new connectors are formed by associating a first connector part secured to the second supporting rope, a second connector part secured to a sheath segment and a third connector part configured to block relative upward movement of the first connector part with respect to the second connector part and to allow relative downward movement of the first connector part with respect to the second connector part, and wherein the first connector parts secured to the first and second supporting ropes travel through the second connector parts secured to the sheath segments when the lower end of the first supporting rope is pulled downward for replacing the first supporting rope by the second supporting rope.
Description
BRIEF DESCRIPTION THE DRAWINGS
[0074] Other features and advantages of the invention disclosed herein will become apparent from the following description of non-limiting embodiments, with reference to the appended drawings, in which:
[0075]
[0076]
[0077]
[0078]
[0079]
[0080]
[0081]
[0082]
[0083]
DESCRIPTION OF EMBODIMENTS
[0084]
[0085] The construction work typically includes a number of stay cables 10, only one of them being shown in
[0086] The structural cable 10 has a load-bearing part 15 which consists of a bundle of tendons disposed parallel to each other. For example, the load-bearing tendons may be strands of the same type as used to pre-stress concrete structures. Each strand may optionally be protected by a substance such as grease or wax and individually contained in a respective plastic sheath (not shown).
[0087] Each stay cable 10 may have a length of up to several hundred meters, and include a few tens of tendons.
[0088] The load-bearing tendons are anchored at both ends of the bundle 15 using an upper anchoring device 16 mounted on the first part 11 of the construction work and a lower anchoring device 17 mounted on the second part 12 of the construction work. Between the two anchoring devices 16, 17, the bundle of tendons 15 follows a catenary curve due to its own weight and the tensile force maintained by the anchoring devices. The anchoring devices 16, 17 are positioned on the first and second parts 11, 12 by taking into account the pre-calculated catenary curve of each stay cable 10, that defines its path.
[0089] The bundle of tendons 15 is contained in a protective sheath 20 typically made of plastic or metallic material.
[0090] To ensure good dynamic properties of the stay cable 10, it may be useful to give the sheath 20 a regular profile, typically with a circular cross-section. The sheath 20 may also be provided with specific surface structure, known in the art, e.g. double helical ribs, to improve its behavior in the presence of a combined action of rain and wind.
[0091] The sheath 20 is made of a plurality of segments 21 assembled along the path of the structural cable 10. The length of each sheath segment 21 is selected as a function of the design of the stay cable structure. It is possible to use segments 21 having a nominal length L, e.g. of the order of 10 to 100 m or more, for building different stay cables 10 of the construction work. One of the segments can then be cut depending on the length of the particular stay cable. Alternatively, the length L of the different segments of a given stay cable can be selected according to the total length set for the stay cable.
[0092] In the example illustrated in
[0093] The weight of the plastic sheath 20 is taken up by one or more supporting ropes 30 which are shown in the diagram of
[0094] Each supporting rope may be made of stainless steel. It extends along the series of sheath segments 21, and has an upper end connected to the construction work at or near the upper anchorage 16 where the loadbearing tendons 15 are anchored.
[0095] In an exemplary configuration discussed here, the supporting ropes 30 are located inside the sheath segments 21, as well as connectors 32 shown diagrammatically in
[0096] Each connector 32 forms the interface between a respective rope 30 and a respective sheath segment 21. It is configured to block relative upward movement of the rope 30 with respect to the sheath segment 21 and to allow relative downward movement of the rope 30 with respect to the sheath segment 21. The connector 32 may also be made of stainless steel.
[0097] The sheath segments 21 are connected to the supporting rope 30 independently of each other by the connectors 32. By way of example, each 100 m segment may be submitted to a compression effort lower than 2.0 MPa.
[0098] In the example shown in
[0099] When the sheath 20 is assembled, the second connector part 32B is in abutment against the first connector part 32A, so that the sheath segment 21 to which the second connector part 32B is secured is supported by the rope 30, as shown on the left-hand side of
[0100] However, as shown on the right-hand side of
[0101]
[0102] Different arrangements of the third connector parts 32C are possible. In the example shown in
[0103]
[0104]
[0105] It will be appreciated that many other connector arrangements providing the required functionality can be considered. It is possible, in some particular embodiments, that the connector 32 does not have any part secured to the supporting rope 30. For example, locking the supporting rope 30 against relative upward movement with respect to a sheath segment 21 can be performed by (conical) jaws interacting with a connector part secured to the sheath segment to lock by a wedge action. Some mechanism may then be needed to unlock the conical jaws when the supporting rope 30 has to travel down with respect to the sheath segments 21.
