Method and apparatus for checking a dialyzer for the presence of a leak
11052182 ยท 2021-07-06
Assignee
Inventors
Cpc classification
B01D65/104
PERFORMING OPERATIONS; TRANSPORTING
A61M1/1684
HUMAN NECESSITIES
International classification
A61M1/36
HUMAN NECESSITIES
Abstract
The present invention relates to a method for checking a dialyzer for the presence of a leak in the semipermeable membrane of the dialyzer, wherein the membrane divides the inner dialyzer space into a least one blood chamber and into at least one dialyzate chamber, wherein the blood chamber is flowed through by blood in the operation of the dialyzer and is in fluid communication with a blood-side line system and the vascular system of the patient, and wherein the dialyzate chamber is flowed through by dialysis fluid in the operation of the dialyzer and is in fluid communication with a dialyzate-side line system, wherein the method comprises the following steps: a) emptying the blood chamber or the dialyzate chamber of blood and of dialysis fluid respectively and keeping the fluid (blood or dialyzate) in the non-emptied dialyzate chamber or blood chamber; b) building up a test pressure by means of a gas, in particular by means of air, in the emptied blood chamber or in the emptied dialyzate chamber; and c) measuring the pressure drop over time in the emptied blood chamber or in the emptied dialyzate chamber or in the line system respectively in fluid communication therewith and/or measuring the pressure increase in the non-emptied blood chamber or in the non-emptied dialyzate chamber or in the line system respectively in fluid communication therewith or measuring the number of air bubbles or of a parameter correlated with the number of air bubbles in the non-emptied blood chamber or in the non-emptied dialyzate chamber or in a line system respectively in fluid communication therewith,
wherein the steps a) to c) are carried out subsequent to the blood treatment of the patient and subsequent to the disconnection of the patient from the blood-side line system.
Claims
1. A method of checking a dialyzer (D) for the presence of a leak in a semipermeable membrane of the dialyzer (D), the membrane dividing an inner dialyzer space into at least one blood chamber and into at least one dialyzate chamber, the blood chamber being flowed through by blood during operation of the dialyzer and being in fluid communication with a blood-side line system (BS) and a vascular system of a patient (P), and the dialyzate chamber being flowed through by a dialysis fluid during operation of the dialyzer and being in fluid communication with a dialyzate-side line system (DS), said method comprising the following steps: a) emptying the blood chamber or the dialyzate chamber of blood and of dialysis fluid, respectively, and keeping the fluid (blood or dialyzate) in the non-emptied dialyzate chamber or blood chamber; b) building up a test pressure via a gas in the emptied blood chamber or in e emptied dialyzate chamber and measuring the test pressure; and c) measuring a pressure increase in the non-emptied blood chamber or in the non-emptied dialyzate chamber or in the line system (BS, DS), respectively, in fluid communication therewith, the steps a) to c) being carried out subsequent to a blood treatment of the patient (P) and subsequent to disconnection of the patient (P) from the blood-side line system (BS), and the step b) build-up of the test pressure and the measuring of the test pressure being carried out multiple times, and a continuation only being made with step c) when a drop of the measured test pressure over time does not exceed a limit value.
2. The method in accordance with claim 1, wherein, subsequent to the carrying out of steps a) to c), no disinfection of the dialysate-side line system (DS) is carried out if no leak was detected in the membrane of the dialyzer (D).
3. The method in accordance with claim 1, wherein the step of measuring the pressure is carried out in the dialysate chamber, in the dialyzate-side line system (DS), in the blood chamber, or in the blood-side line system (BS), or in a plurality thereof.
4. The method in accordance with claim 1, wherein the step c) is carried out while the non-emptied chamber or the non-emptied line system (BS, DS) is closed.
5. The method in accordance with claim 1, wherein the build-up of the test pressure in step b) is carried out via a compressor which conveys environmental air into the emptied blood chamber or dialyzate chamber or in the line system (LS, DS) in communication therewith.
