System for simulating in situ downhole drilling conditions and testing of core samples
10845354 ยท 2020-11-24
Assignee
Inventors
- Joel Franklin Hugghins (The Woodlands, TX, US)
- Robert Patterson (The Woodlands, TX, US)
- William Thrasher (The Woodlands, TX, US)
- David Ghobar (The Woodlands, TX, US)
- Samir Harmad Sharf-Aldin (The Woodlands, TX, US)
- Munir Hamad Sharf-Aldin (The Woodlands, TX, US)
Cpc classification
G01N15/0826
PHYSICS
E21B49/005
FIXED CONSTRUCTIONS
G01N2291/044
PHYSICS
G01N2203/0037
PHYSICS
E21B25/00
FIXED CONSTRUCTIONS
G01N2203/0246
PHYSICS
G01N2203/0256
PHYSICS
G01N2203/0057
PHYSICS
International classification
E21B49/00
FIXED CONSTRUCTIONS
Abstract
A system for simulating in situ drilling and treatment conditions on a core sample from a subterranean formation. The system re-creates various subterranean loads and temperatures on a test sample representative of actual in situ conditions from the particular formation while a test structure within the system performs drilling activities on the core sample using drilling and treating under evaluation for use in the particular subterranean formation. Thus, the impact on selected drilling and treating fluids can be evaluated as well as the impact those fluids had on a sample from the subterranean formation under in situ conditions.
Claims
1. A system for simulating in situ subterranean formation conditions and testing and measuring the performance of a drilling or treating fluid on a core sample from the subterranean formation, the system comprising: a source of the fluid; a motor assembly to circulate the fluid within the system; a first pressure source to generate a pressure representative of the overburden pressure of the subterranean formation; a second pressure source to generate a substantially uniform lateral pressure representative of the pressure exerted on the pores of the sample from the subterranean formation; a third pressure source to generate a pressure representative of the confining pressure exerted laterally on the sample from the subterranean formation; a transfer assembly to impose substantially the same pressure on the fluid as generated by the first pressure source; a first measuring source to detect selected properties of the fluid prior to testing; and a test structure having a frame, a test chamber supported within the frame to support the sample, and a drilling assembly to drill a bore hole in the scruple using the fluid to circulate around a bit within the sample, wherein the test structure includes a header and a hollow rod member supported on the test chamber and in contact with the header, wherein the header is movable onto the hollow rod member to exert a mechanical load onto the sample supported within the test chamber to represent the overbearing pressure of the subterranean formation on the sample to subject the sample to substantially the same pressures as established by the first, second, and third pressure sources, wherein the drilling assembly comprises a drill stem extending through the hollow rod member, and further wherein the drilling assembly is capable of moving independently from the header.
2. The system according to claim 1, the system further comprising a second measuring source to detect selected properties of the fluid following testing.
3. The system according to claim 2 further comprising a processor to compare the results from the first measuring source and the second measuring source to determine the impact of the simulated drilling activity on the characteristics of the fluid and the impact of the fluid on the sample.
4. The system according to claim 3 further comprising a plurality of sensors to measure various properties of the sample.
5. The system according to claim 4 wherein the plurality of sensors comprises at least one sensor to measure radial strain of the sample.
6. The system according to claim 4 wherein the plurality of sensors comprises at least one load cell to measure axial displacement of the sample.
7. The system according to claim 1 wherein the motor assembly comprises a progressive cavity pump.
8. The system according to claim 1 wherein the overburdened pressure is between about 5,000 psi and about 30,000 psi.
9. The system according to claim 8 wherein the overburdened pressure is between about 15,000 psi and about 25,000 psi.
10. The system according to claim 1 further comprising at least one heater to heat the fluid to a predetermined temperature.
11. The system according to claim 10 wherein the predetermined temperature is between about 300 F. and about 450 F.
12. The system according to claim 11 wherein the predetermined temperature is between about 350 F. and about 425 F.
13. The system according to claim 12 wherein the predetermined temperature is about 400 F.
14. The system according to claim 1 wherein the pressure generated by the second pressure source is between about 5,000 psi and about 30,000 psi.
15. The system according to claim 14 wherein the pressure generated by the second pressure source is between about 15,000 psi and about 25,000 psi.
16. The system according to claim 15 wherein the pressure generated by the second pressure source is about 20,000 psi.
17. The system according to claim 1 wherein the pressure generated by the third pressure source is between about 5,000 psi and about 30,000 psi.
18. The system according to claim 17 wherein the pressure generated by the third pressure source is between about 15,000 psi and about 25,000 psi.
19. The system according to claim 18 wherein the pressure generated by the third pressure source is about 20,000 psi.
20. The system according to claim 1 wherein the second pressure source comprises at least one intensifier pump.
21. The system according to claim 1 wherein the third pressure source comprises at least one intensifier pump.
22. The system according to claim 1 wherein the transfer assembly comprises at least one accumulator.
23. The system according to claim 1 wherein the first measuring source comprises a Coriolis meter.
24. The system according to claim 1 wherein the second measuring source comprises a Coriolis meter.
25. The system according to claim 1, the system further comprising at least three heaters.
26. The system according to claim 1, the system further comprising at least five heaters.
27. The system according to claim 1 wherein the test chamber comprises a top plate, a cylindrical sleeve, and a bottom plate.