[0106] It may, however, be preferred to provide first connector parts 32A fixed in advance on the supporting ropes 30 at discrete locations. The intervals between the discrete locations correspond to the lengths L of the individual sheath segments 21.
[0107] It is advantageous that the connectors 32 have no part protruding out of the sheath 20. This avoids impacting the visual aspect of the stay cable 10. It is also preferable for water tightness of the sheath.
[0108] The diagram of
[0109]
[0110] In the embodiment of
[0111] In the example of sheath segments of 100 m, the sleeve portions 41, 42 may be dimensioned to provide a 1.5 m stroke. For HDPE ducts, this is enough to accommodate thermal expansion or contraction in a temperature range of about 80° C.
[0112] Two longitudinal channels 48 are formed within the circular inner cross-section of the duct 40. Two of the supporting ropes 30 are housed in each channel 48. It will be observed that this is merely an example. There could be only one channel 48, or more than two channels. There could also be one supporting rope 30 per channel 48, or more than two. A symmetrical configuration of the channels 48 and supporting ropes 30 will generally be preferred to minimize moments when the sheath segments are lifted.
[0113] A wall 49 of each channel 48, which may be co-extruded with the duct 40, prevents contacts of the supporting ropes 30 with the load-bearing tendons 15 received in the main space of the duct 40, in order to avoid potential damage of the tendons 15 or their individual sheaths.
[0114] In order to allow relative (upward) movements of the sheath segments 21 along the supporting ropes 30, the cross-section of the channel 48 must be sufficient to allow the first connector parts 32A swaged on the ropes 30 to circulate.
[0115] As shown by numeral 48′ in
[0116] The sheath according to the present invention may incorporate cavities for mounting equipment such as, e.g., light sources, as described in the international patent application No. PCT/IB2017/000214 filed on Feb. 3, 2017 and published as WO 2018/130271 A1. Such cavities may be formed together with the above-mentioned channels 48. It will also be noted that a sheath according to the present invention may have a double-walled structure as disclosed in the international patent applications Nos. PCT/IB2016/001314 filed on Jul. 27, 2016 and published as WO 2018/020288 A1 and PCT/IB2016/001978 filed on Nov. 18, 2016 published as WO 2018/020289 A1.
[0117]
[0118]
[0119] In the following description, one of the two supporting ropes 30 is referred to as an active rope 30A, while the other one is referred to as a static rope 30S. When there are two ropes per channel 48 (
[0120] During the installation, static ropes will stay fixed, while the active ropes will make synchronized trips back and forth to grab the sheath segments 21 one by one and lift them together. To do so, during the installation, the static ropes 30S are directly connected to their final upper anchorage (60 in
[0121] Before the lifting operation, the supporting ropes 30 (with their connector parts 32A installed at factory) are inserted inside the first sheath segment 21 by its top side until the lower connector part 32A of each rope goes through the pawl box 32B/C at the other side of the duct 40, thus forming a connector 32. To facilitate threading of the ropes 30 into the through holes 33 of the pawl boxes 32B/C, it is convenient to provide the sheath segments 21 with temporary links extending along the length of the segment and inserted into the through holes 33 and the channels 48 before assembling the lower sleeve portion 41 with the duct 40. When the sheath segment 21 is installed, the end of the temporary link on the upper side of the segment is coupled to the lower end of the supporting rope, and the supporting rope is slid into the channel and the through holes 33 by pulling on the temporary link.
[0122] The initial step of mounting the first sheath segment 21 on the supporting ropes 30 (
[0123] At this point, the first sheath segment 21 is also lifted along the ropes 30, with its connectors 32 locked, to the position illustrated in
[0124] The winch 61 can be operated to reel and unreel the active rope 30A.
[0125] In order to withstand the induced catenary force and to ensure secure conditions for installing the sheath 20, even in windy weather conditions, some tension is applied to the supporting ropes 30 by pulling the sheath segment 21 parallel to the direction of the segment at the assembling position A. This can be done, for example, by means of one or more tensioned slings 62 or legs connected to the ground and to a collar or some other means that grabs the bottom part of the sheath segment 21 located at the assembling position A. Pulling down the segment 21 by means of the sling 62 applies tension to the static rope 30 through the engagement of the pawl box 32B/C with the first connector part 32A of the static rope 30S.