6. The method in accordance with claim 1, wherein pressure development is displayed and/or an evaluation is made based on one or more of measured values as to whether the membrane has a leak, and the result of the evaluation is displayed.
7. An apparatus for checking a dialyzer (D) for the presence of a leak in a semipermeable membrane of the dialyzer (D), said apparatus comprising: the dialyzer (D), which is divided by the semipermeable membrane into at least one blood chamber and into at least one dialyzate chamber, including at least one blood-side line system (BS) which is in fluid communication with the blood chamber and with a vascular system of a patient (P) during a treatment, and including at least one dialyzate-side line system (DS) in fluid communication with the dialyzate chamber, blood flowing through the blood-side line system (BS) and the blood chamber, and dialysis fluid flowing through the dialyzate chamber and the dialysis fluid system (DS) during the treatment; and a control unit, and elements which are controlled by the control unit, and are configured to carry out the method steps in accordance with claim 1.
8. The apparatus in accordance with claim 7, wherein the apparatus has one or more pressure sensors which are arranged indirectly or directly at the dialyzate chamber, at the dialyzate-side line system (DS), at the blood chamber, or at the blood-side line system (BS), or in a plurality thereof, and wherein the apparatus is configured to detect pressure development over time.
9. The apparatus in accordance with claim 7, further comprising a device for emptying the blood from the blood chamber and/or for emptying the dialysis fluid from the dialyzate chamber and a device for introducing pressurized air into the blood chamber emptied of blood or into the dialyzate chamber emptied of dialysis fluid.
10. The apparatus in accordance with claim 7, further comprising a display device configured to display pressure development and/or an evaluation unit configured to carry out an evaluation based on one or more of measured values to determine whether the membrane has a leak, and to display a result of the evaluation.
11. A dialysis device comprising at least one apparatus in accordance with claim 7.
12. The method according to claim 1, wherein the gas is air.
13. The apparatus according to claim 8, wherein, based on the pressure development over time, the apparatus determines whether a leak in the semipermeable membrane is present.
14. The apparatus according to claim 9, wherein the device for introducing pressurized air is a compressor.
15. The apparatus according to claim 9, wherein the pressurized air is introduced into the line system (LS, DS).
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Further details and advantages of the invention will be explained in more detail with reference to an embodiment shown in the drawings. There are shown:
(2)
(3)
(4)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
(5) Further scope of applicability of the present invention will become apparent from the detailed description given hereinafter. However, it should be understood that the detailed description and specific examples, while indicating preferred embodiments of the invention, are given by way of illustration only, since various changes and modifications within the spirit and scope of the invention will become apparent to those skilled in the art from this detailed description.
(6) Reference symbol D indicates the dialyzer which is divided by a semipermeable membrane 11, which is preferably formed by a bundle of hollow fibers, into a dialyzate chamber 10 and into a blood chamber 12.
(7) The blood-side line system BS, which forms the extracorporeal blood circuit, is in communication with the blood chamber 12. The blood pump 40 is located upstream of the dialyzer D and the clamp K2 is located upstream of the blood pump 40 in the blood-side line system BS. The venous drip chamber 30 is located downstream of the dialyzer D. The venous clamp K1 is arranged downstream thereof.
(8) The terms upstream and downstream relate to the direction of flow of the blood with a blood pump 40 in operation, said direction of flow being marked by an arrow in the Figure.
(9) Not only the hose line which represents a component of the blood-side line system BS opens into the drip chamber 30, but also a further line 22. The compressor which conveys air out of the environment into the blood-side line system BS for carrying out the method is located in this further line 22. The valve V3 is located between the compressor 20 and the drip chamber 30. The reference symbol PV indicates a pressure sensor which is located in the venous part of the blood-side line system.
(10) Reference numerals 1 and 2 indicate the arterial and venous connectors of the extracorporeal circuit and the latter is or can be connected by them to the vascular system of the patient P.
