Detention pond method
11028568 · 2021-06-08
Inventors
Cpc classification
E02B3/02
FIXED CONSTRUCTIONS
E03F5/107
FIXED CONSTRUCTIONS
E03F5/103
FIXED CONSTRUCTIONS
E03F5/106
FIXED CONSTRUCTIONS
International classification
E03F1/00
FIXED CONSTRUCTIONS
E02B3/02
FIXED CONSTRUCTIONS
Abstract
A detention pond for the passive temporary storage of detained water during a potential flooding event near a river, stream or bayou where the depth and therefore the volume of the detention pond is not set by the elevation of the normally flowing water in said river, stream or bayou adjacent detention pond but rather the drain line connects to the river, stream or bayou downstream of the detention pond where the elevation is at a lower level, allowing the detention pond to be dug deeper and therefore of proportionately greater volume.
Claims
1. A method of using a detention pond which will completely drain during non-flooding times to minimize flooding during a flooding event, comprising providing a detention pond, digging said detention pond to a deeper elevation than an elevation of a normal flowing level of an adjacent portion of a river, stream, or bayou proximate said detention pond, connecting a first end of a drain pipe to a bottom of said detention pond, and connecting a second end of said drain pipe to said river, stream, or bayou at a downstream location where the normal flowing elevation of said river, stream, or bayou is lower than the normal flowing elevation of said river, stream, or bayou proximate said detention pond, such that said detention pond will completely drain during non-flooding times and therefore have a greater water storage capacity for a given surface area of real estate that a detention pond dug to the normal flowing elevation of the river, stream, or bayou proximate said detention pond.
2. The method of claim 1 wherein said downstream location on said river, stream, or bayou is the location of a second detention pond.
3. The method of claim 1 wherein three or more detention ponds are interconnected.
4. The method of claim 1 further comprising adding a valve to said drain pipe to allow water to be stored in said detention pond at times when flooding is not a consideration.
5. The method of claim 4 further comprising said valve is manually actuated.
6. The method of claim 4 further comprising said valve is equipped with a power actuator such as electric, hydraulic, or pneumatic.
7. The method of claim 4 further comprising said valve is adjustable to regulate the rate of flow from said detention pond back into said river, stream, or bayou.
8. The method of claim 4 further comprising said valve is a multi-position valve with at least a closed position, a high flow position, and a low flow position.
9. The method of claim 1 further comprising connecting two detention ponds with an interconnecting pipe to allow an upstream detention pond to be dug to a similar depth as a downstream detention pond.
10. A method of using a detention pond whose volume is generally a product of a surface area times a depth which will completely drain during non-flooding times to minimize flooding during a flooding event, comprising providing a detention pond, digging said detention pond to a deeper elevation than an elevation of a normal flowing level of an adjacent portion of a river, stream, or bayou proximate said detention pond, connecting a first end of a drain pipe near a bottom of said detention pond, and connecting a second end of said drain pipe to said river, stream, or bayou at a downstream location where a normal flowing elevation of said river, stream, or bayou is lower than the normal flowing elevation of said river, stream, or bayou proximate said detention pond, such that said detention pond will completely drain during non-flooding times and will have a greater water storage capacity for a given surface area of real estate than a detention pond dug to the normal flowing elevation of the river, stream, or bayou proximate said detention pond.
11. The method of claim 10 wherein said downstream location on said river, stream, or bayou is the location of a second detention pond.
12. The method of claim 10 wherein three or more detention ponds are interconnected.
13. The method of claim 10 further comprising adding a valve to said drain-pipe to allow water to be stored in said detention pond at times when flooding is not a consideration.
14. The method of claim 10 further comprising connecting two detention ponds with an interconnecting pipe to allow an upstream detention pond to be dug to a similar depth as a downstream detention pond.
15. A method of using a detention pond which will completely drain during non-flooding times to minimize flooding during a flooding event, comprising providing a detention pond near a river, stream, or bayou which has a first normal flowing water level proximate said detention pond and a lower second flowing water elevation at a downstream location, digging said detention pond to a deeper elevation than said first normal flowing water level of said river, stream, or bayou but not deeper than said lower second flowing water elevation, connecting a first end of a drain pipe to the bottom of said detention pond, and connecting a second end of said drain pipe to said river, stream, or bayou at said downstream location, such that said detention pond will completely drain during non-flooding times and therefore have a greater water storage capacity for a given surface area of real estate that a detention pond dug to said first normal flowing elevation of said river, stream, or bayou.
16. The method of claim 15 wherein said downstream location on said river, stream, or bayou is the location of a second detention pond.
17. The method of claim 15 wherein three or more detention ponds are interconnected.
18. The method of claim 15 further comprising adding a valve to said drain pipe to allow water to be stored in said detention pond at times when flooding is not a consideration.
19. The method of claim 18 further comprising said valve is a multi-position valve with at least a closed position, a high flow position, and a low flow position.
20. The method of claim 15 further comprising connecting two detention ponds with an interconnecting pipe to allow an upstream detention pond to be dug to a similar depth as a downstream detention pond.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
DETAILED DESCRIPTION OF THE INVENTION
(10)
(11) Referring now to
(12) Referring now to
(13) Referring now to
(14) Referring now to
(15) Referring now to
(16) Referring now to
(17) If this process were repeated further upstream, the next detention pond at a five foot higher elevation can be dug ten feet deeper to thirty feet, giving it a one hundred percent increase in capacity. Alternately the process can be repeated downstream with the only limit ultimately being the ocean level.
(18) Referring now to
(19) The drawings presume that the most downstream detention pond will be of the shallower depth of a detention pond without the benefits of the present invention. There is, however, no need for having a detention pond of the shallower depth of a detention pond without the benefits of this invention. All detention ponds can take advantage of the greater depth by having their drain-pipe being diverted to a more downstream location of a lower elevation.
(20) Given that detention ponds are a solution to urban flooding and urban property is both expensive and has restricted availability, this method provides a solution to both having to buy more expensive property to detain water and where to buy the property by giving any detention a greater capacity.
(21) Referring now to
(22) The particular embodiments disclosed above are illustrative only, as the invention may be modified and practiced in different but equivalent manners apparent to those skilled in the art having the benefit of the teachings herein. Furthermore, no limitations are intended to the details of construction or design herein shown, other than as described in the claims below. It is therefore evident that the particular embodiments disclosed above may be altered or modified and all such variations are considered within the scope and spirit of the invention. Accordingly, the protection sought herein is as set forth in the claims below.
SEQUENCE LISTING
(23) N/A