Clamp-on single joint manipulator for use with single joint elevator
10907424 ยท 2021-02-02
Assignee
Inventors
- Keith Lutgring (Lafayette, LA, US)
- Logan Smith (Lafayette, LA, US)
- Nicholas Guidry (Breaux Bridge, LA, US)
Cpc classification
E21B19/16
FIXED CONSTRUCTIONS
International classification
E21B19/00
FIXED CONSTRUCTIONS
E21B19/16
FIXED CONSTRUCTIONS
Abstract
An apparatus for assembling a tubular string includes a rig drilling bail, a joint bail extender, and a device. The joint bail extender is rigidly coupled to the rig drilling bail. The device is coupled to the first joint bail extender and configured to engage a tubular segment.
Claims
1. A method for assembling a tubular string, comprising: lifting a tubular segment using an assembly, wherein the assembly comprises: a top drive; a rig drilling bail, comprising an upper eye and a lower eye, coupled to the top drive; a first bail extender rigidly coupled to the lower eye of the rig drilling bail, such that the first bail extender is restrained from moving with respect to the rig drilling bail; a device coupled to the bail extender, wherein the tubular segment is engaged with the device when the tubular segment is lifted; and a running tool coupled to and positioned below the top drive, wherein the rig drilling bail, the bail extender, and the device are in a first position when the tubular segment is lifted, and wherein a central axis through the rig drilling bail is oriented at an angle that is substantially perpendicular to a central axis through the running tool in the first position.
2. The method of claim 1, further comprising moving the rig drilling bail, the bail extender, and the device from the first position to a second position to align a central axis through the tubular segment with the central axis through the running tool.
3. The method of claim 2, wherein, after the central axes of the tubular segment and the running tool are substantially aligned, the method further comprises lowering the tubular segment into contact with a tubular string positioned there below.
4. The method of claim 3, wherein, after the tubular segment contacts the tubular string, the method further comprises: lowering the running tool with respect to the tubular segment such that the running tool is inserted at least partially into the tubular segment; and engaging the tubular segment with the running tool.
5. The method of claim 4, wherein, after the tubular segment is engaged with the running tool, the method further comprises rotating the tubular segment with respect to the tubular string to add the tubular segment to the tubular string.
6. The method of claim 5, wherein, after the tubular segment is added to the tubular string, the method further comprises disengaging the tubular string from a spider.
7. The method of claim 6, wherein, after the tubular string is disengaged from the spider, the method further comprises lowering the running tool and the tubular string with respect to the spider.
8. The method of claim 7, wherein, as the running tool and the tubular string are being lowered with respect to the spider, the method further comprises disengaging the device from the tubular string.
9. The method of claim 8, wherein, after the device is disengaged from the tubular string, the method further comprises moving the rig drilling bail, the bail extender, and the device from the second position back to the first position.
10. The method of claim 9, wherein, after the rig drilling bail, the bail extender, and the device are moved from the second position back to the first position, the method further comprises lowering the running tool and the tubular string further with respect to the spider.
11. The method of claim 10, wherein, after the running tool and the tubular string are lowered further, the method comprises engaging the tubular string with the spider.
12. The method of claim 11, wherein after the tubular string is engaged with the spider, the method further comprises disengaging the tubular string from the running tool.
13. The method of claim 12, wherein after the running tool and the tubular string are lowered further, the method further comprises engaging a next tubular segment with the device.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate an embodiment of the present teachings and together with the description, serve to explain the principles of the present teachings. In the figures:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13) It should be noted that some details of the figure have been simplified and are drawn to facilitate understanding of the embodiments rather than to maintain strict structural accuracy, detail, and scale.
DETAILED DESCRIPTION
(14) Reference will now be made in detail to embodiments of the present teachings, examples of which are illustrated in the accompanying drawing. In the drawings, like reference numerals have been used throughout to designate identical elements, where convenient. In the following description, reference is made to the accompanying drawing that forms a part thereof, and in which is shown by way of illustration a specific exemplary embodiment in which the present teachings may be practiced. The following description is, therefore, merely exemplary.
(15) The apparatus disclosed may pick up single joints of casing utilizing a top drive and a CRT that is not equipped with a pipe-pickup mechanism. The apparatus requires only a minimum of equipment rig-up. This is accomplished by attaching adjustable bail extenders to the rig drilling bails, thereby lengthening the rig drilling bails past the lower portion of the CRT and providing an attachment point for an SJE. Using the rig's link-tilt, the driller can now easily reach the V-door and retrieve a single joint with the SJE.
