Methods and Apparatus for Installing Solar Panels
20200412295 ยท 2020-12-31
Inventors
- Travis James Miller (Cypress, TX, US)
- Farzad Azizi (Houston, TX, US)
- Ben Mintz (Houston, TX, US)
- Frank Benjamin Springett (Spring, TX)
Cpc classification
F24S25/12
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E10/47
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02S10/00
ELECTRICITY
H02S20/30
ELECTRICITY
F24S30/425
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02P80/20
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
Abstract
Several pre-assemblies holding panels of photovoltaic cells are constructed and pre-wired in a factory. The pre-assemblies are shipped to a solar farm, where they are lifted above posts secured to the ground using, for example, using an excavator connected to an end effector. The pre-assemblies are then connected to the posts and electrically coupled to one another. Such installation of solar panels in a solar farm may be faster and less labor-intensive than other types of installation.
Claims
1. A method of installing solar panels, comprising: forming a pre-assembly at a first site, the pre-assembly including a plurality of frames, and a rail, each of the plurality of frames holding a panel of photovoltaic cells, and each of the plurality of frames being mounted to the rail; lifting the pre-assembly to a position above posts secured at a second site, the second site being remote from the first site; and connecting the pre-assembly to the posts.
2. The method of claim 1, wherein the first site is a factory and the second site is a solar farm.
3. The method of claim 1, further comprising: forming a plurality of pre-assemblies at the first site, wherein each of the plurality of pre-assemblies includes a plurality of frames, and a rail; forming a first arrangement of the plurality of pre-assemblies on a transportation means, wherein some of the pre-assemblies forming the first arrangement are flipped relative to others of the pre-assemblies forming the first arrangement; and forming a second arrangement of a portion of the plurality of pre-assemblies on another transportation means, wherein none of the pre-assemblies forming the second arrangement is flipped relative to any of the pre-assemblies forming the second arrangement, whereby a number of pre-assemblies per a given volume is larger in the first arrangement than in the second arrangement.
4. The method of claim 3, wherein the first arrangement is formed at the first site and the second arrangement is formed at the second site.
5. The method of claim 3, wherein some of the pre-assemblies forming the first arrangement are staggered relative to others of the pre-assemblies forming the first arrangement.
6. The method of claim 1, further comprising: forming a plurality of pre-assemblies at the first site, wherein each of the plurality of pre-assemblies includes a plurality of frames, and a rail; transporting each of the plurality of pre-assemblies from the first site to the second site using a transportation means; connecting each of the plurality of pre-assemblies to the posts secured at the second site; and electrically coupling the plurality of pre-assemblies to one another.
7. The method of claim 1, wherein the pre-assembly further comprises bearing subassemblies mounted to the rail, wherein connecting the pre-assembly to the posts comprises sliding at least one of the bearing subassemblies along the rail and connecting the bearing subassemblies to the posts, and either each of the bearing subassemblies consists essentially of inner bearings coupled to the rail and outer bearings movable relative to the outer bearing, and connecting the bearing subassemblies to the posts comprises: coupling a first bearing housing portion to the posts, and coupling a second bearing housing portion to the first bearing housing portion, or each of the bearing subassemblies comprises an inner bearing coupled to the rail, an outer bearing movable relative to the inner bearing, and a bearing housing coupled to the outer bearing, and connecting the bearing subassemblies to the posts comprises: coupling the bearing housing to one if the posts.
8. The method of claim 1, wherein the rail includes one rail component, or a plurality of rail components joined to one another.
9. The method of claim 1, wherein each of the plurality of frames is fixedly mounted to the rail, or each of the plurality of frames is rotatably mounted to the rail.
10. A method of installing solar panels, comprising: providing a pre-assembly, the pre-assembly including a plurality of frames, and a rail, each of the plurality of frames holding a panel of photovoltaic cells, each of the plurality of frames being mounted to the rail; coupling a temporary support to a post secured at an installation site, the temporary support including a stand having a foot and a rest located above the foot at a height that is adjustable, and a rail alignment means secured to the stand, and a rail receptacle secured to the stand; lifting the pre-assembly to a position above the post; lowering the pre-assembly while maintaining contact of the rail of the pre-assembly against the rail alignment means; engaging the rail with the rail receptacle; supporting the pre-assembly on the adjustable rest; adjusting the height of the rest so that the pre-assembly registers with a top of the post; and connecting the pre-assembly to the post.
