Modular Building System
20200354946 ยท 2020-11-12
Inventors
Cpc classification
E04C2/288
FIXED CONSTRUCTIONS
E04C3/20
FIXED CONSTRUCTIONS
E04B5/04
FIXED CONSTRUCTIONS
E04B7/20
FIXED CONSTRUCTIONS
E04B1/04
FIXED CONSTRUCTIONS
E04B1/14
FIXED CONSTRUCTIONS
E04B1/20
FIXED CONSTRUCTIONS
E04B2103/02
FIXED CONSTRUCTIONS
E04B1/343
FIXED CONSTRUCTIONS
International classification
E04B1/20
FIXED CONSTRUCTIONS
E04B1/14
FIXED CONSTRUCTIONS
E04B1/41
FIXED CONSTRUCTIONS
E04B2/00
FIXED CONSTRUCTIONS
E04B5/04
FIXED CONSTRUCTIONS
E04B7/20
FIXED CONSTRUCTIONS
E04C2/288
FIXED CONSTRUCTIONS
Abstract
This invention relates to a versatile, modular building system for constructing a building frame. The components of the modular system are formed from high-density materials, and include one or more base units, one or more floor units connected to the base units, a plurality of end panel units, the end panels units connected to the base units and/or floor units, at least one front beam unit, the front beam unit adapted to connect to at least two end panel units, and one or more front panel units, the front panel unit adapted to connect to at least two end panel units and/or at least one floor unit. Also described are various additional modular units that may be incorporated into the modular building system described. The modular system is designed to be pre-fabricated off site and quickly erected on building sites with a range of contours.
Claims
1. A modular building system for constructing a building frame, the system comprising plurality of structural units including; one or more floor units, wherein the floor units include a substantially planar surface having an upper face and a lower face separated by two opposing sides and two opposing ends, the two opposing sides extending at substantially right angles from the lower face of the planar surface of the floor unit to form floor unit side walls; a plurality of end units, the end units connected directly or indirectly to the floor unit side walls and shaped to define at least three sides of a wall structure; at least one front beam unit, the front beam unit adapted to connect to at least two end units; and one or more front panel units, the front panel unit adapted to connect to at least two end units and/or at least one floor unit; wherein all units of the building system are formed from high-density materials.
2-10. (canceled)
11. The modular building system of claim 1, wherein the floor unit has an n or m shaped cross section.
12. The modular building system of claim 1, wherein the floor unit includes one or more ribs, the ribs extending from the lower face of the planar surface.
13-16. (canceled)
17. The modular building system of claim 16, wherein the end unit includes a lower beam adapted to connect to one or more floor units, pile units and/or structural base units, a side beam directly or indirectly connected to and extending from a first end of the lower beam at between 60-120, and one or more upper beams directly or indirectly connected to and extending from an opposite end of the side beam at between 60-120.
18. The modular building system of claim 17, wherein the side beam extends at a substantially 90 angle from the lower beam.
19. The modular building system claim 17, wherein the end unit is substantially C shaped.
20. The modular building system of claim 17, wherein the end includes one upper beam extending from the side beam in same direction as the lower beam extends from the side beam.
21. (canceled)
22. The modular building system claim 17, wherein the end unit includes a gutter in the form of an integrally formed channel extending the length or partial length of an exterior face of the end unit.
23. (canceled)
24. The modular building system of claim 22, wherein the gutter extends the length or partial length of an upward facing exterior surface of the upper beam, such that when the front beam is mounted within a building structure, rainwater is containable in the gutter.
25. The modular building system of claim 22, wherein the channel includes at least one open end to facilitate fluid connection to an adjoining channel.
26-27. (canceled)
28. The modular building system of claim 1, wherein the front beam unit includes one or more rebates, recesses, channels, apertures or flanges and adapted such that in use, the front beam unit is connectable at each end to an end unit.
29. The modular building system of claim 28, wherein the front beam unit includes a gutter in the form of an integrally formed channel, the channel extending the length of an exterior face of the front beam unit.
30. The modular building system of claim 29, wherein the channel includes at least one open end to facilitate fluid connection to an adjoining channel.
31. The modular building system of claim 1, wherein the front panel unit includes a substantially rectangular planar first surface forming an exterior face of the front panel unit, the planar surface defined by two side walls, an upper wall and a lower wall, wherein the front panel unit is adapted to connect directly or indirectly to one or more floor units and/or one or more end units.
