RAIL ANCHORING SPIKE
20210079598 ยท 2021-03-18
Inventors
Cpc classification
International classification
Abstract
An improved rail anchoring spike that includes barbs is used for fastening metal to ties. The spike includes a head having one or more flanges and a stand-off extending axially from the flange(s). The spike includes a shank extending axially from the stand-off to form a tapered tip. The shank is adapted to engage dense material of the tie by a combination of threads and barbs on the shank. The threads are generally parallel and extend over a threaded portion of the shank. The shank includes a plurality of barbs positioned in a lower half of the threaded portion. Each barb is positioned between a pair of threads. Each barb is configured to minimize damage to fibers of the tie during installation of the spike as the fibers relax behind, and engage with, a barbed end. This prevents movement of the spike over time despite deterioration of the tie.
Claims
1. A rail anchoring spike for fastening metal to a tie, comprising: (a) a head having one or more flanges; (b) a stand-off extending axially from a bottom flange of said one or more flanges; and (c) a shank extending axially from said stand-off to form a tapered tip; said shank being adapted to engage said tie; said shank comprising: i) a plurality of helical, generally parallel threads extending over a threaded portion of said shank and running from said stand-off to said tapered tip; said stand-off having a length adapted to ensure that said threads are fully engaged in said tie when said spike is used to fasten metal to said tie; said threads for engaging said tie at a depth in said tie to ensure engagement with dense material of said tie; and ii) a plurality of barbs positioned in a lower half of said threaded portion; each of said barbs positioned between a pair of threads and configured to minimize damage to fibers of said tie during installation of said spike as fibers of said tie relax behind and engage with a barbed end of said barb to prevent movement of said spike over time despite deterioration of said tie; each of said barbs positioned along said threaded portion such that said barbs contact a lower portion of said tie when said spike is installed in a rail assembly.
2. The spike according to claim 1, wherein each of said barbs comprises: (a) a starting point oriented away from said one or more flanges and originating in a valley between said pair of threads; (b) a pointed barb on said barbed end; and (c) a barb body extending from said starting point to said barbed end; said barb body growing in height and width relative to said valley; and said barb end forming a substantially flat surface oriented generally perpendicular to an axis of said barb and to ridges formed by said pair of threads.
3. The spike according to claim 2, wherein a height of said barbed end is within a height range ranging between slightly less than and slightly more than heights of said ridges.
4. The spike according to claim 1, wherein said plurality of barbs are positioned at distances within a distance range ranging between slightly less than and slightly more than a barb distance axially from said stand-off.
5. The spike according to claim 1, wherein said barbs are positioned between 1.5 and 2.5 inches from said tapered tip.
6. The spike according to claim 1, comprised of metal.
7. The spike according to claim 1, wherein said shank is cylindrical.
8. The spike according to claim 1, wherein said one or more flanges comprise a first flange and a second flange separated by a spacer portion, said first flange being adjacent to the stand-off.
9. The spike according to claim 8, wherein said first flange and said second flange are circular.
10. The spike according to claim 8, wherein said spacer portion is circular.
11. The spike according to claim 8, wherein said spacer portion has a length of about three-eighths of one inch.
12. The spike according to claim 8, wherein said head comprises a hemispherical surface opposite to said first flange, said surface adapted for driving said spike.
13. The spike according to claim 1, wherein said head comprises a projecting polygonal tool grip opposite to said one or more flanges, said tool grip adapted to engage with a wrench.
14. The spike according to claim 1, wherein said length of said stand-off is between 1.5 and 2.5 inches.
15. The spike according to claim 1, wherein length of stand-off to be long enough to partially embed into the tie.
16. The spike according to claim 1, wherein said threads are adapted to cause rotation of said spike into tie when a force is applied to said head of said spike in a direction towards said tapered tip.
17. The spike according to claim 1, wherein the tie comprises at least wood.
18. The spike according to claim 1, wherein said barb is shaped to minimize damage to fibers of tie upon entry and to ensure relaxation of said fibers behind said barb.
