Updating a topology of a distribution network by successive reallocation of the meters
10802056 · 2020-10-13
Assignee
Inventors
Cpc classification
H02J13/00006
ELECTRICITY
Y04S40/20
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02J3/00
ELECTRICITY
G01R19/003
PHYSICS
H02J2203/20
ELECTRICITY
G01R19/2513
PHYSICS
Y02E60/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S40/12
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
G01R19/00
PHYSICS
H02J13/00
ELECTRICITY
H02J3/00
ELECTRICITY
Abstract
There is proposed a computer-implemented method for automatic correction of a topology of a smart network that uses the information contained in the voltage measurements provided by smart meters in order to determine which meter is connected to which transformer. The method starts from an initial topology and divides up the meters into first and second batches for each transformer. Successive reallocations of meters in the second batches are made according to similarities with average voltages calculated and corrected from the first batches of meters. The method proceeds by iterations until there remain no more meters attributable to other transformers and updates the topology so that its evolution at a given time be readable.
Claims
1. A computer implemented method for automatic correction of a topology of an electrical distribution network defined by respective allocations of meters to transformers, the method comprising the steps of: (i) for each transformer of the topology, dividing up the meters allocated to the transformer into first and second batches according to a dividing criteria and a degree of similarity of the records of voltages measured by the meters with respect to an average voltage estimated with the records of voltages measured by the meters allocated to the transformer so that the first batch comprises the meters whose degree of similarity is higher than the meters of the second batch; (ii) initially for each transformer of the topology then subsequently for each transformer whose allocation of meters has changed, calculating a corrected average voltage with the records of voltages measured by the meters only in the first batch of the transformer; (iii) calculating a similarity of the records of voltages measured by the meters in the second batches of the transformers with the corrected average voltages of the transformers calculated in (ii); (iv) for each transformer of the topology, determining which are, in the second batch, the meters attributable to another transformer according to the similarities calculated in (iii); (v) reallocating at least one of the meters determined in (iv); and (vi) as long as a meter has been reallocated in (v), repeating steps (ii) to (v), the topology being corrected when there remain no more meters attributable to other transformers in the second batches.
2. The method according to claim 1, further comprising the step, between steps (iv) and (v), of prioritizing at least one meter to be reallocated according to a decreasing order of the similarities calculated in (iii).
3. The method according to claim 1, wherein the similarity calculated in (iii) is determined as a function of: a multidimensional analysis of the records of voltages measured, the similarity being quantified according to distances between voltages of time-series of the records with respect to the average voltages of the transformers represented in a multidimensional space; a correlation analysis between the time-series of the records; or results of a function combining results of the multidimensional and correlation analyses.
4. The method according to claim 3, wherein the similarity calculated in (iii) is further determined as a function of a contribution of time-series of records of consumptions measured by the meters.
5. The method according to claim 3, wherein a switching of the records of voltages between the multidimensional analysis and the correlation analysis is carried out as a function of consumption levels determined from corresponding time-series of records of consumptions measured by the meters.
6. The method according to claim 3, wherein the function combining the results comprises a remapping of a distance towards a correlation according to the equation:
7. The method according to claim 3, wherein the similarity calculated in (iii) for a meter under validation further comprises: an estimation of a connection resistance of the meter under validation from the records of voltages measured by the meter under validation, an average voltage estimated with the records of voltages of all the meters connected to the transformer targeted by the calculation of similarity, and values representative of a load at the meter under validation according to records of consumptions measured by the meter under validation; and a correction of the voltage measured by the meter under validation as a function of the connection resistance estimated and the records of consumptions measured by the meter under validation.
8. The method according to claim 7, wherein the connection resistance of the meter under validation is estimated as a function of variations of amplitudes between the records.
9. The method according to claim 7, wherein a potential electrical non-compliance is detected when the connection resistance of the meter under validation has a value outside a predefined valid range.
10. The method according to claim 1, further comprising, before step (i), the step of selecting data segments defining time-stamped ranges of the records to which the calculations in steps (i) to (iii) are applied.
11. The method according to claim 10, further comprising the step of validating the data in the segments by detecting blackouts and anomalies in the data and by rejecting the corresponding time-stamped records.
12. The method according to claim 1, further comprising the steps of: communicating with a topological database of an electrical network to obtain data indicative of the topology of the electrical distribution network and updating the data as a function of the reallocations of the meters in (v); and communicating with a database storing measurements provided by the meters to obtain the records of voltages measured by the meters.