(16)
(17) One or more rig drilling bails (two are shown: 120) may be coupled to and extend downward from the top drive 110. Each of the rig drilling bails 120 may include a shaft 122 with loops (e.g., eyes) 124, 126 positioned at each end thereof. The first, upper loops 124 may be used to couple the rig drilling bails 120 to the top drive 110. The second, lower loops 126 may be positioned below the lower end of the top drive 110.
(18) One or more rig link-tilt mechanisms (two are shown: 130) may be coupled to the rig drilling bails 120. The rig link-tilt mechanisms 130 may be configured to tilt the rig drilling bails 120 from a first position (e.g., inclined or substantially horizontal), as shown in
(19) A casing running tool (CRT) 140 may be coupled to and positioned below the top drive 110. The CRT 140 may be positioned laterally-between the rig drilling bails 120. A lower end of the CRT 140 may extend below the rig drilling bails 120 (e.g., below the second, lower loops 126). Although the CRT 140 is shown and described herein, it will be appreciated other running tools may alternatively be used to run tubular segments and/or strings other than casing such as, for example, drill pipe, production tubing, liner, etc. In at least one embodiment, the CRT 140 may not be configured to pick up an add-on tubular segment 162 from a V-door 170.
(20) A spider 150 may be positioned on the rig floor 154. The spider 150 may be positioned below the top drive 110, the rig drilling bails 120, and the CRT 140. The CRT 140 may be aligned with a vertical bore 152 formed through the spider 150. The spider 150 may include one or more retractable slips that are configured to engage and support an uppermost segment of a tubular string.
(21)
(22) A single joint elevator (SJE) 240 may be coupled to the joint bail extenders 200 proximate to the lower ends 222 thereof. Although the SJE 240 is shown and described herein, it will be appreciated other devices may alternatively be used to engage and move tubular segments. In contrast to some conventional apparatuses, the SJE (or other device for engaging tubular segments) may not be coupled to the CRT 140.
(23)
(24) The upper boom 210 of each joint bail extender 200 may include one or more first connectors (e.g., removable bail clamps) 212 that are configured to couple the upper boom 210 to the shaft 122 of the corresponding rig drilling bail 120. The upper boom 210 of each joint bail extender 200 includes two first connectors 212 that are axially-offset from one another. The upper boom 210 of each joint bail extender 200 may also include a second connector (e.g., a lifting ear) 214 that is configured to couple the upper boom 210 to the lower loop 126 of the corresponding rig drilling bail 120. The first and second connectors 212, 214, which may accommodate different rig drilling bail sizes, not only withstand axial loads associated with lifting joints of casing, but they create a rigid, non-pivoting connection to prevent the joint bail extender 200 from pivoting at the interface with the lower loop 126 of the rig drilling bail 120. In combination with the integral lifting ears, these connectors 212, 214 create a connection between the joint bail extender 200 and the rig drilling bail 120 that can support the combined weight of the SJE 240 and casing joint in either a tilted or vertical configuration. Once the upper boom 210 is secured to the rig drilling bail 120, the lower boom 220 can be adjusted so that the SJE 240 is positioned correctly over the V-door 170 to grip the add-on tubular segment 162.
(25) A crossbar 216 may extend laterally-between and couple the upper booms 210 of the two joint bail extenders 200 together. The crossbar 216 may be disposed between the upper booms 210 to facilitate the stabilization and alignment of the rig drilling bails 120. Additionally, by way of pins and secondary retention means, the crossbar's adjustable design may establish various set distances between the rig drilling bails 120 to accommodate various CRTs 140, top drives 110, and SJEs 240. The joint bail extender 200 may be easily and quickly attached directly to the rig drilling bail 120, unlike conventional alternatives that require rigging down the rig drilling bails 120 to rig up adjustable length single joint links.
(26) As may be seen, the connection(s) between each joint bail extender 200 and the corresponding rig drilling bail 120 may be a rigid (i.e., non-pivoting) connection. In other words, the joint bail extender 200 may not be able to pivot or rotate with respect to the corresponding rig drilling bail 120. As a result, the joint bail extender 200 may remain substantially aligned with the corresponding rig drilling bail 120, even when the rig drilling bail 120 and joint bail extender 200 are tilted to pivot the joint bail extender 200 out to the V-door 170 to pick up an add-on tubular segment 162.
