MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2270/335
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F22B1/1815
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C9/28
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K9/003
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2270/053
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E20/16
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
F01D17/04
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K9/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K23/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C9/52
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C9/28
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K9/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A gas turbine combined cycle (GTCC) power generation plant (100) equipped with a control unit which performs a load reduction following operation with respect to a fuel adjustment valve (Vd), a main steam valve (V1), and a bypass valve (V4), wherein, when a load reduction request for reducing a GTCC load target value has been input in a closed bypass operation, the degree of opening of the fuel adjustment valve (Vd) is reduced in accordance with the target value while the main steam valve (V1) is in an open state, and the bypass valve (V4) is placed in an open state, after which the bypass valve (V4) is placed in the closed state when the GTCC load reaches the target value.
Claims
1. A combined cycle plant comprising: a gas turbine including a compressor which compresses air, a combustor to which fuel is supplied from a fuel supply line so as to combust the air compressed by the compressor, and a turbine which is rotated using combustion gas generated by the combustor, and in which a fuel regulating valve for regulating a fuel supply amount is disposed in the fuel supply line; a heat recovery steam generator that generates steam by recovering heat of exhaust gas discharged from the gas turbine; a steam turbine that is rotated using the steam generated by the heat recovery steam generator; a main steam line that supplies the steam generated by the heat recovery steam generator to the steam turbine; a main steam valve that is disposed in the main steam line so as to regulate a circulation amount of the steam; a bypass line that is branched from the main steam line, and that is connected to a downstream side of the steam turbine in a flowing direction of the steam; a bypass valve that is disposed in the bypass line so as to regulate the circulation amount of the steam; and a control unit that controls the fuel regulating valve, the main steam valve, and the bypass valve to: perform a bypass closing operation for bringing the main steam valve into an open state to have a predetermined degree of opening, setting an opening degree of the fuel regulating valve to an opening degree according to a target value of a total load of the gas turbine and the steam turbine, and bringing the bypass valve into a closed state, and perform a decreasing load following operation for maintaining the main steam valve in the open state with the predetermined degree of opening while bringing the bypass valve into an open state while the main steam valve is in the open state with the predetermined degree of opening in a case where a load decreasing request to decrease the target value of the total load is input, in the bypass closing operation, decreasing the opening degree of the fuel regulating valve in accordance with the target value, and bringing the bypass valve into a closed state while the main steam valve is in the open state with the predetermined degree of opening in a case where the total load reaches the target value after the bypass valve is brought into the open state.
2. The combined cycle plant according to claim 1, wherein the control unit gradually changes the opening degree of the bypass valve in the decreasing load following operation.
3. The combined cycle plant according to claim 1, wherein in the decreasing load following operation, in a case where the load of the steam turbine increases by bringing the bypass valve into the closed state, the control unit decreases the opening degree of the fuel regulating valve so that the load of the gas turbine decreases in accordance with the increasing load of the steam turbine.
4. The combined cycle plant according to claim 1, further comprising: a condenser that is disposed on the downstream side of the steam turbine in the flowing direction of the steam, wherein the steam turbine and the bypass line are connected to the condenser.
5. The combined cycle plant according to claim 4, further comprising: a cooling water supply unit that supplies cooling water for cooling the condenser to the condenser, wherein the control unit has a pump control unit that increases an amount per unit time of the cooling water supplied to the condenser in the decreasing load following operation so as to be more than an amount per unit time of the cooling water supplied to the condenser in the bypass closing operation.
6. The combined cycle plant according to claim 5, wherein the cooling water supply unit has a first supply unit that supplies the cooling water to the condenser in the bypass closing operation and the decreasing load following operation, and a second supply unit that supplies the cooling water to the condenser together with the first supply unit in the decreasing load following operation.
7. The combined cycle plant according to claim 1, wherein the control unit causes the fuel regulating valve, the main steam valve, the bypass valve to perform an increasing load following operation for waiting for an input of the load increasing request after bringing the main steam valve into an open state and bringing the bypass valve into an open state, in the bypass closing operation, in a case where a load increasing request to increase the target value of the total load is input, increasing the opening degree of the fuel regulating valve in accordance with the target value after the load increasing request is input, and bringing the bypass valve into a closed state.
