ASSEMBLY METHOD AND ASSEMBLY APPARATUS FOR CROSS SHAFT UNIVERSAL JOINT
20210102583 · 2021-04-08
Assignee
Inventors
Cpc classification
F16C43/04
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16D2250/0023
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16D2250/0084
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16D3/40
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y10T29/49945
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F16D3/405
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F16D3/38
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
An assembly apparatus includes backup jigs, a press-fitting and caulking part, and an expansion part. The backup jigs is configured to back up arms of a yoke of the cross shaft universal joint from inside in an axial direction. The press-fitting and caulking part is configured to press-fit cup bearings from outside in the axial direction between bearing holes of the arms and a shaft portion of a cross shaft, and configured to caulk the cup bearings. The expansion part is configured to push a wedge body between the backup jigs and to expand the arms outward via the backup jigs. The press-fitting and caulking part is configured to press-fit the cup bearings and to caulk the cup bearings in a state in which the arms are expanded. The expansion part is configured to release an expansion of the arms after the press-fitting and caulking of the cup bearings.
Claims
1. An assembly method of a cross shaft universal joint in which a pair of arms of a yoke are backed up from inside in an axial direction by a pair of backup jigs, and cup bearings are press-fitted from outside in the axial direction between bearing holes of the arms and a cross shaft inserted in the bearing holes, the assembly method comprising: expanding each of the arms outward in the axial direction by each of the backup jigs; press-fitting each of the cup bearings from the outside in the axial direction and caulking each of the cup bearings, with respect to each of the arms in an expanded state; and releasing an expansion of each of the arms by each of the backup jigs after press-fitting and caulking each of the cup bearings.
2. The assembly method according to claim 1, wherein a wedge body disposed at a machine center is pushed between the backup jigs so as to move the backup jigs outward in an expansion direction, in the expanding of the each of the arms.
3. The assembly method according to claim 1, further comprising: a first expansion of expanding each of the arms to a first expanded state; a first press-fitting of press-fitting each of the cup bearings into each of the arms in the first expanded state; a second expansion of further expanding each of the arms to a second expanded state after press-fitting each of the cup bearings; and caulking each of the arms in the second expanded state.
4. The assembly method according to claim 1, further comprising: a third expansion of further expanding each of the arms to a third expanded state after the caulking of the each of the arms in the second expanded state; and a second press-fitting of press-fitting each of the cup bearings into each of the arms in the third expanded state.
5. An assembly apparatus of assembling a cross shaft universal joint, the assembly apparatus comprising: a pair of backup jigs configured to back up a pair of arms of a yoke of the cross shaft universal joint from inside in an axial direction; a press-fitting and caulking part configured to press-fit cup bearings from outside in the axial direction between bearing holes of the arms in a backed up state by the backup jigs and a shaft portion of a cross shaft of the cross shaft universal joint, and configured to caulk the cup bearings; and an expansion part configured to push a wedge body disposed at a machine center between the backup jigs and expand each of the arms outward via each of the backup jigs, wherein the press-fitting and caulking part is configured to press-fit each of the cup bearings and to caulk each of the cup bearings in a state in which the arms are expanded by the backup jigs, and wherein the expansion part is configured to release an expansion of the arms by the backup jigs after press-fitting and caulking of the cup bearings.
Description
BRIEF DESCRIPTION OF DRAWINGS
[0017]
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
DESCRIPTION
[0036] Embodiments will be described in detail with reference to the drawings. The same reference numerals are given to the same names as those of a cross shaft universal joint 2 and the like described in
[0037]
[0038] The wedge body 33 includes a pair of left and right inclined portions 36 corresponding to the backup jigs 31. The inclined portions 36 are inclined at the same angle on left and right sides such that both inclined portions 36 form a narrowing-down taper, and are arranged on an upper side between the backup jigs 31. The servo motor 34 is provided on an upper side of the wedge body 33, and drives the wedge body 33 in the upper-lower direction via a transmission mechanism such as a screw shaft.
[0039] Each backup jig 31 is configured to back up each arm 8 from inside in the right-left direction when press-fitting the cup bearing 11 and forming a caulking portion 18. The backup jig 31 includes a contact portion 37 that can be in contact with an inner side surface of each arm 8 from inside in the left and right direction and an abutment portion 38 that can abut against an inclined portion 36 of the wedge body 33 from outside in the right-left direction.