(11) In the operation of the blood pump 40, blood is conveyed, with a connected patient, through the line 41 to the dialyzer D and from the dialyzer D through the line 42 and the drip chamber 30 back to the patient.
(12) The dialyzate-side line system DS is located on the dialyzate side and has lines, in particular hose lines, by means of which dialysis fluid is guided into or out of the dialyzate chamber 10 in the operation of the device. The movement of the dialysis fluid in the dialyzate-side line system DS is carried out by a pump, not shown.
(13) The terms upstream and downstream relate to the direction of flow of the dialysis fluid with a pump for the dialysis fluid in operation, said direction of flow being marked by an arrow in the Figure. Fresh dialysis fluid is conveyed to the dialyzer D through the line 51. Consumed dialysis fluid is extracted from the dialyzer D through the line 52.
(14) A respective pressure sensor P1 and P2 is located upstream and downstream of the dialyzer in the dialyzate-side line system DS, as can be seen from
(15) Reference symbol B schematically indicate the balancing system which serves the balancing of the dialysis fluid supplied to and removed from the dialyzer D and which communicates with the supplying and removing lines 51 and 52. The lines 51 and 52 or the balancing system can be blocked by valves V4, V5.
(16) The line 53 branches off from the line 52 leading away from the dialyzer D and leads to the outflow A for consumed dialysis fluid.
(17) As can be seen from
(18) Instead of the above-named clamps K1, K2, valves or also any other desired blocking means can also be used. The position of the clamps is also exemplary, i.e. the clamps can also be arranged at another place or in a different number.
(19) Instead of the above-named valves V1, V2, V3, V4, V5, clamps or also any other desired blocking means can also be used. The position of the valves is also exemplary, i.e. the clamps can also be arranged at another place or in a different number.
(20) Two test sequences are described by way of example in the following by means of which it can be determined whether the membrane 11 has one or more leaks or is intact.
(21) In a first embodiment, the blood side is first emptied of blood.
(22) The clamps K1 and K2 are closed. The blood pump 40 is switched off. The balancing chamber system B is blocked by closing the valves V4, V5. This applies to the total test procedure in this embodiment.
(23) The compressor 20 is switched on, the valve V3 is opened and the valves V1 and V2 are opened.
(24) The blood located on the blood side is displaced by the air over the membrane 11 to the dialyzate side. It moves from there, with open valves V1, V2, through the lines 52 and 53 into the drain A.
(25) The compressor remains in operation for so long until a pressure increase is determined by means of the pressure sensor PV.
(26) The compressor 20 is then switched off and the valve V1 is closed.
(27) The build-up of the test pressure on the blood side emptied from blood starts subsequent to this. The blood pump 40 remains switched off for this purpose and the balancing chamber system B is blocked. The compressor 20 is switched on while the valve V1 is closed and the valve V2 remains open. The compressor 20 remains switched on for so long until a specific pressure, e.g. 1250 mm Hg, is reached at the pressure sensor PV at the blood side.
(28) The compressor is then switched off, the valve V3 is closed and the valve V1 is opened. A check is then made whether the pressure drop per time on the blood side now vented or filled with pressurized air exceeds a limit value. If this is the case, the procedure is repeated, i.e. the compressor 20 is switched on and the valve V3 is opened again. The valve V1 is closed and the valve V2 is opened. The compressor is then switched off, the valve V3 is closed and the valve V1 is opened. The pressure development over time is subsequently determined at the pressure sensor PV.
(29) This process is repeated until the pressure drop per time on the blood side does not exceed a limit value.
(30) If this is the case, the actual pressure holding test begins. For this purpose, the compressor 20 is switched off, the valve V3 is closed and the valve V1 is closed. The balancing chamber system B remains blocked. The pressure holding test is thus carried out when the dialyzate side filled with dialysis fluid is closed, i.e. when the supply and removal lines of the dialyzate side are blocked. This allows an air intake into the dialyzate side to be measured precisely by a pressure increase on the dialyzate side.
