Method of extracting gas from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity
10830018 ยท 2020-11-10
Assignee
- China University of Mining and Technology (Jiangsu, CN)
- XUZHOU OLIVINE GEOSCIENCE & GEOTECH CO., LTD (Jiangsu, CN)
Inventors
- Shuxun Sang (Jiangsu, CN)
- Shiqi Liu (Jiangsu, CN)
- Liwen Cao (Jiangsu, CN)
- Xiaozhi Zhou (Jiangsu, CN)
- Haiwen Wang (Shandong, CN)
- Huihu Liu (Anhui, CN)
- Zicheng Li (Hubei, CN)
- Huazhou Huang (Jiangsu, CN)
- Changjiang Liu (Shandong, CN)
- Hongjie Xu (Anhui, CN)
- Ran Wang (Jiangsu, CN)
- Jinlong Jia (Hubei, CN)
- Shuyun Zhu (Jiangsu, CN)
Cpc classification
E21B43/305
FIXED CONSTRUCTIONS
E21B43/29
FIXED CONSTRUCTIONS
E21B43/34
FIXED CONSTRUCTIONS
E21B43/13
FIXED CONSTRUCTIONS
International classification
E21B43/12
FIXED CONSTRUCTIONS
E21B43/34
FIXED CONSTRUCTIONS
E21B41/00
FIXED CONSTRUCTIONS
Abstract
A method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity is provided. A horizontal well drilling and reaming subsystem constructs a U-shaped well in which a horizontal well adjoins a vertical well, and performs a reaming process on a horizontal section of the horizontal well to enlarge a hole diameter. A horizontal well hole-collapse cavity-construction depressurization excitation subsystem performs pressure-pulse excitation and stress release on the horizontal well of tectonically-deformed coal bed methane, and hydraulically displaces a coal-liquid-gas mixture such that the mixture is conveyed towards a vertical well section along a depressurizing space. A product lifting subsystem pulverizes the coal and lifts the mixture towards a wellhead of a vertical well. A gas-liquid-solid separation subsystem separates the coal, liquid and gas. A monitoring and control subsystem detects and controls the operation conditions and the execution processes of technical equipment in real time.
Claims
1. A method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity, wherein a horizontal well drilling and reaming subsystem constructs a U-shaped well in which a horizontal well adjoins a vertical well, and performs a reaming process on a horizontal section of the horizontal well; a horizontal well hole-collapse cavity-construction depressurization excitation subsystem performs pressure-pulse excitation and stress release on the horizontal well, and hydraulically displaces a coal-liquid-gas mixture such that the mixture is conveyed towards a vertical well section along a depressurizing space; a product lifting subsystem further pulverizes the coal and lifts the mixture towards a wellhead of the vertical well; a gas-liquid-solid separation subsystem separates coal, liquid and gas; and a monitoring and control subsystem detects and controls operation conditions and execution processes of technical equipment in real time, so as to collect, display, process, and analyze engineering data, wherein specific steps are as follows: 1) arranging various devices on a ground and connecting corresponding devices, and using an existing drilling device and processing technology to construct vertical well sections and kick-off sections of a vertical well and a horizontal well to a target coal seam; 2) replacing a conventional drilling tool with a drilling tool and lowering the drilling tool to the kick-off section of the underground horizontal well, performing three-stage reaming and large-diameter well completion on a loose tectonically-deformed coal seam, and forming a horizontal well section that runs through the vertical well, to complete an open-hole cavity-construction; 3) removing all drilling tools from the well, lowering an underground injection device to a starting point of the horizontal section of the horizontal well, lowering gas-liquid-coal mixture lifting and production devices, namely, a pulverization disturbance device and a hydraulic jet pump to the vertical well, and connecting a wellhead of the vertical well to a coal-liquid-gas separation device; 4) starting a ground power unit, injecting high-pressure and high-speed fluids into the horizontal section of the horizontal well at a specified frequency, to cut and pulverize a coal rock and form a depressurization cavity, then accelerating water into high-velocity jet flows, to further pulverize and flush coal powder, and conveying a formed gas-liquid-coal mixture to a bottom of the vertical well; 5) starting the underground pulverization disturbance device and the hydraulic jet pump, further pulverizing the coal powder that flows into the bottom of the vertical well, and then lifting the coal powder to the ground to enter the coal-liquid-gas separation device; and 6) pre-treating the mixture that enters the coal-liquid-gas separation device, to enable a coal-liquid mixture and a coal bed methane that are separated to respectively enter a coal-liquid separation device and a gas storage tank, further treating the coal-liquid mixture that enters the coal-liquid separation device, and storing a coal powder and a liquid that are separated in a coal powder collection tank and a liquid storage tank respectively.