8. A combined cycle plant comprising: a gas turbine that has a compressor which compresses air, a combustor to which fuel is supplied from a fuel supply line so as to combust the air compressed by the compressor, and a turbine which is rotated using combustion gas generated by the combustor, and in which a fuel regulating valve for regulating a fuel supply amount is disposed in the fuel supply line; a heat recovery steam generator that generates steam by recovering heat of exhaust gas discharged from the gas turbine; a steam turbine that is rotated using the steam generated by the heat recovery steam generator; a main steam line that supplies the steam generated by the heat recovery steam generator to the steam turbine; a main steam valve that is disposed in the main steam line so as to regulate a circulation amount of the steam; a bypass line that is branched from the main steam line, and that is connected to a downstream side of the steam turbine in a flowing direction of the steam; a bypass valve that is disposed in the bypass line so as to regulate the circulation amount of the steam; and a control unit that controls the fuel regulating valve, the main steam valve, and the bypass valve to: perform a bypass closing operation for bringing the main steam valve into an open state, setting an opening degree of the fuel regulating valve to an opening degree according to a target value of a total load of the gas turbine and the steam turbine, and bringing the bypass valve into a closed state, and to perform an increasing load following operation for waiting for an input of a load increasing request after bringing the main steam valve into an open state and bringing the bypass valve into an open state, in the bypass closing operation, in a case where the load increasing request to increase the target value of the total load is input, increasing the opening degree of the fuel regulating valve in accordance with the target value after the load increasing request is input, and bringing the bypass valve into a closed state.
9. The combined cycle plant according to claim 8, wherein the control unit gradually changes the opening degree of the bypass valve in the increasing load following operation.
10. The combined cycle plant according to claim 8, wherein in the increasing load following operation, in a case where the load of the steam turbine decreases by bringing the bypass valve into the open state, the control unit increases the opening degree of the fuel regulating valve so that the load of the gas turbine increases in accordance with the decreasing load of the steam turbine.
11. The combined cycle plant according to claim 8, further comprising: a condenser that is disposed on the downstream side of the steam turbine in the flowing direction of the steam, wherein the steam turbine and the bypass line are connected to the condenser.
12. The combined cycle plant according to claim 11, further comprising: a cooling water supply unit that supplies cooling water for cooling the condenser to the condenser, wherein the control unit has a pump control unit that increases an amount per unit time of the cooling water supplied to the condenser in the increasing load following operation so as to be more than an amount per unit time of the cooling water supplied to the condenser in the bypass closing operation.
13. The combined cycle plant according to claim 12, wherein the cooling water supply unit has a first supply unit that supplies the cooling water to the condenser in the bypass closing operation and the decreasing load following operation, and a second supply unit that supplies the cooling water to the condenser together with the first supply unit in the increasing load following operation.
14. A method for controlling an operation of a combined cycle plant, the combined cycle plant including a gas turbine that has a compressor which compresses air, a combustor to which fuel is supplied from a fuel supply line so as to combust the air compressed by the compressor, and a turbine which is rotated using combustion gas generated by the combustor, and in which a fuel regulating valve for regulating a fuel supply amount is disposed in the fuel supply line, a heat recovery steam generator that generates steam by recovering heat of exhaust gas discharged from the gas turbine, a steam turbine that is rotated using the steam generated by the heat recovery steam generator, a main steam line that supplies the steam generated by the heat recovery steam generator to the steam turbine, a main steam valve that is disposed in the main steam line so as to regulate a circulation amount of the steam, a bypass line that is branched from the main steam line, and that is connected to a downstream side of the steam turbine in a flowing direction of the steam, and a bypass valve that is disposed in the bypass line so as to regulate the circulation amount of the steam, the method comprising: performing a bypass closing operation for bringing the main steam valve into an open state to have a predetermined degree of opening, setting an opening degree of the fuel regulating valve to an opening degree according to a target value of a total load of the gas turbine and the steam turbine, and bringing the bypass valve into a closed state; and performing a decreasing load following operation for maintaining the main steam valve in the open state with the predetermined degree of opening while bringing the bypass valve into an open state while the main steam valve is in the open state with the predetermined degree of opening in a case where a load decreasing request to decrease the target value of the total load is input in the bypass closing operation, decreasing the opening degree of the fuel regulating valve in accordance with the target value, and bringing the bypass valve into a closed state while the main steam valve is in the open state with the predetermined degree of opening in a case where the total load reaches the target value after the bypass valve is brought into the open state.
