AN OFFSHORE WIND FARM AND SUBSTATION
20200370537 · 2020-11-26
Assignee
Inventors
Cpc classification
F03D13/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2240/95
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/76
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F05B2240/85
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2220/706
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F03D9/257
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2240/96
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/72
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
F03D9/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
H02J3/38
ELECTRICITY
Abstract
An offshore wind farm (1) comprising a number of wind turbine generator arrays (5). Each wind turbine generator array (5) comprises an array transformer (6) and a number of wind turbine generators (6) connected, in use, electrically to the array transformer (8). The array transformer (8) is associated with one wind turbine generator (6) among said number of wind turbine generators (6) and each array transformer (8) is, in use, electrically connected a bus bar (17) on the offshore substation (4). The bus bar (17) on the offshore substation is, in use, directly connected electrically to an export cable (3) or an HVDC converter (18).
Claims
1.-14. (canceled)
15. An offshore wind farm, comprising: a plurality of wind turbine generator arrays, each wind turbine generator array comprising: an array transformer; and a plurality of wind turbine generators electrically connected to the array transformer, wherein the array transformer is co-located with one of the wind turbine generators; and an offshore substation having a bus bar, wherein the array transformers of the plurality of wind turbine generator arrays are electrically connected to the bus bar, and wherein the bus bar is directly electrically connected to at least one of an export cable or an HVDC converter.
16. The offshore wind farm of claim 15, wherein the offshore substation does not have a step up transformer.
17. The offshore wind farm of claim 15, wherein the offshore substation further comprises at least one shunt reactor for compensation of the export cable.
18. The offshore wind farm of claim 17, wherein the at least one shunt reactor is adapted for supplying electrical power for operating the offshore substation.
19. The offshore wind farm of claim 17, wherein the offshore substation does not have a diesel generator.
20. The offshore wind farm of claim 15, wherein at least one of the plurality of wind turbine generator arrays further comprises an earthing reactor or an earthing transformer.
21. The offshore wind farm of claim 20, wherein the earthing reactor or earthing transformer is combined with the array transformer.
22. The offshore wind farm of claim 21, wherein the earthing reactor is designed and rated to wholly or partially compensate an array cable.
23. The offshore wind farm of claim 20, wherein the earthing reactor or earthing transformer is placed on one of the wind turbine generators of the wind turbine generator array.
24. The offshore wind farm of claim 15, wherein the array transformer is arranged on a platform or support structure mounted on the co-located wind turbine generator.
25. The offshore wind farm of claim 24, wherein the platform or support structure is located on the outside of said wind turbine generator.
26. The offshore wind farm of claim 15, wherein the offshore substation comprises a superstructure and a substructure.
27. The offshore wind farm of claim 26, wherein the substructure comprises a monopile.
28. The offshore wind farm of claim 26, wherein the substructure comprises a jacket.
29. The offshore wind farm of claim 26, wherein the substructure comprises a three-leg jacket.
30. An offshore substation for an offshore wind farm, comprising: at least one shunt reactor for compensation of at least one export cable, where the at least one shunt reactor is adapted for supplying electrical power for operating the offshore substation.
31. The offshore substation of claim 30, wherein the offshore substation does not have a step up transformer.
32. The offshore substation of claim 30, wherein the offshore substation comprises a superstructure and a substructure, and wherein the substructure comprises a three-leg jacket or a monopile.
33. A method of arranging an offshore wind farm, comprising: providing a plurality of wind turbine generator arrays, each wind turbine generator array comprising a plurality of wind turbine generators electrically connected to an array transformer co-located with one of the wind turbine generators; and electrically connecting the array transformers of the plurality of wind turbine generator arrays to a bus bar on an offshore substation, wherein the bus bar is directly electrically connected to at least one of an export cable or an HVDC converter.
34. The method of claim 33, further comprising disposing the offshore substation on a substructure that comprises a three-leg jacket or a monopile.