13. The method according to claim 12, wherein the updated data comprise a history of the reallocations of the meters to the transformers in order to keep track of an evolution of the topology and that a configuration of the topology at a given time be determinable.
14. The method according to claim 12, wherein the similarity calculated in (iii) further comprises: a detection of a reallocation of a meter of index i of a transformer k towards a transformer l; and an optimization of a time-stamped location of the reallocation by calculating a similarity for different time positions x of reallocation before and after the reallocation of the meter such as
S.sub.i,k,l,x=S.sub.i,(k.sub.
15. The method according to claim 1, wherein the dividing criteria is a ratio of meters to be distributed between the first and second batches or a maximum number of meters in the second batch.
16. The method according to claim 1, wherein the similarities calculated in (iii) are classified and analyzed with respect to preestablished conditions of detection of outliers indicative of potential electrical non-compliances.
17. A computer system for automatic correction of a topology of an electrical distribution network defined by respective allocations of meters to transformers, the computer system comprising at least one storage device for a database of topological data representing the topology of the electrical distribution network, at least one storage device for records of voltages measured by the meters, and a processing unit having an interface for communicating with the storage devices, at least one processor and a memory storing instructions executable by the processor and configuring the processing unit to perform the steps of: (i) for each transformer of the topology, dividing up the meters allocated to the transformer into first and second batches according to a dividing criteria and a degree of similarity of the records of voltages measured by the meters with respect to an average voltage estimated with the records of voltages measured by the meters allocated to the transformer so that the first batch comprises the meters whose degree of similarity is higher than the meters of the second batch; (ii) initially for each transformer of the topology then subsequently for each transformer whose allocation of meters has changed, calculating a corrected average voltage with the records of voltages measured by the meters only in the first batch of the transformer; (iii) calculating a similarity of the records of voltages measured by the meters in the second batches of the transformers with the corrected average voltages of the transformers calculated in (ii); (iv) for each transformer of the topology, determining which are, in the second batch, the meters attributable to another transformer according to the similarities calculated in (iii); (v) reallocating at least one of the meters determined in (iv); and (vi) as long as a meter has been reallocated in (v), repeating steps (ii) to (v), the topology being corrected when there remain no more meters attributable to other transformers in the second batches.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
(14) The method according to the invention allows updating a database describing the meter-transformer pairing of a low-voltage network. The data used for setting an update are: a database containing the meter-transformer allocation links and possibly comprising a certain proportion of allocation errors, measurements of voltages and preferably of consumption of the meters indexed as a function of an identity of the meter and possibly date and time marked with a timestamp.
(15) The topology of the electrical distribution network comprises at the minimum the meter-transformer allocation links. These links may be available under different indexing forms, with or without date and time marking of the displacements of meters and of the additions of new meters and transformers.
(16) The voltage measurements may be of different natures, for example: instantaneous RMS, average RMS voltage between two timestamps, average RMS voltage for a given time length. The consumption measurements will typically be expressed in kilowatt-hour (kWh) cumulated between two timestamps. It is desirable that these measurements be date and time marked, or, at least, available in time order of reading.
(17) The energy consumption measurement of a meter is mostly independent from the other events occurring on the network. This consumption measurement, summed for the smart meters presumed to be connected to a transformer, represents a portion of the load of this transformer, the other portion being the non-communicating meters, the flat rate connections (e.g. meter-less city lighting) and the electricity theft.
(18) In an embodiment of the method according to the invention, the reactive portion of the impedance is neglected by considering the power factor as unitary, since the corresponding measurements are often not forwarded to the database. However, in a possible embodiment of the method according to the invention, the reactive portion may be considered to improve the likelihood of the proposed corrections by introducing it as an input variable in the following expressions.
(19) Referring to
(20) Moreover, a load switching of a consumer causes a current fluctuation that, due to the impedance of the network, will be perceived as a voltage fluctuation by any meter closely or remotely connected on this network. This voltage fluctuation generated by the switching of a load on the network is attenuated between the switching location and the location of the meter 7 that measures the corresponding voltage fluctuation. These voltage fluctuations may be used to determine a degree of similarity between two meters. For example, if a meter is located in a same building at a few centimeters of a meter that supplies the switched load, both of these meters will sense almost the same voltage fluctuation. Referring also to
(21) Regarding meters connected to a same transformer, two extreme cases of meter location may be discussed, namely the meter whose connection is the closest to the transformer and that whose connection is the farthest from the transformer. For a same switched load, the meter whose connection is the farthest will impact more the voltage of all the meters located between it and the transformer, whereas the meter whose connection is the closest will impact the whole set of meters at a same minimum magnitude. At this stage, for meters connected to a same transformer, the variation of voltage perceived by the meters is function of the position of the meter operating the load switching and of the position of the meter recording the variation of voltage.