28. The system according to claim 1 wherein the frame further comprises: a base; at least two vertical members laterally restrained within the base; at least one rotary motor supported by the vertical members; and at least one gearbox connecting the rotary motor to at least one of the vertical members.
29. The system according to claim 1 wherein the test structure further comprises an inner chamber structure having a top plate, a substantially non-porous, compliant sleeve, and a bottom plate adapted to support the sample during testing.
30. A system for simulating in situ subterranean formation conditions and testing and measuring the performance of a drilling or treating fluid on a core sample from the subterranean formation, the system comprising: source fluid; a motor assembly to circulate the fluid within the system; a first pressure source to generate a pressure representative of an overburden pressure of the subterranean formation; a second pressure source to generate a substantially uniform lateral pressure representative of the pressure exerted on the pores of the sample from the subterranean formation; a third pressure source to generate a pressure representative of the confining pressure exerted laterally on the sample from the subterranean formation; a transfer assembly to impose substantially the same pressure on the fluid as generated by the first pressure source; a first measuring source to detect selected properties of the fluid prior to testing; at least one heater to heat the fluid to a predetermined temperature; a test structure having a frame, a test chamber supported within the frame to support the sample, and a drilling assembly to drill a bore hole in the sample using the heated fluid to circulate around a bit within the sample, wherein the test structure subjects the sample to substantially the same pressures as established by the first, second, and third pressure sources, the frame having a base, at least two vertical members laterally restrained within the base, at least one rotary motor supported by the vertical members, and at least one gearbox connecting the at least one rotary motor to at least one of the vertical members, wherein the test structure has a header releasably connected to the vertical members, and a rod member supported on the test chamber and in contact with the header, wherein activation of the at least one rotary motor and at least one gearbox causes rotational movement of the elongated members thereby lowering the header onto the rod member and exerting a mechanical load onto the sample supported within the test chamber to represent the overbearing pressure of the subterranean formation on the sample; a second measuring source to detect selected properties of the fluid following testing; and a processor to compare the results from the first measuring source and the second measuring source to determine the impact of the simulated drilling activity on the characteristics of the fluid and the impact of the fluid on the sample.
31. A system comprising: a core sample; a source fluid representative of a drilling or treating fluid usable in a subterranean formation and in communication with the core sample; a motor assembly to circulate the fluid within the system; a first measuring source and a second measuring source to detect selected properties of the fluid; a plurality of pressure sources to generate a pressure representative of the overburden pressure of the subterranean formation, a pressure representative of the pressure exerted on the pores of the core sample from the subterranean formation, and a pressure representative of the confining pressure exerted laterally on the core sample from the subterranean formation; a test structure having a frame, a test chamber supported within the frame to support the core sample, and a drilling assembly to drill a bore hole in the core sample using the fluid to circulate around a bit within the core sample, wherein the test structure subjects the core sample to substantially the same pressures as established by the plurality of pressure sources, includes a header and a hollow rod member supported on the test chamber and in contact with the header, wherein the header is movable onto the hollow rod member to exert a mechanical load onto the core sample supported within the test chamber to represent the overbearing pressure of the subterranean formation on the core sample to subject the core sample to substantially the same pressures as established by the plurality of pressure sources and, wherein the drilling assembly comprises a drill stem extending through the hollow rod member, further wherein the drilling assembly is capable of moving independently from the header; a plurality of sensors to measure various properties of the core sample during testing; and a processor to compare the results from the first measuring source and the second measuring source to determine the impact of the simulated drilling activity on the fluid, and to process data coming from said plurality of sensors to determine the impact of the simulated drilling on the core sample.
32. The system according to claim 31 wherein the plurality of sensors comprises at least one acoustical sensor.
33. The system according to claim 32 wherein the plurality of sensors comprises at least one sensor to measure radial strain of the core sample.
34. The system according to claim 32 wherein the plurality of sensors comprises at least one LVDT sensor.
35. The system according to claim 32 wherein the plurality of sensors comprises at least one load cell to measure axial displacement of the core sample.
36. The system according to claim 31 wherein the motor assembly comprises a progressive cavity pump.
37. The system according to claim 31 wherein the overburdened pressure generated is between about 5,000 psi and about 30,000 psi.
38. The system according to claim 37 wherein the overburdened pressure generated is between about 15,000 psi and about 25,000 psi.
39. The system according to claim 38 wherein the overburdened pressure generated is about 20,000 psi.
40. The system according to claim 31 wherein the pore pressure generated is between about 5,000 psi and about 30,000 psi.
41. The system according to claim 40 wherein the pore pressure generated is between about 15,000 psi and about 25,000 psi.
42. The system according to claim 41 wherein the pore pressure generated is about 20,000 psi.
43. The system according to claim 31 wherein the confining pressure generated is between about 5,000 psi and about 30,000 psi.
44. The system according to claim 43 wherein the confining pressure generated is between about 15,000 psi and about 25,000 psi.
45. The system according to claim 44 wherein the confining pressure generated is about 20,000 psi.
46. The system according to claim 31 wherein the pressure source which generates the pore pressure comprises at least one intensifier pump.
47. The system according to claim 31 wherein the pressure source which generates the confining pressure comprises at least one intensifier pump.
48. The system according to claim 31, the system further comprising a transfer assembly to impose substantially the same overburden pressure on the fluid as generated by at least one of the plurality of pressure sources, wherein the transfer assembly comprises at least one accumulator.
