MODULAR SUBSEA EQUIPMENT, SUBSEA DISTRIBUTION EQUIPMENT, SUBSEA DISTRIBUTION EQUIPMENT ASSEMBLY AND REPAIR
20210207456 · 2021-07-08
Assignee
Inventors
Cpc classification
E21B33/035
FIXED CONSTRUCTIONS
E21B43/013
FIXED CONSTRUCTIONS
F16L1/16
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16L39/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
Abstract
The present invention deals with the modularization of SDA components, as well as the assembly, installation, and repair thereof. The blocks (10) have a metallic structure (11) and panels (13) that allow the configuration for several equipment, in such a way that both the hydraulic instrumentation and the electrical instrumentation are also modularized. Modularization, according to the present invention, allows the configuration assembly of equipment (40) and (50) on the vessel (85), thus reducing costs in relation to installations of the art. In addition, the equipment is already installed with the umbilicals connected, which allows the modularization to be carried out using the crane (83) of the vessel (85) or even a buoy (95).
Claims
1. MODULAR SUBSEA EQUIPMENT, characterized in that it comprises: a structure (10) comprising a metallic structure (11), wherein the metallic structure (11) includes panels (13) on its lateral, lower and upper surface and the block (10) further comprises at one end a panel (16), said panel (16) having a hole (15) for installing the umbilical connector; a pipe mat (19) located inside the block (10), wherein the pipe mat (19) comprises parallel pipes (20), wherein the parallel pipes (20) have connectors (21), in which said connectors (21) connect to pipes of the MQCs (14) and Logic Caps (28) and (29) that are located on the surface of the structure (10); an electrical control of the electrical instrumentation is modularized inside the structure (10), which has QUADs comprising junction boxes, electrical connectors (32) and Field Assembled Cable Termination (FACTs) (31), wherein the electrical connectors (32) connect to the inlet and oulet umbilicals.
2. EQUIPMENT, according to claim 1, characterized in that the structure (10) comprises an eye (12) or a flange gasket (55 and 56).
3. EQUIPMENT, according to claim 1, characterized in that the panel has a hole (15) or not.
4. SUBSEA DISTRIBUTION EQUIPMENT comprising a modular equipment described in claims 1-3, characterized in that it comprises blocks (42) and (43), wherein block (42) has, at its end, a STI (44) which is connected to an umbilical cable (35), block (43) has, at its end, a STI (45) which is connected to an umbilical cable (36), said blocks (42) and (43) are connected by a UTAJ (46); said blocks (42) and (43) having a pin (66) on the their lower portion, the subsea distribution equipment (40) further comprising a foundation (47), said foundation (47) comprising a funnel (66).
5. SUBSEA DISTRIBUTION EQUIPMENT comprising a modular equipment described in claims 1-3, characterized in that it comprises blocks (51) and (52), wherein block (51) has, at its end, a STI (53) which is connected to a umbilical cable (35), block (52) has, at its end, a STI (54) which is connected to an umbilical cable (36), block (51) comprises, at the end opposite the STI (53), a female connector (55) and the block (52) comprises a male connector (56), said blocks (51) and (52) are connected by the female connector (55) and the male connector (56), said blocks (51) and (51) are connected to a foundation (57) by screwed gaskets (58).
6. SUBSEA DISTRIBUTION EQUIPMENT ASSEMBLY comprising an equipment described in claim 4, characterized in that it is performed on the deck of the vessel (85) and comprises the following steps: a) transporting the block (43) from the spool using a gutter (81), tensioners (82) and a crane (83) of the vessel (85), wherein said block (43) is transported to the hang-off collar (96) of the vessel (85); said block (43) being connected to the umbilical cable (35); b) after the block (43) arrives at the hang-off collar (96), transporting the block (42) and then installing the eye joint (90), and the transport of the block (42) is performed; c) the eye joint (90) being installed, the eyes (12) of the blocks (42) and (43) are aligned and brought together so that the eyes (12) are connected through the eye joint (90); d) installing the foundation (47), wherein the foundation (47) is lifted by the crane (83) and trolley (84) of the PSL; after the verticalization and stabilization of the foundation (47), the crane cable is disconnected; then the crane and trolley (85) move to the moon pool center (92); e) connecting the foundation (47) to the blocks (42) and (43), wherein the foundation (47) has a pin (71) and the blocks have, on their lower portion, a connector (72) to connect to the pin (71); and the foundation (57) further comprising gaskets (73) to be fastened by screws (49) after connecting the trolley (84); f) then installing a temporary UTAJ (46) between the blocks (42) and (43).
