Method and apparatus of performing maintenance on a wind turbine component
10947959 ยท 2021-03-16
Assignee
Inventors
Cpc classification
F03D1/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02P70/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B66C23/185
PERFORMING OPERATIONS; TRANSPORTING
B66C1/108
PERFORMING OPERATIONS; TRANSPORTING
F05B2230/61
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/72
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F05B2230/80
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B66C23/207
PERFORMING OPERATIONS; TRANSPORTING
International classification
F03D80/50
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B66C23/70
PERFORMING OPERATIONS; TRANSPORTING
B66C23/18
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A method of performing maintenance on a wind turbine component (18, 22, 24) of a wind turbine (10) having an integrated lifting apparatus (40). The method includes lifting a first temporary support (104) using the integrated lifting apparatus (40), coupling the first temporary support (104) to the nacelle (12) or the hub (16) and the integrated lifting apparatus (40), removing the wind turbine component (18, 22, 24) using the integrated lifting apparatus (40) and the first temporary support (104) in combination. The method may further include installing a replacement wind turbine component (18, 22, 24) using at least a part of the integrated lifting apparatus (40) and the first temporary support (104) in combination, decoupling the first temporary support (104) from the nacelle (12) or the hub (16) and the integrated lifting apparatus (40), and removing the first temporary support (104) from the wind turbine (10) using the integrated lifting apparatus (40). A system for performing maintenance on a wind turbine component (18, 22, 24) is also disclosed.
Claims
1. A method of performing maintenance on a wind turbine component of a wind turbine, the wind turbine including a tower, a nacelle, a hub, and at least one rotor blade, wherein the nacelle includes an integrated lifting apparatus having an extendible boom that forms a permanent part of the wind turbine, the method comprising: lifting a first temporary support using at least part of the integrated lifting apparatus; coupling a first end of the first temporary support to the nacelle or the hub and a second end of the first temporary support to the integrated lifting apparatus; removing the wind turbine component using at least part of the integrated lifting apparatus and the first temporary support in combination; installing a replacement wind turbine component using at least part of the integrated lifting apparatus and the first temporary support in combination; decoupling the first end of the first temporary support from the nacelle or the hub and the second end of the first temporary support from the integrated lifting apparatus; and removing the first temporary support from the wind turbine using at least part of the integrated lifting apparatus.
2. The method of claim 1, wherein using at least part of the integrated lifting apparatus further includes using the extendible boom.
3. The method of claim 1, wherein the nacelle includes a frame structure, wherein: coupling the first end of the first temporary support to the nacelle or the hub further includes coupling the first end of the first temporary support to the frame structure, and decoupling the first end of the first temporary support to the nacelle or the hub further includes decoupling the first end of the first temporary support from the frame structure.
4. The method of claim 1, wherein the nacelle includes a frame structure and the first end of the first temporary support includes first and second legs, wherein: coupling the first end of the first temporary support further includes coupling the first leg of the first temporary support to a first side of the frame structure, and the second leg of the first temporary support to a second side of the frame structure; and decoupling the first end of the first temporary support further includes decoupling the first leg of the first temporary support from the first side of the frame structure and the second leg of the first temporary support from the second side of the frame structure.
5. The method of claim 1, wherein removing the wind turbine component further includes removing the wind turbine component having a weight that exceeds the lifting capacity of the integrated lifting apparatus alone, but does not exceed the lifting capacity of the integrated lifting apparatus and the first temporary support when used in combination.
6. The method of claim 1, wherein removing the wind turbine component further includes removing a generator or a gearbox.
7. The method of claim 1, wherein the wind turbine component is located within the nacelle and wherein: lifting the first temporary support further includes lifting the first temporary support into the nacelle through one or more closeable doors located on a top portion of the nacelle, removing the wind turbine component further includes removing the wind turbine component down through a hatch located on a bottom portion of the nacelle, and installing the replacement wind turbine component further includes inserting the replacement wind turbine component up through the hatch located on the bottom portion of the nacelle.