(31) After switching off the compressor 20 and after the closing of the valve V1, the pressure development on the dialyzate side is determined by means of the pressure sensor(s) P1 and/or P2. The filter D is qualified as in order if the pressure increase over time measured by the sensor(s) P1 and P2 does not exceed a limit value, i.e. if the pressure increase measured at the dialyzate side is comparatively small.
(32) If this is not the case, however, i.e. if the pressure at the sensors P1 and/or P2 increases comparatively fast, this is due to a leak of the filter membrane 11. A conclusion can thus be drawn from the speed of the pressure increase measured at the dialyzate side on whether the membrane of the dialyzer D is in order or has one or more leaks.
(33) If the pressure increase measured by means of the sensors P1 and P2 is not identical, this indicates an air intake into the hydraulics so that a hydrostatic pressure difference due to air intake results in this deviation.
(34) Alternatively or additionally to the measurement of the pressure increase on the dialyzate side, the measurement of the pressure drop on the blood side is also conceivable during the pressure holding test.
(35)
(36) The above-described build-up of the test pressure on the blood side by a repeated opening and closing of the valve V1 takes place in the time period A and is indicated by the curve K1. The respective higher value shows the closed valve V1, the respective lower value shows the opened valve V1.
(37) The curve K2 shows the pressure development measured at the pressure sensor PV. As can be seen from
(38) The pressure holding test only starts with the beginning of section B when this requirement is satisfied. This is carried out while the dialyzate side is closed with respect to the drain A and overall so dialysis fluid can neither be supplied nor removed.
(39) The curves K3 and K4 show the pressure developments over time measured at the sensors P1 and P2. It results from
(40) In contrast, with the measurement result in accordance with
(41) The named values are naturally only examples which do not restrict the invention.
(42) The second embodiment starts with the disconnection of the patient by closing the clamps K1 and K2 and by stopping the blood pump 40. The compressor 20 is switched off and the valve V3 is closed so that the blood side is closed overall.
(43) The emptying of the dialyzate side by means of a standard emptying program then follows through the line 52 with opened valves V1 and V2 to the drain A. A venting valve or the compressor can be provided in the line 51 for the emptying. The dialyzate coupling is open on the running of the emptying program.
(44) The valve V2 is subsequently closed and a test pressure is built up by means of air or of another gas on the dialyzate side emptied of dialysis fluid. This pressure build-up takes place by means of a compressor until the desired test pressure, e.g. 1250 mm Hg, is reached. The compressor is stopped.
(45) As soon as this is the case, the valve V2 is closed and the connectors 1 and 2 are connected to one another so that a closed blood circuit is formed. The blood pump 40 is taken into operation.
(46) The air bubble detector 9, which is arranged downstream of the drip chamber 30, for example, detects the number of air bubbles per time unit with a running blood pump 40. The membrane 11 is qualified as intact when the counted number of air bubbles per time unit does not reach a limit value; otherwise a conclusion is drawn on a defective membrane.
(47) Alternatively or, additionally, the pressure is measured at the dialyzate-side pressure sensors P1 and P2. It is conceivable that the result of this pressure measurement and also the measured value of the air bubble detector is used for determining the integrity of the membrane 11.
(48) It is thus possible, for example, that a conclusion is only made on an intact membrane when the number of air bubbles per time unit remains beneath a limit value and, in addition, the pressure loss on the dialyzate side does not exceed a limit value.
(49) Microleaks in a dialyzer can be recognized by means of the present invention. The process takes place after the disconnection of the patient and after the carrying out of the blood treatment. Cross-contaminations can also be avoided by the process without any subsequent disinfection of the dialyzate side.
(50) The invention being thus described, it will be apparent that the same may be varied in many ways. Such variations are not to be regarded as a departure from the spirit and scope of the invention, and all such modifications as would be recognized by one skilled in the art are intended to be included within the scope of the following claims.