CRANE DRIVE METHOD FOR SELECTING AND APPLYING A PREFERENTIAL LOAD CURVE ACCORDING TO THE INCLINATION OF A JIB STRUCTURAL ELEMENT

20230008800 · 2023-01-12

    Inventors

    Cpc classification

    International classification

    Abstract

    A crane drive method is provided for selecting and applying a preferential load curve adapted to a work configuration of a crane having a mast supporting a luffing jib including at least one jib structural element. The method includes an inclination measurement step implementing a measurement of an actual inclination of the jib structural element with respect to a reference axis in the work configuration, a selection step implementing an automated selection of the preferential load curve according to the actual inclination of the jib structural element, the preferential load curve selected from among a plurality of load curves stored in a memory and calculated beforehand for several inclinations of the jib structural element, and a drive step implementing an application of the preferential load curve for maneuvers of lifting and moving a load along the luffing jib in the work configuration of the crane.

    Claims

    1. A crane drive method for selecting and applying a preferential load curve adapted to a work configuration of a crane, said crane comprising a mast supporting a luffing jib comprising at least one jib structural element, said crane drive method implementing the following steps: an inclination measurement step implementing a measurement of an actual inclination of the jib structural element with respect to a reference axis in the work configuration, by means of an inclinometer mounted on said jib structural element; a selection step implementing an automated selection of the preferential load curve according to the actual inclination of said jib structural element, said preferential load curve being selected from among a plurality of load curves stored in a memory and calculated beforehand for several inclinations of said jib structural element; a drive step implementing an application of said preferential load curve for maneuvers of lifting and moving a load along the luffing jib in the work configuration of the crane.

    2. The crane drive method according to claim 1, wherein the luffing jib is foldable and comprises at least two jib structural elements articulated with each other, and wherein: the inclination measurement step implements a measurement of the actual inclinations of the two jib structural elements with respect to the reference axis in the work configuration, by means of inclinometers mounted on said two jib structural elements; and the selection step implements the automated selection of the preferential load curve according to the actual inclinations of said two jib structural elements, said preferential load curve being selected from among the plurality of load curves calculated beforehand for several inclinations of said two jib structural elements.

    3. The crane drive method according to claim 2, wherein the two jib structural elements comprise a first jib structural element, forming a jib foot, which is articulated on the mast, and a second jib structural element articulated on the first jib structural element.

    4. The crane drive method according to claim 3, wherein the luffing jib comprises a third jib structural element, forming a jib tip, which is articulated on the second jib structural element and which is movable between two positions comprising a stowed position in which the third jib structural element is folded and pulled towards the second jib structural element, and a deployed position in which the third structural element jib is unfolded and extends in alignment the second jib structural element, wherein a position detection step implements a detection of the actual position of the third jib structural element among its two positions, and wherein the selection step implements the automated selection of the preferential load curve according to the actual inclinations of said two jib structural elements and the actual position of the third jib structural element, said preferential load curve being selected from among the plurality of load curves calculated beforehand for several inclinations of said two jib structural elements and for the two positions of the third jib structural element.

    5. The crane drive method according to claim 4, wherein the position detection step is implemented by means of a detector selected from: an inclinometer mounted on the third jib structural element, or a position or proximity sensor which is mounted on the second jib structural element or on the third jib structural element to detect the presence/absence of the third jib structural element in one of the two positions.

    6. The crane drive method according to claim 1, comprising a height measurement step implementing a measurement of an actual height of the luffing jib with respect to a ground in the work configuration, and wherein the selection step implements the automated selection of the preferential load curve according to the actual inclination of the jib structural element and the actual height of the luffing jib, said preferential load curve being selected from among the plurality of load curves calculated beforehand for several inclinations of said jib structural element and for several heights of the luffing jib.

    7. The crane drive method according to claim 6, wherein the mast is a telescopic mast comprising mast structural elements telescopically mounted, and the height measurement step is performed by means of a sensor which measures a telescoping level between the mast structural elements.

    8. The crane drive method according to claim 1, wherein the selection step is carried out by a control/command system, said control/command system being connected to the memory storing the plurality of load curves and to maneuvering actuators of the crane to perform the drive step.