19. The spike according to claim 1, wherein said shank has a length between 6 and 7 inches.
20. A railroad track assembly comprising a metal rail, a tie, a metal tie plate adapted to engage said rail, and a spike driven into said tie, said spike adapted to fasten said tie plate and said rail to said tie, said spike comprising: (a) a head having one or more flanges; (b) a stand-off extending axially from a bottom flange of said one or more flanges; and (c) a shank extending axially from said stand-off to form a tapered tip; said shank being adapted to engage said tie; said shank comprising: i) a plurality of helical, generally parallel threads extending over a threaded portion of said shank and running from said stand-off to said tapered tip; said stand-off having a length adapted to ensure that said threads are fully engaged in said tie when said spike is used to fasten metal to said tie; said threads for engaging said tie at a depth in said tie to ensure engagement with dense material of said tie; and ii) a plurality of barbs positioned in a lower half of said threaded portion; each of said barbs positioned between a pair of threads and configured to minimize damage to fibers of said tie during installation of said spike as fibers of said tie relax behind and engage with a barbed end of said barb to prevent movement of said spike over time despite deterioration of said tie; each of said barbs positioned along said threaded portion such that said barbs contact a lower portion of said tie when said spike is installed in a rail assembly.
21. The railroad track assembly according to claim 20, wherein each of said barbs comprises: (a) a starting point oriented away from said one or more flanges and originating in a valley between said pair of threads; (b) a pointed barb on said barbed end; and (c) a barb body extending from said starting point to said barbed end; said barb body growing in height and width relative to said valley; and said barb end forming a substantially flat surface oriented generally perpendicular to an axis of said barb and to ridges formed by said pair of threads.
22. The railroad track assembly according to claim 21, wherein a height of said barbed end is within a height range ranging between slightly less than and slightly more than heights of said ridges.
23. The railroad track assembly according to claim 20, wherein said plurality of barbs are positioned at distances within a distance range ranging between slightly less than and slightly more than a barb distance axially from said stand-off.
24. The railroad track assembly according to claim 20, wherein said barbs are positioned between 1.5 and 2.5 inches from said tapered tip.
25. The railroad track assembly according to claim 20, comprised of metal.
26. The railroad track assembly according to claim 20, wherein said shank is cylindrical.
27. The railroad track assembly according to claim 20, wherein said one or more flanges comprise a first flange and a second flange separated by a spacer portion, said first flange being adjacent to the stand-off.
28. The railroad track assembly according to claim 27, wherein said first flange and said second flange are circular.
29. The railroad track assembly according to claim 27, wherein said spacer portion is circular.
30. The railroad track assembly according to claim 27, wherein said spacer portion has a length of about three-eighths of one inch.
31. The railroad track assembly according to claim 27, wherein said head comprises a hemispherical surface opposite to said first flange, said surface adapted for driving said spike.
32. The railroad track assembly according to claim 20, wherein said head comprises a projecting polygonal tool grip opposite to said one or more flanges, said tool grip adapted to engage with a wrench.
33. The railroad track assembly according to claim 20, wherein said length of said stand-off is between 1.5 and 2.5 inches.
34. The railroad track assembly according to claim 20, wherein length of stand-off to be long enough to partially embed into the tie.
35. The railroad track assembly according to claim 20, wherein said threads are adapted to cause rotation of said spike into tie when a force is applied to said head of said spike in a direction towards said tapered tip.
36. The railroad track assembly according to claim 20, wherein the tie comprises at least wood.
37. The railroad track assembly according to claim 20, wherein said barb is shaped to minimize damage to fibers of tie upon entry and to ensure relaxation of said fibers behind said barb.
38. The railroad track assembly according to claim 20, wherein said shank has a length between 6 and 7 inches.
39. A method of using a railroad spike for fastening metal to a tie, comprising: (a) providing a railroad spike comprising: i) a head having one or more flanges; ii) a stand-off extending axially from a bottom flange of said one or more flanges; and iii) a shank extending axially from said stand-off to form a tapered tip; said shank being adapted to engage said tie; said shank comprising: A. a plurality of helical, generally parallel threads extending over a threaded portion of said shank and running from said stand-off to said tapered tip; said stand-off having a length adapted to ensure that said threads are fully engaged in said tie when said spike is used to fasten metal to said tie; said threads for engaging said tie at a depth in said tie to ensure engagement with dense material of said tie; and B. a plurality of barbs positioned in a lower half of said threaded portion; each of said barbs positioned between a pair of threads and configured to minimize damage to fibers of said tie during installation of said spike as fibers of said tie relax behind and engage with a barbed end of said barb to prevent movement of said spike over time despite deterioration of said tie; each of said barbs positioned along said threaded portion such that said barbs contact a lower portion of said tie when said spike is installed in a rail assembly; (b) providing a tie, a metal rail, and a fishplate adapted to engage with said rail and said tie; and (c) driving said spike into said tie until said threads and said barbs are embedded in said tie, and said fishplate is engaged with said rail.