[0126] It is then possible to bring and assemble the next sheath segments 21 by moving the active rope 30A. In the following, ‘N’ denotes the number of sheath segments 21 of which the sheath 20 is made. Each of the second to N-th sheath segment 21 can be assembled in the same manner, illustrated in
[0127] While the (n−1)-th sheath segment 21 is at the assembling position A and pulled by the sling 62, the ground area G is available for inserting the free ends of the supporting ropes 30 into the next (n-th) sheath segment 21 by its top side, for example with the help of temporary links (
[0128] Once a new connector 32 is formed by associating the lowermost first connector part 32A of the active rope 30A with the pawl box 32B/C of the n-th sheath segment 21, the active rope 30A is reeled back up by activating the winch 61. When the connector part 32A′ of the active rope 30A reaches the pawl box 32B/C of the (n−1)-th sheath segment 21, that (n−1)-th segment starts moving up, along with the n-th segment. The first to (n−2)-th segments, if n>2, are lifted at the same time, new connectors 32 being formed with each of them. Before that point is reached, the static rope 30S is connected to the ground and the sling 62 is removed, as shown in
[0129] While the first to (n−1)-th sheath segments 21 are lifted by operating the winch 61, n−1 connectors 32 are formed with the active rope 30A and also with the static rope 30S by associating, for each integer j such that 1<j<n, a first connector part 32A secured to a rope 30A or 30S at the (n−j+1)-th discrete location and a pawl box 32B/C of the j-th sheath segment 21.
[0130] The reeling action of the winch 61 may lift the n-th sheath segment 21 slightly beyond the assembling position A, as shown in
[0131]
[0132] Once all the sheath segments 21 have been installed, the active rope 30A can be fixed in its final position by removing the winch 61 and replacing it by a permanent anchorage 60. In certain cases, the active rope(s) 30 may be used only temporarily, or as a tool to successively install different stay cables of the construction work. In such a case, the active rope 30A may be removed after installation of the N sheath segments 21 by pulling it from its lower end.
[0133] In the above-described exemplary embodiment of the installation process, the first to (n−1)-th sheath segments 21 are lifted along the supporting ropes 30, so as to clear the assembling position A, at the same time as the n-th sheath segment 21 is brought to the assembling position A. The lifting and bringing actions are completed simultaneously by means of the active rope 30A. Variations of the method where the two actions are separated can also be considered.
[0134] The above-described installation method is suitable when the sheath segments 21 have an integral cross-section. However, other methods are applicable within the scope of the present invention, including methods in which the sheath segments are made of sectors assembled together on site. For example, such sheath segments made of sectors can be assembled around the bundle of load-bearing tendons 15 which has been installed and anchored beforehand (like in U.S. Pat. No. 5,479,671). In such an embodiment, it may be sufficient to use only one supporting rope for independent suspension of the sheath segments.
[0135] A nice feature of the above-described sheath arrangement is that it makes it possible to replace one or more of the supporting ropes 30 during the lifetime of the construction work, if needed.
[0136] Such a replacement phase may be performed as follows: [0137] the old rope 30 to be replaced is disconnected from its anchorage 60; [0138] its upper end is coupled to the lower end of a new rope having first connector parts 32A distributed at the prescribed locations along its length; [0139] the lower end the old rope is pulled to remove it while installing the new rope; [0140] the upper end of the new rope adjacent is connected in place of the old rope.
[0141] The connectors 32 that were formed by associating first connector parts 32A secured to the old rope with pawl boxes 32B/C of the sheath segments 21 disappear in the replacement phase as the first connector parts 32A of the old rope travel through the pawl boxes 32B/C while the lower end the old rope is pulled. Instead, new connectors 32 are formed by associating the first connector parts 32A secured to the new rope with the pawl boxes 32B/C of the sheath segments 21 after the first connector parts 32A of the new rope have travelled through the pawl boxes 32B/C when the new rope has been pulled all the way down.
[0142] It will be appreciated that the embodiments described above are illustrative of the invention disclosed herein and that various modifications can be made without departing from the scope as defined in the appended claims.
[0143] For example, the invention is applicable to structural cables other than stay cables.