Abstract
In an anchorage 1 of continuous fiber-reinforced polymer (CFRP) strands that anchors continuous fiber-reinforced polymer strands 2 to concrete structures, there is provided an untwisted diameter-expanded portion 3 expanded to a diameter D2 by being radially expanded with respect to a diameter D1 of a general portion 4 of the CFRP strands 2 by untwisting any section of the CFRP strands 2 formed by stranding a plurality of element wires (20, 21) that are bundles of multiple continuous fibers, and filling and curing a time curable material 5 in a clearance among the element wires the untwisted section that is untwisted.
Claims
1. An anchorage of continuous fiber-reinforced polymer strands, comprising: a continuous fiber-reinforced polymer strands formed by stranding a plurality of element wires that are bound together multiple continuous fibers; and a single or a plurality of untwisted diameter-expanded portions radially expanded with respect to a diameter of a general portion, the untwisted diameter-expanded portion being radially expanded by filling and curing curable materials in a clearance among the element wires in a single or a plurality of untwisted sections where the plurality of element wires in any section of the continuous fiber-reinforced polymer strands are untwisted, the general portion being other than the untwisted section of the continuous fiber-reinforced polymer strands, the untwisted diameter-expanded portion receiving bearing resistance by directly contacting with the surrounding curable materials, such as concrete.
2. The anchorage of the continuous fiber-reinforced polymer strands according to claim 1, wherein the untwisted diameter-expanded portion has a front and a rear bundled so as not to be untwisted any further.
3. The anchorage of the continuous fiber-reinforced polymer strands according to claim 1, wherein the untwisted diameter-expanded portion has a length that is at least five times or more the diameter of the general portion.
4. The anchorage of the continuous fiber-reinforced polymer strands according to claim 1, wherein the untwisted diameter-expanded portion has a maximum diameter that is at least 1.2 times or more the diameter of the general portion.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
DESCRIPTION OF PREFERRED EMBODIMENTS
[0038] The following describes an exemplary anchorage of CFRP strands according to the present invention and the manufacturing method in details with reference to drawings.
Anchorage of CFRP Strands
First Configuration
[0039] First, using from
[0040]
[0041] As illustrated in from
CFRP Strands
[0042] The CFRP strands 2 are structural cable formed of CFRP strands formed by stranding a plurality (seven in illustrated configuration) of element wires (20, 21) formed of approximately circular cross-sectional shapes with a diameter of bundles of multiple continuous fibers of approximately 5 mm. The element wire according to the embodiment is, what is called, a Carbon Fiber-Reinforced Plastics (CFRP) element wire, which is made by binding and bundling a multiple (approximately tens of thousands of) carbon fibers having a diameter of approximately 5 m to 7 m applying thermosetting resin. That is, the CFRP strands 2 used in the present invention are premised that it is in a rope shape with the stranded element wires, and has a structure that can be untwisted.
[0043] Surely, the continuous fiber according to the present invention is not limited to the carbon fiber, but it may be an aramid fiber or a glass fiber. Basically, the continuous fiber is only necessary to be a long continuous fiber having predetermined tensile strength. However, using the carbon fiber provides tensile strength of approximately 2690 N/mm.sup.2, thereby ensuring a reinforcing material or a tendon having extremely high strength compared with a steel PC strands.
[0044] The thermosetting resin is preferably an epoxy resin or a vinylester resin highly resistant to alkalinity of a cement-based filler. It should be noted that the element wire can be bound and bundled with a thermoplastic resin instead of the thermosetting resin. This thermoplastic resin includes a polycarbonate resin, a vinyl chloride resin, and the like.
[0045] The CFRP strand 2 according to the first configuration is formed of seven element wires in total of one core wire 20 positioned in a center in an axial direction and six side wires 21 stranded about the core wire 20 as illustrated in
[0046] However, the CFRP strands according to the present invention may be CFRP strands 2 according to a modification 1, formed of 19 element wires in total of one core wire 20 positioned in the center in the axial direction and 18 side wires 21 stranded about the core wire 20 as illustrated in
[0047]
[0048] As illustrated in
[0049]
[0050] At this time, the CFRP strands 2 according to the modification 1 have a diameter (D1) of approximately 20.5 mm to 28.5 mm, and the CFRP strands 2 according to the modification 2 have a diameter (D1) of approximately 35.5 mm to 40.0 mm. Basically, the CFRP strands according to the present invention preferably have a diameter (D1) range within a range of approximately 7.5 mm to 40.0 mm.