(22) The case of a network where single-phase clients are connected to clients having a three-phase supply is more complex than the single-phase circuit described above and illustrated in
(23) Whether in the search of a maximum of similarity or the search of a minimum of dissimilarity, the finality is the same. In the following, the terms similar and similitude may respectively correspond to the terms dissimilar and dissimilitude, with inversion of the terms of optimisation such as the maximization or the minimization.
(24) The discrete series of instantaneous average voltage of the line corresponding to the instantaneous average of the voltages of all the meters i connected to a line L may be expressed as
(25)
where L is the set of indexes of the meters connected to the line L, and for which measurements of voltages v.sub.i,n are available and this for the timestamp of index n.
(26) Referring to
(27) The discrete time-series of the instantaneous average voltage of one of the transformers connected to the medium-voltage line may be expressed as
(28)
where T.sub.k is the set of indexes of the meters connected to the transformer k. In a multidimensional representation, the discrete time-series of the instantaneous average voltage associated to the different transformers will appear as points 21, 22, 23. Each one of these points will be located at the centroid of a cloud made of the voltages of the meters 24 connected to the corresponding transformer 22.
(29) A correlation defined as the product of centered correlation (Pearson) may be expressed as
(30)
with the discrete time averages of voltages
(31)
where v.sub.i,n and v.sub.j,n are two series of records of voltages compared with n as time index. The distance between two compared series of records of voltages with n as time index may be expressed as
(32)
(33) For the relations 3 and 5, the comparison may be performed between two meters, between one meter and the instantaneous average voltage calculated for a transformer or even between the instantaneous average voltage of the line and that of a transformer.
(34) A set of records may for example comprise from some hours to some months of records. The corresponding time length may be shorter if the records are at close time interval, for example every 5 or 15 minutes instead of every hours.
(35) In multidimensional representation of the discrete time-series of the measured voltage (or measurements of voltages), the points corresponding to the farthest meters from the transformer will be closer to the origin (0,0, . . . ) whereas those corresponding to the closest meters having a higher voltage on average will be located farther from the origin with respect to the point corresponding to the average voltage of all the meters.
(36) A preferred embodiment of the method according to the invention uses the discrete derivatives of voltage instead of the voltage so that the method is less sensible to voltage changes of long period common to all the meters and also less sensible to systematic errors attributable to the calibration differences in the meters. As it is possible to use the method with the voltages as with the voltage derivatives, for the disclosure hereinafter, the term discrete time-series of voltage measurements may also correspond to discrete time-series of the derivative of the voltage measurements, unless specified otherwise. However, where derivatives of voltage will appear (in the mathematical expressions, in the text and the figures), they should not be substituted by the voltages. Also, in order to simplify the text, the term voltage-series will be used to designate a discrete time-series of voltage. In the case of a meter, this will correspond to a discrete time-series of the voltage measured by the meter. In the case of a transformer, it will correspond to a discrete time-series of instantaneous average voltage calculated for the transformer while in the case of a line, it will correspond to a discrete time-series of instantaneous average voltage calculated for the line.
(37) Referring to
(38) To improve the correlation, the voltage-series calculated for the line may be subtracted. The voltage-series of the line v.sub.L,n is a significant voltage of the voltage of the power source supplying all the meters of this line. If the voltage-series v.sub.L,n is subtracted from the voltages-series measured by both meters in equation 2, such that v.sub.i,nv.sub.L,n and v.sub.j,nv.sub.L,n respectively replace v.sub.i,n and v.sub.j,n, this gives
(39)
This may be expressed as
(40)
after algebraic manipulation, by supposing that the line voltage variations are not correlated with the variations induced by the loads, and with
(41)
as the square of the quadratic dispersion of the line voltage. From a geometric point of view in the multidimensional space R.sup.N, the removal of the vector V.sub.L[v.sub.L,1, v.sub.L,2, . . . , v.sub.L,N] from the vectors V.sub.i[v.sub.i,1, v.sub.i,2, . . . , v.sub.i,N] and V.sub.j[v.sub.j,1, v.sub.j,2, . . . , v.sub.j,N] corresponds to a translation of the points pointed by these two vectors. This translation changes the correlation values without moving these points closer or farther. A decision based on the correlation may be modified by a translation while a decision based on the distance is independent from the translation. It may be concluded that the result of the correlation is affected by the magnitude of the series V.sub.L of line voltages that appears common in the networks, which is not the case for a distance calculation.
