Stability frame, system and method for the installation of a wind turbine on an offshore substructure
11845639 · 2023-12-19
Assignee
Inventors
Cpc classification
B63B75/00
PERFORMING OPERATIONS; TRANSPORTING
B66C23/54
PERFORMING OPERATIONS; TRANSPORTING
B66C23/185
PERFORMING OPERATIONS; TRANSPORTING
B66C1/108
PERFORMING OPERATIONS; TRANSPORTING
F05B2230/61
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2230/6102
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
B63B75/00
PERFORMING OPERATIONS; TRANSPORTING
B66C23/00
PERFORMING OPERATIONS; TRANSPORTING
B66C23/18
PERFORMING OPERATIONS; TRANSPORTING
F03D13/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A stability frame for the installation of a wind turbine on an offshore substructure, wherein the wind turbine comprises a tower configured to be anchored to a rigging assembly below the barycenter of the wind turbine, has a main body configured to be mounted about the upper part of the tower; and a plurality of guides, which extend outwardly from the main body and are configured for constraining parts of the rigging assembly so as to laterally support the wind turbine by the rigging assembly.
Claims
1. A wind turbine offshore substructure installation stability frame comprising: a main body configured to be mounted about an upper part of a tower of a wind turbine, the tower being configured to be anchored to a rigging assembly below a barycenter of the wind turbine; a plurality of guides each extending outwardly from the main body and are each configured to constrain a part of the rigging assembly; and two hooking members mounted on the main body and configured to cooperate with an automatic hooking assembly of a crane vessel.
2. The wind turbine offshore substructure installation stability frame of claim 1, wherein the main body comprises two attachments for tugger lines.
3. The wind turbine offshore substructure installation stability frame of claim 1, wherein the main body is U-shaped.
4. The wind turbine offshore substructure installation stability frame of claim 1, wherein each guide comprises two bars with flared free ends configured to facilitate an insertion of the part of the rigging assembly into the guide.
5. The wind turbine offshore substructure installation stability frame of claim 1, wherein the plurality of guides comprises four guides arranged two-by-two along opposite sides of the main body.
6. The wind turbine offshore substructure installation stability frame of claim 1, further comprising a clamp assembly mounted on the main body and configured to selectively anchor the main body to the tower and release the main body from the tower.
7. The wind turbine offshore substructure installation stability frame of claim 6, wherein the clamp assembly comprises at least one idle clamp mounted to the main body and extending inwardly from the main body, and two actuated clamps configured to be actuated between retracted positions and inwardly projecting positions towards the idle clamp.
8. The wind turbine offshore substructure installation stability frame of claim 7, further comprising at least one hydraulic cylinder for each actuated clamp.
9. A wind turbine offshore substructure installation system comprising: a stability frame comprising: a main body mounted about an upper part of a tower of a wind turbine, a plurality of guides each extending outwardly from the main body, and two hooking members mounted on the main body; a crane vessel comprising an automatic hooking assembly that cooperates with the two hooking members of the stability frame; and a rigging assembly anchored to the tower below a barycenter of the wind turbine and configured to be constrained by the stability frame.
10. The wind turbine offshore substructure installation system of claim 9, wherein the crane vessel comprises a first lifting crane and a second lifting crane, and the rigging assembly comprises a first rigging that operates with the first lifting cane and a second rigging that operates with the second lifting crane.
11. The wind turbine offshore substructure installation system of claim 10, wherein each rigging comprises two hoisting lines, each hoisting line comprising a distal eyelet anchored to the tower and a rigid section inserted into a guide of the stability frame.
12. The wind turbine offshore substructure installation system of claim 9, further comprising a hydraulic circuit comprising a first portion mounted on the stability frame, a second portion located in a remote position with respect to the stability frame, and an umbilical that selectively connects the first portion to the second portion.
13. The wind turbine offshore substructure installation system of claim 12, wherein: the first portion comprises a remotely controlled valve, a quick connect coupling connected to the umbilical, and a hydro-pneumatic accumulator, and the second portion comprises a high-pressure unit.
14. The wind turbine offshore substructure installation system of claim 9, further comprising a control system comprising a first portion mounted on the stability frame, a second portion located in a remote position with respect to the stability frame, and an umbilical that selectively connects the first portion to the second portion.
15. The wind turbine offshore substructure installation system of claim 14, wherein: the first portion comprises a sensor configured to acquire a signal correlated to the operating status of the stability frame, and the second portion comprises a control unit and a control panel.
16. The wind turbine offshore substructure installation system of claim 9, further comprising a first winch that operates a first tugger line connected to the stability frame.
17. The wind turbine offshore substructure installation system of claim 16, further comprising a second winch that operates a second tugger line connected to a bottom of the tower.
18. A method of installing a wind turbine on an offshore substructure, the method comprising: coupling a stability frame to an upper half of a tower of the wind turbine, the stability frame comprising a main body, a plurality of guides each extending outwardly from the main body, and two hooking members mounted on the main body; controlling a rigging assembly by a crane vessel; anchoring the rigging assembly to a lower part of the tower below a barycenter of the wind turbine; constraining a plurality of parts of the rigging assembly into the plurality of guides of the stability frame; vertically lifting the wind turbine by the crane vessel; transferring the wind turbine to the offshore substructure; and lowering the wind turbine on the offshore substructure.