Untwisted Diameter-Expanded Portion
[0051] The untwisted diameter-expanded portion 3 is formed by filling and curing curable materials 5 in a clearance formed by untwisting the side lines 21 into a gradual lantern shape over a length L of any section of the above-described CFRP strands 2 as illustrated in
[0052] Here, untwisting means increasing intervals among the side lines 21 by unraveling the strand of the side lines 21 excluding the core wire 20 in the above-described CFRP strands 2. The general portion 4 is a portion excluding an untwisted section of the length L (untwisted section). The diameter D1 of the general portion 4 means an outer diameter of the above-described CFRP strands 2 itself.
[0053] The curable materials 5 used in the anchorage 1 according to the embodiment are preferred to be, for example, the resin mortar made from an epoxy resin, fine aggregate, and the like, the polymer cement mortar made from quick setting cement, a synthetic resin, fine aggregate, water, and the like, and the grout cement mortar made from quick setting cement, a non-shrink material, silica sand, water, and the like. Surely, it is needless to mention that the curable materials according to the present invention are applicable without limiting a kind of material as long as the material has fluidity to some extent when it is filled and cures after a predetermined time. However, the strength of the curable materials is preferred to be equal to or more than the compressive strength (design compressive strength) of concrete in a peripheral area where the anchorage 1 is anchored, and preferably, is higher by approximately 2 to 5 N/mm.sup.2. The reason why the compressive strength of the curable materials is made larger than the compressive strength of the concrete in the peripheral area where the anchorage 1 is anchored, is to ensure surely receiving bearing resistance from the concrete in the peripheral area by having a core effect in the compressive strength in the untwisted diameter-expanded portion. For the curable material 5 according to the first configuration, one that has strength after curing of approximately 30 to 80 N/mm.sup.2 is used.
[0054] The length L of the untwisted section as illustrated in
[0055] The maximum diameter D2 of the untwisted diameter-expanded portion 3 illustrated in
[0056] It should be noted that the untwisted diameter-expanded portion 3 has a front and a rear bundled with cable ties 6, such as INSULOKs (registered trademark), such that the CFRP strands 2 are not untwisted any further and the strand of the side lines 21 is not unraveled. In view of this, a shape management of the anchorage of the CFRP strands can be accurately performed, thereby ensuring a productization as a highly reliable anchorage.
[0057] Surely, the cable tie 6 can bundle even if it is a different binder, such as a binding wire (annealed thin iron wire). However, for rust prevention, the cable tie 6 is preferably a binder made of a resin material, such as the INSULOK (registered trademark).
Anchoring Mechanism of Anchorage
[0058] Next, using
[0059] The anchoring mechanism of the anchorage 1 according to the first configuration is mainly configured of two factors. An anchoring mechanism 1 as the first factor is a point that the maximum diameter D2 of the untwisted diameter-expanded portion 3 of the anchorage 1 is larger by at least 1.2 times or more the diameter D1 of the general portion 4 by unraveling the strand of the side lines 21, and filling and curing the curable materials 5 as described above. This causes the anchorage 1 to receive tensile force from a concrete C in the peripheral area or bearing resistance B resisting tensioning force T as illustrated in
[0060] In the anchoring mechanism 2 as the second factor, a bonding force A is increased due to an increased surface area in contact with the concrete C in the untwisted diameter-expanded portion 3 caused by unraveling the strand of the side lines 21, and filling and curing the curable materials 5. In the anchoring mechanism 2, furthermore, a mechanical bonding force A with the concrete C is increased by a significant unevenness formed by the outer surface of the curable materials 5 and the side lines 21 since the intervals among the side lines 21 of the untwisted diameter-expanded portion 3 illustrated in
Verification Experiments
[0061] Next, using Table 1, Table 2, and
Pull-Out Experiment 1
[0062] First, a pull-out experiment 1 in which CFRP strands are pulled out from test pieces in which the CFRP strands composed of the carbon fibers similar to the above-described anchorage 1 are anchored in concrete was executed. In this pull-out experiment 1, CFRP strands (guaranteed breaking load Pg=270 kN) with the diameter D1=15.2 mm formed of seven element wires similar to the above-described anchorage 1 was used. The maximum diameters D2 of the untwisted diameter-expanded portions 3 were 1.2 to 2.6 times the diameter D1 of the general portions 4. The test pieces have a concrete portion whose cross-sectional dimension was 500 mm500 mm and whose length was 470 mm. Relatively high strength concrete with compressive strength of 56 N/mm.sup.2 was used. For a portion of the CFRP strands other than the untwisted diameter-expanded portion 3, the bond stress was cut with a vinyl tape+application of grease. Grout cement mortar with compressive strength of 70 N/mm.sup.2 was used as the curable materials 5 into the untwisted diameter-expanded portion 3.