32. (canceled)
33. The modular building system of claim 1, wherein the system further includes one or more pre-cast wall panel units adapted for connection to one or more of the structural units of the building system, the wall panel units formed from a high density material and a low-density material.
34-42. (canceled)
43. The modular building system of claim 1, wherein the building system includes a plurality of roof panel units, the roof panel units are adapted to be connected to an adjacent roof panel unit and/or end unit and/or front beam unit of the building frame.
44-49. (canceled)
50. A modular building system for constructing a building frame, the system comprising plurality of structural units including; one or more floor units, wherein the floor units include a substantially planar surface having an upper face and a lower face separated by two opposing sides and two opposing ends, the two opposing sides extending at substantially right angles from the lower face of the planar surface of the floor unit to form floor unit side walls; a plurality of end units, the end units connected directly or indirectly to the floor unit side walls, the end unit including a lower beam adapted to connect to one or more floor unit side walls, a side beam directly or indirectly connected to and extending from a first end of the lower beam at 90, and one or more upper beams directly or indirectly connected to and extending from an opposite end of the side beam at between 60-120, wherein the upper beam extends from the side beam in same direction as the lower beam extends from the side beam; at least one front beam unit, the front beam unit adapted to connect to at least two end units; and one or more front panel units, the front panel unit adapted to connect to at least two end units and/or at least one floor unit; wherein all units of the building system are formed from high-density materials.
51-54. (canceled)
55. The modular building system of claim 43, wherein the system further includes one or more soaker flashing units, the soaker flashing units including at least one planar surface and at least one side flange extending from the planar surface, the planar surface dimensioned to span an abutment region between two or more adjacent structural units or roof panel units.
56. The modular building system of claim 43, wherein the system further includes one or more capping units, the capping units including at least one planar surface and at least one side flange, the planar surface dimensioned to span an abutment region between two or more adjacent structural units or roof panel units.
57. A building frame, the frame comprising a plurality of structural units including; two end units, each end unit including a lower beam, a side beam connected to and extending from a first end of the lower beam at 90, and one or more upper beams connected to and extending from an opposite end of the side beam at between 60-120, wherein the upper beam extends from the side beam in same direction as the lower beam extends from the side beam; a front beam unit, the front beam unit connected at a first end to the lower beam of a first end unit and connected at a second end to the lower beam of a second end unit; and one or more front panel units, the front panel unit connected to upper beam of a first end unit and connected at a second end to the upper beam of a second end unit; wherein the building frame is formed from high-density materials.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0086] One or more embodiments of the invention will be described below by way of example only, and without intending to be limiting, with reference to the following drawings, in which:
[0087]
[0088]
[0089]
[0090]
[0091]
[0092]
[0093]
[0094]
[0095]
[0096]
[0097]
[0098]
[0099]
[0100]
[0101]
[0102]
[0103]
[0104]
[0105]
[0106]
[0107]
[0108]
[0109]
[0110]
[0111]
[0112]
[0113]
[0114]
[0115]
[0116]
[0117]
[0118]
[0119]
[0120]
[0121]
[0122]
[0123]
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS OF THE INVENTION
[0124] The modular building system described herein is designed to provide a solid, long lasting building frame that can be manufactured and constructed in a short time frame with a reduced number of parts compared to known construction methods, as well as in a material that results in a low maintenance building having a high thermal mass and extended durability.
[0125] The modular building frame described here is formed from the connection of a range of structural units formed from high density building materials. The high density materials suitable for forming the structural units of the modular system may be selected from a range of materials having a density of greater than 800 kg/m.sup.3. Such materials include but are not limited to concrete, metal or steel, cement, stone, aggregates, brick, glass and compacted earth.
[0126] One of the most readily available, durable and flexible high density materials that can be used is concrete. Concrete is one of the preferred materials as it is stable, hard wearing, fire resistant, has good capacity for reducing noise, high strength and does not burn or emit toxic fumes. Concrete does not rot, warp or twist, which are characteristics often found with timber. Concrete is recyclable, water resistant and breathable and has excellent thermal mass.