19. The method of claim 18, wherein controlling the rigging assembly comprises controlling a first rigging of the rigging assembly by a first lifting crane of the crane vessel and controlling a second rigging of the rigging assembly by a second lifting crane of the crane vessel to insert the plurality of parts of the rigging assembly into the plurality of guides of the stability frame from opposite sides of the stability frame.
20. The method of claim 18, wherein coupling the stability frame comprises clamping the stability frame to the upper half of the tower by a hydraulic cylinder mounted on the stability frame.
21. The method of claim 18, further comprising tensioning a first plurality of tugger lines between the stability frame and the crane vessel.
22. The method of claim 21, further comprising tensioning a second plurality of tugger lines between a lower part of the tower and the crane vessel.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) A number of non-limiting embodiments of the present disclosure will be described by way of example with reference to the accompanying drawings, in which:
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION
(8) Number 1 in
(9) With reference to
(10) With reference to
(11) In the embodiments shown, the stability frame 5 comprises two hydraulic cylinders 29 for each actuated clamp 28. These hydraulic cylinders 29 of each actuated clamp 28 are operated in parallel and are configured to operate singly in case of failure of one of said two hydraulic cylinders 29. Each actuated clamp 28 is articulated to an A-shaped frame 30, which, in turn, is articulated to the main body 23 and each hydraulic cylinder 29 is articulated to the A-shaped frame 30 and the main body 23. The stability frame 5 is provided with supporting legs 31 and is displaced by the lifting cranes 4 and for this purpose is provided with two hooking members 33 mounted on the main body 23 for connection of the stability frame 5 to the lifting cranes 4, in particular to an automatic hooking assembly 32 associated to lifting cranes 4. The stability frame 5 comprises two attachments 34 for tugger lines 35 operated from winches 36 of the dual crane vessel 3 (
(12) With reference to
(13) According to a variation (not shown in the drawings), the umbilical is omitted and the hydraulic circuit is confined in the stability frame. In such a case, the source of pressure for actuating the cylinders may be embodied in a container under pressure and valves controlled by telemetry.
(14) The control system 38 comprises a first portion mounted on the stability frame 5; and a second portion located in the crane vessel. The first and the second portion of the control system 38 are connected by umbilical 39 configured to selectively connect the first portion to the second portion.
(15) The first portion of the control system 38 comprises sensors 44, such as strain gauges and position sensors, configured to acquire signals correlated to the operating status of the stability frame 5, and the second portion comprises a control unit 45 and a control panel 46. In alternative, the umbilical can be omitted.
(16) With reference to
(17) In use, the installation of the wind turbine 2 on an offshore substructure 49 requires lifting the wind turbine 2 off the onshore basement 7 by the vessel crane 3 in direction D1 (
(18) The rotor 10 of the wind turbine 2 is locked with respect to the nacelle 9 with one blade 12 parallel to the tower 8, and the nacelle 9 is locked in a configuration according to which the rotor 10 is on the opposite side of the shore. Once the wind turbine 2 is locked in the above configuration, the stability frame 5 is coupled to the tower 8 of the wind turbine 2, in particular to the upper half of the tower 8 in particular in close proximity of the nacelle 9 with the assistance of the crane vessel 3. The stability frame 5 is first transferred onshore from the deck of the crane vessel 3 by one lifting crane 4 and then is lifted by the two lifting cranes 4 and inserted about the tower 4. When the stability frame 5 is in the target position, the stability frame 5 is clamped to the tower 8 by the remotely controlled hydraulic cylinders 29. Valve 40 are closed to lock the pressure into the hydraulic cylinders 29 and avoid that the hydraulic fluid flows back from hydraulic cylinders 29. The control system 38 checks from a remote position by telemetry or through the umbilical 39 whether the forces exerted by hydraulic cylinders 29 are within a given or designated range.
(19) Once the stability frame 5 is safely clamped to the wind turbine 2, the lifting cranes 4 are equipped with the rigging assembly 6, which, in turn, is anchored to the wind turbine 2 and is partly inserted into the guides 25 of the stability frame 5 according to the configuration shown in
(20) Each lifting crane 4 provide for arranging two eyelets 21 in close proximity of two corresponding trunnions 13, and the two rigid sections 22 in proximity of two corresponding guides 25. The eyelets 21 are anchored to the trunnions 31 and the rigid sections 22 are inserted into the guides 25.
(21) Once the wind turbine 2 is lifted off the onshore substructure 7 as shown in
(22) Once the stability wind turbine 2 is safely hung to the lifting cranes 4 and secured to the crane vessel 3 by tugger lines 35 and 48, the wind turbine 2 is transferred offshore above the offshore substructure 49 as shown in
(23) Once the wind turbine 2 is secured to the offshore substructure 49, tugger lines 35 and 48, rigging assembly 6, and the stability frame 5 are recovered on the crane vessel 3.
(24) In case of emergency, the hydraulic fluid under pressure into the hydraulic cylinders 29 can be recovered into the hydro-pneumatic accumulator 42 (
(25) It is clear that the present disclosure includes variations that are not specifically described and fall within the scope of the protection of the following claims. Accordingly, various changes and modifications to the presently disclosed embodiments will be apparent to those skilled in the art.