15. A method for controlling an operation of a combined cycle plant, the combined cycle plant including a gas turbine that has a compressor which compresses air, a combustor to which fuel is supplied from a fuel supply line so as to combust the air compressed by the compressor, and a turbine which is rotated using combustion gas generated by the combustor, and in which a fuel regulating valve for regulating a fuel supply amount is disposed in the fuel supply line, a heat recovery steam generator that generates steam by recovering heat of exhaust gas discharged from the gas turbine, a steam turbine that is rotated using the steam generated by the heat recovery steam generator, a main steam line that supplies the steam generated by the heat recovery steam generator to the steam turbine, a main steam valve that is disposed in the main steam line so as to regulate a circulation amount of the steam, a bypass line that is branched from the main steam line, and that is connected to a downstream side of the steam turbine in a flowing direction of the steam, and a bypass valve that is disposed in the bypass line so as to regulate the circulation amount of the steam, the method comprising: performing a bypass closing operation for bringing the main steam valve into an open state, setting an opening degree of the fuel regulating valve to an opening degree according to a target value of a total load of the gas turbine and the steam turbine, and bringing the bypass valve into a closed state; and performing an increasing load following operation for waiting for an input of a load increasing request after bringing the main steam valve into an open state and bringing the bypass valve into an open state, in the bypass closing operation, in a case where the load increasing request to increase the target value of the total load is input, increasing the opening degree of the fuel regulating valve in accordance with the target value after the load increasing request is input, and bringing the bypass valve into a closed state.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
DESCRIPTION OF EMBODIMENTS
(12) Hereinafter, embodiments of a gas turbine combined cycle (GTCC) power plant according to the present invention will be described with reference to the drawings. The present invention is not limited by the embodiments. In addition, configuration elements in the following embodiments include elements which can be easily replaced by those skilled in the art, or elements which are substantially the same.
First Embodiment
(13)
(14) The gas turbine 10 has a compressor 11, a combustor 12, and a turbine 13. The compressor 11 fetches air from an air introduction line La, and compresses the air into compressed air having high temperature and high pressure.
(15) The combustor 12 supplies fuel to the compressed air supplied from the compressor 11 via a compressed air supply line Lb, and combusts the compressed air with the fuel. A fuel supply line Ld is connected to the combustor 12. The fuel supply line Ld supplies the fuel to the combustor 12. A fuel regulating valve Vd is disposed in the fuel supply line Ld. The fuel regulating valve Vd regulates a fuel supply amount for the combustor 12 by regulating an opening degree. The opening degree of the fuel regulating valve Vd is regulated by the control unit 60.
(16) The turbine 13 is rotated by combustion gas having high temperature and high pressure which is supplied from the combustor 12 via a combustion gas supply line Lc. The turbine 13 is connected to a rotor 14 and a drive shaft 15. The rotor 14 and the drive shaft 15 are rotated by the rotation of the turbine 13. The drive shaft 15 is connected to a generator G1. The generator G1 converts rotational energy of the drive shaft 15 into electric energy, and outputs the electric energy. The generator G1 transmits an output value (load) to the control unit 60. In addition, the turbine 13 discharges the combustion gas (exhaust gas) used for the rotation to an exhaust gas line Le.
(17) The heat recovery steam generator 20 is installed in the exhaust gas line Le, performs heat exchange with the exhaust gas flowing in the exhaust gas line Le, recovers heat of the exhaust gas, and generates steam. The heat recovery steam generator 20 discharges the generated steam to a main steam line L1. The heat recovery steam generator 20 has a heat recovery unit 21. The heat recovery unit 21 is a heat exchanger. A heat medium (steam) flows into a heat transfer tube L0, and the heat recovery unit 21 performs the heat exchange between the exhaust gas flowing outside the heat transfer tube and the heat medium flowing inside the heat transfer tube L0. The heat recovery unit 21 having one heat exchanger is illustrated in
(18) The steam turbine 30 is connected to the main steam line L1. The steam turbine 30 has a turbine 31 and a rotor 32. The turbine 31 is rotated by the steam supplied from the heat recovery steam generator 20 via the main steam line L1. The rotor 32 is rotated by the rotation of the turbine 31. The rotor 32 is connected to a generator G2. The generator G2 converts rotational energy of the rotor 32 into electric energy, and outputs the electric energy. The generator G2 transmits an output value (load) to the control unit 60. The turbine 31 discharges the steam used for the rotation to the discharge line L2.
(19) The main steam line L1 has a main steam valve V1. The main steam valve V1 regulates a flow rate of the steam circulating in the main steam line L1. An opening/closing operation of the main steam valve V1 is controlled by the control unit 60.
(20) In addition, the main steam line L1 has a bypass line L4. The bypass line L4 is branched from the main steam line L1, and is connected to the discharge line L2 on a downstream side of the steam turbine 30 in a flowing direction of the steam. The bypass line L4 supplies at least some of the steam circulating in the main steam line L1 to the discharge line L2 by causing the steam to bypass the steam turbine 30. The bypass line L4 has a bypass valve V4. The bypass valve V4 regulates a flow rate of the steam circulating in the bypass line L4. An opening/closing operation of the bypass valve V4 is controlled by the control unit 60.
(21) The condenser 40 is disposed on the downstream side of the steam turbine 30 in the flowing direction of the steam, and is connected to the discharge line L2, for example. The condenser 40 condenses moisture in the steam supplied from the discharge line L2 so as to generate a condensate. The condenser 40 discharges the generated condensate to the condensate line L3. The condensate line L3 is connected to the above-described heat transfer tube L0. Therefore, the condensate supplied from the condensate line L3 circulates in the heat transfer tube L0.