[0127] Buildings constructed of concrete and other high density materials have a unique energy-saving advantage because of their inherent thermal mass. These materials absorb energy slowly and hold it for much longer periods of time than do less massive materials. This delays and reduces heat transfer through a thermal mass building component, leading to fewer spikes in the buildings heating and cooling requirements, since mass slows the response time and moderates indoor temperature fluctuations. In addition, high mass buildings use less energy than a similar low mass building due to the reduced heat transfer through the high mass elements. The concrete or other high density material used in the formation of the different units of the system may be reinforced concrete. During manufacture, each of the units may be reinforced using standard reinforcing materials such as rebar, steel, fibrous material including steel, synthetic, natural or glass fibres for example.
[0128] The modular building system is discussed in more detail below with reference to
[0129] The modular building system is designed to be used on both substantially flat and sloping terrain, with pile units being used as an additional component in the system particularly when the building site is sloped, or not substantially level.
[0130]
[0131] Base units 10 form the foundation for the building frame to connect to. Base units 10 will vary in number and size depending on the configuration of building frame being constructed. In preferred embodiments, base units 10 are typically formed with a depth of 1/12.sup.th their span, however these will be engineered to suit the final design and specific ground conditions.
[0132] Base unit 10 will be substantially levelled on upper surface 11 to enable a floor unit 30 to be mounted directly on the upper surface 11 of base unit 10 (see
[0133] In some embodiments, base units may not be required for the construction of the building frame, for example when the ground surface is suitably firm and level. However, the use of the base units provides additional strength and stability to the building frame in the majority of building situations.
[0134] In a preferred embodiment that enables construction of a range of dwelling configurations, floor units 30 are formed of reinforced pre-cast concrete 7 m long and2.5 m wide. This size floor unit makes the floor units a reasonable weight and size for ease of transportation and lifting. Future design efficiencies could allow these dimensions to be increased if required. Floor units 30 can be connected to each other using bolts to form wider floor units as seen in
[0135] In
[0136] Floor units 30 include a substantially planar upper face 31 and lower face 32. Once floor unit 30 is mounted on upper face 11 of base unit 10 as seen in
[0137] One or more ribs 34 extend at substantially right angles from the lower face 32 of floor unit 30, rib(s) 34 are preferably evenly spaced parallel to side walls 33 and provide added strength and spanning capacity to floor unit 30 and to allow for openings that may be used for stairways or a service access space that allows services to be retrofitted after the floor units 30 are installed. In preferred embodiments, the cross section of the floor unit 30 including the side walls and a central rib forms an m shape, with the side walls and ribs preferably deep enough to create a crawl space for retrofitting services and installing bolted connections during assembly of the structure on site.
[0138] Ribs 34 may be positioned in a variety of ways, for example running the full length or partial length of floor unit 30, parallel and/or orthogonal and/or diagonal to the side edges and may be a range of different widths and depths depending on the construction details and the spanning capacity required from the units.
[0139] Floor units 30 may be open at one or both ends between ribs 34 (for m shape) and side walls 33. When designed with one end closed, a wall is formed between side walls 33 and if present, ribs 34, meaning access to the crawl space between side walls 33 is from one end only.
[0140] Each of the floor unit designs provide a crawl space 37 that has a wide range of uses. As well as the immediate ability to bolt units together unseen from underneath during assembly on site and obvious access for installation and maintenance of services, the crawl space allows for access by remote-controlled all-terrain bogies which may be adapted to transport floor units to building sites without the need for access roads to be constructed. Construction of access roads for building projects imparts a huge cost on the build. By enabling the floor units (and any further materials stacked on top of the units) to be moveable via the crawl space and easily placed in position, huge cost efficiencies may be attained.
[0141] Crawl space 37 also creates an insulation void for use of a rollout bladder 160 underneath the house as seen in
[0142] Bladders 160 may also be utilised for other purposes such as grey and cold water storage. The accessibility of crawl space 37 means the bladders can be removed, refilled or replaced easily.
[0143] Floor units 30 may also include adjustable supports mounted on the base of ribs 34 to allow for levelling of the flooring units. In one example, screw jacks may be mounted at points on the rib bases, with individual screw jacks being independently moveable to ensure a completely level flooring system. This type of levelling system allows for readjustment of the building on it's foundations following events such as earthquakes where the contours or levels of the ground may change.