49. The system according to 31 wherein the first measuring source comprises a Coriolis meter.
50. The system according to claim 31 wherein the second measuring source comprises a Coriolis meter.
51. The system according to claim 31, the system further comprising at least three heaters.
52. The system according to claim 31, the system further comprising at least five heaters.
53. The system according to claim 31, the system further comprising at least one heater to heat the fluid to a predetermined temperature, wherein the predetermined temperature is between about 300 F. and about 450 F.
54. The system according to claim 53 wherein the predetermined temperature is between about 350 F. and about 425 F.
55. The system according to claim 54 wherein the predetermined temperature is about 400 F.
56. The system according to claim 31 wherein the test chamber comprises a top plate, a cylindrical sleeve, and a bottom plate.
57. The system according to claim 31 wherein the frame further comprises: a base; at least two vertical members laterally restrained within the base; at least one rotary motor supported by the vertical members; and at least one gearbox connecting the at least one rotary motor to at least one of the vertical members.
58. The system according to claim 31 wherein the test structure further comprises an inner chamber structure having a top plate, a rubber sleeve, and a bottom plate adapted to support the core sample during testing.
Description
DESCRIPTION OF THE DRAWINGS
(1) In order to more fully describe the drawings used in the detailed description of the present invention, a description of each figure is provided.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
DETAILED DESCRIPTION OF THE INVENTION
(23) Characteristics and advantages of the present disclosure and additional features and benefits will be readily apparent to those skilled in the art upon consideration of the following detailed description of exemplary embodiments of the present disclosure and referring to the accompanying figures. It should be understood that the description herein and appended drawings, being of example embodiments, are not intended to limit the claims of this patent or any patent or patent application claiming priority hereto. On the contrary, the intention is to cover all modifications, equivalents and alternatives falling within the spirit and scope of the claims. Many changes may be made to the particular embodiments and details disclosed herein without departing from such spirit and scope.
(24) In showing and describing preferred embodiments in the appended figures, common or similar elements are referenced with like or identical reference numerals or are apparent from the figures and/or the description herein. The figures are not necessarily to scale and certain features and certain views of the figures may be shown exaggerated in scale or in schematic in the interest of clarity and conciseness.
(25) As used herein and throughout various portions (and headings) of this patent application, the terms disclosure, present disclosure and variations thereof are not intended to mean every possible embodiment encompassed by this disclosure or any particular claim(s). Thus, the subject matter of each such reference should not be considered as necessary for, or part of, every embodiment hereof or of any particular claim(s) merely because of such reference.
(26) Certain terms are used herein and in the appended claims to refer to particular components. As one skilled in the art will appreciate, different persons may refer to a component by different names. This document does not intend to distinguish between components that differ in name but not function. Also, the terms including and comprising are used herein and in the appended claims in an open-ended fashion, and thus should be interpreted to mean including, but not limited to . . . . Further, reference herein and in the appended claims to components and aspects in a singular tense does not necessarily limit the present disclosure or appended claims to only one such component or aspect, but should be interpreted generally to mean one or more, as may be suitable and desirable in each particular instance.
(27) Referring now to
(28) The system permits the introduction of a variety of downhole conditions including extreme bore pressure representing the overburden pressure, the static drilling string/bit load, and the dynamic drilling load from the bit, pore pressure representing the fluid load introduced into the core sample, confining pressure around the core sample representing the load on the core sample from the adjacent formation. Additionally, the core sample can be exposed to extreme temperature introduced into the drilling fluids being evaluated and/or by heating or cooling the sample. These downhole conditions can be simulated in a variety of combinations to simulate, for example, a deep hole drilling operation. Such may include, for example, simulating a downhole overburden and drilling loads on the order of 20,000 psi while heating the fluids under evaluation to temperatures on the order of about 400 F.
(29) The system also permits the study of the integrity of the drill bit within the core sample and an accurate measurement of the displacement of the bit within the core sample under such extreme operating conditions. Further, the frictional impact caused by the rotation of the bit can be measured again under extreme operating and drilling conditions. The system can measure not just a compressive load on the sample core caused by these extreme conditions but also fractures, voids, of other geological anomalies created by the various parameters and fluid properties used. These geologically related events including their size and orientations are measured axially and radially by acoustic sensors, electromagnetic sensors and Wheatstone Bridge sensors as described herein.
(30) By evaluating a core sample under these extreme in situ conditions, the immediate impact on the core is demonstrated and the impact specific drilling and treating fluids may have, demonstrated. In addition, the interaction of the fluids and the sample can be studied yielding an in situ comparison between the various fluids being tested and the subterranean formation. Thus, a specific cocktail of fluids may be developed for the drilling and treatment of a particular formation thousands of feet below the earth's surface.
(31) Referring to
(32) System 100 comprises a mud tank skid 200 which supports vats 210, 212, and 214. Referring to
(33) Pumps 310/320 are in fluid communication with vats 212/214 via lines 217/219 and serve to advance the drilling fluid through system 100 at a selectable rate of about 0-4 gallons per minute. Skid 300 also supports a Coriolis meter 380 in fluid communication with, and downstream of, pumps 310/320. Meter 380 serves to measure the density, volume, rate and mass of the drilling or treating fluid.
