ARRANGEMENT AND METHOD FOR CONFIGURING A TECHNICAL SYSTEM
20200285782 ยท 2020-09-10
Inventors
Cpc classification
G05B2219/23005
PHYSICS
G05B2219/31354
PHYSICS
G05B2219/31353
PHYSICS
G06Q10/04
PHYSICS
G06F30/27
PHYSICS
International classification
Abstract
An optimized and automated design of technical installations to be planned individually is provided. For this purpose, operating parameters are first of all recorded in pre-existing technical installations and stored centrally. If the intention is to plan a new technical installation, then the specifications for the new installation may be compared with the previously recorded operating parameters in order to efficiently generate an optimum configuration of the new technical installation.
Claims
1. An arrangement for configuring a technical system, having: a number of recording devices, wherein each recording device is designed to record predetermined operating parameters of a respective existing technical system; a storage device that is designed to receive and to store the operating parameters recorded by the number of recording devices; and a configuration device that is designed to receive predefined specifications for a technical system to be newly designed, to read the operating parameters stored in the storage device, and to use the predefined specifications and the stored operating parameters to determine a configuration for the technical system to be newly designed.
2. The arrangement as claimed in claim 1, wherein the operating parameters comprise a minimum and/or maximum operating temperature of a resource, a threshold value being exceeded and/or fallen below, failure of a resource, in particular a time of the failure of the resource, a switched-on duration and/or switched-off duration of a resource, relative loading of a resource, a degree of use of a resource or mechanical loading of a resource.
3. The arrangement as claimed in claim 1, wherein the configuration device is designed to define a dimensioning of a module of the technical system to be newly designed using maximum loading of a corresponding module of an existing technical system, and wherein the maximum loading of the corresponding module of the existing technical system is determined using the stored operating parameters.
4. The arrangement as claimed in claim 3, wherein the configuration device is designed to determine expected loading of a module of the technical system to be newly designed using the operating parameters stored in the storage device.
5. The arrangement as claimed in claim 1, wherein the configuration device is designed to adjust the recording of the predetermined operating parameters of the existing technical systems.
6. The arrangement as claimed in claim 5, wherein the configuration device is designed to adjust the recording of the predetermined operating parameters in the existing technical systems using the predefined specifications for a technical system to be newly designed.
7. The arrangement as claimed in claim 1, wherein the recording devices comprise a memory and a processing device, wherein the memory is designed to store the recorded operating parameters, and wherein the processing device is designed to compress the stored operating parameters and to transmit the compressed operating parameters to the storage device.
8. The arrangement as claimed in claim 1, wherein the recording device is designed to transmit the predetermined operating parameters to the storage device continuously or at predetermined time intervals.
9. The arrangement as claimed in claim 1, wherein the recording device is designed to transmit the predetermined operating parameters when a predetermined event has been detected in the respective existing technical system.
10. The arrangement as claimed in claim 1, wherein the storage device comprises a classification device that is designed to classify and/or to group the data provided by the recording device on the basis of predetermined criteria.
11. The arrangement as claimed in claim 10, wherein the predetermined criteria comprise a spatial position of the respective existing technical system, a frequency of faults, a fault cause, a usage rate of the respective existing technical system and/or an operating state of the respective existing technical system.
12. The arrangement as claimed in claim 1, wherein the configuration device comprises a neural network that is designed to determine the configuration of the technical system to be newly designed, and wherein the configuration device is designed to train the neural network using the operating parameters stored in the storage device.
13. A method for configuring a technical system, having the steps of: recording predetermined operating parameters of a number of existing technical systems; storing the recorded operating parameters in a central storage device; receiving predefined specifications for a technical system to be newly designed; reading the operating parameters stored in the storage device; and determining a configuration for a technical system to be newly designed using the predefined specifications and the stored operating parameters.
14. The method as claimed in claim 13, wherein the step of determining the configuration comprises calculating a probability of failure for a predetermined resource of the technical system to be newly designed, and wherein the probability of failure is calculated using the stored operating parameters.
Description
BRIEF DESCRIPTION
[0029] Some of the embodiments will be described in detail, with reference to the following figures, wherein like designations denote like members, wherein:
[0030]
[0031]
[0032]
[0033]
DETAILED DESCRIPTION
[0034]
[0035] The existing technical systems 100-i may be any technical systems, in particular any technical installations. By way of example, the technical systems 100-i may be power plants for generating electric power, substation installations, power converters, for example inverters for converting DC voltage into a single-phase or multiphase AC voltage, technical installations for manufacturing particular products, for example production installations in the paper industry, production installations for any other products, installations in the chemical industry, or any other technical installations. It is understood that the application to the design of technical systems is not restricted to the individual cases described above. Rather, any technical systems or installations may be designed and configured accordingly.
