Apparatus and process of forming an integrally bladed rotor with cooled single crystal blades and an equiax nickel disk
10801338 ยท 2020-10-13
Assignee
Inventors
Cpc classification
B22F7/08
PERFORMING OPERATIONS; TRANSPORTING
F05D2300/131
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D5/34
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D5/3061
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B22F7/064
PERFORMING OPERATIONS; TRANSPORTING
F05D2300/607
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B22F7/08
PERFORMING OPERATIONS; TRANSPORTING
B22F2998/10
PERFORMING OPERATIONS; TRANSPORTING
B22F5/009
PERFORMING OPERATIONS; TRANSPORTING
F01D5/3023
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D5/186
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D5/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D5/30
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2230/42
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2230/211
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2230/22
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B22F7/064
PERFORMING OPERATIONS; TRANSPORTING
F05D2300/1723
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B22F5/009
PERFORMING OPERATIONS; TRANSPORTING
F05D2240/24
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B22F2998/10
PERFORMING OPERATIONS; TRANSPORTING
F05D2230/23
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F01D5/30
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D5/34
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B22F5/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
An air cooled integrally bladed rotor with single crystals turbine rotor blades having cooling air passages formed into an equiax rotor disk, where a mold having expendable Molybdenum tooling and reusable molybdenum tooling is used to form the IBR. An annular blade ring with openings is used to secure the single crystal rotor blades within the mold, and a number of tube tools are inserted into a bottom end of each blade that forms a cooling air supply passage within the rotor disk. Two molybdenum circular shaped hubs are used to secure a bottom end of the tube tools with the mold. The mold is filled with metal powder and high pressure is used to solidify the powder to form the IBR. Expendable tooling is removed using sublimation when exposed to oxygen. Reusable tooling is reused to form additional IBRs.
Claims
1. A process of forming an air cooled integrated bladed rotor disk having single crystal material rotor blades and an equiax rotor disk comprising the steps of: forming a plurality of single crystal turbine rotor blades, each of the plurality of single crystal turbine rotor blades having an airfoil section extending from an attachment section with an internal cooling air passage having an inlet; forming an annular blade ring tool having a plurality of openings; inserting the plurality of single crystal turbine rotor blades into the plurality of openings in the annular blade ring tool; inserting a different one of a plurality of tubular tools into the inlet of each of the plurality of single crystal turbine rotor blades; placing the annular blade ring tool with the plurality of single crystal turbine rotor blades and the plurality of tubular tools within a mold; filling the mold with a metal powder material; and, compressing the metal powder material within the mold to form an equiax rotor disk with the plurality of single crystal turbine rotor blades embedded within the equiax rotor disk.
2. The process of forming an air cooled integrated rotor disk of claim 1, further comprising the step of forming the plurality of tubular tools of a material that can be removed by sublimation when exposed to oxygen; and the forming of the annular blade ring tool including forming the annular blade ring tool of the material that can be removed by sublimation when exposed to oxygen.
3. The process of forming an air cooled integrated rotor disk of claim 2, wherein the material used to form the annular blade ring tool and the plurality of tubular tools is Molybdenum.
4. The process of forming an air cooled integrated rotor disk of claim 1, wherein the forming of the plurality of single crystal turbine rotor blades includes forming each of the plurality of single crystal turbine rotor blades with a platform having a bottom side, the bottom side of the platforms forming an outer radius of the rotor disk.
5. The process of forming an air cooled integrated rotor disk of claim 1, further comprising the step of: securing a bottom end of each of the plurality of tubular tools with the mold using two circular shaped dies that engage with the plurality of tubular tools to secure the plurality of tubular tools in place.
6. The process of forming an air cooled integrated rotor disk of claim 1, and further comprising the steps of: forming the mold with a forward die and an aft die and a center die in which the forward die forms a forward side of the rotor disk and the aft die forms an aft side of the rotor disk and the center die forms a central axial bore of the rotor disk; and, the forward die and the aft die and the center die are formed of a Molybdenum material that is reused to form additional air cooled integrated bladed rotor disks.
