Self-lifting concrete form adapted to accommodate horizontal reinforcing steel
10961726 ยท 2021-03-30
Assignee
Inventors
Cpc classification
E04G11/02
FIXED CONSTRUCTIONS
E04G11/20
FIXED CONSTRUCTIONS
E04G11/28
FIXED CONSTRUCTIONS
E04G11/22
FIXED CONSTRUCTIONS
International classification
E04G11/20
FIXED CONSTRUCTIONS
E04G11/22
FIXED CONSTRUCTIONS
E04G11/24
FIXED CONSTRUCTIONS
E04G11/28
FIXED CONSTRUCTIONS
Abstract
A forming system includes a frame and two forming walls. The two forming walls are positioned at a distance from each other to define a first vertical wall course. One forming wall is supported by the frame such that the one forming wall can be translated toward or away from the respective other forming wall. The frame can be raised to raise the two forming walls to be positioned to pour a second vertical course on top of the first vertical course. The translation of the one forming wall allows for the pouring of the first vertical course with horizontally extending rebar that extends through the one forming wall outside of the first vertical wall course, to tie in to a subsequently poured floor slab. The translation permits the vertical raising of the one forming wall, without striking the extending rebar, to pour the second vertical course on the first vertical course. A worker's platform is provided that is supported by the frame and vertically movable by raising the frame. The worker's platform is located below the one forming wall on a side of the one forming wall opposite the respective other forming wall and is retractable to also clear the extending rebar during raising of the frame.
Claims
1. A forming system, comprising: a frame; two forming walls that are movable to a distance from each other to define a thickness of a vertical void to be filled with concrete to form a first vertical wall course, one forming wall of the two forming walls is supported by the frame such that the wall can be translated toward or away from the respective other forming wall of the two forming walls, the respective other forming wall also supported by the frame, the frame can be raised to raise the two forming walls to be positioned to pour a second vertical course on top of the first vertical wall course, wherein the translation of the one forming wall allows for the pouring of the first vertical wall course having a plurality of horizontally extending rebar, that extends outside of the first vertical wall course to tie in a floor slab to the first vertical wall course, and for the vertical raising of the two forming walls to pour the second vertical wall course on the first vertical wall course without interference of the vertical movement of the one forming wall with the plurality of horizontally extending rebar, wherein the one forming wall is movable horizontally away from the respective other forming wall by a distance sufficient to clear the plurality of horizontally extending rebar; wherein the one forming wall has a plurality of spaced-apart openings, each opening sized for receiving a horizontally extending rebar, allowing the plurality of horizontally extending rebar to pass through the one forming wall outside of the vertical void.
2. The forming system according to claim 1, further comprising a worker's platform supported by the frame and vertically movable by raising the frame, the worker's platform located below the one forming wall on a side of the one forming wall opposite the respective other forming wall, wherein the worker's platform is retractable to also clear the plurality of horizontally extending rebar when moved vertically after forming the first vertical wall course to form the second vertical wall course.
3. The forming system according to claim 2, wherein the worker's platform is hung pivotally from the frame and is pivoted away from the one forming wall to clear the plurality of horizontally extending rebar.
4. The forming system according to claim 2, wherein the worker's platform is hung from the frame and is folded back to clear the plurality of horizontally extending rebar.
5. The forming system according to claim 1, wherein a forming strip is positioned onto the one forming wall to provide the spaced-apart openings for the plurality of horizontally extending rebar and forms part of the forming surface of the one forming wall.
6. The forming system according to claim 5, wherein when the one forming wall is moved away from the respective other forming wall after the poured concrete between the two forming walls has sufficiently set or cured, the forming strip detaches from the one forming wall and is thereafter stripped off of the first vertical wall course and from around the plurality of horizontally extending rebar.
7. The forming system according to claim 1, wherein the two forming walls are hung from the frame and the one forming wall is hung with a rolling connection to be translated toward or away from the respective other forming wall.
8. The forming system according to claim 2, wherein the worker's platform is hung pivotally from the frame and is pivoted away from the one forming wall to clear the horizontally extending rebar; and a forming strip is positioned onto the one forming wall to provide the spaced-apart openings for the plurality of horizontally extending rebar and forms part of the forming surface of the one forming wall.
9. The forming system according to claim 8, wherein when the one forming wall is moved away from the respective other forming wall after the poured concrete between the two forming walls has sufficiently set or cured, the forming strip detaches from the one forming wall and is thereafter stripped off of the first vertical wall course and from around the plurality of horizontally extending rebar.
10. The forming system according to claim 9, wherein the two forming walls are hung from the frame and the one forming wall is hung with a rolling connection to be translated toward or away from the respective other forming wall.
11. The forming system according to claim 2, wherein the worker's platform is hung from the frame and is folded back to clear the plurality of horizontally extending rebar; and wherein a forming strip is positioned onto the one forming wall to provide the spaced-apart openings for the plurality of horizontally extending rebar and forms part of the forming surface of the one forming wall.
12. The forming system according to claim 11, wherein when the one forming wall is moved away from the respective other forming wall after the poured concrete between the two forming walls has sufficiently set or cured, the forming strip detaches from the one forming wall and is thereafter stripped off of the first vertical wall course and from around the plurality of horizontally extending rebar.
13. The forming system according to claim 12, wherein the two forming walls are hung from the frame and the one forming wall is hung with a rolling connection to be translated toward or away from the respective other forming wall.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
DETAILED DESCRIPTION
(7) While this invention is susceptible of embodiment in many different forms, there are shown in the drawings, and will be described herein in detail, specific embodiments thereof with the understanding that the present disclosure is to be considered as an exemplification of the principles of the invention and is not intended to limit the invention to the specific embodiments illustrated.