(22) The cooling water supply unit 50 supplies cooling water to the condenser 40. The cooling water supply unit 50 has a water intake pipe 51 and a drain pipe 52. One end of the water intake pipe 51 is disposed in the sea, and the other end is connected to the condenser 40. The water intake pipe 51 has a first pump 53. The first pump fetches seawater, causes the seawater to circulate in the water intake pipe 51, and supplies the seawater to the condenser 40. One end of the drain pipe 52 is connected to the condenser 40, and the other end is disposed in the sea. The drain pipe 52 causes the cooling water supplied to the condenser 40 and used for cooling to circulate and return to the sea.
(23) In addition, the cooling water supply unit 50 has a branch pipe 54. The branch pipe 54 is branched from a first portion 51a on an upstream side of the first pump 53 in the water intake pipe 51 in the flowing direction of the cooling water. In addition, the branch pipe 54 is connected to a second portion 51b on the downstream side of the first pump 53 in the water intake pipe 51 in the flowing direction of the cooling water. Therefore, the branch pipe 54 is connected to the water intake pipe 51 so as to bypass the first pump 53. The branch pipe 54 has a second pump 55. The second pump 55 fetches the seawater, and causes the seawater to circulate from the water intake pipe 51 through the first portion 51a and the branch pipe 54 to the second portion 51b and the water intake pipe 51, thereby supplying the seawater to the condenser 40.
(24) The control unit 60 controls an operation of each unit of the GTCC power plant 100.
(25) The main steam valve control unit 61 controls an opening/closing operation of the main steam valve V1. The bypass valve control unit 62 controls an opening/closing operation of the bypass valve V4. The bypass valve control unit 62 can regulate an opening degree of the bypass valve V4. The fuel regulating valve control unit controls an opening/closing operation of the fuel regulating valve Vd. The fuel regulating valve control unit 63 can regulate an opening degree of the fuel regulating valve Vd. The pump control unit 64 controls each operation of the first pump 53 and the second pump 55. The pump control unit 64 can separately control each operation of the first pump 53 and the operation of the second pump 55.
(26) Subsequently, an operation of the GTCC power plant 100 configured as described above will be described.
(27) First, the control unit 60 activates the gas turbine 10. In the gas turbine 10, the compressor 11 compresses the air. The compressed air and the fuel are combusted in the combustor 12, and the turbine 13 is rotated using the combustion gas. The generator G1 starts power generation by rotating the turbine 13, and transmits an output value to the control unit 60.
(28) In this operation, the control unit 60 regulates an opening degree of the fuel regulating valve Vd in accordance with a target value (Step S10). For example, in a case where the GTCC power plant 100 performs a constant load operation, the control unit 60 sets a target value of the total load of the gas turbine 10 and the steam turbine 30 (hereinafter, referred to as a GTCC load) to 100%. Then, the control unit 60 regulates an opening degree of the fuel regulating valve Vd so that the GTCC load is 100%. A relationship between the target value and the opening degree of the fuel regulating valve Vd can be obtained in advance and stored in the control unit 60 as a data table.
(29) In the control unit 60, the main steam valve control unit 61 sets the main steam valve V1 to an open state (Step S20) with a predetermined degree of opening, and the bypass valve control unit 62 sets the bypass valve V4 to a closed state (Step S30). In Step S20 and Step S30, the main steam line L1 is opened, and the bypass line L4 is closed.
(30) In addition, in the control unit 60, the pump control unit 64 activates the first pump 53, and supplies the cooling water to the condenser 40 (Step S40). In this way, in Step S10 to Step S40, the control unit 60 sets the main steam valve V1 to an open state, and sets an opening degree of the fuel regulating valve Vd to an opening degree according to the target value of the GTCC load, thereby performing a bypass closing operation for bringing the bypass valve V4 into a closed state. The control unit 60 may perform all operations in Step S20 to Step S40 at the same time, or may perform at least one operation at a different time.
(31) In the gas turbine 10, the turbine 13 discharges exhaust gas G to the exhaust gas line Le. The exhaust gas G is supplied to the heat recovery steam generator 20 via the exhaust gas line Le. The heat recovery steam generator 20 absorbs exhaust heat of the exhaust gas G supplied from the exhaust gas line Le, and generates steam S1.
(32) In the steam turbine 30, the turbine 31 is rotated using the steam S1 supplied from the heat recovery steam generator 20. The generator G2 starts power generation by rotating the turbine 31, and transmits an output value to the control unit 60. The steam turbine 30 discharges steam S2 used for the rotation, and supplies the steam S2 to the condenser 40 via the discharge line L2. The condenser 40 condenses moisture in the supplied steam S2 so as to generate a condensate W, and supplies the condensate W to the heat recovery steam generator 20 via the condensate line L3. The cooling water supply unit 50 cools the condenser 40 by causing the first pump 53 to supply cooling water R to the condenser 40. The cooling water R used in cooling the condenser 40 is discharged into the sea from the drain pipe 52.