7. The process of forming an air cooled integrated rotor disk of claim 1, further comprising the step of: using a slip agent on the annular blade ring tool and the plurality of tubular tools to prevent bonding of the rotor disk with the annular blade ring tool and the plurality of tubular tools.
8. The process of forming an air cooled integrated rotor disk of claim 1, and further comprising the step of: forming each attachment section as a single curved root attachment.
9. The process of forming an air cooled integrated rotor disk of claim 6, and further comprising the step of: forming an axial center opening in the forward die and the aft die to fit the center die and secure the center die within the mold.
Description
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
DETAILED DESCRIPTION OF THE INVENTION
(9) The present invention is an air cooled turbine integrally bladed rotor for a gas turbine in which the rotor blades are single crystal material cast into a high strength nickel alloy disk using reusable and expendable molybdenum tooling. Single crystal turbine rotor blades have higher temperature resistance and better creep resistance than typical nickel superalloy blades that are not single crystal. The rotor disk can still be made of high strength nickel equiax alloy material due to the superior fatigue capability of this material.
(10)
(11)
(12)
(13)
(14)
(15)
(16) Some benefits of the cooled IBR of the present invention are listed below. The rotor blades are cast single crystal blades with internal cooling passages. Each blade uses a single tooth curved root blade attachment. The rim of the disk is contiguous and thus not subject to parasitic coolant air leakage.
(17) The rotor disk is IN100 powder solidified using a HIP process with reusable and expendable tooling. The solidified IBR with the molybdenum expendable tooling is exposed to an elevated temperature in air of around 1,300 degrees F. to sublimate the Molybdenum cores and remaining tooling. The IBR can be finished with machining of the rotor surfaces, and then even stress relieved by heat treatment.
(18) The forward and aft Molybdenum dies 11 and 13 are machined at the interface to represent a shape of the rotor surfaces before final machining. either the forward or aft Molybdenum dies 11 and 13 is installed with the bladed ring 16 and the bore hub 12 which has two thin molybdenum outer center hubs 14 and 17. These outer hubs 14 and 17 enter from the front and back and have semi-circular shaped ends that match a shape of the coolant tubular tools 15 to secure the coolant tubular tools 15 within the mold assembly. Metal powder is inserted into the resultant cavity and measures are taken to ensure a complete fill. If the outer hubs 14 and 17 bond to the inner hub 12, they are expendable when exposed to the air. However, a slip agent (such as a glass lubricant) can be applied in-between the inner hub 12 and the two outer hubs 14 and 17 to prevent bonding. Either a slip agent is applied at the interface of the nickel powder and the Molybdenum tooling, or a thin sacrificial Molybdenum foil can be placed in any interface to prevent bonding of the tool to the rotor during the formation.
(19) With all tooling in place, the assembly is then preheated in a vacuum and then placed in a press to facilitate the consolidation of the metal powder by applying pressure to the forward die 11 and the aft die 13. The assembly is maintained at the elevated temperature (around 2,160 degrees F.) sufficient to super plastically flow the metal powder and ensure that there are no voids or unconsolidated powder. Once sufficient time has elapsed in a vacuum (around 3 hours) to ensure complete formation, the assembly is withdrawn from the press and allowed to cool. The reusable Molybdenum tooling is removed and the IBR is heated to around 1,300 degrees F. in air to allow the remaining Molybdenum tooling to sublimate and disappear.
(20) The process of consolidation of the metal powder should yield a near-net shape of the IBR. However, some final machining might be required such as for skin cuts for cleanup of surfaced. Then, a final stress relief heat treatment can be performed.
(21) The resulting IBR with single crystal turbine rotor blades with cooling embedded within a Nickel disk can be used in a flow path temperature exceeding 2,400 degrees F. in a small gas turbine engine.