(8)
(9) The system includes a frame 26 that has beams 27 supported by a plurality of hydraulic jacks 32. The platform 26 includes an upper platform deck 28 and appropriate railings 29. A cover 30 can be lifted or pivoted giving acces through the platform 28 to the work below.
(10) A first forming wall 42 is fixedly hung from the beams 27 at a connection 52. A second forming wall 48 is hung from the beams 27 using a rolling connection 56. The rolling connection includes wheels 56a that roll along a bottom flange 27a of the beam 27. The second wall 48 can be rolled toward and away from the first wall 42. A work platform or scaffold 64 is hung from the frame 26. The scaffold includes spaced apart vertical members 66, 68 that support horizontal supports 70. A platform 76 is supported on the supports 70. The platform includes a fixed section 78a connected to a first pivoting section 78b, by a hinge 78d. The first pivoting section 78b is connected to a second pivoting section 78c by a hinge 78e.
(11) The jacks 32 are supported by brackets 86 that are fastened to a previously poured course or level or vertical section 88.
(12) The state or position of the apparatus 20 in
(13)
(14) In order to accommodate the rebar 112 extending out of the side of the volume 106a between the walls 42, 48, a forming strip 114 is fit into the wall 48. The forming strip 114 can be plywood, a wood plank, expanded metal or some other material. The forming strip 114 is provided with holes for passing the horizontal legs of the rebar 112 therethrough.
(15)
(16) The forming strip 114 will most likely be somewhat bound to the rebar 112 and it is anticipated that a new forming strip 114a will be needed for each new course and the previous forming strip 114 will need to be stripped from the rebar 112 and the previous course before a floor slab is poured around the rebar 112.
(17) Although
(18) A typical construction sequence can be: Self-lifting concrete form is erected; A replaceable forming strip 114 is installed in the moving forming wall 48; Protruding reinforcing steel 112 is installed through the replaceable strip 114; The moving wall 48 is moved toward the wall 42; Concrete is poured; After concrete is sufficiently set the forms are moved, stripped or retracted; The moving wall 48 is moved back leaving the protruding reinforcing steel 112 and the replaceable forming strip 114 in place; Primary scaffolding section 78b, 78c are retracted or hinged back in order to clear the protruding reinforcing steel 112; Operating personal stand on the fixed section 78a while this step is performed; Once the protruding reinforcing steel 112 is clear of the moving forming wall 48 and all scaffolding, the self-lifting form is operated and lifted to the next pour level; Once on the next pour level the self-lifting concrete form is anchored and aligned for the next pour; Another replaceable strip 114a is put in place in the moving forming wall 48 and the sequence is repeated; and Prior to pouring the concrete floor slab 113, the replaceable strip 114 that was previously poured against is removed from the protruding reinforcing steel 112.
(19)
(20) The system includes a frame 126 that has beams 127 supported by a plurality of hydraulic jacks 32. The first forming wall 42 is fixedly hung from the beams 127 at the connection 52. The second forming wall 48 is hung from the beams 127 using the rolling connection 56 which rolls on the lower flange 127a of the beams 127. The second wall 48 can be rolled toward and away from the first wall 42.
(21) A work platform or scaffold 164 is hung from the frame 126. Particularly, the a hinged extension 127b is hinged to the beams 127 at a hinge 128. A fastener 128a below the hinge, with the hinge secures the beams 127, 127b together for non rotation about the hinge. A post 130 is fixed to a top side of the extension 127b, and a knee brace 132 connects the post to the extension 127b. A jack, such as a ratchet jack 140, is fixed at opposite ends to the post and the beam 127, such that by shortening the length of the ratchet jack by operation of the jack handle 142, the post 130 and the extension 127b can pivot about the hinge 128 (as shown in
(22) The jacks 32 are supported by brackets 86 that are fastened to a previously poured course or level or vertical section 88.
(23) The state or position of the apparatus 120 in
(24)
(25) In order to accommodate the rebar 112 extending out of the side of the volume 106a between the walls 42, 48, the forming strip 114 is fit into the wall 48.
(26)
(27) Although
(28) A typical construction sequence can be: Self-lifting concrete form system 120 is erected; A replaceable forming strip 114 is installed in the moving forming wall 48; Protruding reinforcing steel 112 is installed through the replaceable strip 114; The moving forming wall 48 is moved toward the wall 42; Concrete is poured; After concrete is sufficiently set the forms are moved, stripped or retracted; The moving wall 48 is moved back leaving the protruding reinforcing steel 112 and the replaceable forming strip 114 in place; Platform 176 is rotated away from the poured wall using the jacks 140 in order to clear the protruding reinforcing steel 112; Once the protruding reinforcing steel 112 is clear of the moving forming wall 48 and all the platform 176, the self-lifting form is operated and lifted to the next pour level; Once on the next pour level the self-lifting concrete form is anchored and aligned for the next pour; Another replaceable strip 114a is put in place in the moving forming wall 48 and the sequence is repeated; and Prior to pouring the concrete floor slab 113, the replaceable strip 114 that was previously poured against is removed from the protruding reinforcing steel 112.
(29) From the foregoing, it will be observed that numerous variations and modifications may be effected without departing from the spirit and scope of the invention. It is to be understood that no limitation with respect to the specific apparatus illustrated herein is intended or should be inferred.