Combination pier
10822762 ยท 2020-11-03
Assignee
Inventors
Cpc classification
E02D5/48
FIXED CONSTRUCTIONS
E02D2250/0023
FIXED CONSTRUCTIONS
E02D31/00
FIXED CONSTRUCTIONS
E02D3/08
FIXED CONSTRUCTIONS
E02D5/34
FIXED CONSTRUCTIONS
E02D7/00
FIXED CONSTRUCTIONS
International classification
E02D3/08
FIXED CONSTRUCTIONS
E02D5/36
FIXED CONSTRUCTIONS
E02D7/00
FIXED CONSTRUCTIONS
E02D31/00
FIXED CONSTRUCTIONS
E02D5/34
FIXED CONSTRUCTIONS
Abstract
A combination pier includes: a pile disposed in a bore hole from the bottom of the bore hole to a desired depth; and a pier disposed in the bore hole from the desired depth to the surface. A method for constructing a combination pier includes: forming a pile in a bore hole from the bottom of the bore hole to a desired depth; and forming a pier from the desired depth to the surface.
Claims
1. A method for constructing a combination pier, comprising: forming a bore hole in the earth; forming a pile in the bore hole, the pile extending from the bottom of the bore hole to a desired depth and comprising cast-in-place material; waiting for the cast-in-place material to harden; and forming a pier comprising rammed aggregate in the bore hole above and in direct contact with the pile once the cast-in-place material has hardened, the pier extending from the desired depth to the surface of the earth.
2. The method of claim 1, wherein forming the pile comprises forming an augured cast-in-place pile.
3. The method of claim 1, wherein forming the pile includes disposing a rebar axially with a longitudinal axis of the bore hole and within the pier.
4. The method of claim 3, further comprising disposing a bond barrier positioned atop the pier.
5. The method of claim 1, further comprising disposing a bond barrier positioned atop the pier.
6. A method for constructing a combination pier, comprising: forming a lower section disposed in a bore hole formed in the earth, the lower section comprising cast-in-place material disposed in the bore hole; waiting for the cast-in-place material to harden; and forming an upper section disposed in the bore hole above the lower section and in direct contact with the lower section once the cast-in-place material has hardened, the upper section comprising rammed aggregate.
7. The method of claim 6, wherein the cast-in-place material comprises high compressive strength grout.
8. The method of claim 6, wherein forming the lower section includes: auguring the bore hole to a terminal depth; and casting the material in the bore hole to a desired depth as the augur is tripped out.
9. The method of claim 6, wherein forming the upper section includes: depositing an aggregate in the bore hole above the lower section after the cast-in-place material is set to a predetermined depth through a shoe; ramming the aggregate; lifting the shoe a predetermined distance; and iterating the above actions until the surface is reached.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention may be understood by reference to the following description taken in conjunction with the accompanying drawings, in which like reference numerals identify like elements, and in which:
(2)
(3)
(4)
(5)
(6)
(7) While the invention is susceptible to various modifications and alternative forms, the drawings illustrate specific embodiments herein described in detail by way of example. It should be understood, however, that the description herein of specific embodiments is not intended to limit the invention to the particular forms disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.
DETAILED DESCRIPTION
(8) Illustrative embodiments of the subject matter claimed below will now be disclosed. In the interest of clarity, not all features of an actual implementation are described in this specification. It will be appreciated that in the development of any such actual embodiment, numerous implementation-specific decisions must be made to achieve the developers' specific goals, such as compliance with system-related and business-related constraints, which will vary from one implementation to another. Moreover, it will be appreciated that such a development effort, even if complex and time-consuming, would be a routine undertaking for those of ordinary skill in the art.
(9) The present invention will now be described with reference to the attached figures. Various structures, systems and devices are schematically depicted in the drawings for purposes of explanation only and so as to not obscure the present invention with details that are well known to those skilled in the art. Nevertheless, the attached drawings are included to describe and explain illustrative examples of the present invention.
(10)
(11) Those in the art will recognize from the description and the drawing herein that the lower section 105 of the illustrated embodiment is a pile and that the upper section 110 is a pier. The combination pier 100 therefore comprises a pilei.e., the lower section 105disposed in the bore hole 115 from the bottom 125 of the bore hole to a desired depth 130 and a pieri.e., the upper section 110 disposed in the bore hole 115 from the desired depth 130 to the surface 145. Thus, the presently disclosed technique provides a combination pier that exhibits the desirable characteristic of both piers and piles while mitigating the disadvantages of each.