8. The method of claim 1, wherein the wind turbine component is a rotor blade, the method further comprising: lifting a second temporary support using the integrated lifting apparatus; and coupling the second temporary support to the nacelle, wherein removing the rotor blade further includes using at least part of the integrated lifting apparatus, the first temporary support, and the second temporary support in combination, and wherein installing a replacement rotor blade further includes using at least part of the integrated lifting apparatus, the first temporary support, and the second temporary support in combination.
9. The method of claim 8, wherein the integrated lifting apparatus further includes first and second pulley systems, and first and second lifting lines, wherein removing the rotor blade further includes: aligning the first temporary support to the center of gravity of the rotor blade; disconnecting the rotor blade from the hub; lowering the rotor blade using the first lifting line, the first pulley system, the integrated lifting apparatus and the first temporary support in combination; and rotating the rotor blade to be generally perpendicular to the tower using the first lifting line, the first pulley system, the extendible boom and the first temporary support in combination to support a first rotor portion and the second temporary support, the first pulley system and the second lifting line supporting a second rotor portion.
10. The method of claim 8, wherein coupling the first and second ends further includes coupling the first end of the first temporary support to the hub and the second end of the first temporary support to the integrated lifting apparatus.
11. The method of claim 10, wherein the hub includes first and second attachment locations and the first end of the first temporary support includes first and second legs, wherein: coupling the first end of the first temporary support further includes coupling the first leg of the first temporary support to a first attachment location and the second leg of the first temporary support to a second attachment location; and decoupling the first end of the first temporary support further includes decoupling the first leg of the first temporary support from the first attachment location and the second leg of the first temporary support from the second attachment location.
12. The method of claim 9, further including: decoupling the second temporary support from the nacelle; and removing the second temporary support from the nacelle using at least part of the integrated lifting apparatus.
13. The method of claim 9, wherein removing the rotor blade further includes removing the rotor blade having a weight that exceeds the lifting capacity of the integrated lifting apparatus alone, but does not exceed the lifting capacity of the integrated lifting apparatus and the first and/or second temporary supports when used in combination.
14. The method of claim 1, wherein the integrated lifting apparatus further includes a first winch, a first lifting line and a power system, the method further comprising: articulating the integrated lifting apparatus on a base fixed to the nacelle allowing the integrated lifting apparatus to move in azimuth and in elevation relative to the nacelle to lift and/or remove the first temporary support.
15. A system for performing maintenance on a wind turbine component, the system comprising: a wind turbine including a tower, a nacelle, a hub, at least one wind turbine blade, and an integrated lifting apparatus including an extendible boom that forms a permanent part of the wind turbine; and a first temporary support coupled to the nacelle or the hub and further coupled to at least part of the integrated lifting apparatus, wherein the lifting capacity of the integrated lifting apparatus and the first temporary support in combination is greater than the lifting capacity of the integrated lifting apparatus alone.
16. The system of claim 15, wherein the nacelle includes a frame structure, wherein the first temporary support is coupled to the frame structure.
17. The system of claim 15, wherein the nacelle includes a frame structure having first and second sides and the first temporary support includes first and second legs, wherein the first leg is coupled to the first side and the second leg is coupled to the second side.
18. The system of claim 15, further comprising a second temporary support, wherein second temporary support is coupled to the nacelle and the first temporary support is coupled to the hub.
19. The system of claim 15, wherein the extendible boom of the integrated lifting apparatus includes a free end, wherein the free end of the extendible boom is coupled to the first temporary support.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Various additional features and advantages of the invention will become more apparent to those of ordinary skill in the art upon review of the following detailed description of one or more illustrative embodiments taken in conjunction with the accompanying drawings. The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate one or more embodiments of the invention and, together with the general description given above and the detailed description given below, serve to explain the one or more embodiments of the invention.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
DETAILED DESCRIPTION
(16)
(17) Although many of the individual components are not shown in the figures for clarity, the nacelle shown in
(18) To enable variable speed operation of the wind turbine 10, the alternating current output by the generator 24 is first converted, or rectified, to direct current (DC) and is then converted back into alternating current, or inverted, at the correct frequency and voltage in order to integrate with the frequency and voltage that is required from the national grid system via supply line (not shown). The process of rectification and inversion is handled by a power system 34 that is contained in an internal tower structure 36 to which the generator 24 is electrically connected by way of a high voltage AC current line 38.