[0144] A further advantage of the pre-cast floor units of this system is that the floor units may be formed off site with a polished upper surface, providing polished concrete floor immediately on installation. This is a significant advantage over the common practice when concrete floors are required, which is pouring the floor in-situ, then waiting a number of weeks before the concrete is sufficiently cured enough to be ground and polished. The grinding and polishing can be done at the factory by machines which offers considerable cost savings where quality and environmental controls are easier to implement. The floor units are flexible in use within the modular building system. They can be used with lightweight walls (
[0145] Floor units 30 may be adapted to allow bladder 160 to be accessible from the upper surface 31 or ribs 34 of the floor unit. For example, apertures may be incorporated into the floor unit so pipes or hoses may extend through floor unit 30 to make the bladder contents accessible from other areas. Alternatively, apertures may include connection means mounted or formed directly within the floor unit to enable attachment of a range of connectors or valves. Such connection means will provide alternative access to the contents of bladder 160 to the under floor access, which may be useful for accessing the contents of the bladder from within the building, or if outside access is restricted due to environmental conditions or landscape contours for example.
[0146] As will be clear to a person skilled in the art, the size and configuration of the building and site will determine the number, size and position of the base or pile and floor units required to form a flooring structure for a particular building frame.
[0147]
[0148] End units may take a wide range of shapes and sizes (see
[0149] The end unit is preferably formed as a single piece, reducing the risk of leaks between joints and minimising the build time associated with preparing and installing a multi-component frame for an end wall. Preferably, walls 41, 42 and 43 have a cross sectional size of between 350 mm200 mm and 700 mm600 mm, with a preferred cross section being 500 mm400 mm. These dimensions are particularly suitable to be both aesthetically appealing and large enough to provide adequate surface area for fixings, connections and cladding to be connected on to. To achieve both of the above would make a full end panel too heavy to transport and assemble using normal means. Using a C shape panel minimises the volume of material required and the weight of the end panel can be kept within the normal operating range making transportation and handling easier and faster.
[0150] As less dense materials (the ideal being 1000 kg/nn3) are tested and accepted the volume of material in the end panels will be able to be increased.
[0151] In addition to acting as a frame for the wall of the building, end units 40 may include cast in recesses for guttering, typically in the form of an elongate channel 44 along the length of upper wall 43. When mounted on base unit 10, upper wall 43 and channel 44 are outside the living space, minimising the risk of water ingress in to the building. Channel 44 has an opening 45 which allows the channel to connect to an additional guttering channel on an adjacent unit or a rain scupper. Spigots could also be cast in to the channel for the connection of downpipes.
[0152] End panels 40 may also include any number of weather rebates, apertures, flanges or recesses 46 for joinery connections or structural connections on any surface that are required. In use, the end unit 40 forms the guttering, fascia and soffit of the building frame all in one. Waterproofing additives such as Xypex and coloured oxides added at the time of pouring may further negate the need for any other waterproofing membranes or surface treatments.
[0153] In some embodiments, end unit 40 may include a vertical bracing means 47. Bracing means 47 may be formed from concrete, steel or other high density material and provides an attachment means for other units, cladding and/or joinery, as well as supporting the walls 41 and 43 in their separated positions. In other embodiments, space 48 defined by walls 41-43 may be reduced by increasing the width of any of the walls. In such designs where the walls require less structural support due to their size and the overall shape of the end unit 40, bracing 47 may not be required, or may be located in a different position or angle, as would be appreciated by a person skilled in the art.
[0154] An internal bracing wall 49 can be used to provide additional structural support to end unit 40, as well as acting as an interior wall.
[0155]
[0156] As with other units, the front beam unit 50 is preferably precast off-site from concrete and sized to fit the spaces required for a particular frame design.
[0157] Front beam 50 may include a guttering means (seen in
[0158] Front beam 50 may also include any number of weather rebates, apertures, flanges or recesses for joinery connections or structural connections on any surface that are required.
[0159]
[0160] When in use as shown in
[0161] Rear wall 70 as seen in
[0162]
[0163]
[0164] As with back panel 70, all non-structural cladding and wall panels may be formed as pre-cast units again having bolt on or quick fit connections to the end units, front beam units, front panel units, base units, pile units and/or floor units.
[0165] Such panels may include but are not limited to panels having a layered structure. In the example of
[0166]
[0167]
[0168] The embodiment of the invention discussed above is particularly suited to substantially flat building sites where base units 10 can be laid directly on the ground, or via landing pads. When a building site is sloped, the building system of the present invention incorporates pile units into the modular building frame to manage the changing height of the ground on which the system is mounted. In other scenarios the use of pile units with the building system may occur when the site is substantially flat and additional strength is required, or for multi-story buildings on substantially flat sites. It should be appreciated that while sloped sites is a particularly suitable use for the building frame with pile units, these are not restricted to use with such sites and may be incorporated in any building system where required. The building systems may also include a combination of base units mounted on or in the ground, together with pile units.