(12) For example, a pier can generally be driven only a few tens of feet, up to perhaps 45 (14 m) into the ground, the maximum depth depending on soil conditions and the pier installation equipment used. Piles, however, can be driven or augured much deeper, perhaps 120 (36 m) deep and sometimes more. The combination pier 100 can reach the depths common to piles because the lower section 105 is, in fact, a pile even, though the uppers section 110 is a pier.
(13) Turning now to
(14)
(15) The diameter and depth of the bore hole 115 will be implementation specific. A structural engineer will determine these parameters for any particular embodiment given the load the combination pier 100 is expected to bear in light of well-known considerations such as soil type, etc. In the illustrated embodiment, the diameter may be anywhere between 12-30 (30 cm-76 cm) and the target depth may be up to 120 (36 m).
(16) Once the augur 205 has reached the target depth, concrete, grout, or some other suitable fluid 225 known in the art for this purpose is then pumped through the hollow stem 215 of the augur 205 using a fluid delivery system 230. The augur 205 is then retrieved from the bore hole 115 as shown in
(17) There are a variety of fluids known in the art suitable for fabricating piers in this manner. Twoconcrete and groutare mentioned above. However, any suitable fluid known in the art may be used. In the illustrated embodiment, the fluid 225 is a 2500 psi (17.23 MPa) to 5000 psi (34.47 MPa) high compressive strength grout.
(18) Once the fluid 225 hardens, whether by setting or curing, it forms the lower section 105. Construction of the upper section 110 can then begin. The upper section 110 is a pier, and there are many pier construction techniques known in the art. For example, one technique known as the vibro-replacement or wet method uses high pressure water to create a bore hole. The bore hole is then incrementally filled with graded stone that is compacted at each increment. A second technique known as the vibro-displacement or dry method that uses a vibratory probe assisted by compressed air to create a bore hole by downward and lateral compaction of the soil around the probe. The bore hole is then incrementally filled with crushed concrete, crushed stone, cement treated aggregate, or some combination of these that is compacted with each increment.
(19) There are a number of other techniques known in the art for constructing ground improvement piers. Any such suitable pier construction technique may be used in the construction of the upper section 110. The illustrated embodiment uses a rammed aggregate technique like the one disclosed in U.S. Pat. No. 5,249,892. As noted above and shown in
(20) More particularly, and as shown in
(21) The aggregate is then compacted, or rammed, using a hammer 265, shown in
(22) Returning to
(23) Once the aggregate 235 has been compacted as desired, the hammer 265 is lifted so that additional aggregate 235 can be deposited on top the first lift 140 as shown in
(24) In the description above, the bore hole 115 is described as having a diameter, which is a function of a circular cross-section for the bore hole 115. The bore hole 115 of the illustrated embodiment indeed has a circular cross-section. This is a function of the bore hole 115 being, constructed using the augur 205. However, such a circular cross-section is not required for the practice of the invention. Should other techniques be used for constructing the bore hole 115, other geometries may be employed for the cross-section of the bore hole 115.
(25) Alternative embodiments are shown in
(26) The combination pier, as described above, eliminates the need for pile caps, and eliminates point loading of the foundation, and allows the use of spread footing technology in some embodiments. Elimination of the pile caps allows the installation to be permitted as a ground improvement rather than a deep foundation. The combination pier therefore allows, in these embodiments, ground improvements to reach depths of 150 (46 m) below grade or more and lowering the cost of the foundation. Current technology limits ground improvements to depths of less than 50 (15 m) below the surface of the ground.
(27) This concludes the detailed description. The particular embodiments disclosed above are illustrative only, as the invention may be modified and practiced in different but equivalent manners apparent to those skilled in the art having the benefit of the teachings herein. Furthermore, no limitations are intended to the details of construction or design herein shown, other than as described in the claims below. It is therefore evident that the particular embodiments disclosed above may be altered or modified and all such variations are considered within the scope and spirit of the invention. Accordingly, the protection sought herein is as set forth in the claims below.