2. The method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity according to claim 1, wherein in step 2), three-stage reaming rates are respectively 150%, 200%, and 300%, and a diameter increase after the reaming is 200% to 300%.
3. The method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity according to claim 1, wherein in step 4), a depressurization excitation range after the pressure-pulse excitation and the stress release are performed on the horizontal well is 15.
4. The method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity according to claim 3, wherein in step 5), coal powder concentration after the pulverizing is 50%.
5. The method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity according to claim 4, wherein in step 4), the high-pressure and high-speed fluids are mixed with a particular proportion of an abrasive.
6. The method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity according to claim 2, wherein in step 4), a depressurization excitation range after the pressure-pulse excitation and the stress release are performed on the horizontal well is 15.
7. The method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity according to claim 6, wherein in step 5), coal powder concentration after the pulverizing is 50%.
8. The method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity according to claim 7, wherein in step 4), the high-pressure and high-speed fluids are mixed with a particular proportion of an abrasive.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4) In the figures: 1: Drill tower; 2: Pump group; 3: Liquid storage tank; 4: Coal-liquid separation device; 5: Coal-liquid-gas separation device; 6: Gas storage tank; 7: Vertical well; 8: Hydraulic jet pump; 9: Depressurization cavity; 10: Drilling tool; 10-1: Pilot assembly; 10-2: Primary and secondary reaming and retraction assembly; 10-3: Third-stage reaming and retraction assembly; 10-4: Plunger drill bit; 10-5: Blade; 10-6: Second locking mechanism; 10-7: First locking mechanism; 10-8: Drilling fluid outlet; 11: Horizontal well; 12: Coal powder collection tank; 13: Abrasive tank; 14: Abrasive mixing device; 15: Ground power unit; and 16: Underground injection device.
DETAILED DESCRIPTION OF THE EMBODIMENTS
(5) The present invention is further described below with reference to the accompanying drawings (a left-right direction in the following description is the same as a left-right direction in
(6)
(7) The horizontal well hole-collapse cavity-construction depressurization excitation subsystem includes a ground power unit 15 and an underground injection device 16. An inlet of the ground power unit 15 is in communication with a liquid storage tank 3, and an outlet of the ground power unit 15 is in communication with the underground injection device 16. The underground injection device 16 is disposed at one side of a depressurization cavity 9 in the horizontal well 11 near the drill tower 1. After completing the open-hole cavity-construction through reaming of the horizontal well 11, a booster pump in the ground power unit 15 injects high-pressure and high-speed fluids to a horizontal well cavity at a particular pulse frequency, which are sprayed by the underground injection device 16 to the depressurization cavity 9, to implement pressure-pulse excitation and stress release on the horizontal well of tectonically-deformed coal bed methane; and a gas-liquid-coal mixture is displaced through the injected high-pressure and high-speed fluids such that the mixture is conveyed towards the vertical well 7 along a depressurizing space and then produced. A depressurization excitation range (a stress release area width/a coal thickness) after the pressure-pulse excitation and the stress release are performed on the horizontal well is 15.
(8) The product lifting subsystem includes a pulverization disturbance device and a hydraulic jet pump 8. The hydraulic jet pump 8 is a wide-flow jet pump, is disposed in the vertical well 7 near the bottom of the well, and is configured to lift the gas-liquid-coal mixture to a wellhead. The pulverization disturbance device is disposed between the depressurization cavity 9 and the vertical well 7 for pulverizing coal powder at the bottom of the well, so that the coal powder can be more easily lifted by the hydraulic jet pump 8 to the wellhead of the vertical well 7. In this way, fluids with coal powder concentration 50% are efficiently produced.
(9) The gas-liquid-solid separation subsystem includes a coal-liquid-gas separation device 5 and a coal-liquid separation device 4. An inlet of the coal-liquid-gas separation device 5 is in communication with a wellhead pipeline of the vertical well 7, and two outlets of the coal-liquid-gas separation device 5 are in communication with a gas storage tank 6 and the coal-liquid separation device 4 respectively. Two outlets of the coal-liquid separation device 4 are in communication with a coal powder collection tank 12 and the liquid storage tank 3 respectively. The subsystem can achieve gas-liquid-coal mixture pre-treating, gas separation, liquid-coal separation, coal-gas collection, excitation liquid (or water) purification and recycling, with gas separation efficiency of above 90% to 95%, excitation liquid separation and collection efficiency of above 80% to 90%, and a coal powder collection capability of above 98%. The main function is to achieve preliminary separation of gas, liquid, and coal powder through the coal-liquid-gas separation device 5 and the coal-liquid separation device 4. The separated coal and gas respectively enter the coal powder collection tank 12 and the gas storage tank 6 for storage, and the treated excitation liquid enters the liquid storage tank 3 for recycling, to ensure continuous extraction.