[0169]
[0170]
[0171] Elongate piles 21 may be formed from any high density material, but as with other units are preferably formed from reinforced concrete and more preferably pre-cast off site and then mounted on site in a short time period. The piles 21 may have a range of different cross sectional shapes such as round, square, rectangular, triangular or other cross section that would be understood to form a pile having sufficient strength and may be reinforced using known techniques.
[0172] The pile units 20 shown in
[0173] Depending on the positioning of a pile unit 20 within the building structure, piles units 20 may be formed, as shown by arrow A, with a single base unit 10 forming an upper mounting surface, the base unit 10 supported by two elongate piles 21 extending orthogonally from the lower face of the base unit 10. This formation allows floor units 30 to be mounted on and connect to upper face 11 of pile unit 20 shown by arrow A.
[0174] When pile units 20 are to be used in a position where the elongate piles 21 can provide additional structural strength, for example (but not limited to) below the rear wall of a building, they may take the form indicated by arrow B. Pile unit 20 indicated by arrow B includes two elongate piles 21 spanned by base unit 10. Elongate piles 21 extend from the lower surface of base unit 10 to provide connection to the ground 3, and upwardly from upper surface 11 of base unit 10 to provide additional strengthening to the building frame, with piles 21 being dimensioned so as to extend to the height of the building wall or any other height as required.
[0175] In preferred configurations piles 21 extend upwardly from base unit 10 to create additional wall framing or connection means for non-structural cladding. In some embodiments, the elongate piles 21 are adapted to support a cross beam 25 mounted parallel to the base unit across the upper surfaces 22 of the piles 21 to further strengthen the building frame. An example of a steel cross beam 25 supported by piles 21 can be seen in
[0176] The positioning of base units 10 relative to each other on adjacent pile units 20 allows for the mounting of floor units 30 substantially horizontally across a sloping site. As seen in
[0177] The size of the elongate piles 21 and base units 10 will vary depending on a number of factors, including but not limited to the load bearing requirements of the building, the size and number of flooring units 30 and/or end units 40 to be mounted on the base units 10 and the type of ground the structure is being built on.
[0178] In one example of a preferred embodiment, elongate member 21 is 300 mm wide in direction Y (
[0179] Base unit 10 is also preferably sized to overhang elongate piles 21 at one or both ends of the base unit 10. The end overhang (corbel) may be the same at both ends of the base unit 10, but may also differ depending on where the pile unit 20 is to be placed in the structure. For example, a pile unit 20 designed for use at the edge of a building may have a small base unit corbel on the interior end of the base unit 10, and a larger base unit corbel on the exterior end of the base unit 10. For example, this would provide additional room for an end unit 40 to be mounted on the base unit 10 at the exterior side of the pile next to a floor unit 30 that may not be required at the opposing end of the base unit 10.
[0180] Elongate piles 21 may be precast as continuous reinforced beams or columns, with base units 10 integrally formed with the elongate piles during the casting process. While this method of manufacture saves both time and increases durability due to the reduced number of connections, the base unit 10 and elongate piles 21 may alternatively be formed separately and connected together using known connection means such as bolts, grouting connections, anchors, brackets, and other known connection means.
[0181] Adopting the above method of construction allows the piles to be placed in one site visit for a simple dwelling, or in a matter of days for a larger, more complex dwelling.
[0182]
[0183] In contrast with the building frame shown in
[0184]
[0185] Both
[0186] Various types of wall cladding that may be used with the system of the present invention were discussed earlier with reference to
[0187] In an alternative embodiment as shown in
[0188] When connected to a floor panel via a hinge assembly, the wall panels 70 may optionally be adapted at the base to include recesses or apertures 73 that allow hinges 72 to be mounted a distance above the base of wall panel 70. Alternatively, hinges may be mounted directly to the inner surface of the wall and the corner of the floor unit. The hinges are mounted such that the wall panel unit is moveable from a first position where it lies horizontal on top of the floor units 30, to a second position where it is rotated substantially 90 degrees to a substantially vertical position perpendicular to the floor unit. By mounting hinges 72 at a distance above the base of wall panel 70, wall panel 70 is prevented from being raised and tilted substantially more than 90 degrees from horizontal, as base 74 of wall panel 70 acts as a barrier by abutting side wall 33 of floor unit 30 when wall panel 70 is in an upright position. This feature helps to both ensure correct wall positioning and improve safety for the builder during construction.