(34) System 100 further includes process tank skid 400 and an intensifier pump sub-system. Referring to
(35) System 100 also includes an accumulator skid 500 supporting two accumulators 520 and 530 as shown. An accumulator is used to build up pressure and store fluid volume to address sudden increases or decreases in pressure. Referring to
(36) At their upper cylinder head 555, each accumulator 520/530 is in fluid communication with the intensified hydraulic fluid from intensifier pumps 420 at junction 570. Drilling fluid entering line 550 from meter 380 is re-routed through a hollow portion 512 of piston stem 514. Thus, fluid passes through each piston stem 514 of accumulators 520/530 into the chambers 516 of accumulators 520/530. With the enhanced pressures created by intensifier pumps 420 the fluid passes into the top portion above the piston head within the cylinders thereby compressing the cylinder to the desired high testing pressures, i.e. 20,000 psi. In this manner, each accumulator 520/530 may introduce significant fluid pressure into the drilling fluids which is representative of significant overburden pressures and static and dynamic drilling loads. Each accumulator 520/530 may also serve to avoid sudden increases or decreases in the drilling fluid volume which is helpful. The use of two accumulators 520/530 is preferred because once the stroke of accumulator 520, for example, is complete and retracting for energizing, the other accumulator 530 is used to ensure consistent high pressure and to avoiding sudden increases or decreases in the drilling fluid pressure movement. In this way, the two accumulators 520/530 work in tandem. Once again, balancing the shift from one accumulator 520 to the other one 530 is achieved through a series of valves 580.
(37) System 100 further includes drilling table 600. Referring to
(38) Intensifier pump 430 of skid 400 is connected at junction 632 of table 600 to introduce a confining pressure against the core sample 630. This confining pressure represents the pressure of the adjacent formation to more accurately simulate the continuity of the subterranean formation against core sample 630.
(39) System 100 also includes a pore pressure process tank skid 700. Referring to
(40) System 100 further includes a control flow loop skid 800. Referring to
(41) To heat the drilling fluid to temperatures of about 400 F., one or more heaters may be used at various locations within system 100 such as between skids 200 and 300, between skids 400 and 500, and between skids 500 and 600. Such fluid heaters may be added to components as well and may be resistance heaters or heat exchangers well known to those skilled in the art.
(42) In addition, chillers may be used to cool the fluid and the core sample to simulate extreme cold temperature in artic conditions, particularly during the start-up conditions of a drilling operation when the drilling fluid may be a temperatures only slightly above freezing, and the rock formation nearer the surface may be below freezing. Such chillers may be located at various locations such as between skids 200 and 300, between skids 400 and 500, and between skids 500 and 600. Such chillers may be Model AD15R-40-A11B, manufactured by PolyScience Company of Niles, Ill., www.polyscience.com.
(43) Furthermore, if the fluid is heated then it may be chilled by chiller 890 to ambient temperature once the test is finished and the fluid is to be purged. Since the fluid may be heated to temperatures of about 400 F., it may be preferable to chill the fluid to be properly and safely handled for disposal.
(44) To provide a more detailed description of each sub-assembly, a discussion of each sub-assembly is provided.
(45) Fluid Sub-System Supported within Skid 200
(46) Referring now to
(47) Fluids are removed from vats 212 and 214 through lines 217 and 219, respectively. In this manner using valves 230, the fluids under investigation, which may be drilling fluid or various treating fluids, are selectively introduced into system 100 from lines 217/219 into line 330 of the flow system supported on the progressive cavity pump skid 300.
(48) Frame 270 also supports injector pumps 260 and 261 which are located on lines 218 and 219, respectively. Lines 218/220 begin at the top of corresponding vats 121/214. Following testing, pumps 260/261 are used to purge the fluid from the entire system 100. Pumps 260 and 261 are commercially available as, for example, model number P1/PPPPP from the Wilden Pump and Engineering Company, LLC of Grand Terrace, Calif., www.wildenstore.psddover.com. Vat 210 is used to store waste fluid following testing prior to purging and cleaning the entire system. Vat 210 is drained by opening line 216 to pumps 260 and 261. In this manner, pumps 260/261 purge all the fluid though ports A into waste disposal containers.
(49) Progressive Cavity Pump Sub-System Supported within Skid 300
(50) Referring now to
(51) Fluid to be evaluated enters the system through line 330 passes a series of actuator valves 335, pressure gauge 337, and thermocouple 339. The fluid is advanced forward by pumps 310 or 320 driven by corresponding motors 311/321. Progressive cavity pumps are used since they provide a very accurate volume of pumped fluid without risk of shearing the fluids. Such is important in measuring the results generated from system 100. Cavity pumps operate on an Archimedean screw principle and are well known to those skilled in the art for their accuracy and reliability. Pumps 310/320 are commercially available as, for example, model number 895-4000 from National Oilfield Varco of Fort Worth, Tex., www.nov.com. In the operation of system 100 pumps 310/320 would typically operate in the range of about 0 gallons per minute to about 4 gallons per minute, more preferably in the range of about 2 gallons per minute to about 3 gallons per minute, and most preferable in the range of about 2.5 gallons per minute to about 3 gallons per minute.