(19) Having described the overall structure of the wind turbine 10, discussion will now turn to the integrated lifting apparatus 40 that is located within the nacelle 12, as shown in
(20) The integrated lifting apparatus 40 may have three degrees of freedom (telescope, elevate, and slew) allowing for access to many areas of the nacelle 12. For this reason, the integrated lifting apparatus 40 includes a power system (not shown), which is configured to drive the telescopic, elevation and slewing (i.e. azimuth) operations of the boom 44 relative to the base 42. In one exemplary embodiment, the power system may be an electrohydraulic power system. In the deployed condition, the boom 44 may be extended telescopically so as to reach a maintenance platform 46 shown in
(21) The integrated lifting apparatus 40 is configured to be placed in two conditions or modes: i) a first stowed condition in which the boom 44 is housed within the nacelle 12 and ii) a second deployed condition in which the boom 44 is movable with respect to the base 42 of the integrated lifting zo apparatus 40. As shown in stowed condition of
(22) As shown in
(23) Having described the overall operation of the integrated lifting apparatus 40 in general terms, discussion will now turn to the more detailed construction of the frame structure 30 that provides the nacelle 12 with structural strength. As shown in
(24)
(25) First and second upper front bridging members 86, 88 separate the first side upper horizontal member 74 from the second side upper horizontal member 80, while a first upper rear bridging member 90 separates the first side upper horizontal member 74 from the second side upper horizontal member 80. Similarly, first and second upper rear bridging members 94, 96 separate the first side upper horizontal member 74 from the second side upper horizontal members 80, while a first lower rear bridging member 98 separates the first side zo lower horizontal member 76 from the second side lower horizontal member 82. Connector elements 102, such as gusset plates, may be included at some or all of the connection points of two or more members.
(26)
(27) There are many benefits to using the first temporary support 104 in combination with the integrated lifting apparatus 40 to perform maintenance on a wind turbine component. First, no jack-up vessel is necessary when a large component is to be repaired and/or replaced. Generally, jack-up vessels cost far more than other vessels due to the capacity and size. Other vessels, such as dynamic positioning vessels, are sufficient to carry the first temporary support 104 in combination with the large wind turbine component. Additionally, the integrated lifting apparatus 40 does not need to be significantly modified and/or can be retrofitted if needed. This allows the exemplary method to be performed on wind turbines 10 already in use. Further, the first temporary support 104 provides a truss-like structure that lessens the tension and compression stress concentrations, allowing for the lifting capacity of the integrated lifting apparatus 40 to be greatly increased. Using the integrated lifting apparatus 40 alone creates a significant moment, the effect of which is greatly reduced using the first temporary support 104.
(28) While not shown, the first temporary support 104 may be brought to the wind turbine 10 using a variety of vehicles. For an off-shore wind turbine, the first temporary support 104 may be supplied to the wind turbine 10 by a helicopter or vessel, such as a dynamic positioning vessel. For an on-shore zo wind turbine, the first temporary support 104 may be supplied to the wind turbine 10 by a truck, train, or helicopter.
(29)
(30) As shown, the first leg 108 includes a second receiving structure 124 configured to couple to the frame structure 30 (or the hub 16 as will be discussed below with respect to
(31) The integrated lifting apparatus 40 may lift the first temporary support 104 through the bottom of the nacelle 12 through hatch 136 (shown in
(32)
(33)
(34)
(35) The schematic cross-sections of
(36) Inserting a replacement wind turbine component is performed using many of the same steps as described above, but in reverse. For example, the integrated lifting apparatus 40 and the first temporary support 104 are used in combination to insert the replacement wind turbine component through the hatch 136 located on the bottom portion 146 of the nacelle 12 or through the first and second closable doors 50a and 50b of the nacelle 12.