Description
[0020] The invention will now be described in greater detail based on nonlimiting exemplary embodiments and with reference to the drawings on which:
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028] Turning first to
[0029] In conventional wind farms the medium voltage array cable is normalty continued to the offshore substation where it is stepped up to high voltage such as 132 or higher. For the present 400 MW example, that would typically involve two heavy 230 MVA step-up transformers. According to the invention, however, the array transformer 8 is placed on one of the wind turbine generators 6 in the array 5, preferably the one closest to the offshore substation 4. If the wind turbine generators are arranged on a string, the array transformer 8 is preferably on the last wind turbine generator 6 on the string, closest to the offshore substation 4. The above string topology is, however, not the only possible topology. E.g. the array transformer 8 may instead be common to a number of arrays or sub-arrays. One example is if the array transformer 8 is placed in the middle of a string, in which case the two parts of the string constitute sub-arrays. The inventors have realized that with the power capacity of the array already limited by the available MV cable 7, the weight of the corresponding step up transformer can be carried by the wind turbine generators 6 and their foundations. Thus the connection from the wind turbine array 5 to the offshore substation 4 is provided as a high voltage cable 9. This means that the high voltage step-up transformers and their weight can be removed from the offshore substation 4, as indicated in
[0030] Having removed the high voltage step-up transformers, and with them the medium voltage switchgears, what remains on the substation is essentially the high voltage gas insulated switchgear (HV GIS) 10, the high voltage shunt reactor 11, SCADA and a reduced amount of low voltage and utility equipment. This reduces the load carrying requirements for the platform itself as well as its foundation. Typically, the remaining equipment makes up only about 15 percent of the equipment weight on the platform, whereas the transmission assets, i.e. the high voltage step-up transformers and the high voltage gas insulated switchgear, accounts for the remainder. The remaining 85 percent would typically be distributed as follows. 60% of that weight is related to the two step-up transformers. Another 20% is reserved for the shunt reactors and the remaining 20% is for the MV GIS; HV GIS and auxiliary/earthing transformers. The weight reduction is thus substantial. For the 400 MW example with two 230 MVA step-up transformers, the weight removed would be approximately 670 tonnes.
[0031] Instead, the large high voltage step-up transformers are now split into multiple smaller array transformers 8, able to transform the power from one string, typically a maximum of 85 MVA at 66 kV or 45 MVA at 33 kV, to the required high voltage level, typically 155 kV, 220 kV, 275 kV or other high voltages. Instead six 80 MVA transformers are placed, one in each array 5, normally on the last wind turbine generator 6, which normally is feeding the power towards the offshore substation 4. A platform or support structure 20 will of course have to be added to the wind turbine generator foundation to support this transformer 8 as illustrated in
[0032] These smaller array transformers 8 are connected to bus bar 17 via the HV GIS switchgear 10 on the platform of the offshore substation 4. However, with the higher voltage already available from the array 5, the 66 kV array cable which would have been connected to the offshore substation 4 is replaced by a high voltage cable. So, instead of a 500 mm.sup.2 66 kV medium voltage cable, as used in this example, only a much smaller HV cable, e.g. in the conductor cross-section area interval of 120 to 400 mm.sup.2 is needed for connecting to the offshore substation 4. The cable conductor cross section needed to transmit a certain level of power depends on the system voltage. Hence, for other cable voltages other cable dimensions will apply.
[0033] Furthermore, by removing the main step-up transformers from the offshore substation 4 and placing instead smaller array transformers 8 on the wind turbine generator foundations, the medium voltage gas insulated switchgear MV GIS on the offshore substation 4 can also be omitted. The incoming HV Cable from the last WTG now directly connects to the HV GIS on the offshore substation. Also, a MV GIS may not be required on the medium voltage side of the array transformer 8 placed on the last wind turbine generator 6, assuming the same protection philosophy as in the current designs is applied.
[0034] Instead, however, in the new setup, the HV GIS consists of six incoming array bays, assuming that six strings 9 are connected, one export cable outgoing switchgear and a disconnector arrangement to the high voltage shunt reactor 11, resulting in a total of 8 HV GIS bays. In the conventional setup the HV GIS would have two main transformer incomers, one export cable outgoing switchgear and a disconnector arrangement to the high voltage shunt reactor.