(42) Referring again to
(43) In the following development, it is proposed to add the optimization of the distance to the similarity function.
(44) Referring to
(45) As illustrated by bloc 103, the similarity 104 between the meters that are connected to a same transformer is calculated for each transformer. For example, the similarity function S estimating a similarity
s.sub.i,k=S(v.sub.i:{v.sub.j.sub.
between the voltage vector v.sub.i corresponding to the meter i and the voltage vectors v.sub.j.sub.
v.sub.z[v.sub.z,1,v.sub.z,2, . . . ,v.sub.z,n, . . . v.sub.z,N] with z{i,j.sub.1,j.sub.2, . . . },(10)
n being the time index of the records. The meters connected to the transformer k or a subset of these meters participate to the estimation expressed by equation 9.
(46) Referring again to
(47)
or, still, the sum of the distances (possibly less precise) such as
(48)
or, still, according to a preferred embodiment of the method,
(49)
where the voltage v.sub.k,n is the voltage-series of the transformer k as calculated with equation 2. The expression 11c tends towards zero when the multidimensional representation point corresponding to a meter tends to overlap to that of the transformer 22, while 11a and 11b tend towards a non-zero quantity that is a function of the dispersion of the meters 24 around the transformer 22.
(50) Referring again to
S.sub.k=[ . . . s.sub.i,k . . . ].(12)
(51) This vector will be used in step 105 of dividing up the meters between U.sub.k unchangeable meters that are the most similar, and C.sub.k changeable (mobile) meters such that
(52)
with U.sub.kC.sub.k=T.sub.k and U.sub.k+C.sub.k=T.sub.k, i.e. the union of the sets of unchangeable meters and of the changeable meters corresponds to the set of meters connected to the transformer k according to the initial topological description. The number of changeable meters may be a fixed number or, according to a preferred embodiment of the method, given in a determined proportion of the number of meters connected to the transformer. According to the preferred embodiment, the process parameter
(53)
sets the ratio of the number of unchangeable meters U.sub.k over the total number of meters T.sub.k. Typically but not restrictively, the ratio is set to 30% with a minimum of one changeable meter from a population of three or more meters assigned to a transformer. U.sub.k=1 and C.sub.k=0 in the case of a transformer having only one meter connected thereto. In such a case, the meter will be considered to be unchangeable. A preferred embodiment of the method will sort the s.sub.i,k elements of S.sub.k by decreasing order of similarity and will classify the U.sub.k first elements as unchangeable. As illustrated by block 106, a calculation of the corrected voltage-series attributed to a transformer
(54)
is achieved from the voltages-series of the U.sub.k unchangeable meters. This ensures that the remote meters 28 of the cloud made of the voltages-series of meters connected to the transformer and that, possibly, may not be connected to the transformer do not participate to this corrected voltage-series calculation. For the case of a changeable meter to be validated with respect to its initial transformer, this calculation allows to not consider the voltage-series of the meter to be validated in the calculation of the voltage-series of the transformer. Without this exclusion, for a network comprising I meters, there would be an advantage for this choice of meter-transformer connection in a proportion of 1/I reflecting the relative weight of the voltage of the meter under validation with respect to the other meters.