40. The method according to claim 39, wherein each of said barbs comprises: (a) a starting point oriented away from said one or more flanges and originating in a valley between said pair of threads; (b) a pointed barb on said barbed end; and (c) a barb body extending from said starting point to said barbed end; said barb body growing in height and width relative to said valley; and said barb end forming a substantially flat surface oriented generally perpendicular to an axis of said barb and to ridges formed by said pair of threads.
41. The method according to claim 40, wherein a height of said barbed end is within a height range ranging between slightly less than and slightly more than heights of said ridges.
42. The method according to claim 39, wherein said plurality of barbs are positioned at distances within a distance range ranging between slightly less than and slightly more than a barb distance axially from said stand-off.
43. The method according to claim 39, wherein said barbs are positioned between 1.5 and 2.5 inches from said tapered tip.
44. The method according to claim 39, comprised of metal.
45. The method according to claim 39, wherein said shank is cylindrical.
46. The method according to claim 39, wherein said one or more flanges comprise a first flange and a second flange separated by a spacer portion, said first flange being adjacent to the stand-off.
47. The method according to claim 46, wherein said first flange and said second flange are circular.
48. The method according to claim 46, wherein said spacer portion is circular.
49. The method according to claim 48, wherein said spacer portion has a length of about three-eighths of one inch.
50. The method according to claim 46, wherein said head comprises a hemispherical surface opposite to said first flange, said surface adapted for driving said spike.
51. The method according to claim 39, wherein said head comprises a projecting polygonal tool grip opposite to said one or more flanges, said tool grip adapted to engage with a wrench.
52. The method according to claim 39, wherein said length of said stand-off is between 1.5 and 2.5 inches.
53. The method according to claim 39, wherein length of stand-off to be long enough to partially embed into the tie.
54. The method according to claim 39, wherein said threads are adapted to cause rotation of said spike into tie when a force is applied to said head of said spike in a direction towards said tapered tip.
55. The method according to claim 39, wherein the tie comprises at least wood.
56. method according to claim 39, wherein said barb is shaped to minimize damage to fibers of tie upon entry and to ensure relaxation of said fibers behind said barb.
57. The method according to claim 39, wherein said shank has a length between 6 and 7 inches.
58. The method according to claim 39, wherein said fishplate further comprises a metal boss, and said boss is adapted to hold said rail onto said tie.
59. The method according to claim 39, wherein said fishplate comprises a top face, a lower face, and a cavity having a length extending between said top face and said lower face.
60. The method according to claim 59, wherein said stand-off is at least as long as said cavity.
61. The method according to claim 59, wherein said cavity is circular, and said stand-off is cylindrical.
62. The method according to claim 61, wherein a diameter of said cavity is greater than the diameter of said stand-off.
63. The method according to claim 39, further comprising the step of boring a hole in said tie before driving said spike into said hole in said tie.
64. The method according to claim 39, wherein driving comprises engaging a driving device with said head.
65. The method according to claim 64, wherein said driving device is an automated spike driver.
66. The method according to claim 65, wherein said driving device is an automated impact spike driver.
67. The method according to claim 64, wherein said driving device is power driven and hand-operated.
68. The method according to claim 64, wherein said driving device is selected from the group consisting of impact drivers and rotary drivers.
69. The method of claim 68, wherein said driving device is an impact driver selected from the group consisting of hammers, sledges, and mauls.
70. The method of claim 64, wherein said driving device applies a force to said head of said spike directed towards said tapered tip.
71. The method of claim 64, wherein said driving device is adapted to hold said spike in operational engagement with said driving device.
72. The method of claim 71, wherein said driving device is magnetic, and magnetic forces operate to hold said spike in operational engagement with said driving device.
Description
DESCRIPTION OF DRAWINGS
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
[0040] Like reference symbols in the various drawings indicate like elements.