7. SUBSEA DISTRIBUTION EQUIPMENT ASSEMBLY comprising equipment described in claim 5, characterized in that it is performed on the vessel's deck and comprises the following steps: a) transporting the block (52) from the spool using the gutter (81), tensioners (82) and the crane (83) of the vessel (85), wherein said block (52) is transported to the hang-off collar (96) of the vessel (85); said block (43) being connected to the umbilical cable (35); b) transporting the block (51) through the gutter (81) and the tensioners (82) and lifting using the crane (83) of the PLS, the umbilical cable (36) that is connected to the block (51) being supported by the moon pool tugger winches and Chinese fingers; c) performing the connection of blocks (52) and (54) in such a way that the male connector (55) of the block (51) is connected to the female connector (56) of the block (52), then performing all electrical and hydraulic connections between the blocks; d) after the connection made in the previous step, the foundation (57) is lifted by the crane (83) and trolley (84) of the PSL, after the verticalization and stabilization of the foundation (57), the crane (83) and the trolley (84) of the PSL move to the moon pool center; e) connecting the foundation (57) to the blocks (51) and (52), at that moment, the trolley (84) of the PSL releases the foundation (57), then the Electrical Flying Leads are installed in the SDA (50).
8. REPAIR characterized in that it repairs the SDA (40) and comprises the following steps: a) removing the UTAJ (46) for installing the recovery tool (100) in the block (42), and subsequently unlocking the foundation (47), b) unlocking the pin (66) of the block (42); c) lifting the block (42) using the umbilical (36) and/or the crane (83) of the vessel (85); d) rotating the block (42); e) disconnecting the hook of the crane (83) and elevating it to the surface; e) moving downwards the recovered block (42), wherein the recovery tool (100) is connected to the eye of the block (42); f) rotating the block (42); g) checking the position of the block (42) and the ROV (not shown) in relation to the foundation (47) and, after said checking, housing the pin (66) in the funnel (67) of the foundation (47); h) performing the payment of the crane cable and the umbilical cable (36), i) locking the pin (66) and unlocking the recovery tool (100).
Description
DESCRIPTION OF THE FIGURES
[0010] The present invention can be well understood from the accompanying illustrative figures, which in a schematic and non-limiting way of the invention represent:
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
DETAILED DESCRIPTION OF THE INVENTION
[0039] As can be seen in
Structure
[0040] As can be seen in
[0041] Still referring to
[0042] In a first embodiment of the structure (10), as can be seen in
[0043] In a second embodiment, illustrated by
[0044] It is important to note that the panel format (13) varies according to the type of electro-hydraulic function and the control logic required for each field of production or injection of oil and gas.
[0045] It is noted that the block (10) allows several configurations, given the possibility of installing specific panels according to the needs of the subsea equipment design.
Hydraulic Instrumentation
[0046] As previously mentioned, the present invention also comprises the modularization of hydraulic instrumentation, said hydraulic instrumentation, illustrated by
[0047] Next, the sequence of a hydraulic configuration according to the present invention will be illustrated, wherein
[0048]
[0049] After the assembly of the distribution modules (23-26), the couplers (27) are installed in the UTAJ (22), illustrated by
[0050] After the assembling of the Logic Caps (28) and (29), the MQC distribution modules (23-26) and the couplers (26) of the UTAJ (22) and the couplers (29) of the Logic Caps (28) and (29), the structure (10) is installed in the hydraulic configuration (30) illustrated by
[0051] As can be seen in
[0052] [Note that the pipe mat (19) allows configuring several arrangements according to the desired use. The pipe mat (19) connects with the inlet umbilicals, outlet umbilicals, as well as the MQC and Logic caps (LC), in order for the block to obtain a maximum number of functions. If there is a need for a smaller number of functions, the reduction in the number of tubbings (20), fittings, couplers and MQC will be sufficient to adapt the block (10) to the system.
Electrical Instrumentation
[0053] As can be seen in
Embodiments
[0054] Using the modularization proposed above, two embodiments for two SDAs (40) and (50), according to the present invention, are provided.
[0055] As can be seen in
[0056] The two blocks (42) and (43) are mounted on a foundation (47), where said foundation (47) comprises a funnel (67), as can be seen in
[0057] It is important to mention that the UTAJ (46) is temporary, after the installation of the SDA (40) on the seabed, a permanent UTAJ (49) is installed, as will be illustrated in
[0058] In a second embodiment, illustrated by
[0059] These embodiments of SDA (40) and (50) have a lower weight compared to the SDA (01) of the art, wherein SDA (01) weights 28,000 kgf, while the SDA (40) weights 12,000 kgf and the SDA (50) weights 9,000 kgf.
Assembly
[0060] Among the factors that are important for the assembly of the SDA (40) and (50), the limitations of the tower, the gutter, A&R, the tensioners' opening, deflectors, and the sizes of the work floor of a vessel should be highlighted. SDAs (40) and (50) allow their assembly to be carried out on smaller vessels, in order to reduce the cost of renting vessels, since SDAs (40) and (50) have fewer components and consequently less weight. In addition, the SDAs (40) and (50) disclosed herein further are smaller.