[0189] In further variations, wall panel units may be connected to other structural units or faces of the modular building system using the hinge assembly described above. Walls may be connected at the side, upper or lower edges as required to create cantilevered units of a variety of configurations.
[0190] Further structural units such as balcony units may be added to the building frame as shown in
[0191] The building frame formed by the combined use of the range of structural units described above may be manufactured entirely off-site as pre-cast units, then transported to the building site and erected in a very short period of time when compared to traditional timber framed houses. Once erected, the building structure provides a sound base structure to which a range of different design features, cladding and joinery may be added.
[0192]
[0193] As can be seen in
[0194] In the majority of the examples, the end unit is substantially C shaped, with a side beam or side edge 42 extending from a first end of a lower beam 44 at between 60-120, and one or more upper beams 43 directly or indirectly connected to and extending from an opposite end of the side beam 42 at between 60-120. In a majority of the preferred embodiments the side beam extends at a substantially 90 angle from the lower beam, however all end units are shaped to result in a structurally sound frame.
[0195] The corners of end panels 40 may be curved or angled or use combinations thereof. Many of the illustrated end panels 40 include at least one substantially right angle corner. While these and other units of the system are preferably pre-cast as single units, certain shapes or sizes may be formed in a number of pieces and connected together on site in order to achieve the desired shapes the building requires.
[0196] Connecting the different components of the modular structure can be achieved by using a self-locating bolt through system that secures adjacent structures together. While conventional bolt systems will work, the addition of a flexible, resilient spacer between the adjacent members being connected will create a thermal break between units if this is required but will also improve flexibility of the building between the elements by deforming and expanding, during seismic events. A material such as neoprene is particularly suited for use in this application due to its flexibility, relative inertness and weatherproof properties, as well as being a cost effective product that can be readily replaced within the building structure if necessary. In regions where building standards require connections to be rigid and for buildings to be anchored to the ground, rigid grouted connections may be used. However, the use of sliding foundations or flexible mounts with other flexible connections and controlled points of failure is the preferred type of connection for use with the current invention.
[0197] A material with a typical hardness of around shore A80 is particularly suitable for this purpose. In the event of an earthquake or other ground movement, the washers and/or spacer will take up the force of minor movement, with the bolt being the next point of failure. A series of units bolted together in this manner would absorb movement of the land through the connection mechanism, reducing the risk of cracking or breaking of the more brittle prefabricated concrete units.
[0198] In addition to the flexible spacers absorbing small movements, the connection mechanism becomes self-locating as well as increasing the area of shear created between the building elements by pre-forming connection apertures within the building units. Connection apertures may be standard circular apertures, or may have tapered (or otherwise shaped) entry ports to receive a bolt and a correspondingly shaped flexible washer or spacer. Examples of two such self-locating connection systems are seen in
[0199]
[0200]
[0201] Following construction of the building frame, a suitable roofing system may be connected to the upper beams 43 of the end units 40 and/or front beam 50 by utilising the recessed gutters as connection points for both roofing panels and flashings. Such roof panels may be formed from insulated thermal panels for example, or other known roofing materials that are available in panel form. A wide range of size and shapes may be used depending on the design features of a particular building.
[0202]
[0203] Capping sections 142 may extend the length of the guttering (not shown) and cover any areas of connection between separate modular units in the roofing structure. For example, capping 142 may be mounted over connections between roof panels 140, roof panel to beam connections or beam to beam connections.
[0204]
[0205]
[0206] Three different styles of rail support 120A, 120B and 120C are exemplified in
[0207] Down post 123 may be formed in a variety of lengths as shown by rail supports 120A, B and C. Rail support 120A shows a support having a comparably shorter down post 123 extending part-way down the edge face of front beam 50. Rail support 120B shows down post 123 extending the length of edge face of front beam 50 to connect to a second cross bar 124 partially extending across the bottom face of front beam 50. Second cross bar 124 provides additional stabilisation to rail support 120B and is optionally adapted to be directly connected to front beam 50 using a connection means 125, which may take the form of a screw clamp or bolt, enabling the entire rail support 120B to be securely fixed into position on front beam 50. In other embodiments, the distance between cross bars 128 and 124 may be formed so as to exactly fit around the guttering of front panel 50, without the additional of connecting means 125, allowing gravity to maintain the rail support in position.