(33) In this way, the generator G1 generates power by the operation of the gas turbine 10, and the generator G2 generates power by the operation of the steam turbine 30. In a case where the GTCC load reaches the target value of 100%, the GTCC power plant 100 performs a constant load operation (time t1).
(34) Next, the control unit 60 detects whether or not a load decreasing request for decreasing the target value of the GTCC load from 100% is input (Step S50). The load decreasing request is input in a case where the GTCC load of the GTCC power plant 100 is decreased, for example, such as in a case where a demand drops in a power system.
(35) In a case where the input of the load decreasing request is detected (Yes in Step S50, time t2), the control unit 60 performs a decreasing load following operation so as to cause the GTCC load to follow a new target value set in the load decreasing request. Hereinafter, the decreasing load following operation in a case where the load decreasing request to decrease the target value of the GTCC load to 80% is input will be described in detail as an example.
(36) The pump control unit 64 activates the second pump (Step S60). The second pump 55 is activated, thereby causing the fetched seawater to flow from the water intake pipe 51 to the first portion 51a and the branch pipe 54. The seawater flows through the second portion 51b and the water intake pipe 51 so as to be supplied to the condenser 40. Therefore, the condenser 40 is cooled using the cooling water R supplied by the first pump 53 and the cooling water R supplied by the second pump 55. Therefore, the amount of the cooling water R per unit time for cooling the condenser 40 increases compared to a case where only the first pump 53 is activated. In a case where the bypass valve V4 is in an open state, the steam S1 which does not flow by way of the steam turbine 30 is supplied to the condenser 40. The steam S1 has more thermal energy than the steam S2 which flows by way of the steam turbine 30. The cooling water R is supplied to the condenser 40 by the first pump 53 and the second pump 55. Accordingly, unnecessary temperature rising of the cooling water R in the condenser 40 is suppressed, and temperature rising in an outlet of the condenser 40 is suppressed.
(37) In addition, the fuel regulating valve control unit decreases an opening degree of the fuel regulating valve Vd in accordance with the new target value set in the load decreasing request (Step S70). That is, the fuel regulating valve control unit 63 decreases the opening degree of the fuel regulating valve Vd in order to decrease the fuel supply amount to be supplied to the combustor 12. At this time, the fuel regulating valve control unit 63 controls the opening degree of the fuel regulating valve Vd so that the opening degree gradually decreases with the lapse of time.
(38) In addition, the bypass valve control unit 62 changes the bypass valve V4 so as to be in an open state (Step S70, time t2 to time t3) while the main steam valve V1 is still in the open state with the predetermined degree of opening (see
(39) In Step S70, the bypass valve control unit 62 gradually increases an opening degree of the bypass valve V4 with the lapse of time. For example, as illustrated in
(40) The GTCC power plant 100 changes the bypass valve V4 so as to be in an open state. In this manner, some of the steam S1 flowing from the heat recovery steam generator 20 to the main steam line L1 flows to the bypass line L4. Therefore, the supply amount of the steam S1 supplied to the steam turbine 30 decreases. The time required until the amount of the steam supplied to the steam turbine 30 decreases after the bypass valve V4 is changed so as to be in the open state is faster than the time required until the amount of the steam generated in the heat recovery steam generator 20 decreases as the load of the gas turbine 10 decreases. Therefore, the load of the steam turbine 30 efficiently decreases.
(41) Thereafter, the control unit 60 detects whether or not the GTCC load reaches the target value (Step S80), and continuously performs the above-described operation until the GTCC load reaches the target value (No in Step S80). In a case where it is detected that the GTCC load reaches the target value (Yes in the Step S80, time t4), the bypass valve control unit 62 changes the bypass valve V4 so as to be in a closed state (Step S90).
(42) In this step, the bypass valve control unit 62 gradually decreases an opening degree of the bypass valve V4 with the lapse of time. For example, as illustrated in
(43) In addition, in a case of decreasing the opening degree of the bypass valve V4, the steam S1 flowing in the bypass line L4 so far flows through the main steam line L1. Therefore, the amount of the steam S1 supplied to the steam turbine 30 increases, and the load of the steam turbine 30 increases. Therefore, the fuel regulating valve control unit 63 decreases an opening degree of the fuel regulating valve Vd (Step S90). In the present embodiment, the operation for causing the fuel regulating valve control unit 63 to decrease the opening degree of the fuel regulating valve Vd is performed in parallel with the operation for causing the above-described bypass valve control unit 62 to change the bypass valve V4 so as to be in the closed state. In this regard, both the operations are described in Step S90 in the same manner. However, the present invention is not limited thereto. For example, any one of the operations may be performed earlier. In this step, the opening degree of the fuel regulating valve Vd decreases. Accordingly, the load of the gas turbine 10 decreases. The control unit 60 suppresses fluctuations in the GTCC load by decreasing the load of the gas turbine 10 with respect to an increase in the load of the steam turbine 30.