[0063] For CFRP strands of the test pieces, there were fabricated twelve types of test pieces in total of eleven types of test pieces of the anchors 1 having the lengths L of the untwisted diameter-expanded portions 3 of 5.0 to 11.8 times the diameter D1 of the general portion 4, and a reference test piece that is without an untwisting process for a comparison of anchoring efficiencies and have an anchoring length of 11.8 times the diameter D1.
[0064] In the pull-out experiment 1, the maximum pull-out loads Pm (kN) of the respective test pieces were measured and ratios (load ratio Pm/Pg) to the guaranteed breaking load Pg (kN) were obtained. The one core wires 20 in the centers of the CFRP strands 2 were projected approximately 5 mm from distal ends of the anchors 1 to be projected from end surfaces of the concrete test pieces. With this, extraction displacement in conjunction with the pull-out loads of the anchors 1 was measured. The results are shown in Table 1 below.
TABLE-US-00001 TABLE 1 Pull-out experiment 1 Diameter D1 of general portion = 15.2 mm, Guaranteed breaking load Pg = 270 kN Concrete compressive strength = 56 N/mm.sup.2, Curable material compressive strength = 70 N/mm.sup.2 Maximum Extraction Apparent pull-out Load displacement Ratio to bonding Diameter-expanded Length-expanded load Pm ratio during extraction of stress Test piece portion D2 (mm) D2/D1 portion L (mm) L/D1 (kN) Pm/Pg Pm (mm) non-untwisted (N/mm.sup.2) Non-untwisted 15.2 1.0 180.0 11.8 118.0 0.44 20.1 1.00 13.7 Untwisted 1 23.7 1.6 167.2 11.0 255.1 0.94 13.4 0.67 32.0 Untwisted 2 22.5 1.5 152.0 10.0 270.3 1.00 14.4 0.72 37.3 Untwisted 3 22.5 1.5 136.8 9.0 224.1 0.83 17.5 0.87 34.3 Untwisted 4 21.9 1.4 121.6 8.0 183.5 0.68 15.3 0.76 31.6 Untwisted 5 20.4 1.3 106.4 7.0 118.4 0.44 13.6 0.68 23.3 Untwisted 6 18.5 1.2 91.2 6.0 87.7 0.32 18.7 0.93 20.1 Untwisted 7 18.2 1.2 76.0 5.0 53.6 0.20 12.2 0.61 14.8 Untwisted 8 24.7 1.6 127.5 8.4 243.8 0.90 12.1 0.60 40.1 Untwisted 9 29.3 1.9 145.0 9.5 260.4 0.96 9.0 0.45 37.6 Untwisted 10 34.2 2.3 162.5 10.7 272.2 1.01 3.6 0.18 35.1 Untwisted 11 39.7 2.6 180.0 11.8 270.4 1.00 2.3 0.11 31.5
[0065] As illustrated in Table 1, the pull-out experiment 1 has summarized experimental results such that the non-untwisted reference test piece (anchoring length L=180.0 mm) (non-untwisted) and untwisted test pieces (untwisted 1 to untwisted 11) with various kinds of varied shape parameters can be compared. Regarding extracted displacement during maximum pull-out loads are applied (during Pm), from results indicating the ratio based on the reference test piece, it is seen that every test piece of the anchors 1 has small extracted displacement and provides a satisfactory performance as an anchorage. As a result of obtaining apparent bonding stresses during the maximum pull-out loads are applied (during Pm) from bonding areas presuming that the diameters of the diameter-expanded portions are the diameter D1 of the general portion, and also as a result of comparing the apparent bonding stresses with that of the non-untwisted reference test piece, it was found that every test piece of the anchors 1 had the apparent bonding stress larger than that of the non-untwisted reference test piece. From these results, it is found that the length L of the untwisted diameter-expanded portion 3 can provide its anchoring effect as long as it is at least five times or more the diameter D1 of the general portion 4. It is also found that the maximum diameter D2 of the untwisted diameter-expanded portion 3 can provide its anchoring effect as long as it is at least 1.2 times or more the diameter D1 of the general portion 4.