    9. A crane comprising a mast supporting a luffing jib comprising at least one jib structural element, said crane further comprising: an inclinometer mounted on said jib structural element for a measurement of the actual inclination of the jib structural element with respect to a reference axis in a work configuration; a control/command system connected to the inclinometer and to a memory storing a plurality of load curves calculated beforehand for several inclinations of said jib structural element; wherein said control/command system is configured to carry out an automated selection of a preferential load curve according to the actual inclination of said jib structural element, said preferential load curve being selected from among the plurality of load curves stored in said memory; and said control/command system is connected to maneuvering actuators and is configured to drive maneuvers of lifting and moving a load along the luffing jib in the work configuration of the crane, by applying said preferential load curve.

    10. The crane according to claim 9, wherein the luffing jib is foldable and comprises at least two jib structural elements articulated with each other and on which are mounted respective inclinometers for measuring the actual inclinations of the two jib structural elements with respect to the reference axis in the work configuration, and wherein the control/command system is configured to carry out the automated selection of the preferential load curve according to the actual inclinations of said two jib structural elements, said preferential load curve being selected from among the plurality of load curves calculated beforehand for several inclinations of said two jib structural elements.

    11. The crane according to claim 10, wherein the two jib structural elements comprise a first jib structural element, forming a jib foot, which is articulated on the mast, and a second jib structural element articulated on the first jib structural element.

    12. The crane according to claim 11, wherein the luffing jib comprises a third jib structural element, forming a jib tip, which is articulated on the second jib structural element and which is movable between two positions comprising a stowed position in which the third jib structural element is folded and pulled towards the second jib structural element, and a deployed position in which the third structural element jib is unfolded and extends in alignment the second jib structural element, wherein a detector is configured for a detection of an actual position of the third jib structural element among its two positions, and wherein the control/command system is configured to carry out the automated selection of the preferential load curve according to the actual inclinations of said two jib structural elements and the actual position of the third jib structural element, said preferential load curve being selected from among the plurality of load curves calculated beforehand for several inclinations of said two jib structural elements and for the two positions of the third jib structural element.

    13. The crane according to claim 12, wherein the detector is selected from: an inclinometer mounted on the third jib structural element, or a position or proximity sensor which is mounted on the second jib structural element or on the third jib structural element to detect the presence/absence of the third jib structural element in one of the two positions.

    14. The crane according to claim 9, comprising a height measurement device for implementing a measurement of an actual height of the luffing jib with respect to a ground in the work configuration, and wherein the control/command system is configured to carry out the automated selection of the preferential load curve according to the actual inclination of the jib structural element and the actual height of the luffing jib, said preferential load curve being selected from among the plurality of load curves calculated beforehand for several inclinations of said jib structural element and for several heights of the luffing jib.

    15. The crane according to claim 14, wherein the mast is a telescopic mast comprising mast structural elements telescopically mounted, and the height measurement device comprises a sensor which measures a telescoping level between the mast structural elements.

    Description

    BRIEF DESCRIPTION OF THE DRAWINGS

    [0051] Other features and advantages of the present invention will appear on reading the detailed description hereinafter, of a non-limiting example of implementation, made with reference to the appended figures in which:

    [0052] FIG. 1 is a schematic view of a crane in accordance with the invention, with an illustration of four distinct work configurations;

    [0053] FIG. 2 is a partial schematic view of a first jib element, forming a jib foot, on which a first inclinometer is mounted;

    [0054] FIG. 3 is a partial schematic view of a second jib element on which a second inclinometer is mounted.

    DESCRIPTION

    [0055] Referring to FIG. 1, a crane 1 according to the invention comprises a mast 2 mounted on a platform 10 and supporting a luffing jib 3. The mast 2 may be a foldable mast comprising mast elements articulated with each other, or be a telescopic mast comprising mast structural elements 21, 22 telescopically mounted as in the illustrated example. In turn, the luffing jib 3 is a foldable jib comprising jib structural elements 31, 32, 33 articulated with each other.