11. The method of claim 10, further comprising: adjusting the height of the rest so that the post supports the pre-assembly; disengaging the rail from the rail receptacle; and decoupling the temporary support from the post.
12. The method of claim 11, wherein lifting the pre-assembly to the position above the post is performed using an excavator connected to an end effector.
13. The method of claim 11, wherein lifting the pre-assembly to the position above the post is performed using a standard lifting means.
14. The method of claim 10, wherein the pre-assembly is indirectly connected to the post via one or more of an inner bearing coupled to the rail, an outer bearing movable relative to the inner bearing, and a bearing housing coupled to the outer bearing.
15. A pre-assembly for expediting installation of solar panels, comprising: a plurality of frames, each of the plurality of frames holding a panel of photovoltaic cells; and a rail, wherein each of the plurality of frames is mounted to the rail; wherein the pre-assembly is not connected to any post secured at an installation site.
16. The pre-assembly of claim 15, wherein each of the plurality of frames is pre-wired.
17. The pre-assembly of claim 15, wherein the pre-assembly further comprises bearing subassemblies mounted to the rail, and either each of the bearing subassemblies consists essentially of inner bearings coupled to the rail and outer bearings movable relative to the outer bearing, or each of the bearing subassemblies comprises an inner bearing coupled to the rail, an outer bearing movable relative to the inner bearing, and a bearing housing coupled to the outer bearing.
18. The pre-assembly of claim 15, wherein the rail includes one rail component, or a plurality of rail components joined to one another.
19. The pre-assembly of claim 15, wherein each of the plurality of frames is fixedly mounted to the rail, or each of the plurality of frames is rotatably mounted to the rail.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0025] For a more detailed description of the embodiments of the disclosure, reference will now be made to the accompanying drawings, wherein:
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
DETAILED DESCRIPTION
[0040] This disclosure describes a method that involves the construction of pre-assemblies of frames, each frame holding one or more panel(s) of photovoltaic cells. The pre-assemblies are shipped from a first site, such as a factory, to a second site, such as a solar farm where the pre-assemblies are installed on post secured into the ground. This disclosure also describes a method of lifting the pre-assemblies from a transportation means, such as a truck trailer, train, vessel, or a shipping container, and positioning them on temporary supports located next to posts secured in the ground at a solar farm. The temporary supports include alignment means that do not require precise control of the lifting. Thus, a lifting means, such as an excavator, crane, jacks, gantry, lift tower, hoist, or forklift, may be used to lift the pre-assemblies. The temporary supports permit a few workers to connect the pre-assemblies to the posts and then, the pre-assemblies together. In some embodiments, the pre-assemblies may be connected together electrically as well as mechanically. In some embodiments, the pre-assemblies may only be connected together electrically.
[0041]
[0042] The pre-assembly 10 includes a plurality of frames 12, a rail 16, and bearing subassemblies 14. Each of the plurality of frames 12 holds one or more panel(s) of photovoltaic cells.
[0043] Each of the plurality of frames 12 is fixedly mounted to the rail 16, for example, using clamping mechanisms. Alternatively, each of the plurality of frames 12 may be rotatably mounted to the rail 16, and may rotate around it before their installation on a solar farm.
[0044] The bearing subassemblies 14 are mounted to the rail 16 so that they can slide along the rail 16 to accommodate variations in the spacing between the posts on which they will be coupled. Alternatively, without compromising the capability to accommodate variations in the spacing between the posts on which the bearing subassemblies 14 will be coupled, one of the bearing subassemblies 14 can be mounted to the rail 16 so that it cannot slide along the rail 16, and the other of the bearing subassemblies 14 can be mounted to the rail 16 so that it can slide along the rail 16.