(55) The corrected voltage-series of each transformer is used to perform the calculation of the similarities such as, according to a preferred embodiment of the method,
(56)
(57) The use of the set of unchangeable meters may be extended to the calculation of the correlation between a changeable meter i and a transformer k such as
(58)
(59) The voltage perturbations caused by an electricity theft or the presence of a non-communicating meter do not impair the method. On the contrary, in R.sup.N (
(60) This latter similarity function based on the distance provides excellent results when the meter carries a small load (a load that does not vary much through time in the case of the voltage derivative) compared to the other meters. In the opposite situation, when the meter carries a significant load (a load that varies much through time in the case of the voltage derivative) compared to the other meters, the voltage of this meter moves away from the instantaneous average voltage of the transformer. In the extreme case of a single meter that carries significant loads compared to the other meters, the multidimensional representation shown in
(61) In practice, different extremes may well be observed for different meters at different times. An advantageous strategy resides in applying the best method at the moment deemed appropriate. In the following, it will be said that a meter is silent if it carries a small load or in the case of the voltage derivative, if it carries a small load variation. Likewise, it will be said that a meter is loud if it carries a high load or in the case of the voltage derivative, if it carries a high load variation compared to the other meters connected to the targeted transformer. To modulate the method between both extreme solutions, i.e. for a silent meter and for a loud meter, an improvement is brought to the similarity function based on the distance by correcting the voltage measured by the meter to take into account the voltage drop associated to the load flowing across the connection resistance of the meter, i.e. the resistance of the cable connecting the meter to the line. With this correction, the similarity by the distance gives good results for a meter that is between the silent state and the loud state. The corrected voltage-series for the meter i may be expressed as
v.sub.i,n.sup.c=v.sub.i,n+R.sub.i.Math.c.sub.i,n(19)
with
(62)
a factor representative of the connection resistance. This factor is in Ohm units when the variable c.sub.i,n corresponds to the average current calculated for the time interval n. The quantity c.sub.i,n may also correspond to the consumption in kWh or to any other quantity representative of the load at the meter.
v.sub.i,n=v.sub.i,nv.sub.i,n-1,(21)
v.sub.k,n=v.sub.k,nv.sub.k,n-1 and(22)
c.sub.i,n=c.sub.i,nc.sub.i,n-1(23)
are calculated for N records and consequently give N1 derivative values. For equations 20 to 23, the voltage-series variables cannot be substituted by variables derived from voltage-series contrary to the other expressions.
(63) Referring to
(64) The voltage-series at the transformer 22 appearing in expression 22 (and 20 by extension) may also be calculated from expression 2 on different populations of meters, whether on the unchangeable meters such as
v.sub.k,n=v.sub.k,n.sup.U,(24)
or on the totality of the meters
(65)
in which case the meter i 25 is included or not. For the calculation of the factor R representative of the connection resistance, a preferred embodiment of the calculation method of v.sub.k,n is that expressed by equation 25 with exclusion of the meter i.
(66) The distance similarity function is expressed as
(67)
(68) The estimation of the connection resistance given in 20 is not limited to the correlation of the voltage-series measured by a meter: it has many uses, one of which among others is the detection of electrical non-compliances. Indeed, as an example, a shunt circuit of the meter increases the apparent connection resistance. A resistance threshold may then be fixed so that, beyond the threshold, it will mean that there is a strong possibility of electrical non-compliance.
(69) According to a preferred embodiment of the method, using equation 25 with exclusion of the meter i, in the case where c.sub.i,n corresponds to a current, the connection resistance estimated by equation 20 is higher or equal to the real value of the connection resistance. If the meter is the one located the closest to the transformer then the statistical expectation R.sub.i for a large number of estimations is equal to the connection resistance. If the meter is the farthest one connected on the line, considering that several meters are evenly distributed on the length of this line, the estimation given by equation 20 overestimates the resistance of about a half-length of the line on which it is connected. The intended goal of equation 20 is not to have an unbiased value of the connection resistance but rather to bring the voltage-series of the meter as close as possible from the voltage-series of the transformer before the distance calculation.
(70) Illustrated in the multidimensional space, the correction 27 proposed by expression 19 brings the point corresponding to the voltage-series of the meter under validation 25 closer to the point of the voltage-series at the transformer 22 and results in that the similarity by the distance provides good results even if the meter is a bit loud. However, this correction may amplify or introduce an error when the estimation of the connection resistance is wrong. The estimation of the connection resistance of a meter is inaccurate when this meter carries no significant load such that the information on the connection resistance is not present in the measurements for this meter: however, since there is no significant manipulation of load c.sub.i,n for this meter, the result of expression 19 is unaffected. The problem is different in presence of an electrical non-compliance or of an error of allocation to the appropriate transformer which alters the estimation of the connection resistance when the meter carries significant loads with respect to the other meters. If too high resistance values are sometimes observed, too small values and even negative values are frequently observed too. Two thresholds are thus preferably set, a threshold for the minimum acceptable value of the connection resistance and a threshold for the maximum value. In a preferred embodiment, the minimum threshold is set between zero and the minimal resistance expected at the secondary of a distribution transformer, i.e. between zero and typically less than 10 m. The maximum threshold of resistance is set in correspondence with the length of the anticipated maximal connection and the gage of the cable. Among the situations that explain why the connection resistance is outside these thresholds, there is that where the meter is not connected to the target transformer, that where the consumption conveyed by the meter is too small to obtain a valid estimation of the connection resistance and that where there is an electrical non-compliance.