[0061] Therefore, the present invention allows the assembly of the SDAs using the structure of the existing vessel in order to reduce assembly and installation costs of the SDA. Later, the assembly of the SDA (40) and (50) on a vessel (85) will be disclosed. The assembly is carried out on the deck of the vessel (85) and comprises the following steps, which are illustrated by
[0062] a) As can be seen in
[0063] b) After the block (43) arrives at the hang-off collar (96), block (42) is transported and then the eye joint (90) is installed, and the block (42) is transported, as shown in
[0064] c) After installing the eye joint (90), the eyes (12) of the blocks (42) and (43) are aligned and brought together, so that the eyes (12) are connected through the eye joint (90); as seen in
[0065] d) After the blocks (43) and (42) are connected by the eye joint (90), the foundation (47) is installed, wherein the foundation (47) is lifted by the crane (83) and trolley (84) of the PSL. After the verticalization and stabilization of the foundation (47), the cable of the crane (83) is disconnected; then the crane and the trolley (85) move to the moon pool center (92); as can be seen in
[0066] e) The foundation (47) is connected to the blocks (42) and (43), wherein the foundation (47) has a pin (71) and the blocks, on its lower portion, have a connector (72) to connect to that pin (71); and the foundation (57) also comprises gaskets (73) to be fastened by screws (49) after connecting the trolley (84); the foundation (47) is released,
[0067] f) then, a temporary UTAJ is installed (46) between blocks (42) and (43).
[0068] Similarly, the assembly of the SDA (50) follows the subsequent steps, illustrated by
[0069] a) As can be seen in
[0070] b) Subsequently, as can be seen in
[0071] c) The connection between blocks (52) and (54) is made in such a way that the male connector (55) of the block (51) is connected to the female connector (56) of the block (52), as can be seen in
[0072] d) After the connection made in the previous step, the foundation (57) is lifted by the crane (83) and trolley (84) of the PSL. After the verticalization and stabilization of the foundation (57), the crane (83) of the PSL and the trolley of the PSL (684 travels to the moon pool center) are removed. As can be seen in
[0073] e) the foundation (57) is connected to the SUDs (51) and (52), at that moment, the trolley (84) of the PSL releases the foundation (57), then the Electrical Flying Leads are installed in the SDA (50), as can be seen in
Installation
[0074] After assembling the SDA (40) and (50), the installation can be done in two ways, using the crane (83) of the vessel (85) or using a buoy (95). In the case of the crane (83) of the vessel (85), the SDA (40 or 50) is lifted by the Snatch block's Master Link and launched overboard. Since the SDA (40 or 50) is launched vertically, the vessel (85) remains motionless so that the SDA (40 and 50) moves in a horizontal direction. After the SDA (40 and 50) reach the seabed, the cables of the crane (83) are removed. The process is illustrated by
[0075] In the case of the installation with the buoy (95), the SDA (40 and 50) has on its upper surface a buoy (95) to slow down the lowering of the equipment to the seabed. Due to the fact that the SDA (40 and 50) are launched vertically, the vessel (85) moves so that the equipment (40, 50) when moving downwards, gradually changes its direction to horizontal direction. After the equipment (40, 50) arrives at the seabed, the buoy (95) is removed. The process is illustrated by
[0076] Furthermore, after the SDA (40), reaches the seabed, the process of replacing the temporary UTAJ (46) with a permanent UTAJ (49) takes place. As can be seen in
[0077] Additionally, the installation of the SDA (40 and 50) of the present invention occurs in a more efficient way in relation to SDA (state of the art) (01),
SUT Recovery and Reinstallation
[0078] In case of any problem due to hydraulic or electrical failure, the present invention presents a method of recovering and reinstalling the blocks (42) and/or (43), wherein the recovery method, in an exemplary embodiment of recovery, comprises the following steps I-IV, illustrated by
[0079] a) In step I, after removing the UTAJ (46), the recovery tool (100) is installed in the block (42) and unlocks the foundation (47);
[0080] b) In step II, the pin (66) of the block (42) is unlocked;
[0081] c) In step III, the block (42) is lifted using the umbilical (36) and/or the crane (83) of the vessel;
[0082] d) In step IV, the block (42) rotates;
[0083] e) In step V, the hook of the crane (83) is disconnected and the elevation to the surface takes place.
[0084] After removing the block (42), the procedure for reinstalling the block (42) already recovered or even the installation of a new block (42) is performed, illustrated in
[0085] a) In step VI, the recovered block (42) moves downwards, wherein the recovery tool (100) is connected to the eye of the block (42); the foundation, in step VII, the block (42) rotates;
[0086] b) In step VIII, the position of the block (42) and the ROV (not shown) are checked in relation to the foundation (47), after said checking, the pin (66) is housed in the funnel (67) of the foundation (47);
[0087] c) In step IX, payment of the crane cable and the umbilical cable (36) is performed;
[0088] d) In step X, the pin (66) is locked and the recovery tool (100) is unlocked.
[0089] The present invention allows a simplification of the subsea field configuration, illustrated by
[0090] Among the numerous advantages that the modularization of subsea systems, object of the present invention, provides, those skilled in the art have noted the: [0091] reduction of design and manufacturing costs; [0092] reduction of the weight and size of the final structure; [0093] ease in transport the final structure; [0094] reduction of the number of parts of the structure; and [0095] reduction of the amount of welding that the structure requires.