(52) As the fluid leaves either pump 310 or 320, it again passes through a pressure gauge 337 and a pressure transducer 341. At that point, the fluid would either pass through a Coriolis meter 380 or alternatively bypassed the meter through line 381. Most often, the fluid would pass through meter 380 to collect the initial readings of the fluids density, velocity, mass, rate, etc. which will be used subsequently to compare with the same types of measurements from a second Coriolis meter after the fluid has been evaluated in test structure 610. Coriolis meter 380 are commercially available as, for example, model number RHM series from Rheonik Messtechnik GmbH of Odelzhausen, Germany, www.rheonik.com.
(53) The fluid would then leave the progressive cavity pump skid 300 along line 391 and advance into the accumulator sub-system supported by skid 500 into the later and serve the accumulator skid 500.
(54) The pressure transducers, pressure gauges, pneumatic valves, and thermocouples as mentioned throughout this specification are well known to those skilled in the art.
(55) Pressure transducers 341 are commercially available as, for example, model number XSEL from WIKA USA of Pasadena, Tex., www.wika.us.
(56) Pressure gauges 337 are commercially available as, for example, model number 23x.34-4.5 from WIKA USA of Pasadena, Tex., www.wika.us.
(57) Pneumatic values 335 are commercially available as, for example, model number 113466 from Rotork PLC of Bath, UK. www.retork.com.
(58) Thermocouples 668 are commercially available as, for example, model number Type K from Omega of Norfolk, Conn., www.omega.com.
(59) Intensifier Pump Sub-System Supported within Skid 400
(60) Referring now to
(61) Increased hydraulic pressure then continues through line 416. The hydraulic pressure is measured at a pressure transducer 417 and a relief valve 419 to exhaust pressure if necessary. The enhanced hydraulic pressure is then exhausted from line 416 at port B. As described below ports B are the entry connection point for the accumulator sub-system, and serve to provide the hydraulic pressure to the accumulator sub-system to assist in creating the overburden load and the static//dynamic drilling loads for the test structure.
(62) A similar operation occurs with respect to pump 430. That is, fluid from line 404 is in fluid communication with intensifier pump 430. Again, pump 430 may be servo-controlled as in the case of pumps 420. The pressure generated by pump 430 is measured by a pressure transducer 423. A relief valve 424 is as available to relieve the pressure of needed, if necessary. The intensified pressure is then available at port C. This pressure at port C will be used to provide the confining pressure onto the test core sample as will be described below. Generally, a higher confining pressure is preferred to evaluate the influence of the combined loads on the sample as discussed below. Typically, such confining pressure may be on the order of 25000 psi.
(63) Accumulator Sub-System Supported within Skid 500
(64) Referring now to
(65) The accumulator sub-system comprises preferably at least two accumulators 520 and 530. Each is in fluid communication at their upper ends 540 to lines 550 with the drilling fluid leaving Coriolis meter 380 through line 391 of the progressive cavity pump sub-system supported by skid 300. The drilling or treating fluid under evaluation then flows in the direction of arrows 509 ascending to the top of either accumulator 520 or 530. Each accumulator 520 and 530 operates the same way. The fluid then descends as shown by arrows 511 to the top of an accumulator piston stem 514 of each accumulator 520/530. Each stem 514 includes a hollow portion 512 throughout the length of the stem 514 to provide fluid communication for the drilling fluid as it exits line 550 into the corresponding piston stem 514. The fluid is then in fluid communication with piston chamber 516 of each accumulator 520/530.
(66) The hydraulic pressure generated by intensifier pumps 420 from the intensifier pump sub-system (discussed above) is available at port B as shown in
(67) In this manner, the fluids under evaluation may either be circulated through lines 550 into the top portion of accumulator 520 or alternatively 530 and permitted to exit lines 560 of either accumulator by the use of various pneumatically operated valves 566 to route the fluid. Two accumulators 520/530 are used in a staggered manner so that one may be active in compressing the fluid to the desired hydraulic pressure introduced at port B while the other is retracting its piston 514 to begin a new cycle when the need arises. Thus, since accumulators 520/540 operate in tandem and flows are regulated by pneumatic valves 566 through corresponding lines 550/560, an operator can maintain a consistent and steady pressurized drilling or treating fluid and can compensate for any sudden increases or decreases of the fluid as the need arises. Accumulators 520/530 are well known in the art and commercially available as, for example, model A50US-Q-0924 of Kocsis Technology of Alsip, Ill. www.kocsistech.com
(68) Drilling and Testing Sub-System Supported on Test Table 600
(69) Referring now to
(70) More particularly, referring to
(71) Test chamber structure 620 is mounted to base 601. Test structure 620 comprises top plate 622, cylindrical body 621, and bottom plate 623, defining an interior chamber 624. Positioned within interior chamber 624 is inner chamber structure 665. Inner chamber structure 665 comprises top plate 667, bottom plate 692, and rubber sleeve 684 which is attached to top plate 667 and bottom plate 692.
(72) In the operation of the testing sub-system core sample 630 is laterally encapsulated with sand 682 and placed within inner chamber structure 665. The inner chamber structure 665 is then supported within interior chamber 624. Rod 664 contacts top plate 667. Motors 650 are started and apply a rotary load to gearboxes 660. This results in a downward load onto members 640 and to header 622. Header 622 then applies the mechanical load onto rod 664 that then applies the load to the core sample 630. Thus, the downward mechanical force applied to members 640, through header 622, onto rod 664 of the inner chamber structure 665 simulates the overburden force above the core sample, in other words, the weight of the earth (water and rock) above the location of the core sample under evaluation.