Pull-Out Experiment 2
[0066] In a pull-out experiment 2, the comparisons of pull-out experiments were performed for a case where the curable material 5 (polymer cement mortar, compressive strength=74 N/mm.sup.2) filled into the untwisted diameter-expanded portion 3 was filled and a case where the curable material 5 was not filled, and the influences on the anchoring effect of the curable materials 5 were examined. The used CFRP strands have a diameter D1=15.2 mm (guaranteed breaking load Pg=270 kN). The concrete test piece has a cross-sectional dimension of 150 mm150 mm, is provided with a 20 mm bonding cut, and has concrete compressive strength of 71 N/mm.sup.2.
[0067] The maximum diameter D2 of the untwisted diameter-expanded portion 3 was 1.5 times the diameter D1 of the general portion 4. For CFRP strands of test pieces, three types of test pieces with lengths L of the untwisted diameter-expanded portions 3 of ten times (L=152 mm), fifteen times (L=228 mm), and twenty times (L=304 mm) the diameter D1 of the general portion 4 were fabricated. The results of the pull-out experiment 2 are shown in Table 2 below.
TABLE-US-00002 TABLE 2 Pull-out experiment 2 Diameter D1 of general portion = 15.2 mm, Guaranteed breaking load Pg = 270 kN, D2/D1 = 1.5 Concrete compressive strength = 71 N/mm.sup.2, Curable material compressive strength = 74 N/mm.sup.2 Length L of Maximum Presence/absence untwisted pull-out Load of curable diameter-expanded L/D1 load Pm ratio material portion (mm) ratio (kN) Pm/Pg Curable material 152 10 165 0.61 polymer cement 228 15 247 0.92 mortar 304 20 270 1.00 No curable 152 10 38 0.14 material 228 15 128 0.47 304 20 198 0.74
[0068] From the results of the pull-out experiment 2, the results of the case where the curable materials were filled in the untwisted diameter-expanded portion 3 and the pull-out experiment was performed after predetermined strength had developed, demonstrated approximately similar tendency of the pull-out experiment 1. Meanwhile, the case where the curable materials were not filled in the untwisted diameter-expanded portion resulted in a substantially reduced pull-out load. This is because, even when the concrete was placed in the peripheral area of the CFRP strands having the void untwisted diameter-expanded portion 3, the maximum aggregate diameter of the concrete was 20 mm, and therefore, the concrete was never sufficiently filled inside the untwisted diameter-expanded portion, thereby resulting internally leaving a void. As a result, it is determined that an original role of the untwisted diameter-expanded portion 3 could no longer be played. That is, it is found that the curable materials being filled and cured in the clearance among the element wires of the CFRP strands in the untwisted section is indispensable.
Pull-Out Experiment 3
[0069] Next, a pull-out experiment 3 will be described. The pull-out experiment 3 is comparisons of relationships between the pull-out loads and extraction displacements for the non-untwisted reference test piece, and the test pieces of the untwisted 10 and the untwisted 11 executed in the pull-out experiment 1.
[0070] In the pull-out experiment 3, for the reference test piece that was non-untwisted and had a length of an anchoring portion of 180 mm, the untwisted 10 had D2/D1=2.3, L/D1=10.7, and the untwisted 11 had D2/D1=2.6, L/D1=11.8.