DETAILED DESCRIPTION
[0041]
[0042]
[0043] The spike has a head 10 having one or more flanges, for example, first and second annular flanges 11a and (optionally) 11b. The first and second annular flanges 11a and 11b are axially spaced by spacer portion 18. In some embodiments, the diameter of first annular flange 11a is preferably greater than the diameter of second annular flange 11b. The spike has a stand-off 15 extending axially from the first flange 11a, a shank 5 extending axially from the stand-off 15 to form a tapered tip 8, and a plurality of pitched, helical, generally parallel threads 6 extending over at least a portion of the shank, running from the stand-off 15 to the tip 8. The threads have an upper thread surface 6b, and a lower thread surface 6a.
[0044] As shown in
[0045]
[0046]
[0047]
[0048]
[0049]
[0050]
[0051]
[0052]
[0053] As depicted in
[0054] A hemispherical head 13 can be provided to permit driving of the spike into the tie using impact spike driving methods that apply a force to the head 13 of the spike in the general direction of the spike tip. The hemispherical head 13 is preferably deformable by virtue of the material used to make the head 13, and is adapted to deform slightly under impact driving, thereby preventing damage to the tool grip that could prevent removal of the spike using a wrench. In addition, the thread design allows the spike 1 to be readily driven using hand operated impact spike driving equipment such as hammers, sledges, mauls, or power-driven/hand operated spike drivers such as the Ingersol Rand Spike Driver Model MX60, (Ingersol Rand, Inc.), Ingersol Rand Spike Driver Model MX 90 (Ingersol Rand, Inc.), or the like.
[0055] Preferably, the pitched helical threads 6 are adapted to permit driving of the spike 1 into the tie 9 using a generally clockwise rotary motion applied to the tool grip, and to permit removal of the spike 1 from the tie 9 using a generally counter-clockwise rotary motion applied to the tool grip. Both clockwise and counterclockwise directions refer to the rotational direction of the tool grip when viewing the spike from the side of the flange opposite to the shank. Alternatively, the threads 6 are adapted to permit driving of the spike 1 into the tie 9 using a generally clockwise rotary motion applied to the tool grip, and to permit removal of the spike 1 from the tie 9 using a generally counter-clockwise rotary motion applied to the tool grip.
[0056] The spike 1 is generally used with a metal tie plate or fishplate 12 to secure the rail 18 to the tie 9. If a fishplate is used, the fishplate preferably comprises a metal boss or elastic fastener 16 adapted to engage with the flange 14 of the rail, and a cavity into which the shank of the spike may be inserted to permit driving of the spike into the tie. As shown in
[0057]
[0058] It will be understood by those skilled in the art that the diameter and overall length of the spike are not critical, and may be varied according to the dimensions of the tie and tie plate or fishplate. Even though the overall length of the spike is not critical and may be any suitable length, this length is generally in the range of 15-25 cm. However, the length D of the stand-off 15 must be adapted to ensure that the threads are engaged with the wooden tie 9 when the spike 1 is driven into the tie 9. This also ensures that the barbs 19 are engaged with the wooden tie 9 with a force sufficient to prevent or reduce the tendency for the spike to loosen under the load of passing railroad locomotives and rolling stock (not shown). Preferably, the length D of the stand-off 15 is at least as long as the length C of the cavity in the fishplate 12, thereby ensuring that the threads are fully-engaged with the wooden tie. Most preferably, the length of the stand-off is between about 2 cm to 5 cm. The threads, and particularly the use of the barbs 19, can prevent loosening of the spike 1 over time regardless of deterioration of the tie nearest the surface.
[0059] Notwithstanding the improvements embodied in the present disclosure, it will be understood by those skilled in the art that it may be necessary to replace components of a railroad track assembly due to damage or wear. Such replacement will generally require the removal of one or more spikes. It is understood that some damage to the wooden tie may occur due to repeated removal or installation of improved spikes of the present disclosure. An aspect of the present disclosure therefore involves removal of an improved spike having a first stand-off length, and replacement with an improved spike having a second, longer stand-off length, in order to ensure that the threads of the replacement spike engage wood fibers that are substantially undamaged by the removed spike.