(73) Referring to
(74) Referring to
(75) Referring to
(76) Hydraulic pressure from the pore pressure sub-system supported on skid 700 (discussed below) is introduced through line 750 into aperture 691 at bottom plate 623. Normally, this pore pressure is the same as the overburden pressure, i.e. 20,000 psi. The hydraulic pressure routed through line 691 continues through bottom plate 623 into an aperture nipple 695 located within bottom plate 669 of inner chamber structure 665. In this manner, the pressure generated by intensifier pumps 740 serves to introduce a pressure with in sand 682 that preferably encapsulates core sample 630. Thus, this pressure subjects the core sample to a circumscribing pressure on its pores (influenced by its porosity) represented again by the overburden pressure the core sample would actually experience in situ.
(77) Concurrently, a confining hydraulic pressure from pump 430 of the intensifier pump sub-system which exists at port C of skid 400 (
(78) In order to subject the core sample to extreme cold temperature, reference is now made to
(79) Referring now to
(80) This mechanical load can be determined by taking the overburden pressure of the subterranean formation and converting it into a load based on the cross-sectional area of the core sample. Then, there is pore pressure 1020 created by the pore pump sub-system on skid 700 which subjects the pores of core sample 630 to the impact of the pore pressure. Pore pressure 1020 is exerted in both lateral directionsagainst the sample and also against the inner wall of sleeve 684. In this manner, pore fluid under pressure is allowed to migrate within the pores, cracks, and other cavities within the sample and correspondingly influence the behavior of the core sample in an in situ manner to that of the corresponding formation. This will also demonstrate the influence of drilling and treating fluids on the sample as the bit drills into the core. Concurrently, the confining pressure from pump 430 introduces the lateral confining pressure 1030 of the adjacent subterranean formation at the same overburden pressure. In this manner, core sample 630 is subjected to the overburden load and pressures that the representative formation would exert on the test core sample from which it was taken. The confining pressure (i.e., 25000 psi) offers a resistive pressure against the outer surface of sleeve 684 which is larger than the reacting pore pressure (i.e., 20,000 psi).
(81) At this point, core sample 630 is ready to be subjected to the drilling aspect of the test. The drilling/treating fluid and its impact on the core sample 630 is achieved by routing the heated drilling/treating fluid entering at port D through line 612, drill stem 670 and into bit 677. The drill stem is rotated by rotary motor 674 to simulate rotary drilling loads, both static and dynamic, the drilling/treating fluid circulates through bit 677 and into the bore being drilled within the core sample.
(82) In this manner, the combined effect of all the loads described and shown in
(83) Drilling/treating fluid is returned from core sample 630 through line 651 (see
(84) Motors 650 are commercially available as, for example, model number EC2020 from the Brevini USA of Yorktown, Ind., www.brevini.us.
(85) Gearbox 660 are commercially available as, for example, model number B201-5463 from Brevini USA of Yorktown, Ind. www.brevini.us.
(86) Drill bit 677 are commercially available as, for example, model number SC-1A4A from the Scorpion Engineering Company of West Jordan, Utah, www.scorpionengineering.com.
(87) Rotary motor 674 are commercially available as, for example, model number NTM-355-CBNS from the Control Techniques division of the MRO Electric & Supply Company of Cary, N.C., www.mroelectric.com.
(88) Pore Pressure Process Sub-System Supported on Skid 700
(89) Referring now to
(90) As noted above, pumps 740 are servo-controlled and intensify hydraulic pressure by compressing the fluid under evaluation from reservoir 720. The pressurized fluid from reservoir 720 then passes pneumatic actuator valve 743, pressure transducer 744, and pressure gauge 746. The pressurized fluid from reservoir 720 then exits through line 750 and is introduced into aperture 691 at bottom plate 623 of the drilling and testing sub-system described above. In this manner, the pressurized fluid from reservoir 720 is introduced which is representative of the pore pressure load 1020 discussed above with respect to
(91) Control Flow Loop Sub-System Supported on Skid 800
(92) Referring now to
(93) The lines shown in
(94) More particularly, drilling/treating fluid leaving the drilling and testing sub-system through line 651 passes into line 820. The fluid may then be circulated through either fluid blank 855 or 856. Alternatively, the fluid may be rerouted through line 870 and recirculated back into the drilling and testing structure through line 697 (
(95) In operation, the circulating drilling/treating fluid returning from the drilling and testing sub-system passes through line 820 and goes either through line 830 or 840 to either filter bank 855 or 856, respectively. Pressure gauge 831 and pressure transducers 832/833 are positioned along these lines to measure pressure and transmit the results. In this manner, the operator may select either filter bank 855 or 856 depending on the condition of the filter bank at the time of operation. Filter banks 855/856 are commercially available as, for example, model number P8614-V100WE from Hatfield and Company of Rockwall, Tex. www.hatfieldandcompany.com. The sub-system includes sample line 857/port L or line 858/port M ports to draw a sample of the drilling fluid prior to going through either filter bank 855/856.