[0040] Each contact portion 37 protrudes downward from an inner end side of the backup jig 31. Each abutment portion 38 is provided on an inner end side of an abutment plate 39 fixed on the backup jig 31, and is inclined at substantially the same angle as that of the inclined portion 36 so as to be in surface contact with the inclined portion 36 of the wedge body 33. Inclination angles of the inclined portion 36 and the abutment portion 38 are small such that the wedge body 33 can sufficiently withstand a reaction force from a side of the backup jig 31. Further, the backup jigs 31 and the wedge body 33 constitute an expansion part that expands the arms 8 of a yoke 5. The abutment portion 38 may be provided on the backup jig 31 by omitting the abutment plate 39.
[0041] A press-fitting and caulking part 35 includes a press-fitting pin 40 disposed in the right-left direction and a caulking punch 41 provided on an outer peripheral side of the press-fitting pin 40 concentrically inside and outside. The press-fitting pin 40 and the caulking punch 41 are separately driven by a driving part (not shown), and press-fitting of the cup bearing 11 and caulking of a caulking portion 18 are separately performed.
[0042] As shown in
[0043] That is, in the preparation step 45, the yokes 5, the cross shaft 6, and the like are set on the assembly apparatus 30. Shaft portions 10 of the cross shaft 6 are inserted in bearing holes 17 of the yoke 5. Further, the yoke 5 is temporarily clamped and is in a state of being movable in the right-left direction.
[0044] In the centering step 46, centering is performed such that the arms 8 of the yoke 5 temporarily fixed on the assembly apparatus 30 are expanded to both sides in the right-left direction to the first expanded state Q1, and the center P between arms of the yoke 5 coincides with the machine center O of the assembly apparatus 30 (see
[0045] The centering step 46 includes a reference step 54, a zero-touch step 55, and an expanding and centering step 56. In the reference step 54, the abutment portions 38 of the backup jigs 31 are butted against the inclined portions 36 of the wedge body 33 from the outside in the right-left direction so as to align the backup jigs 31 with reference positions R of a machine reference (see
[0046] First, in the reference step 54, the backup jigs 31 are moved inward in the right-left direction in directions indicated by arrows in
[0047] When the abutment portions 38 of the backup jigs 31 are abutted against the inclined portions 36 of the wedge body 33 as shown in
[0048] In the zero-touch step 55, the backup jigs 31 are moved outward in the right-left direction in directions indicated by arrows in
[0049] The backup jigs 31 are already positioned right-left symmetrically with respect to the machine center O, and the contact portions 37 of the backup jigs 31 positioned right-left symmetrically are in contact with the arms 8. Therefore, the contact portions 37 of the backup jigs 31 are in contact with the arms 8, so that the center P between arms of the arms 8 of the yoke 5 can substantially coincide with the machine center O. Positions of the backup jigs 31 at this time are measured and read with a displacement meter, and stored as the zero-touch positions S of the backup jigs 31.
[0050] When the backup jigs 31 are moved outward in the right-left direction in the directions indicated by the arrows in
[0051] However, in most of the yokes 5 arranged on the assembly apparatus 30, the center P between arms is displaced from the machine center O in either a left or right direction. For example, in a case where the center P between arms of the yoke 5 is displaced to a left side as shown in
[0052] The backup jigs 31 are moved in left and right directions that are opposite to each other. When the contact portion 37 of the backup jig 31 on the right side is in contact with the arm 8 on the right side, an interval between a contact portion 37 of a backup jig 31 on a left side and an arm 8 on the left side is 2α. Thereafter, as shown in
[0053] When the center P between arms of the yoke 5 coincides with the machine center O, the contact portion 37 of the backup jig 31 on the left side is in contact with an inner side surface of the arm 8 on the left side as shown in
[0054] The air cylinders 32 are low pressure types which generate necessary pressure for the abutment portions 38 of the backup jigs 31 being abutted against the inclined portions 36 of the wedge body 33 in the reference step 54, for the contact portions 37 of the backup jigs 31 being in contact with the arms 8 of the yoke 5 in the zero-touch step 55, or for moving the yoke 5 disposed at a displacement position in either one of the left and right directions so as to correct displacement. A driving of the air cylinders 32 is stopped after the abutment portions 38 are abutted against the inclined portions 36 or after the contact portions 37 are in contact with the arms 8, or the driving is stopped after a predetermined time after the contact. The air cylinders 32 do not have driving force for expanding the arms 8.