[0071]
Method for Manufacturing Anchorage of CFRP Strands
[0072] Next, using
(1) Untwisting Process
[0073] First, in the method for manufacturing the anchorage according to the embodiment performs an untwisting process that untwists the side lines 21 in any section of the CFRP strands 2 (see first step to second step in
[0074] Specifically, the length L in the untwisted section untwisted corresponding to the effecting tensile force is set, and the CFRP strands 2 are reversely stranded in a direction reverse of the stranded direction, and thus, the clearance where the curable materials 5 are filled is formed among the core wire 20 and the side lines 21. At this time, the core wire 20 has a role to form an axis of the untwisted diameter-expanded portion, therefore, an attention should be paid not to bend the core wire 20.
[0075] As illustrated in
(2) Bundling Process
[0076] Next, in the method for manufacturing the anchorage according to the embodiment, a bundling process to bundle both ends of the untwisted section untwisted in the previous process is performed (see third step in
[0077] Specifically, the front and the rear of the untwisted section are bundled with the cable ties 6, such as INSULOKs (registered trademark). This is for ensuring the length L of the untwisted diameter-expanded portion 3 set corresponding to the effecting tensile force, and for improving the operation efficiency of the later operation. Surely, when the end portion of the general portion 4 has been bundled in the previous process, the process is only bundling the rest portion side of the CFRP strands 2 with the cable tie 6.
(3) Curable Material Filling Process
[0078] As a preparation of a filling process of the curable materials, a sheet form 7 is formed by wrapping the peripheral area of the untwisted section with a sheet, such as a blue tarpaulin and a plastic sheet so as not to cause the curable materials to leak out. This sheet form 7 has an opened upper portion such that the curable materials can be filled from above. Next, in the method for manufacturing the anchorage according to the embodiment, a curable material filling process that injects resin mortar, such as an epoxy resin, into the untwisted section is performed (see fourth step in
[0079] As one example, as illustrated in
[0080] It should be noted that, as described above, the material that should have firstly fluidity and cures after a predetermined time, such as grout cement mortar and polymer cement mortar, can be used as the curable materials 5. However, the strength of the curable materials is preferably equal to or more than the compressive strength (design criteria strength) of the concrete where the anchorage 1 is anchored.
[0081] When these curable materials 5 cure after elapse of a curing period, the states illustrated in
Advantages of Anchorage of CFRP Strands and Method for Manufacturing
[0082] Next, the advantages of the above-described anchorage 1 will be described while comparing it with the past technique, such as a conventional anchorage of a CFRP strands and a conventional anchorage of steel PC strands.
[0083] (1) With the above-described anchorage 1 and method for manufacturing, the anchorage 1 is untwisted without needing a special machine or a device since the side lines 21 of the CFRP strands 2 are flexible, and the curable materials 5 can be filled in the clearance thus formed. In view of this, manufacturing (fabricating) of the anchorage 1 is extremely simple, thereby needing no plant production. However, the past anchorage needed the machine or device for manufacturing, and thus, the plant production was necessary.
[0084] In particular, in the case of the steel PC strands, stranding a hardened high strength piano wire provides a high strength and quality stable tendon. Therefore, untwisting the strands of the steel PC strands needed a dedicated tool or device due to high rigidity of the piano wire. In contrast to this, the CFRP strands 2 of the anchorage 1 are fabricated by integrating the continuous fibers, such as carbon fibers, aramid fibers, and glass fibers, as described above with a resin, thereby ensuring easily untwisting without the special tool.
[0085] (2) With the anchorage 1 and the method for manufacturing the same, no special skill is needed for manufacturing the anchorage 1. Everything can be processed and manufactured at the construction site. Thus, it only requires a labor for untwisting, a labor for filling, and a cost of the filler material, thereby being low cost in manufacturing. In contrast to this, the conventional anchorage of the CFRP strands needed the metal sleeve having rigidity for anchoring by the expansion pressure of the expansion material and the friction force between the expansion material and the metal sleeve, and therefore, it was necessary to work in a plant or the like until securing the metal sleeve to the CFRP strands. In view of this, it was expensive and transport efficiency was also poor.
[0086] (3) With the anchorage 1 and the method for manufacturing the same, the anchorage 1 can be manufactured with any anchoring processing position, and therefore, the anchoring position can be conveniently set. Therefore, a flexible application, such as after anchoring once, additionally placing concrete for joint and anchoring, is possible. That is, the anchoring position is not limited to the end portion of the CFRP strands, thus improving a freedom of design.