[0045] In the embodiment shown in
[0046] The panels(s) of photovoltaic cells may be pre-wired, and the wiring tested at the factory. In some embodiments, the pre-assembly 10 may include motorization to effect rotation of the rail 16 inside the bearing subassemblies 14, and/or panel washing circuitry.
[0047] In some embodiments, a shipping arrangement of a plurality of pre-assemblies 10 may be assembled on a trailer at or near the factory.
[0048] The shipping arrangement may not be convenient for delivering the pre-assemblies 10 and 10a in the solar farm. However, the shipping arrangement may be relatively compact, that is, it may accommodate a larger number of pre-assemblies 10 per a given volume than other arrangements. Accordingly, the shipping arrangement may reduce the number of trailers needed to transport the pre-assemblies.
[0049]
[0050] The delivery arrangement may be assembled near or at the solar farm. Alternatively, the delivery arrangement may be assembled at the factory, for example, when the distance between the factory and the solar farm is sufficiently short.
[0051] While
[0052]
[0053] Workers may have previously coupled a temporary support 26 to each post 28. The temporary support 26 is used to guide, and properly position the pre-assembly 10 above the posts 28. Thus, the excavator 24 is not required to provide a precisely controlled placement of the pre-assembly 10 above the post 28.
[0054] While
[0055] Furthermore, while
[0056]
[0057] Finally, the workers can adjust the height of the temporary support 26 so that the posts 28 support the pre-assembly 10. Then, the workers can disengage the rail 16 of the pre-assembly 10 from the rail temporary support 26, and decouple the temporary support 26 from the posts 28. The temporary support 26 may then be moved to another post and used again to connect another pre-assembly 10 to posts 28.
[0058]
[0059]
[0060]
[0061] In use, the excavator lowers the pre-assembly while maintaining contact of the rail of the pre-assembly against the alignment plate 32 until the pre-assembly is supported on the adjustable rest 34. The rail engages the receptacle 36, which maintains the position of the rail above the post.
[0062] In some embodiments, the receptacle 36 is coupled to the stand via a quick-release connection, so that the rail can be rapidly disengaged once it is connected to the post.
[0063] While
[0064]
[0065] The foldable pre-assembly 10 shown in
[0066] The foldable pre-assembly 10 shown in
[0067] The foldable pre-assembly 10 shown in
[0068] Like the pre-assembly shown in
[0069] Like the pre-assembly shown in
[0070]
[0071]
[0072] Similarly to
[0073] The positioning of the foldable pre-assembly 10 shown in
[0074] The connection of the foldable pre-assembly 10 shown in
[0075] In other embodiments, the bearing subassembly 14 may consist essentially of an inner bearing that is mounted to the rail assembly. Furthermore, the outer bearing may comprise first and second components jointed to the bearing housing portions 14a and 14b, respectively. For example, the first outer bearing component may be shaped like the lower profile of the inner bearing so that it can receive the inner bearing portion, and the second outer bearing component may be shaped like the upper profile of the inner bearing portion such that when the bearing housing portion 14b is connected to the bearing housing portions 14b, the first and second components of the outer bearing come in contact with and surround the inner bearing. In such embodiments, workers may couple the bearing housing portions 14a and the first outer bearing component joined thereto to each post 28. The workers may then align the bearing subassemblies 14 with the bearing housing portions 14a and the first outer bearing components previously coupled to the posts 28. Finally, the workers may connect the bearing housing portion 14b and the second outer bearing component joined thereto to the outer bearing portion 14a and the first outer bearing component.
[0076]
[0077] Since the foldable pre-assemblies 10 have been pre-wired at the factory, the workers may only need to electrically couple the wirings of the pre-assemblies together. In some embodiments, the workers may also need to couple the lines controlling the motorization to effect rotation of the pre-assemblies 10, and/or circuitry for washing the pre-assemblies 10.
[0078] In the embodiment shown in
[0079]
[0080] It should be appreciated that the temporary support shown in
[0081] While the posts 28 are described herein as being secured into the ground, the post may be secured into any suitable medium for securing solar panels, including concrete slabs, or metallic frames.
[0082] The disclosure is susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and description. It should be understood, however, that the drawings and detailed description thereto are not intended to limit the claims to the particular form disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the scope of the claims.