[0055] In this way, if the reference positions R can be obtained in the reference step 54 and the zero-touch positions S can be obtained in the zero-touch step 55, since an interval between the contact portion 37 and the abutment portion 38 in the right-left direction is already known, a dimension between arms of the yoke 5 can be calculated based on those reference positions R, zero-touch positions S, and the like.
[0056] When the backup jigs 31 are moved to the zero-touch positions S, the gap corresponding to an amount of movement from the reference position R in the reference step 54 to the zero-touch position S in the zero-touch step 55 is formed between the abutment portion 38 of each backup jig 31 and the inclined portion 36 of the wedge body 33 (see
[0057] If the dimension between arms of the yoke 5 can be calculated, a movement amount of the wedge body 33 from the expansion start position T to a first expansion position corresponding to the first expanded state Q1, and movement amounts of the wedge body 33 at first to third expansion positions corresponding to the first to the third expanded states Q1 to Q3 can be calculated based on the inclination of the inclined portion 36 and the like.
[0058] The expanding and centering step 56 includes an expansion start position movement step 57, and a first expansion step 47. In the expansion start position movement step 57, the wedge body 33 is lowered so as to move the wedge body 33 to the expansion start position T. In the expansion start position T, the wedge body 33 is in contact with the abutment portions 38 of the backup jigs 31 at the zero-touch positions S (see
[0059] In this embodiment, in the first expansion step 47 of the centering step 46, when the yoke 5 is centered by expanding a space between the arms 8 to the first expanded state Q1, the arms 8 are expanded before the first press-fitting step 48 at that time.
[0060] However, when an expansion amount during centering is smaller than an expansion amount of the arms 8 before the first press-fitting step 48, the expansion step during centering and the expansion step before the first press-fitting may be separated, and expansion during centering may be performed first, and then expansion before the first press-fitting may be performed.
[0061] The first to third expanded states Q1 to Q3 when the arms 8 are expanded to a left side and a right side are predetermined by a dimension, a material, and the like of the yoke 5, and are set such that the expansion amount becomes large from the first expanded state Q1 in which an arm 8 is expanded outward by a predetermined amount from a normal position Q0 to the second expanded state Q2 and the third expanded state Q3 sequentially, as shown in
[0062] Expansion amounts of the expanded states Q1 to Q3 are within a range in which the arms 8 can be elastically deformed without being plastically deformed. Further, the expansion amounts of the expanded states Q1 to Q3 may be slightly different from one another. When the expansion during centering and the expansion before the first press-fitting are separately performed, a centering expanded state Q01 may be provided between the normal state Q0 of the arm 8 and the first expanded state Q1.
[0063] In the expansion start position movement step 57, based on the expansion start position T, the servo motor 34 operates the wedge body 33 in a lowering direction and moves the wedge body 33 in the lowering direction by the calculated movement amount (see
[0064] In the first expansion step 47, the servo motor 34 is operated in the lowering direction from the expansion start position T, and the wedge body 33 is moved in the lowering direction by the calculated second movement amount. When the wedge body 33 is lowered to the first expansion position and the wedge body 33 is inserted between the abutment portions 38 of the backup jigs 31 (see
[0065] As shown in
[0066] Therefore, the arms 8 are expanded to the predetermined first expanded state Q1, so that centering in which the center P between arms of the yoke 5 accurately and reliably coincides with the machine center O can be automatically performed.
[0067] Incidentally, even at a time point of the zero-touch step 55 before the expansion, although the center P between arms of the yoke 5 can be made to coincide with the machine center O, the abutting portions simply abut at this time point, and an abutting state varies among the abutting portions. Therefore, centering accuracy of the yoke 5 cannot be sufficiently secured. However, by expanding the arms 8 to the first expanded state Q1, since the variation in the abutting state among the abutting portions can be eliminated, the yoke 5 can be centered automatically, accurately, reliably, and highly precisely.