(71) In the preferred embodiment, the value of the connection resistance is limited by the minimum and maximum thresholds set in the calculation of the correction 27 (equation 19). Considering that the calculation of the connection resistance may be wrong and/or that the loads carried do not correspond to reality, the distance calculation retains the minimum distance value such as
(72)
i.e. the minimum distance value with or without correction of the voltage drop with the load.
(73) If a meter is loud on occasion and that its connection resistance value is outside the set thresholds while the voltage of this meter is close to the voltage-series of the transformer (v.sub.k,n or v.sub.k,n.sup.U) for several records, it means that this meter is most probably connected to the transformer and carries hidden loads or a hidden load proportion most of the time: the correspondences of voltages are observed at the moments where there is no manipulation of loads. If a meter is always silent, it is normal that the estimation of its connection resistance value is incorrect but, in return, the similitude by the distance is accurate and should locate it close to the voltage-series of a transformer: it should be an unchangeable meter. In a preferred embodiment, if a changeable meter has its connection resistance value outside the set thresholds for the calculation performed with the transformer to which it finally connects, this meter is qualified as a potential electrical non-compliance and its identifier is added to a list of potential electrical non-compliances 117 (as shown in
(74) At the end of the process of the respective allocations of meters to transformers, a classification and an analysis of the similarity indexes allow identifying similarity outliers if there are any. The analysis may for example consist in simply using a threshold value. In the case of the correlation, a minimum threshold may for this purpose be set at 20%. If the meter under validation cannot be reallocated elsewhere on the line with a better percentage, this may indicate for example that it is not on the line (it is then possible to check if it should be allocated to another transformation station). There are also the correlations of negative values that will be considered as null and that are most often explained by statistical artefacts between the voltage-series of a meter and the voltage-series of a transformer to which it is not connected. In the case of the distance, the threshold value may be set to 3 standard deviations with respect to the average. For a similarity value comprised between 0 and 1, where 1 corresponds to the similarity maximum, a remapping may be achieved for the values close to 1 to tend towards a Gaussian distribution. The outliers may be joined to the list of potential ENCs 117. It is possible that a non-communicating meter be located close to the meter under validation, or that the meter be connected to another line or to a transformer not in the initial topological database thus explaining the outliers so obtained.
(75) Two means of qualification of the pairing of a meter to a transformer are thus available, the first one, the correlation, is unit-less and the second one, the distance, is expressed in volts. The first means may advantageously be maximized while the second may advantageously be minimized. It is a matter of properly combining both expressions in order to pass from one to the other with some continuity. A remapping of the distance is proposed so that it is in the same domain as the correlation, i.e. [0.0, 1.0] and where the similarity maximum has a value of one. This remapping seeks to preserve the sensitivity that the distance has with the difference of length of the compared vectors, which the correlation has not since it is a collinearity indicator between the vectors regardless of their length differences. The link between both expressions may be expressed with respect to V.sub.a and V.sub.b that are two vectors each corresponding in the present context to a series of measured voltages. The square of the multidimensional distance
V.sub.aV.sub.b.sup.2=V.sub.a.sup.2+V.sub.b.sup.22.Math.(V.sub.a.Math.V.sub.b), where . . . is the norm operator,(27)
is function of the correlation since
V.sub.a.Math.V.sub.b=V.sub.a.Math.V.sub.b.Math.cos(),(28)
with the angle being the angle between both vectors in the multidimensional space, and that the cosine of this angle is the correlation coefficient such as =cos(). Since d.sub.a,b=V.sub.aV.sub.b, this gives the relation
(76)
(77) In this expression of the correlation, the term on the left compensates for the distance that comes from the difference between the lengths of the vectors. Indeed, there is obtained
(78)
with the equality to one when the vectors have the same length. If this term on the left is replaced by one, there is no longer compensation as desired for the remapping of the distance towards the correlation. Then
(79)
is the distance to correlation remapping function.
(80) With the increase of the load manipulation amplitude, the situation shown in
(81)
may define the equivalent of a correlation coefficient calculated from the distance between the voltage-series of a meter and that of a transformer.