(44) In
(45) In addition, if the bypass valve V4 is brought into a fully closed state, the bypass line L4 is closed. Accordingly, the steam Si is not supplied to the condenser 40 from the main steam line L1. Therefore, it is less necessary to supply the cooling water R by using the second pump 55. Therefore, in a case where the bypass valve V4 is brought into the fully closed state, the pump control unit 64 stops the operation of the second pump 55 (Step S100, time t5). After the operation of the second pump 55 is stopped or in a case where the input of the load decreasing request is not detected in Step S50 (No in Step S50), it is detected whether or not an operation completion instruction of the GTCC power plant 100 is input (Step S110). In a case where If the operation completion instruction is detected, the operation is completed (Yes in Step S110). In addition, in a case where the operation completion instruction is not detected (No in Step S110), the operation subsequent to Step S50 is repeatedly performed. In this way, the control unit 60 performs the decreasing load following operation.
(46) As described above, in the GTCC power plant 100 according to the present embodiment, in a case where the load decreasing request is input, in the decreasing load following operation, some of the steam S1 flowing from the heat recovery steam generator 20 to the main steam line L1 are caused to flow to the bypass line L4. Therefore, the supply amount of the steam S1 supplied to the steam turbine 30 decreases. In this manner, it is possible to efficiently decrease the load of the steam turbine 30 so as to satisfy the load decreasing request. Therefore, it is possible to improve load followability of the steam turbine 30.
(47)
(48) As illustrated in
(49) In addition, according to the present embodiment, in a case where the opening degree of the fuel regulating valve Vd is regulated, the fuel regulating valve control unit 63 gradually decreases the opening degree with the lapse of time. In addition, in a case where the bypass valve V4 is switched between an open state and a closed state, the bypass valve control unit 62 gradually changes the opening degree with the lapse of time. In this manner, sudden fluctuations in the load of the gas turbine 10 and the steam turbine 30 can be suppressed. Therefore, poor power supply quality can be suppressed.
Second Embodiment
(50) Next, a second embodiment will be described. In the second embodiment, an operation in a case where a load increasing request to increase the GTCC load is input when the bypass closing operation is performed in the GTCC power plant 100 will be described. The load increasing request is input in a case of increasing the GTCC load, for example such as a case where an increasing demand is expected in the power system.
(51)
(52) The control unit 60 performs the bypass closing operation for bringing the main steam valve V1 into an open state, setting an opening degree of the fuel regulating valve Vd to an opening degree according to the target value of the GTCC load, and bringing the bypass valve V4 into a closed state. In the second embodiment, for example, the control unit 60 sets the opening degree of the fuel regulating valve Vd so that the GTCC power plant 100 has 80% of the GTCC load. The second embodiment shows a case where the target value of the GTCC load is increased in a state of the bypass closing operation. Accordingly, the target value of the GTCC load in the bypass closing operation may be less than 100%.
(53) In this state, in a case of time t6 which is a predetermined time earlier than time t8 at which the input of the load increasing request is scheduled, the control unit 60 performs the increasing load following operation for causing the GTCC load to follow a new target value set in the load increasing request. The predetermined time (the time from time t6 to time t8) can be set in advance. Hereinafter, the increasing load following operation in a case where the load increasing request to increase the target value of the GTCC load up to 100% is input will be described in detail as an example.
(54) The bypass valve control unit 62 changes the bypass valve V4 so as to be in an open state (Step S210). Since the bypass valve V4 is set to the open state, the bypass line L4 is opened, and the main steam line L1 and the discharge line L2 are connected to each other. Therefore, some of the steam S1 flowing in the main steam line L1 is fed to the discharge line L2 via the bypass line L4, and is supplied to the condenser 40.
(55) In Step S210, the bypass valve control unit 62 gradually increases the opening degree of the bypass valve V4 with the lapse of time. For example, as illustrated in
(56) In addition, in a case where the bypass valve V4 is opened, some of the steam S1 flowing in the main steam line L1 so far flows to the bypass line L4. Therefore, the amount of the steam S1 supplied to the steam turbine decreases, and the load of the steam turbine 30 decreases. Therefore, the fuel regulating valve control unit 63 regulates the fuel regulating valve Vd so that the opening degree of the fuel regulating valve Vd increases (Step S220). In Step S220, the opening degree of the fuel regulating valve Vd increases. Accordingly, the load of the gas turbine 10 increases. The control unit 60 suppresses fluctuations in the GTCC load by increasing the load of the gas turbine 10 with respect to a decrease in the load of the steam turbine 30.