[0068] Further, by expanding the arms 8, the yoke 5 can be centered. Accordingly, even though the centering accuracy of the yoke 5 is high, operations of the centering step 46 is easy and a centering operation of the yoke 5 itself can be automatically and efficiently performed. Particularly, since the left and right arms 8 of the yoke 5 are expanded so as to center the yoke 5, even when dimension accuracy of the left and right arms 8 of the yoke 5 is deviated, it is not necessary to determine and correct an amount of displacement of the left and right arms 8, and the centering operation can be performed easily and rapidly.
[0069] When the wedge body 33 is lowered from the expansion start position T to the first expansion position by a predetermined movement amount so as to expand the arms 8 to the first expanded state Q1, since centering of the yoke 5 is completed during the expansion of the arms 8, by operating the press-fitting pins 40 of the press-fitting and caulking parts 35, the cup bearings 11 between the shaft portions 10 of the cross shaft 6 and the bearing holes 17 of the arms 8 are press-fitted from both left and right sides at substantially the same time, or are press-fitted sequentially one by one (the first press-fitting step 48) (see
[0070] When press-fitting the cup bearing 11, a side of the bottom portion 15 of the cup bearing 11 is pressed inward in the right-left direction by a press-fitting pin 40 until the press-fitting pin 40 reaches a predetermined position. A press-fitting load at this time varies in accordance with a position of the cup bearing 11, as shown in
[0071] That is, when the cup bearing 11 is press-fitted to a fourth position X4 via a first position X1, a second position X2, and a third position X3 in
[0072] The press-fitting load when the cup bearing 11 is press-fitted to the fourth position X4 (or a time point at which the cup bearing 11 is press-fitted to a position where the first press-fitting is completed) is higher than that at a press-fitting start time point as shown in
[0073] When the first press-fitting of the cup bearing 11 is completed, in the second expansion step 49, the wedge body 33 is further lowered by driving of the servo motor 34 so as to insert the wedge body 33, and the arms 8 are expanded to the second expanded state Q2 while maintaining a centered state via the backup jigs 31 (the second expansion step 49) (see
[0074] In
[0075] If the arms 8 are expanded to the second expanded state Q2, with the first press-fitted state maintained by the press-fitting pins 40, each caulking punch 41 is inserted into a bearing hole 17 of each arm 8 from outside in the right-left direction so as to form a caulking portion 18 on an inner periphery of the bearing hole 17 in proximity to an outer end side of the cup bearing 11, and the caulking portion 18 prevents the cup bearing 11 from coming off (the caulking step 50) (see
[0076] A reason why the arms 8 are expanded from the first expanded state Q1 to the second expanded state Q2 while caulking is that a caulking load by a caulking punch 41 is larger than a press-fitting load by a press-fitting pin 40. If the arms 8 are expanded to the second expanded state Q2 in this way, even when a large caulking load is applied, an expansion load during the second expansion can sufficiently withstand against the caulking load. Therefore, the caulking portions 18 are formed in the second expanded state Q2 of the arms 8, so that the cup bearings 11 can be reliably prevented from disconnected.
[0077] An expansion amount from the first expanded state Q1 to the second expanded state Q2 may be determined in consideration of a difference between the press-fitting load and the caulking load. Therefore, if the difference between the press-fitting load and the caulking load is small, the amount of expansion to the second expanded state Q2 can be reduced.
[0078] If the expansion load of each arm 8 in the first expanded state Q1 is sufficiently large or the inclination of each inclined portion 36 of the wedge body 33 is small enough to sufficiently withstand a caulking load, expansion of each arm 8 to the second expanded state Q2 can be omitted.
[0079] When the caulking step 50 is completed, the wedge body 33 is further lowered by driving of the servo motor 34, and the arms 8 are expanded to the third expanded state Q3 while the centered state is maintained by the wedge body 33 via the backup jigs 31 (the third expansion step 51) (see
[0080] The expansion amount from the second expanded state Q2 to the third expanded state Q3 may be determined in consideration of a difference between the caulking load and the second press-fitting load. Therefore, if the difference between the caulking load and the second press-fitting load is small, an amount of expansion to the third expanded state Q3 can be small.