    [0056] In the illustrated example, the luffing jib 3 comprises three successive jib structural elements 31, 32, 33, namely: [0057] a first jib structural element 31, forming a jib foot, which is articulated on the mast 2, [0058] a second jib structural element 32, forming a central element, articulated on the first jib element 31, and [0059] a third jib structural element 33, forming a jib tip, articulated on the second jib element 32.

    [0060] The first jib structural element 31 and the second jib structural element 32 form the two first jib structural elements 31, 32.

    [0061] The crane 1 is configurable in several work configurations comprising the following four work configurations CW1, CW2, CW3 and CW4 which are schematized in FIG. 1: [0062] a first work configuration CW1 in which the luffing jib 3 is horizontal and completely unfolded, with its jib structural elements 31, 32, 33 which are unfolded, to extend substantially horizontally, in other words along a horizontal axis; [0063] a second work configuration CW2 (or reach-crane configuration) in which the luffing jib 3 is raised and completely unfolded, with its jib structural elements 31, 32, 33 which are unfolded to extend along an axis inclined with respect to the horizontal at a given inclination angle AN; [0064] a third work configuration CW3 in which the luffing jib 3 is horizontal and partially unfolded, with its two first jib structural elements 31, 32 which are unfolded and which extend substantially horizontally, in other words along a horizontal axis, and with its third jib structural element 33 which is folded back above the second jib element 32; [0065] a fourth work configuration CW4 in which the luffing jib 3 is raised and partially unfolded, with its two first jib structural elements 31, 32 which are unfolded and which extend substantially along an axis inclined with respect to the horizontal at a given inclination angle AN, and with its third jib structural element 33 which is folded back above the second jib structural element 32.

    [0066] In the third work configuration CW3 and in the fourth work configuration CW4, the third jib structural element 33 remains folded back, above the second jib structural element 32, which is advantageous for working with a shorter luffing jib 3, depending on the needs and local working conditions. In other words, the third jib structural element 33 is movable between two positions comprising: [0067] a stowed position (in the third work configuration CW3 and in the fourth work configuration CW4) in which the third jib structural element 33 is folded and pulled towards the second jib structural element, and [0068] a deployed position (in the first work configuration CW1 and in the second work configuration CW2) in which the third jib structural element 33 is unfolded and extends in alignment the second jib structural element 32.

    [0069] In the different work configurations, the mast 2 is deployed, and more specifically the mast structural elements 21, 22 are unfolded (in the foldable mast version) or are deployed (in the telescopic mast version).

    [0070] Furthermore, the crane 1 may be of the self-erecting crane type, and can thus also be configurable in a transport configuration CT (not illustrated) in which the mast 2 and the luffing jib 3 are joined together or side-by-side and extend horizontally, in order to form a transportable package, and more specifically in which the mast structural elements 21, 22 are folded on themselves (in the foldable mast version) or are retracted on themselves (in the telescopic mast version) and the jib structural elements 31, 32, 33 are folded both on themselves and on the mast structural elements 21, 22.

    [0071] The crane 1 is thus equipped with a motor-driven folding/unfolding system 7 which is coupled to the mast 2 and to the luffing jib 3 to act on the mast 2 and on the luffing jib 3 to fold and unfold the crane 1 and thus make it switch from a work configuration to the transport configuration, and vice versa. In other words, this motor-driven folding/unfolding system 7 allows performing configuration change operations implementing kinematics of folding and unfolding the luffing jib 3, and, where appropriate of deploying and retracting the mast 2.

    [0072] The crane 1 further comprises a control/command system 5 connected to maneuvering actuators (for example a hoisting winch 81 to lower/raise a hoisting hook 9, and a distribution winch 82 to move a distribution trolley 4 along the jib 3). This control/command system 5 is configured to drive maneuvers of lifting and moving a load along the luffing jib 3 in the work configuration of the crane 1, by controlling the maneuvering actuators 81, 82, according to drive commands exerted by a crane driver on a drive interface, and by applying a preferential load curve; such a preferential load curve defining maximum operating loads at the spans considered along the luffing jib 3. This control/command system 5 can for example be a microcontroller, a microprocessor, or an electronic control card.