(27) The lower boom 220 of each joint bail extender 200 may be configured to extend and retract (e.g., telescope) with respect to the corresponding upper boom 210 to vary the length of the joint bail extender 200. A pivot link 230 may be coupled to the lower end 222 of each lower boom 220, and the pivot link 230 may couple the lower boom 220 to the SJE 240.
(28)
(29) As illustrated in
(30) As illustrated in
(31) As shown in
(32) As shown in
(33) The method 400 may also include engaging the add-on tubular segment 162 with the CRT 140 after the CRT 140 is inserted therein, as at 410. The CRT 140 may be configured to support the weight of the add-on tubular segment 162 (and subsequently the entire tubular string 160) when engaged therewith. By engaging the add-on tubular segment 162 with the CRT 140 prior to coupling the add-on tubular segment 162 to the tubular string 160, as discussed below, the joint bail extenders 200 do not have to support the full weight of the tubular string 160. Rather, the joint bail extenders 200 are only supporting a single add-on tubular segment 162 at a time. Thus, the joint bail extenders 200 may be rated for a single add-on tubular segment 162 (e.g., about 10 tons) rather than the weight of the full tubular string 160. As a result, the joint bail extenders 200 may be lighter weight and less expensive than conventional alternatives.
(34) The method 400 may also include rotating the add-on tubular segment 162 with respect to the tubular string 160, as at 412. The add-on tubular segment 162 may be rotated using the top drive 110 and/or the CRT 140. The rotation of the on add-on tubular segment 162 with respect to the tubular string 160 may couple or make-up the add-on tubular segment 162 to the tubular string 160, such that the add-on tubular segment 162 becomes a part of the tubular string 160.
(35) The method 400 may also include actuating the spider 150 from an engaged state to a disengaged state, as at 414. The spider 150 may be actuated from the engaged state to the disengaged state after the add-on tubular segment 162 becomes a part of the tubular string 160. The slips of the spider 150 may contact and support the tubular string 160 when the spider 150 is in the engaged state, and the slips of the spider 150 may be spaced apart from the tubular string 160 such that the spider does not support the tubular string 160 when the spider 150 is in the disengaged state.
(36) As shown in
(37) As shown in
(38) As shown in
(39) Once the upper end of the tubular string 160 is at the predetermined distance above the spider 150, the method 400 may include actuating the spider 150 from the disengaged state to the engaged state, as at 424. As mentioned above, the spider 150 may contact and support the tubular string 160 when the spider 150 is in the engaged state. Once the spider 150 has engaged the tubular string 160, the method 400 may include disengaging the CRT 140 from the tubular string 160, as at 426. The method 400 may also include engaging the next add-on tubular segment 164 with the SJE 240, as at 428. The method 400 may then loop back to 402 and begin again.
(40) As used herein, the terms inner and outer; up and down; upper and lower; upward and downward; above and below; inward and outward; uphole and downhole; and other like terms as used herein refer to relative positions to one another and are not intended to denote a particular direction or spatial orientation. The terms couple, coupled, connect, connection, connected, in connection with, and connecting refer to in direct connection with or in connection with via one or more intermediate elements or members.
(41) While the present teachings have been illustrated with respect to one or more implementations, alterations and/or modifications may be made to the illustrated examples without departing from the spirit and scope of the appended claims. In addition, while a particular feature of the present teachings may have been disclosed with respect to only one of several implementations, such feature may be combined with one or more other features of the other implementations as may be desired and advantageous for any given or particular function. Furthermore, to the extent that the terms including, includes, having, has, with, or variants thereof are used in either the detailed description and the claims, such terms are intended to be inclusive in a manner similar to the term comprising. Further, in the discussion and claims herein, the term about indicates that the value listed may be somewhat altered, as long as the alteration does not result in nonconformance of the process or structure to the illustrated embodiment. Finally, exemplary indicates the description is used as an example, rather than implying that it is an ideal.
(42) Other embodiments of the present teachings will be apparent to those skilled in the art from consideration of the specification and practice of the present teachings disclosed herein. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the present teachings being indicated by the following claims.