[0087] The anchoring structure corresponding to a U-shape hook and an L-shape hook used in the rebars anchoring structure in the past technique can be achieved with the anchorage 1, thereby ensuring establishing the anchoring structure even after the reinforcement works have been done in some cases.
[0088] (4) With the anchorage 1 and the method for manufacturing the same, all anchoring of the anchorage 1 is anchoring inside the concrete member, thereby no risk of deterioration of the anchoring end portion. In particular, when the CFRP strands were applied as a tendon, external anchoring had a risk due to an accident and the like even though a rustproof material was applied for the anchoring end portion. However, with the anchorage 1, not only it does not rust, but a possibility of ultraviolet degradation is also reduced since the CFRP strands are hidden inside the concrete.
[0089] (5) With the anchorage 1 and the method for manufacturing the same, since the length L of the untwisted diameter-expanded portion 3 is five times or more the diameter D1 of the general portion 4, it is compact compared with the past anchorage. Therefore, it can be utilized for joint between the concrete members, thereby ensuring downsizing the joint portion.
[0090] (6) With the anchorage 1 and the method for manufacturing the same, the metal sleeve or the like is not used. Therefore, there is no risk of metallic corrosion, and it is possible to establish the whole concrete structures with non-corrosive materials. In contrast to this, the conventional anchorage of the CFRP strands, as described above, needed the metal sleeve for anchoring by the expansion pressure of the expansion material, and the metal sleeve needed to be made of highly durable stainless steel for rust prevention, and therefore, there was a problem of a high manufacturing cost.
[0091] (7) With the anchorage 1 and the method for manufacturing the same, the curable materials 5 used as a filler are a structure that receives the compressive stress, thereby no risk of receiving a long-term structural deterioration. Even when the CFRP material receives a fatigue load, there also lies no risk of fatigue destruction of the curable materials 5.
[0092] (8) With the anchorage 1 and the method for manufacturing the same, the curable materials 5 of the untwisted diameter-expanded portion 3 are cured before placing the concrete of the concrete structure where the anchorage 1 is anchored. In view of this, there occurs no problem of failing in providing desired bearing pressure and bonding force caused by a failure of successfully filling the placed concrete inside the untwisted diameter-expanded portion 3 when it is attempted to anchorage in the concrete in which the coarse aggregate is mixed in the clearance among the unraveled element wires like the conventional anchorage that does not preliminarily fill the curable materials 5 in the untwisted diameter-expanded portion 3, thereby sufficiently functioning as an anchorage.
[0093] (9) With the anchorage 1, end portion anchoring when tensioning the CFRP strands can be not only utilized in a usage that preliminarily anchors in the concrete fixing end, but also utilized in a usage that anchors in, what is called an anchoring method after prestressing, which anchors by placing concrete, cement grout, or cement mortar in the peripheral area after prestressing in a state where the anchorage 1 is in the middle of the CFRP strands. In particular, the utilizing method as the stressed end is dramatically simple and downsizing of the anchorage is significant compared with the anchoring method up to the present.
[0094] (10) With the anchorage 1 and the method for manufacturing the same, it is not necessary to have a member corresponding to the metal sleeve, and to fit the CFRP strands in a mold and perform a heating process to bend the CFRP strands in a plant or the like as with a conventional anchorage. The anchorage 1 is manufacturable even at a construction site, thereby ensuring a reduced manufacturing cost. Moreover, since the member corresponding to the metal sleeve is not necessary, the CFRP strands can be transported in a rolled shape, thereby increasing the transport efficiency, thus ensuring a lowered transportation cost.
Second Configuration
[0095] Next, using
[0096] As illustrated in
[0097] With this anchorage 10, forming a plurality of the untwisted diameter-expanded portions 3 in some cases is more advantageous than the anchorage 1 having the above-described single untwisted diameter-expanded portion 3 depending on conditions of anchoring performance and anchoring space applied as an anchorage of CFRP strands.