[0035] In a conventional configuration, the high voltage shunt reactor compensates as a rule of thumb ca. 40% of the export cable capacity on the offshore substation. The MVAr generated (or consumed) shall normally be compensated at the place of occurrence.
[0036] For the present example, it is assumed that the offshore substation 4 will have a 140 MVAr shunt reactor 11 as in the conventional setup. In some cases, however, there might be possibilities to decrease the shunt reactor's capacity 11 to an absolute minimum, still compensating and preventing issues such as zero miss phenomenon to occur, and obeying cable compensation requirements and imposed limits on how much MVAr may flow. The skilled person will understand that if the present invention, though conceived for far offshore windfarms 1, is used for near shore installations the shunt reactor 11 might be omitted completely.
[0037] With a now much smaller offshore substation 4, the need for low voltage power is significantly reduced. Low voltage loads are expected to be less than 120 kVA.
[0038] At the same time, as there is no MV GIS collector bus on the offshore substation 4, so the need for the earthing part on the offshore substation 4 is also removed.
[0039] The reduced need for power has led to the realisation by the inventors that the low voltage power needed for the offshore substation 4 can be provided by using a tertiary winding 19 on the available shunt reactor. It can even be envisaged to use so called Power Voltage Transformers to supply power to the offshore substation 4.
[0040] The reduced low voltage power requirements for the offshore substation 4, in turn, leads to further advantages and weight saving, e.g. that low voltage systems can be minimized to only use 230 VAC and 230 VAC UPS systems or corresponding systems such as 110 VAC and 110 VAC UPS. All such low voltage systems can be placed in one single 40 container.
[0041] Furthermore, there will be no need for an emergency Diesel generator, because with low voltage supply minimized to the absolute minimum, emergency operation can be limited to the use of battery systems.
[0042] In terms of emergency, it should be noted that fire hazard is highly decreased, as with the removal of the main transformers from the offshore the oil they contain is also removed. The high voltage shunt reactor 11 may contain ester oil not posing a fire hazard. Depending on regulatory requirements it may also be possible that, without oil containing components the need for oil sump, oil separators etc. is avoided, in turn leading to further weight reduction.
[0043] Earthing of the 66 kV in the string shall be provided by using a 66 kV earthing reactor 12 or alternatively an earthing transformer, which may be combined with the array transformer 8 as mentioned above. Placement of this reactor can be on the last wind turbine generator but is not necessarily and can be placed in/on any wind turbine generator in the string. In particular the the earthing reactor 12 (or earthing resistor) may be connected to a star point of the MV side of the array transformer 8.
[0044] The transformer protection and control is normally located on the transformer platform. Protection of the now high voltage array transformers 8 remains necessary and is still located on the offshore substation 4 close to the HV GIS 10.
[0045] In case of a fault in the high voltage array 9 or array transformer 8, the HV GIS breaker has to be opened. On the 66 kV side, the already existing under voltage protection in the wind turbine generator 6 will open the wind turbine generator infeed 13 to the string. Also the Buchholz relay for the array transformer 8 will result in an opening of the HV GIS breaker as well as the 66 kV wind turbine generator breaker systems.
[0046] To put the above advantages into perspective, typical weight values for the 400 MW example would compare as follows: Conventional, comprising transformers, MV GIS, HV GIS, HV shunt, earthing/aux transformers, LV & utilities, SCADA & telecom, mechanical and other systems would give a resulting equipment weight of approximately 1240 tonnes, whereas an offshore substation 4 according to the invention, comprising HV GIS, HV shunt, earthing/aux transformers, LV & utilities, SCADA & telecom, mechanical and other systems would result in only approximately 440 tonnes. Because of the reduced weight to be carried, the supporting construction may be made lighter, and the weight of the civil engineered parts including substation steel would fall from approximately 1460 tonnes to approximately 440 tonnes.
[0047] With the reduced weight of the superstructure 16 of the offshore substation 4 as illustrated in