(82) Both indicators may be merged as follows. Referring to
(83) For example, a meter may be loud 124 or silent 128. Likewise, the sum of the consumptions of the meters may be loud 130 or silent 126. Among the occasions where a meter may be loud 124, it may be loud at some of these occasions 140 while the sum of the set of the meters appears to be silent 126, thus for a high proportion of consumption between that of the meter and the sum of the meters. Conversely, among the occasions where a meter may be silent 128, it may be silent at some of these occasions 142 while the sum of the set of the meters appears to be loud 130, thus for a small ratio of consumption between that of the meter and the sum of the meters. It is a matter of using these statistical opportunities to apply the correlation based similarity in the first case and the distance based similarity in the second case. It may be understood that these opportunities quickly decrease with the reading time interval of the meters (15 minutes, 60 minutes).
(84) The generalized similarity function between the voltage-series of the meter i and a transformer k may be expressed as
(85)
(86) which is function 1) of the distance between two voltage-series expressed in a multidimensional space, 2) of the correlation between these series and 3) of the time-series of consumption of the meter c.sub.i,n, and of the time-series of consumption c.sub.k,n of the meters connected to the transformer k. The highest similarity value determines to which transformer the meter is connected. In this preferred embodiment, the correlations and the distances are carried out between the meter under validation and the voltage-series of the transformer calculated from the voltages-series of the unchangeable meters.
(87) In an embodiment, the generalized similarity function
s.sub.i,k,M.sup.g=((1P.sub.i,M).Math..sub.i,k.sup.Ud).sup.e(P.sub.i,M.Math..sub.i,k.sup.U).sup.e,(33)
with the distribution (or switching) function
(88)
(89) is calculated for M non-necessarily time contiguous records such that nM, namely that the time index n of a record is an element of the set M of the indexes considered for this calculation. The exponent c is preferably set close to one. The distribution function may, for example, be a square root, a T.sub.k-th root or a polynomial function limited between zero and one.
(90) This expression (eq. 34) has the drawback of mixing the circumstances where the meter to be validated is silent with other moments where it is loud. Ideally, it is preferable to separate these moments and to cumulate each ones with the appropriate similarity function. In a preferred embodiment, the generalized similarity function
(91)
where, from equation 17,
(92)
with N.sup.S the set of records where the meter is silent and N.sup.B the set of records where the meter is loud, and this, such that
(93)
(94) The distribution function
(95)
characteristic of the relative consumption between the consumption of the meter and that of all the meters, allows choosing the records between the loud ones and the silent ones such as
iN.sup.S if P.sub.i,n<Threshold_silent(39a)
and
iN.sup.B if P.sub.i,nThreshold_loud(39b)
with Threshold_loudThreshold_silent. The thresholds may be set before execution of the method, may be function of the number of meters or dynamically or even iteratively adjusted in order to obtain a judicious distribution. In a preferred embodiment, the initial value is the same for both thresholds and is of 20%. The generalized similarity function has its value comprised between zero and one. This function has a maximum value when the meter is allocated to the proper transformer.
(96) The case of city lightings is an example for which the generalized similarity function given at equation 35 provides much better results than that given at equation 33. Indeed, a city lighting always approximately has the same consumption and switches twice a day. Either on or off, the city lighting is perfectly silent regarding the derivative of the voltage-series. It is loud only when it switches. Combining the distance based similarity for periods where it is silent and the correlation based similarity when it switches gives the best result.
(97) Referring again to
(98) Referring to
(99) At step 108, a meter may be displaced if its similarity increases with the displacement. When more than one meter may be displaced, a choice is preferably made for the most relevant meter to be displaced, which is performed at step 110. For each meter that can be displaced, the process has the similarity value that the meter has with the transformer k to which it is connected and the similarity value that the meter has with the transformer l targeted by this displacement. The combined function of the similarities to be optimized (minimized or maximized depending on the case) in the choice of the meter to be displaced may then be expressed as
f(s.sub.i,k.sup.g,s.sub.i,l.sup.g)(40)
where k and l are respectively the index of the initial transformer and the index of the transformer targeted by the displacement. A person skilled in the art may consider several possible functions. A preferred embodiment of the method is expressed as
f(s.sub.i,k.sup.g,s.sub.i,l.sup.g)s.sub.i,l.sup.gs.sub.i,k.sup.g(41)
so that among the changeable meters, it will be the one that gives a maximum to the combined function of similarity that will be selected as meter to be displaced.