(57) In
(58) In addition, the pump control unit 64 activates the second pump 55 (Step S230). As the second pump 55 is activated, the fetched seawater flows from the water intake pipe 51 to the first portion 51a and the branch pipe 54, flows to the second portion 51b and the water intake pipe 51, and is supplied to the condenser 40. The cooling water R is supplied to the condenser 40 by the first pump 53 and the second pump 55. Accordingly, unnecessary temperature rising of the cooling water R in the condenser 40 is suppressed, and temperature rising in an outlet of the condenser 40 is suppressed.
(59) In this state, the control unit 60 detects whether or not the load increasing request is input (Step S240), and waits until the load increasing request is input (No in Step S240). In a case where the load increasing request is input (Yes in Step S240), the fuel regulating valve control unit 63 increases the opening degree of the fuel regulating valve Vd according to a new target value set in the load increasing request (Step S250). In this step, the fuel regulating valve control unit 63 controls the opening degree of the fuel regulating valve Vd so that the opening degree gradually increases with the lapse of time.
(60) In addition, the bypass valve control unit 62 maintains the bypass valve V4 so as to be in an open state even after time t8 to input the load increasing request elapses, and changes the bypass valve V4 so as to be a closed state at time t9 after a predetermined time elapses (Step S250). The time to maintain the bypass valve V4 so as to be in the open state after the load increasing request is input, that is, the time from time t8 to time t9 may be set in advance. For example, depending on a value of the GTCC load, the control unit 60 may calculate the time. In the present embodiment, the operation for causing the bypass valve control unit 62 to change the bypass valve V4 so as to be in the closed state is performed in parallel with the operation for causing the above-described the fuel regulating valve control unit 63 to increase the opening degree of the fuel regulating valve Vd. In this regard, both the operations are described in Step S250 in the same manner. However, the present invention is not limited thereto. For example, any one of the operations may be performed earlier. In this step, the bypass valve control unit 62 gradually decreases the opening degree of the bypass valve V4 with the lapse of time. For example, as illustrated in
(61) The GTCC power plant 100 brings the bypass valve V4 into a closed state. In this manner, the flow of the steam S1 is blocked in the bypass line L4, and the steam S1 flows from the heat recovery steam generator 20 to the main steam line L1. Therefore, the supply amount of the steam S1 supplied to the steam turbine 30 increases. The time required until the amount of the steam supplied to the steam turbine 30 increases after the bypass valve V4 is changed so as to be in the closed state is faster than the time required until the steam generation amount increases in the heat recovery steam generator 20 as the load of the gas turbine 10 increases. Therefore, the load of the steam turbine 30 efficiently increases.
(62) In
(63) In addition, in a case where the bypass valve V4 is in the fully closed state, the pump control unit 64 stops the operation of the second pump 55 (Step S260, time t10). In this way, the control unit 60 performs the increasing load following operation.
(64) As described above, the GTCC power plant 100 according to the present embodiment causes some of the steam S1 flowing from the heat recovery steam generator 20 to the main steam line L1 to flow in the bypass line L4 in advance. In a case where the load increasing request is input, the steam S1 caused to flow in the bypass line L4 in advance is caused to flow to the main steam line L1. Accordingly, the supply amount of the steam S1 supplied to the steam turbine 30 can be efficiently increased. In this case, the load of the steam turbine 30 can be increased earlier than when the steam generation amount increases in the heat recovery steam generator 20 as the load of the gas turbine 10 increases. In this manner, it is possible to improve load followability of the steam turbine 30.
(65)
(66) As illustrated in
(67) The technical scope of the present invention is not limited to the above-described embodiments, and appropriate modifications can be added thereto without departing from the spirit of the present invention. For example, in the above-described embodiments, the operation in a case where the GTCC power plant 100 performs each of the decreasing load following operation and the increasing load following operation has been described as an example. However, the present invention is not limited thereto. A configuration may be adopted in which both the decreasing load following operation and the increasing load following operation can be performed.
(68)
(69) Next, the control unit 60 detects whether or not the load decreasing request for decreasing the target value of the GTCC load is input (Step S320). In a case where the input of the load decreasing request is detected (Yes in Step S320), the control unit 60 performs the decreasing load following operation in order to cause the GTCC load to follow a new target value set in the load decreasing request (Step S330). In Step S330, as the decreasing load following operation, the GTCC power plant 100 performs operations in Step S60 to Step S100 in the first embodiment, for example.
(70) In a case where the input of the load decreasing request is not detected (No in Step S320), the control unit 60 detects whether or not the load increasing request to increase the target value of the GTCC load is scheduled (Step S340). In a case where it is detected that the input of the load increasing request is scheduled (Yes in Step S340), the control unit 60 performs the increasing load following operation in order to cause the GTCC load to follow a new target value in a case where the load increasing request is input (Step S350). In Step S350, as the increasing load following operation, the GTCC power plant 100 performs operations in Step S210 to Step S260 in the second embodiment, for example.