[0208] Rail support 120C exemplifies a further option for the rail support shape, with comparably longer lower post 123. The longer lower post 123 enables a user to easily mount rail support 120C in position over guttering of front beam 50 whilst safely standing at ground level, using lower post 123 as a handle to raise rail support 120C into position on the roof as seen in
[0209] It should also be noted that the edge protection system may be modified in design while still retaining the main features of being connectable to front beam 50 or upper end panel beams 43 of the building system. For example, in
[0210] Guard rail 127 seen in
[0211] The edge protection system provides a simple and more cost effective alternative to traditional scaffolding by engaging directly with the guttering of the upper beams 43 of the end panels 40 or the front beam 50. The strength of the high density material guttering or channel, for example a concrete guttering or channel, allows it to be used as a stable base for connection of the edge protection system, with significant weight capable of being supported due to the solid construction of the beams.
[0212] As further examples,
[0213] The method of constructing the building frame of the present invention requires a number of steps, but is a significant advantage over other building methods in that the construction of the building frame can occur in a matter of days.
[0214] In practice, the design and layout of the building frame with respect to the land on which it will be erected is predetermined and the individual structural units precast for direct transport to the site.
[0215] On sloped sites, the building frame is preferably built up a hill, rather than down a hill in order to maintain balance in the units as the build progresses.
[0216] One of the significant advantageous with the construction of this modular building system is the ability to transport the building materials easily to sites that may not have access roads built, or that are located on uneven or remote land.
[0217] The following construction method will be described with reference to a frame erected on a sloped site, but the same method can be applied when the frame is erected on flat ground without pile units.
[0218] In a first construction step for mounting the building structure on a sloped site, holes are augured into the ground and one or more pile units 20 are concreted into the ground at the desired spacing such that the horizontal base units 10 of the pile units 20 are accurately positioned to receive floor units 30. When piles are in place, the upper surfaces of the base units 10 in the pile units 20 are levelled to create a substantially horizontal mounting surface (see
[0219] Following placement of the pile units 20, floor units 30 are laid across the pile units 20, each floor unit spanning two or more pile units 20 such that the floor unit is supported at a first end by the base unit of one pile unit A and a second end by the base unit of another pile unit B. To maintain stability when laying floor units 30, central floor units are placed, followed by outer floor units 30. Once floor units are in position, they are connected to each other and the base units 10 using bolts or other suitable connection means (see
[0220] Following placement of the floor units 30, end panels 40 are placed at the edges of a number of floor units to form the frame for the outer walls. End panels 40 are rested on their lower surface on base units 10, the inside edge of the end panel 40 directly adjacent the edge of the outer floor unit 30. Once correctly position, the end panels 40 are bolted to both the adjacent floor unit 30 and base unit 10 on which they rest (
[0221] At this point any front panels and the front beam 50 can be added as can any required roof bracing. Any such bracing can be immediately tensioned.
[0222] The front beam unit 50 is directly connected to the upper edges of the end panel 40 (
[0223] Once the front beam unit 50 is connected, a front panel unit 60 is mounted below the front beam unit to provide a front face to the frame. The front panel unit 60 is connected to the floor units 30 and the bracing members of the end units 40. Depending on the design of the end units 40, the front panel unit 60 may also connect directly to the end units 40 or the floor units 30 at one or more locations (
[0224] Once the frame structure is in place, the non-structural wall panel units 70, 80, 90, 100 are mounted between the upper beam 43 and lower beam 41 of the end units 40, with spaces provided for window joinery as required. Similarly, wall panels 70, 80, 90, 100 forming the back wall of the structure can be added at this point and mounted adjacent the elongate piles 21, end panels 40, floor units 30 and/or cross beam 25.
[0225] Once the modular structure has been erected, roofing can be completed followed by the installation of window joinery.
[0226] It is anticipated that the process for construction of the building frame using pre-cast units will be completed in 1-2 days for a small to medium sized structure, with structures having multiple storys taking a few days longer.
[0227] It should be noted that the construction steps described above describe only one way of erecting the building frame of this invention. The general concepts may be applied to a wide range of different building designs having multiple levels, styles and configurations and should not be seen as limiting in either their method or order.