[0060] The head design of the spike depicted in
[0061] Preferably, the spike comprises a metal. Although the spike may be made of any number of metals or metal alloys, ferrous metals such iron or steel are preferred. Ferrous metals are preferred for use with an automated spike driving apparatus, since magnetic forces may then be used to hold the spike in operational engagement with the driving device.
[0062] Another aspect of this present disclosure provides an improved railroad track assembly. The assembly comprises a metal rail, a wooden tie, a metal tie plate adapted to engage the rail, and an improved spike of the present disclosure. The improved spike is described in the previous detailed description of the present disclosure and in
[0063] In an embodiment of this improved track assembly, the improved spike is driven into a wooden tie to secure a metal rail and a metal tie plate to the tie. The tie plate is adapted to engage the rail at the rail flange. The improved spike comprises a head having an annular flange (or in the case of the embodiment depicted in
[0064] In some variations of this embodiment, the shank further comprises a plurality of helical, generally parallel threads extending over at least a portion of the shank, running from the stand-off to the tip. In one variation of this embodiment, the threads are adapted to permit driving of the spike into the tie using an impact driving method, and to permit easy removal of the spike using a wrench or other rotary spike removal method. The threads are generally parallel, helical threads extending from the stand-off in the direction of the tip. The threads are adapted to cause rotation of the spike into the tie during installation using automated or manual impact spike-driving methods. In other words, the helical threads are preferably adapted to screw the spike threads into the wooden tie when a force is applied to the hemispherical head 13 of the spike in a direction generally towards the spike tip.
[0065] In another variation of this embodiment, the spike head is adapted for use with impact spike-driving methods. The hemispherical head 13 of the spike is preferably hemispherical or dome shaped and is adapted to for use with manual or automated impact spike-driving methods. Preferably, the hemispherical head 13 is adapted to deform slightly under impact driving, thereby preventing damage to the tool grip.
[0066] The present disclosure also provides a method of using an improved railroad spike to secure a metal rail and a metal tie plate to a wooden tie. The improved spike is described in the preceding detailed description of the present disclosure and in
[0067] In some embodiments, the tie plate comprises a cavity into which the tip of the spike shank is inserted before the spike is driven into the tie. The improved spike of the present disclosure is preferably driven into the tie until the spike flange engages with the tie plate and the threads and barbs of the spike engage the wood of the tie. In the usual case, a hole or cavity (e.g., a pilot hole) is bored into the wooden tie before the spike tip is inserted into the tie plate cavity and the spike is driven into the hole or cavity of the tie. Preferably, the hole or cavity bored in the wooden tie has a diameter smaller than the diameter of the shank of the improved spike.
[0068]
[0069] At 1002, a railroad spike is provided. The railroad spike includes a head (1008) having one or more flanges, a stand-off (1010) extending axially from a bottom flange of the one or more flanges, and a shank (1012) extending axially from the stand-off to form a tapered tip. The shank is adapted to engage the tie. The shank includes a plurality of helical, generally parallel threads (1014) extending over a threaded portion of the shank and running from the stand-off to the tapered tip. The stand-off has a length adapted to ensure that the threads are fully engaged in the tie when the spike is used to fasten metal to the tie. The threads are for engaging the tie at a depth in the tie to ensure engagement with dense material of the tie. The shank also includes a plurality of barbs (1016) positioned in a lower half of the threaded portion. Each of the barbs is positioned between a pair of threads and configured to minimize damage to fibers of the tie during installation of the spike as fibers of the tie relax behind and engage with a barbed end of the spike to prevent movement of the spike over time despite deterioration of the tie. Each of the barbs is positioned along the threaded portion such that the barbs contact a lower portion of the tie when the spike is installed in a rail assembly.
[0070] At 1004, a wooden tie, a metal rail, and a fishplate adapted to engage with the rail and the tie are provided.
[0071] At 1006, the spike is driven into the tie until the threads and the barbs are embedded in the tie, and the fishplate is engaged with the rail.
[0072] In some embodiments, a driving device is used to drive the spike into the tie, thereby securing the metal rail to the wooden tie. Generally, the driving device may be either an impact driver, such as a hammer, sledge, or maul; or a rotary driver, such as an open-end wrench, box end wrench, socket wrench, or socket driver. Preferably, an automated impact spike-driving method is employed.
[0073] Other embodiments of the present disclosure are within the scope of the following claims.