(96) Once the fluid passes through either filter bank 855 or 856, it is allowed to pass through Coriolis meter 861. As noted before, meter 861 serves to measure the density, volume, rate and mass of the drilling/treating fluid after being subjected to significant downhole in situ pressures and temperatures on the test core sample in the drilling and testing sub-system. The results from the first meter 380 are then compared with the results of the second Coriolis meter 681 to generate in situ results reflecting real time analysis and accurately simulated overburden loads, and static and dynamic drilling loads. Such results provide the operator with the impact of the particular drilling/treating fluid on the core sample to achieve particular results in the drilling operation on the specific formation in question. If an election is made to bypass Coriolis meter 680, line 871 is available. The fluid passes through Port J and through chiller 890 and is returned at port N of
(97) Tubing
(98) The use of the term line to describe the piping within the various sub-systems above should not be interpreted in the limiting manner Such lines also may be referred to as tubing or piping. All such terms are substantially equivalent and well known to those skilled in the art in the fabrication of the lines or tubing. Obviously, billet material may be used with holes or cavities drilled in the material to effectively represent passageways instead of tubing.
(99) The selection of the particular size and material used to fabricate the lines or tubing varies depending typically on the maximum anticipated working pressure. For the simulated downhole overburden pressure of 20,000 psi, a working pressure of 21,000 psi is usually selected to include a factor of safety. In such event the size tubing or lines as disclosed herein for the various sub-systems would typical be type 316 stainless steel tubing in the following sizes: 0.070; 0.086; and 1 0.219. In the case of the confining pressure skid 400 the tubing and other piping would be designed for a higher pressure of 25000 psi. Thus, the wall thicknesses would be increased accordingly, well known to those skilled in the art.
(100) Temperatures and Pressures
(101) Furthermore, if the fluid is heated then it may be chilled by chiller 890, or other heat exchanger, to ambient temperature once the test is finished and the fluid is to be purged. Since the fluid may be heated to temperatures of about 400 F., it is useful to cool it so that it may be properly and safely handled for disposal.
(102) Referring to
(103) As noted above, the present invention is adapted to simulate significant overburden loads, for example, loads generated as a result of 20,000 psi pressure at the subterranean formation. As mentioned, the actual load is determined by multiplying the pressure (i.e., 20,000 psi by the cross-sectional area of the test core sample 630). However, as the final pressure selected is a function of the location of the subterranean formation, the pressure may be more or less.
(104) In view of the teachings of the present invention, a drilling simulation testing system may be provided to accommodate significantly higher pressures by selecting other materials and sizes to accommodate more pressure. For example, the tubing discussed above may be modified in material type and sizes to accommodate higher pressures.
(105) The selection of the number and sizes of heaters is a function of the anticipated testing temperatures and the flow rate of the drilling/treating fluid controlled by the progressive cavity pumps 310/320. The operating temperature range should be between about 300 F. and about 450 F. The preferable temperature range is between about 350 F. and about 425 F. The more preferred temperatures for most testing applications is about 400 F. To achieve these high temperature ranges with a flow rate between about 3 gallons per minute and about 4 gallons per minute by pumps 310/320, six of the types heaters mentioned above may be required. In such event heaters 2001/2003/2005 may comprise a pair of heaters at each such locations or even mounted on components as discussed herein.
(106) In addition, chillers or other heat exchanges may be used to cool the fluid and the core sample to simulate extreme cold temperature in artic conditions, particularly during the start-up conditions of a drilling operation when the drilling fluid may be a temperature only slightly above freezing, and the rock formation nearer the surface may be below freezing. Such chillers may be located at various locations such as between skids 200 and 300, between skids 400 and 500, and between skids 500 and 600, or even mounted on components as discussed herein. Such chillers may be Model AD15R-40-A11B, manufactured by the PolyScience Company of Niles, Ill., www.polyscience.com.
(107) Additionally, connections at the joints of the tubing and in-line instruments, such as the pneumatic valves and pressure transducers, may be designed of materials selected to accommodate higher pressures. The selection of the materials for fabricating the tubing and connectors, including connections with valves, gauges and transducers is well known to those skilled in the art and adaptable based on the teachings of the present invention. The present invention is anticipated to provide pressure in the range of between about 5000 psi and about 30000 psi, preferably between about 15,000 psi and about 25,000 psi, and more preferably about 20,000 psi.
(108) Sensors
(109) Particular sensors as discussed above collect the following type of data:
(110) TABLE-US-00001 TABLE I Sensor Measurement Type Coriolis Meter Mass flow rate Volumetric flow rate Fluid density Temperature of fluid LVDT Axial displacement of sample Wheatstone Bridge Radial strain of sample Thermocouples System temperature Pressure Transducer System pressure Load cell Press load Drill stem motor RPM, ROP, Friction, Torque
Their use within the operation of the system are discussed below with respect to
Operation
(111) In the operation of the present invention, temperature and overburden pressure are first selected for the drilling/treating fluid under evaluation based on the location of the core sample under review. Typically, it is necessary to elevate the temperature and the pressure to the desired level before testing begins. The length of time it will take to do so will vary depending on the pressures and temperatures selected and the attributes of the core sample selected.
(112) The evaluation typically begins with the preparation of sample 630. A core is selected from a particular formation or representative of a particular formation. It may be pre-shaped based on the quality of the drilling core provided or it may be shaped prior to insertion in the chamber 620.