[0081] If the expansion load of each arm 8 in the second expanded state Q2 is sufficiently large or the inclination of each inclined portion 36 of the wedge body 33 is small enough to sufficiently withstand the caulking load, expansion to the third expanded state Q3 can be omitted.
[0082] In the second press-fitting in the second press-fitting step 52, the press-fitting pin 40 is moved at a low speed in a press-fitting direction so as to press a convex portion 15a of the bearing cup 13 of the cup bearing 11 on a side of the bottom portion 15 toward an outer end surface side of the shaft portion 10 at a low speed. Therefore, as shown in
[0083] When press-fitting loads during the second press-fitting of the cup bearings 11 reach a predetermined value and the press-fitting is completed, the wedge body 33 is raised by reverse driving of the servo motor 34 so as to release the third expanded state Q3 of the arms 8 (the expansion releasing step 53) (see
[0084] In the expansion releasing step 53, when the expansion of the arms 8 in the third expanded state Q3 is released, a gap between each arm 8 and the cup bearing 11 is offset by spring back of each arm 8. Therefore, the cup bearing 11 in the bearing hole 17 of each arm 8 can be fixed without looseness.
[0085]
[0086] Therefore, there is no looseness in the right-left direction between the cup bearing 11 and the shaft portion 10 of the cross shaft 6, and generation of an abnormal noise due to movement in the axial direction of the cross shaft 6 can be prevented. Further, since there is no gap where the cross shaft 6 is moved in the axial direction by the left and right arms 8 of the yoke 5, it is possible to prevent water, dust, and the like from entering.
[0087] Since the reference position R and the like are measured by the displacement meter every time assembly is performed, even when a contact location such as a contact portion between each inclined portion 36 of the wedge body 33 and the abutment portion 38 of each backup jig 31 is worn or the like, it is possible to prevent a decrease in assembly accuracy due to the wear or the like.
[0088]
[0089] Also in this case, since an expansion force during the second expansion is applied to the arms 8 while the arms 8 are caulked by the caulking punches 41, a large caulking load during the caulking can be sufficiently withstood.
[0090] While the embodiments have been described in detail above, the present invention is not limited to the embodiments, and various modifications can be made without departing from the scope of the present invention. In the assembly apparatus 30 of the embodiments, the wedge body 33 is on an upper side with respect to the backup jigs 31, and the wedge body 33 is driven by the servo motor 34 on an upper side. However, the backup jigs 31, the wedge body 33, and the servo motor 34 may be arranged upside down. Further, various modifications may be made, such as disposing the wedge body 33 so as to move in the front-rear direction with respect to the backup jigs 31 that move in the right-left direction.
[0091] In the embodiments, the dimension between arms is calculated based on the reference position R, the zero-touch position S, and the like, and the expansion position of each arm 8 in the subsequent expanded state is calculated based on the dimension between arms. However, when there is a small variation in the dimension between arms or the like, the expansion position may be set in advance and the steps may be executed in accordance with the expansion position. Further, in the embodiments, although an operation is temporarily stopped at the expansion start position and expansion is performed from the expansion start position to the expansion position, stopping at the expansion start position may be omitted.
[0092] In the embodiments, a case is illustrated where the centering and expanding step 56 of the arms 8 in the centering step 46 of the yoke 5 and the subsequent first expansion step 47 of the arms 8 before the press-fitting step of the cup bearings 11 are commonly performed in one step. However, the centering and expanding step 56 of the arms 8 in the centering step 46 and the first expansion step 47 of the arms 8 before the first press-fitting step 48 of the cup bearings 11 may be performed separately.
[0093] In this case, in the centering step 46, the arms 8 are expanded within a range necessary for centering the yoke 5. In the first expansion step 47 of the arms 8 before the first press-fitting step 48 of the cup bearings 11, expansion from the centered and expanded state to the first expanded state Q1 may be performed within a range necessary for press-fitting the cup bearings 11.
[0094] If an expansion amount of the arms 8 in the first expansion step 47 is sufficient to withstand press-fitting and caulking, the cup bearings 11 may be firstly press-fitted and caulked in the first expanded state.
[0095] According to examples, there is an advantage that a cup bearing can be easily and reliably fixed to a proper position by using spring back of an arm.