(10) The monitoring and control subsystem includes three layers of network architecture and software including on-site workstations, monitoring instruments and sensors, and a central server control system. Based on a high-precision sensor technology, through construction of the three layers of network architecture including the sensors, the on-site workstations, and the central server control system, and application of configuration analysis software and an Internet of Things perception technology, a data acquisition and monitoring system that is accurate, visual, interactive, fast, and intelligent is formed to detect and control the operation conditions and the execution processes of technical equipment in real time, so as to collect, display, process, and analyze engineering data.
(11) The horizontal well hole-collapse cavity-construction depressurization excitation subsystem further includes an abrasive mixing device 14. An inlet of the abrasive mixing device 14 is in communication with the liquid storage tank 3 and an abrasive tank 13, and an outlet of the abrasive mixing device 14 is in communication with the inlet of the ground power unit 15. The addition of a particular proportion of an abrasive to the excitation liquid improves the capability of the excitation liquid to cut a coal rock, thereby improving extraction efficiency.
(12) The blade 10-5 on the drilling tool 10 is rotated and opened towards the direction of the drill tower 1. A drilling fluid outlet 10-8 is disposed on the right of the blade 10-5, and gradually inclines towards the direction of the blade 10-5 when extending towards the outer circumference of the drilling tool 10 from an inner cavity of the drilling tool 10. During drilling, drilling fluids can achieve cooling and auxiliary cutting functions like conventional drilling fluids, and can also provide sufficient support for the expansion of the blade 10-5, to reduce rigid deformation of a connecting member with the blade 10-5, and prolong a service life of the device.
(13) Pumps in the extraction system are all integrated in a pump group 2 except for the hydraulic jet pump 8, which is convenient for communication with the liquid storage tank 3 and underground equipment pipelines, thereby reducing the complexity of connections between the devices in the extraction system.
(14) A method of extracting gas from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity includes the following steps:
(15) 1) arranging various devices on the ground and connecting the corresponding devices, and using an existing drilling device and processing technology to construct vertical well sections and kick-off sections of a vertical well 7 and a horizontal well 11 to a target coal seam, where a drilling fluid circulation pump in a pump group 2 provides drilling fluids for the underground during construction;
(16) 2) replacing a drilling tool with a drilling tool 10 and lowering the drilling tool 10 to the kick-off section of the underground horizontal well, performing three-stage reaming and large-diameter well completion on a loose tectonically-deformed coal seam, and forming a horizontal well section that runs through the vertical well 7 (forming a U-shaped well in which the horizontal well adjoins the vertical well), to complete an open-hole cavity-construction, where the drilling fluid circulation pump in the pump group 2 provides the drilling fluids for the underground during construction;
(17) 3) removing all drilling tools from the well, lowering an underground injection device 16 to a starting point of the horizontal section of the horizontal well 11, lowering gas-liquid-coal mixture lifting and production devices, namely, a pulverization disturbance device and a hydraulic jet pump 8 to the vertical well 7, and connecting a wellhead of the vertical well 7 to a coal-liquid-gas separation device 5;
(18) 4) starting a ground power unit 15, namely, a high-pressure pulse pump in the pump group 2, injecting high-pressure and high-speed fluids into the horizontal section of the horizontal well 11 at a specified frequency, to cut and pulverize a coal rock and implement pressure-pulse excitation and stress release on the horizontal section of the horizontal well 11 to form a depressurization cavity 9, then accelerating water into high-velocity jet flows, to further pulverize and flush coal powder, and conveying a formed gas-liquid-coal mixture to the bottom of the vertical well 7, where during the pressure-pulse excitation and the stress release on the horizontal section of the horizontal well 11, an abrasive mixing device 14 may be connected between a liquid storage tank 3 and the underground injection device 16, and through combined action of a high-pressure mud pump and the high-pressure pulse pump in the pump group 2, an excitation liquid containing an abrasive is injected into the underground, to improve the capability of the excitation liquid to cut a coal rock, thereby improving extraction efficiency;
(19) 5) starting the underground pulverization disturbance device and hydraulic jet pump 8, further pulverizing the coal powder that flows into the bottom of the vertical well 7, and then lifting the coal powder to the ground to enter the coal-liquid-gas separation device 5; and
(20) 6) pre-treating the mixture that enters the coal-liquid-gas separation device 5, to enable a coal-liquid mixture and coal bed methane that are separated to respectively enter a coal-liquid separation device 4 and a gas storage tank 6, further treating the coal-liquid mixture that enters the coal-liquid separation device 4, and storing coal powder and a liquid that are separated in a coal powder collection tank 12 and the liquid storage tank 3 respectively.
(21) In step 6), the separated liquid is purified before entering the liquid storage tank 3 to ensure efficient recycling in production.