    [0073] According to the invention, the crane 1 comprises at least one inclinometer mounted on one of the jib structural elements 32, 32, 33 for measuring actual inclinations of this jib element with respect to a reference axis, such as a horizontal axis or a vertical axis. In the example illustrated in FIG. 1, the crane 1 comprises two inclinometers, namely a first inclinometer 61 and a second inclinometer 62, mounted on the first jib structural element 31 and the second jib structural element 32 respectively, for measuring the actual inclinations of this first jib element 31 and of this second jib element 32 respectively.

    [0074] Referring to FIG. 2, the first inclinometer 61, fastened on the first jib structural element 31, may be placed proximate to the articulation of the first jib element 31 on the top of the mast. Referring to FIG. 3, the second inclinometer 62, fastened on the second jib structural element 32, may be placed proximate to the articulation between the second jib structural element 32 and the first jib structural element 31.

    [0075] Each of the two inclinometers 61, 62 may be an inclinometer with absolute angular measurement with respect to the vertical or to the horizontal, depending on the model. The inclinometers 61, 62 may be sensors with a reduced size which are directly mounted in a protected location of the structure of each jib structural element 31, 32.

    [0076] It is also possible to provide for a detector 63 which detects the actual position of the third jib structural element 33 from among its two positions (stowed position and deployed position). This detector 63 may be an inclinometer mounted on the third jib structural element 33, or alternatively a position or proximity sensor which is mounted on the second jib structural element 32 or on the third jib structural element 33 to detect the presence/absence of the third jib structural element 33 in one of the two positions.

    [0077] As shown in FIG. 1, the control/command system 5 is connected to the two inclinometers 61, 62 and to a memory 50 storing a plurality of load curves calculated beforehand for several inclinations of the two first jib structural elements 31, 32. Thus, the control/command system 5 is configured to carry out an automated selection of a preferential load curve according to the actual inclinations of the two first jib structural elements 31, 32, the preferential load curve being selected from among the plurality of load curves stored in the memory 50.

    [0078] Advantageously, the control/command system 5 is connected to the two inclinometers 61, 62 and also to the detector 63, and the memory 50 stores a plurality of load curves calculated beforehand for several inclinations of the two first jib structural elements 31, 32 and for the two positions of the third jib structural element 33. Thus, the control/command system 5 is configured to carry out an automated selection of a preferential load curve according to the actual inclinations of the two first jib structural elements 31, 32 and the actual position of the third jib structural element 33, the preferential load curve being selected from among the plurality of load curves stored in the memory 50.

    [0079] Thus, the control/command system 5 selects the preferential load curve which is adapted to the work configuration of the crane 1; this work configuration being dependent on the actual inclinations of the two first jib structural elements 31, 32 and the actual position of the third jib structural element 33. The invention thus allows selecting and applying a preferential load curve adapted to the work configuration of the crane 1.

    [0080] To enrich this adaptation, it is possible to provide a height sensor 64 which allows a measurement of an actual height of the luffing jib 3 with respect to the ground in its work configuration. In the context of a telescopic mast 2, this height sensor 64 may be a sensor which measures a telescoping level between the mast structural elements 21, 22. In this improved version, the control/command system 5 is connected to the two inclinometers 61, 62, possibly to the detector 63, and to the height sensor 64, and the memory 50 stores a plurality of load curves calculated beforehand for several inclinations of the two first jib structural elements 31, 32, for the two positions of the third jib structural element 33, and for several heights of the luffing jib 3. Thus, the control/command system 5 is configured to carry out an automated selection of a preferential load curve according to the actual inclinations of the two first jib structural elements 31, 32, the actual position of the third jib structural element 33 and the actual height of the luffing jib 3, the preferential load curve being selected from among the plurality of load curves stored in the memory 50.

    [0081] Thus, the control/command system 5 recovers measurement data from the different sensors 61, 62, 63, 64, and automatically applies the preferential load curve which is adapted to the work configuration deduced from these measurement data.