(37) Similar to
(38) Similar to
(39) According to another exemplary embodiment shown in
(40) In this embodiment, the second temporary support 152 is lifted using the integrated lifting apparatus 40 in much the same manner as described above with respect to the first temporary support 104. Likewise, the second temporary support 152 is coupled to the frame structure 30 in much the same manner as the first temporary support 104, and will now be described in greater detail.
(41) As shown in
(42) Further as shown, the outwardly extending portion 156 may include a first outwardly extending member 176, a second outwardly extending member 178, and a third outwardly extending member 180 that may each terminate at a first end to create a second lifting location 182 outside of the nacelle 12. The second end 184 of the first outwardly extending member 176 may be attached directly to the frame structure 30, shown as the first side upper zo horizontal member 74, or alternatively, may be attached to the first end 164 of the first attachment member 158. Similarly, the second end 186 of the second outwardly extending member 178 may be directly attached to the frame structure 30, shown as the first side upper horizontal member 74, or alternatively, may be attached to the first end 166 of the second attachment member 160. As shown in
(43) After the second temporary support 152 is sufficiently coupled to the frame structure 30 of the nacelle 12, the integrated lifting apparatus 40 may be completely disconnected from the second temporary support 152, so that the integrated lifting apparatus 40 may lift the first temporary support 104. Once lifted, the first temporary support 104 is coupled to hub 16 shown in
(44) Similar to above, the integrated lifting apparatus 40 may include a system of winches, pulleys, lifting lines, and lifting attachments. For example, as shown, the integrated lifting apparatus 40 may include the first winch 52, the second winch (not shown), the first and second pulley system 195,196, first and second lifting lines, 54, 198, a first lifting attachment 60 and a second lifting attachment (not shown). As previously discussed, the first and second winches, first and second pulley systems 195, 196 and first and/or second lifting lines 54, 198 may be temporary resulting in using only part of the integrated lifting apparatus 40. As most clearly shown in
(45)
(46) In removing the rotor blade 18, special attention is given to the center of gravity (CG) of the rotor blade 18 as will now be discussed with respect to
(47) Once the rotor blade 18 is lowered to the desired height, the rotor blade 18 is rotated as shown in
(48) Once the rotor blade 18 is removed, a replacement rotor blade may be inserted in much the same manner as described above regarding the removal of the rotor blade 18, but with the steps performed in reverse. While not shown, according to an alternative embodiment, the second temporary support 152 may be decoupled from the nacelle 12 prior to the first temporary support 104 being decoupled from the hub 16 using the integrated lifting apparatus 40.
(49) According to this exemplary embodiment, after removing the first temporary support 104, the second temporary support 152 may be decoupled from the nacelle 12 by removing the fourth, fifth and six connecting structures 170, 172, 174. The second temporary support 152 may then be removed using the integrated lifting apparatus 40, as similarly discussed above with respect to the first temporary support 104.
(50) Replacing the rotor blade 18 in this exemplary manner, prevents the need for a jack-up vessel as described above, which saves both time and money. Additionally, using the first temporary support 104 and the second temporary support 152 greatly increases the lifting capacity of the integrated lifting apparatus 40 without significantly increasing the size and weight of the integrated lifting apparatus 40.
(51) While the present invention has been illustrated by the description of various embodiments thereof, and while the embodiments have been described in considerable detail, it is not intended to restrict or in any way limit the scope of the appended claims to such detail. The various features discussed herein may be used alone or in any combination. Additional advantages and modifications will readily appear to those skilled in the art. The invention in its broader aspects is therefore not limited to the specific details and illustrative examples shown and described. Accordingly, departures may be made from such details without departing from the scope of the general inventive concept.