(113) Additionally, the sample 630 may be fractured by drilling sample 630 before or after evaluation. This is achieved by predisposing sample 630 before evaluation to intentionally created flaws, such as minor perforations, grooves, or holes. These artificial flaws will then be exploited during testing to generate differing types of fractures by the application of excessive overburden forces, managed-pressure-drilling techniques, non-uniform lateral stresses, micro-detonations, twisting of the core, or rapid stress cycling of the core. Thus, the present invention enables deliberate fracturing of core sample 630 to simulate and analyze fluid migration behavior through a specific formation.
(114) The particular drilling or treating fluid is then selected and deposited in vats 212 and 214 of the fluid sub-system as discussed above and shown in
(115) It then enters the progressive cavity pump sub-system discussed above and shown in
(116) As the fluid leaves meter 380 it is heated by heater 2003 and enters the accumulator sub-system described above and shown in
(117) The drilling/treating fluid then enters through line 612 of the drilling and testing sub-system into drill stem 670 to begin the drilling operation as discussed above with respect to
(118) The fluid leaving Coriolis meter 861 passes through chiller 890 (used to lower the temperature of the fluid for disposal, if necessary at that time), or the fluid is re-circulated through line 697 again through the progressive cavity pump sub-system to re-enter the entire process.
(119) Following completion of the testing, system 100 may be purged by activating motors 260/261 of the mud tank sub-system discharging the used fluid at ports A as shown in
(120) Flow and mass meters can be used to enhance the ability to collect many complex measurements in real time. Both precision and accuracy become increasingly essential as measurements become hyper-critical indicators of system behaviors. Today's Coriolis meters, such as 380, integrate the aspects of fluid flow as well as mass flow to provide uniquely insightful measurements that are not disruptive to the experiment at hand. The most sophisticated approach is mass balance conclusions.
(121) It is not uncommon for systems to monitor (and control) fluid flowrates through flow meter feedback. Mass balance, however, monitors upstream fluid flowrates for the purpose of baselining behaviors in the sample chamber. Fluids within the boundary of concern are subjected to constant enthalpy through the maintenance of both constant temperature and pressure thereby making fluids of slight compressibility effectively incompressible within the boundary of concern. The incompressibility of these test fluids insures that, barring events in the test chamber or leaks in the system, downstream flowrates mirror upstream flowrates precisely. The same is true for mass flowrates, however, debris and fluid deposited into or removed from the sample chamber will be exposed as it passes through the downstream mass meter. Volumetrically, the flow is generally constant. But from a mass balance perspective the minute fluctuations in mass flow represent powerful indicators of events occurring inside of the testing chamber.
(122) Precise control of both temperature and pressure within the test chamber and surrounding system are crucial in order to apply mass balance principles. Deltas, rather than absolute measures, are used to make critical inferences, but these no longer hold once temperature or pressure are allowed to deviate within the system. Pressure losses exist due to piping realities and the bit nozzle effect, but these are both quantifiable and insignificant to the overall balance.
(123) Referring now to
(124) All inferences that include debris transmission are validated and quantified downstream by the substantial collection of the aforementioned debris in fine mesh filter bank 855 or 856. The filter debris collected should be equal to the amount of mass transfer detected through mass balance provided no pore fluid exchange has taken place. Essentially, any mass of rock drilled out of core sample 630 and any additional debris from core sample 630 released during wellbore deterioration should be accounted for in filter unit 855 or 856, depending on the loop selected.
(125) Once the drilling phase is completed, mass flow is then monitored in order to quantify the amount of fluid being deposited into core sample 630 over time, because under these conditions, the flowrates upstream will not necessary equal the flowrates downstream. The delta here represents the fluid being deposited if the fluid density shows no change. Changing fluid density would be a real-time indicator in a post-drilling situation that the wellbore is deteriorating (releasing debris into the passing fluid), or that a fracturing event has occurred exchanging pore fluids with the drilling fluids. One example of core exchange includes the formation of a membrane (a/k/a filter cake) across the inner surface of the drilled hole. Density decline indicates pore fluid exchange through the core. Density instability and increase would indicate debris transmission from the core. Further, instantaneous events (such as core fracturing) are generally irreversible and would not show correction or stabilization over time.
(126)
(127) Also during this post-drilling phase, one can monitor and determine other event-related phenomena that is more subtle in nature using a mass balance approach. These events could take the form of wellbore strengthening activities or lost-circulation recovery. Using mass balancing, one could monitor these impacts in real-time by measuring the depositing material and fluid losses through changes seen in the downstream fluid properties or compositions.
(128) Referring now to
(129) Referring still to
(130) Referring still to
(131) All the data from the test chamber vessel and skid sensors are then sent to a computer or microprocessor 1200 which processes the data in accordance with the operative software to evaluate the performance of sample 630 under the test conditions. Stress and strain readings from various sensors as shown in
{dot over (M)}.sub.upstream={dot over (M)}.sub.downstream (pre-drilled state)
{dot over (M)}.sub.upstream={dot over (M)}.sub.downstream+{dot over (M)}.sub.core exchange+{dot over (M)}.sub.exiting debris (drilled state)
(132) Microprocessor 1200 compiles data streams generated by the various sensors set forth in
(133) The foregoing invention has been described in terms of various embodiments. Modifications and alterations to these embodiments will be apparent to those skilled in the art in view of this disclosure. It is, therefore, intended that all such equivalent modifications and variations fall within the spirit and scope of the invention as claimed.