[0228] It should also be recognised that the dimensions, shapes and sizes of the modular components exemplified are not intended to be limiting, but provide examples of preferred sizes for the examples given. While it is preferable for the building frame to have a solid, robust appearance, the final sizes and shapes of the components may be determined by a skilled builder or architect and may take any form required that meets the structural needs and design aesthetics of a particular building frame design.
[0229] The modular building system of the present invention has a number of advantages over the prior art.
[0230] The system is very adaptable to various sites, it is flexible so that the home owner still has scope to choose a configuration that suits their particular site and preferred layout and function. The building owner can easily change the final appearance to personalise the dwelling to suit their taste without any significant engineering input. The robustness of the preferred embodiment allows for over engineering to allow a high degree of flexibility for the home owner.
[0231] The use of high density building materials such as concrete results in a building that is highly sustainable with a significantly longer life span and lower maintenance than buildings constructed from timber or other light weight material.
[0232] The manufacture of the individual components of the frame is fast and limits the use of chemicals commonly applied to treated wood products or weatherboard, and can be made to order, limiting wastage during the manufacturing process.
[0233] The system easily reverts to conventional methods of construction. For example a client may choose to use part of the claimed system but then incorporate building methods from elsewhere for particular features.
[0234] The strength and robustness of the perimeter beams allow for casting in of all inserts for bolt on purlin cleats, which provides very fast methods of construction.
[0235] Specific beneficial features of the system include:
[0236] Drainage channels and any connections, penetration or joins in the drainage channel are all generally located outside the living space;
[0237] Walls become cladding panels hung from the concrete structural skeleton which is an extremely durable, readily available building material which is essentially unaffected by moisture.
[0238] The design allows for significant portions of the build to be completed by a building owner without constant supervision, reducing build costs.
[0239] The building system caters to all the important aspects of a building and is designed with the home owner in mind. A significant feature to achieving housing affordability is to maximise the work that a homeowner can do themselves. The future accessibility of all areas afforded by the structure of the floor units allow for the home owner to self-manage the build and self-install services. The units could utilise a 24 v system which the home owner could install themselves equally plumbing could be push-fit type fittings allowing the homeowner to self-install. Because all areas of the frame are fully accessible there is no reason why these trades cannot be completed by the home owner and then inspected by the local authority for compliance before being put into use. The homeowner could opt for more conventional power and plumbing and because the building can be retrofitted the home owner could make considerable saving by managing these trades and all finishing trades directly.
[0240] The above principles could also be applied to the joinery installation. The weatherproofing system incorporated into the building frame is extremely robust. Leaks would not cause any structural damage and would be easy to detect and simple to repair, as all components can be readily inspected and replaced.
[0241] The design allows clients to start off small and affordable and add further modules when more funds allow.
[0242] The modular buildings have high thermal mass, which is a base requirement to create temperature stable homes.
[0243] The system lends itself to sloping sites and difficult sites. These types of sites are usually avoided by housing companies, so further options are provided for faster, more economical building on a wider range of terrain.
[0244] The modular design reduces the skill level required to construct a building, making the process accessible to a wider range of people.
[0245] It is a modular precast concrete building system which allows concrete buildings to be built on difficult sites very quickly. It is expected that a two-story modular building could be erected using precast units within seven days.
[0246] Bolt together floor units create a useful mass anchor for propping and bracing items to.
[0247] The design minimises the number of joints and the number of components, improving durability and weather-tightness.
[0248] The concrete guttering systems of the present invention allow for the use of simple modular flashings that can easily be replaced without moving key building elements. This is in significant contrast to conventional fascias and guttering systems that are labour intensive, time consuming and require significant maintenance.
[0249] The system is particularly suited to mass production, providing the opportunity to reduce costs even further. The design minimises the number of trades and number of site hours required. This reduces project risk and should also reduce the number of accidents, costs and ultimately the impact on the environment.
[0250] The entire disclosures of all applications, patents and publications cited above and below, if any, are herein incorporated by reference.
[0251] Reference to any prior art in this specification is not, and should not be taken as, an acknowledgement or any form of suggestion that that prior art forms part of the common general knowledge in the field of endeavour in any country in the world.
[0252] Where in the foregoing description reference has been made to integers or components having known equivalents thereof, those integers are herein incorporated as if individually set forth.
[0253] It should be noted that various changes and modifications to the presently preferred embodiments described herein will be apparent to those skilled in the art. Such changes and modifications may be made without departing from the spirit and scope of the invention and without diminishing its attendant advantages. It is therefore intended that such changes and modifications be included within the present invention.