[0098] With the anchorage 10, relatively shortening the untwisted section and utilizing a bearing effect in a front portion of the anchorage 1 described in the anchoring mechanism 1 ensure increased contribution portion that improves the anchoring efficiency as its reactive force. In view of this, it is possible to shorten a total length L (L+L) of the two untwisted diameter-expanded portions 3 as an anchoring length of the anchorage 10. Surely, it is needless to mention that selections of the length L and the number of the untwisted diameter-expanded portion 3 can be appropriately determined considering the compressive strength of the concrete to be anchored, the proximity degree of other anchors 1 and 10, and the like.
Third Configuration
[0099] Next, using
[0100] When a tendon to which high tensile force effects, like a fixing end of a tendon that applies a prestress to a PC structure, is anchored in a concrete structure, a space for dispersing the anchoring force is necessary in its peripheral area. In view of this, the anchorage according to the third configuration uses a plurality of the anchors 1 according to the above-described first configuration and it disperses the anchors 1 in a circumferential direction from a core axis with the deviator 8.
[0101] The reference numeral 9 is a spiral reinforcement mounted freely fitted to each of the untwisted diameter-expanded portions 3 of the respective anchors 1, although only one is illustrated in the drawing. This spiral reinforcement 9 has a function to resist split tensile fracture caused by ring tension (annular tensile force) when the untwisted diameter-expanded portion 3 pushes and opens the concrete to cave into the concrete. With the spiral reinforcement 9, excessive rebars reinforcement is avoided to reduce a difficulty of casting concrete, and an excellent toughness can be provided. However, this spiral reinforcement 9 is not a necessary configuration requirement of the present invention.
[0102] The anchorage 11 according to the third configuration ensures a significantly economical end portion anchoring structure compared with the conventional multistrand system anchorage formed of steel PC strands. It is extremely advantageous in the interests in rust prevention compared even with a conventional anchoring end portion of a CFRP material since no metal member is present. Moreover, the anchorage does not require being filled with the mortar and the like later as in a conventional manner, has reduced possibilities of ultraviolet resistance and aged deterioration, and can solve a problem of an increased manufacturing cost by producing with a stainless steel.
Fourth Configuration
[0103] Next, using
[0104] As illustrated in
[0105] With the anchorage 12 according to the fourth configuration, since the anchorage 1 is compact as described above, a joining length of a joining portion of the precast concrete slabs is shortened. In view of this, a placement amount of the filling concrete C decreases to ensure achieving a reduced joining operation time and improved work efficiency in site.
[0106] It should be noted that, as the anchorage 12 according to the fourth configuration, the case of applying it to the connection between the precast concrete slabs has been described as an example. However, the anchorage according to the present invention can be applied to a U-shape hook joint and the like used for lap joint of rebars or joining the major precast reinforced concrete structures such as the concrete column structures or the concrete girder structures.
[0107] The anchorage of the CFRP strands according to the embodiment of the present invention and the method for manufacturing the same has been described in details above. However, any of the above-described or illustrated embodiments is merely one embodiment embodied for executing the present invention, and therefore, the technical scope of the present invention should not be interpreted in a limited way because of these.
[0108] Particularly while the description has been made by illustrating concrete structures, it is considered that the present invention is applicable to an anchorage (anchoring structure) of a tendon of another type of structures, such as a masonry structure. Basically, the present invention is preferably applicable to an anchoring structure relating to a joint between structures.
DESCRIPTION OF REFERENCE SIGNS
[0109] 1, 10, 11, 12: Anchorage (anchorage of CFRP strands) [0110] 2, 2, 2: CFRP strands [0111] 20: Core wire (element wire) [0112] 21: Side line (element wire) [0113] 3: Untwisted diameter-expanded portion (CFRP strands) [0114] D2: Maximum diameter of untwisted diameter-expanded portion [0115] 4: General portion (CFRP strands) [0116] D1: Diameter of general portion [0117] 5: Curable material [0118] 50: Filling instrument [0119] 6: Cable tie [0120] 7: Sheet frame [0121] 8: Deviator [0122] 9: Spiral reinforcement [0123] C: Concrete [0124] C: Filling concrete [0125] L: Length of untwisted diameter-expanded portion (length of untwisted section) [0126] L: Total length of untwisted diameter-expanded portion [0127] PCa: Precast concrete slab (precast member) [0128] A: Bonding force [0129] B: Bearing resistance [0130] T: Tensile force