(71) After the decreasing load following operation is performed, after the increasing load following operation is performed, or in a case where it is not detected that the input of the load increasing request is scheduled (No in Step S340), the control unit 60 determines whether or not to complete the operation of the GTCC power plant 100 (Step S360). In a case where it is determined to complete the operation (Yes in Step S360), the control unit 60 completes the operation of the GTCC power plant 100 in accordance with the determination. In a case where it is determined to continue the operation (No in Step S360), the GTCC power plant 100 repeatedly performs operations subsequent to Step S320.
(72) In this manner, the GTCC power plant 100 can efficiently increase or decrease the load of the steam turbine 30 even in a case where any one of the load decreasing request and the load increasing request is input. In this manner, it is possible to improve load followability of the steam turbine.
(73) In the above-described embodiments, the configuration including one steam turbine 30 has been described as an example. However, the present invention is not limited thereto. A configuration may be adopted in which the steam turbines 30 are disposed in multiple stages. In addition, in a case where the steam turbines 30 are disposed at multiple stages, a downstream side end portion of the bypass line L4 may be connected between the steam turbine on the high-pressure side and the steam turbine on the low-pressure side.
(74) In addition, in the above-described embodiments, the case where the control unit 60 changes the opening degree of the bypass valve V4 and the fuel regulating valve Vd at a fixed rate in the decreasing load following operation and the increasing load following operation has been described as an example. However, the present invention is not limited thereto. For example, the control unit 60 may change the opening degree of the bypass valve V4 and the fuel regulating valve Vd in a stepwise manner. In addition, the control unit 60 may gradually increase or decrease a changing rate of the opening degree of the bypass valve V4 and the fuel regulating valve Vd.
(75) In addition, in the above-described embodiment, the following case has been described as an example. In a case where the load of the steam turbine 30 is increased by closing the bypass valve V4 in the decreasing load following operation, the load of the gas turbine 10 is decreased in order to suppress the fluctuations in the GTCC load. However, the present invention is not limited thereto. For example, if the fluctuations in the GTCC load fall within an allowable range, the load of the gas turbine 10 may not be decreased.
(76) Similarly, the following case has been described as an example. In a case where the load of the gas turbine 10 is increased in order to suppress fluctuations in the GTCC load in a case where the load of the steam turbine 30 is decreased by opening the bypass valve V4 in the increasing load following operation. However, as long as the fluctuations in the GTCC load fall within an allowable range, the load of the gas turbine 10 may not be increased.
(77) In addition, in the above-described embodiments, the following case has been described as an example. In the cooling water supply unit 50, the cooling water fetched by the first pump 53 and the second pump 55 merges at the second portion 51b of the water intake pipe 51, and is supplied to the condenser 40. However, the present invention is not limited thereto. For example, a configuration may be adopted in which the cooling water fetched up by the first pump 53 and the cooling water fetched by the second pump 55 are supplied to the condenser 40 via mutually different paths.
REFERENCE SIGNS LIST
(78) G: EXHAUST GAS G1, G2: GENERATOR La: AIR INTRODUCTION LINE Lb: COMPRESSED AIR SUPPLY LINE Lc: COMBUSTION GAS SUPPLY LINE Ld: FUEL SUPPLY LINE Le: EXHAUST GAS LINE L0: HEAT TRANSFER TUBE L1: MAIN STEAM LINE L2: DISCHARGE LINE L3: CONDENSATE LINE L4: BYPASS LINE R: COOLING WATER S1, S2: STEAM t1, t2, t3, t4, t5, t6, t7, t8, t9: TIME Vd: FUEL REGULATING VALVE V1: MAIN STEAM VALVE V4: BYPASS VALVE W: CONDENSATE 10: GAS TURBINE 11: COMPRESSOR 12: COMBUSTOR 13, 31: TURBINE 14, 32: ROTOR 15: DRIVE SHAFT 20: HEAT RECOVERY STEAM GENERATOR 21: HEAT RECOVERY UNIT 30: STEAM TURBINE 40: CONDENSER 50: COOLING WATER SUPPLY UNIT 51: WATER INTAKE PIPE 51a: FIRST PORTION 51b: SECOND PORTION 52: DRAIN PIPE 53: FIRST PUMP 54: BRANCH PIPE 55: SECOND PUMP 60: CONTROL UNIT 61: MAIN STEAM VALVE CONTROL UNIT 62: BYPASS VALVE CONTROL UNIT 63: FUEL REGULATING VALVE CONTROL UNIT 64: PUMP CONTROL UNIT 100: GTCC POWER PLANT 102, 104, 106, 108: CURVE