(100) Referring to
(101) The overlap of these possibilities may be noted. In reality, the overlaps are minimal and located at the middle of the segments as illustrated by the parallelepipeds in
(102) The differential method detects a meter displacement and roughly locates it, close to a segment length. When a displacement of the meter of index i is detected between the transformer k towards the transformer l, the similarity calculation for the distinct portions may be reexecuted to increase the resolution of the time location of the displacement, i.e. before (n<x) and after (nx) the displacement of the meter, such as
S.sub.i,k,l,x=S.sub.i,(k.sub.
where x is a positive integer such as x{0, 1, 2, 3 . . . ,N} determining the calculation range for the time index n. This similarity calculation will be performed for different time positions x of displacement to determine the position that gives the best similarity. Typically, the process will chose a search interval of time-stamped records of the range 0-N corresponding to a day for the step value of positions.
(103) Once the displacement scheme of a meter between two transformers is found, the information {i, k, l, x} obtained from the optimization of 42 preferably forms part of the correlation performed at step 108 and is stored in the database 301 (as shown in
(104)
(105) This method may advantageously be modified to reduce the computing power by modifying steps 3 to 7 so that they correspond to a binary search where the search range is reduced by half at each step. Other application methods of equation 42 may be used to estimate the position x corresponding to the moment of the displacement of the meter.
(106) A preferred embodiment with respect to the different steps, and more particularly the equations 2 and 15 for the calculation of the voltage-series of a transformer and the calculation of the corrected voltage-series of a transformer, will take the position x into account in the allocation of the member i to the set T.sub.k in the expression iT.sub.k in order to consider the displacement of each meter through time to allocate the portion of the voltage-series (or derivative of the voltage-series) measured by a meter to the transformer connected for this time portion.
(107) At the beginning of the application of the method, the topological description may correspond to an overview of it at a given time or yet a topological description where the information {k,l,x} is historically known for each meter. However, the result given by the application of the method is preferably organized to be dynamic through time, so as to comprise a history of the displacements of meters and from this history to be able to extract a corresponding topology for a desired moment. A situation of the state of the topology, the data used and the progression of the execution of the method according to the invention at any moment chosen by the user or ongoing may be presented on a user interface in real-time or not in the form of graphics, data, pictures, graphs, diagrams, messages, etc.
(108) The method according to the invention allows updating a topology exhibiting a minimal average proportion of valid allocations. In the case where this minimal proportion is not reached and that there is no convergence towards a plausible solution or in the case where there is no information on the topology of the network in the database, there is proposed a method that imperfectly builds up a first topology that may thereafter be corrected by the correction method according to the invention. Assuming clouds made of the voltages-series of the meters 24 as shown in
(109) Table A shows results obtained for a line comprising 116 transformers with 1118 consumption sites. An exhaustive validation in the field has allowed confirming 24 allocation errors in the non-corrected topological database. For a resolution of 0.01V and 0.01 kWh with a reading every 15 minutes, the proposed method has detected 23 of the 24 allocation errors with only two false positives, which respectively corresponds to an accuracy rate of 92% and a recall of 96%, regarding the 24 allocation errors. It may be noticed that the accuracy of the method decreases with the time lengthening of the reading interval and may not be reliable for a resolution of 1V and 1 kWh.
(110) TABLE-US-00001 TABLE A Results obtained for a medium-voltage line comprising 1118 consumption sites as a function of the resolution of the measurement and the reading time interval Measurement resolution 0.01 V and 0.01 kWh 1 V and 1 kWh Time interval 15 min 30 min 60 min 15 min 30 min 60 min False 2 (8%) 2 (8%) 3 (13%) 32 (68%) 94 (87%) 211 (98%) positive False 1 (4%) 3 (13%) 4 (17%) 9 (38%) 10 (42%) 19 (79%) negative
(111) Referring to
(112) The processing unit 304 has in its memory 304 instructions executable by the processor 303 and configuring the processing unit 302 to perform the steps of the method according to the invention, as described hereinabove. The network 300 comprises the distribution and consumption electrical network, the smart meters and any communication equipment, servers and database connected to this network. The history of the voltages contained in the database 301 may have been generated and stored therein by the network 300 and/or the processing unit 302. The processing unit 302 may be configured by a terminal 306 connected thereto or by another equipment connected thereto by a communication network 307. According to an embodiment, the configuration comprises among other things the interval between two automatic executions of the update of the topology and the choice of the parameter a. When available in the database 301, the relational table describing the topology of the distribution network is transmitted to the processing unit 302, or else the processing unit applies a clustering method to find a first assessment of the topology. The processing unit 302 may start the application of the method by the selection of the segments 101 (as shown in
(113) While embodiments of the invention have been illustrated in the accompanying drawings and described above, it will be evident to those skilled in the art that modifications may be made therein without departing from the invention.