[0036] Numerous operating parameters of the existing technical systems 100-i may be recorded during the operation of the respective technical systems 100-i. For this purpose, sensors that record one or more physical parameters within the respective technical system 100-i may for example be provided. Control commands between individual components of the respective technical system 100-i may furthermore also be logged. Such control commands may be exchanged between individual components of the respective technical system 100-i. Control commands or setpoint value specifications may furthermore also be issued to components of the technical system 100-i by a central control station. Any other operating parameters of the technical system 100-i may in principle also be recorded and provided to the respective recording device 10-i. The operating parameters may be provided directly to the respective recording device 10-i in the form of digital data. As an alternative, analog signals may also be provided to the recording device 10-i, and the analog signals may be converted into digital signals by way of a suitable analog-to-digital converter (not illustrated). The further processing of the recorded operating parameters in the recording device 10-i is explained in even more detail further below.
[0037] The recorded operating parameters may be transmitted from the recording devices 10-i of the respective technical systems 100-i to a central storage device 20. By way of example, the recording devices 10-i may be connected to the storage device 20 via a suitable communication connection, for example a wired or wireless connection. By way of example, the transmission may take place via an Internet connection, in particular via a protected Internet connection such as for example a VPN tunnel or the like. The transmission may furthermore also take place at least partly via a wireless connection, in particular a radio connection, such as for example a mobile radio connection.
[0038] The storage device 20 may receive the respective operating parameters from the recording devices 10-i and store them. Before the operating parameters are stored, the received operating parameters may possibly first of all be pre-processed, for example categorized, classified or the like. This is explained in even more detail below.
[0039] The database, stored in the storage device 20, of the operating parameters of the existing technical systems 100-i may be used for the design of a new technical system. In this case, properties for a technical system to be newly designed may in particular be determined at least partly automatically, using the operating parameters stored in the storage device 20. This is explained in more detail below.
[0040] If the intention is to design a new technical system, then the required specifications for the technical system to be newly designed may be provided to the configuration device 30. These specifications may for example comprise desired properties of the technical system to be newly designed. By way of example, the specifications may comprise a desired (maximum) power of the system, in particular an electric power, a desired throughput of a certain amount of substance, an amount of a starting product, properties of input values, for example an input voltage, a maximum input power, amount or properties of substances that are provided as starting products or the like. Any other specifications are furthermore of course also possible. The specifications may in particular also for example comprise specifications for modules to be used, component parts or the like. Further specifications, such as for example properties regarding a planned location and boundary conditions linked thereto such as temperature, possible cooling power, etc. may likewise be specified.
[0041] The configuration device 30 may then compare the specified requirements for the technical system to be newly designed with the data regarding the operating parameters of the existing technical systems that are stored in the storage device 20. It is thereby possible for example to derive which components already in use are capable of meeting the requirements according to the specifications for the technical system to be newly designed. By way of example, it is possible to establish, from the operating parameters stored in the storage device 20, whether an output power required according to the specifications of the technical system to be newly designed is able to be achieved using one or more modules of pre-existing technical systems. Further boundary conditions, such as for example maximum heating that occurs, a cooling power linked thereto, etc., may in particular in this case also be taken into consideration. Frequencies of malfunctions and failures of component parts in pre-existing technical systems may furthermore for example be determined on the basis of the operating parameters stored in the storage device 20. A required redundancy of modules, which redundancy is required in order to achieve operational reliability required according to the specifications for the technical system to be newly designed, may for example be derived from these data. It is thereby for example possible to determine a required number of standby components required in order to replace modules that potentially fail, such that a desired maintenance interval for exchanging faulty components is able to be complied with. It is however understood that the examples mentioned here for the design and configuration of a technical system to be newly designed on the basis of the predefined specifications and the stored operating parameters of pre-existing technical systems are to be understood as being merely exemplary. Any other configurations and dimensioning, implementations, etc. may of course also be determined on the basis of predefined specifications for a technical system to be newly designed and data regarding the operating parameters of pre-existing technical systems.
[0042] Specifications for the configuration, implementation, dimensioning of modules, required redundancy, etc. of the technical system to be newly designed may in this case be determined fully or at least partly automatically by the configuration device 30. For this purpose, the configuration device 30 may read the stored operating parameters from the storage device 20 via a suitable data interface. The information about the specifications of the technical system to be newly designed may furthermore be provided to the configuration device 30 via suitable data interfaces. A manual input interface for specifying properties of the technical system to be newly designed is optionally also possible. The automatically created configuration of the technical system to be newly designed may be provided to an output interface of the configuration device 30. The automatically created parameters may possibly be edited manually. Automatic further processing, as far as automatic planning and dimensioning of the modules of the technical system to be newly designed, is furthermore also possible.
[0043] The configuration generated by the configuration device 30 for the technical system to be newly designed may then be used as a basis for the further engineering. The further engineering of the technical system to be newly designed may in particular be performed fully or at least partly automatically. For this purpose, the data of the configuration generated by the configuration device 30 may for example be fed to a planning device 40. The planning device 40 receives the data of the configuration from the configuration device 30 and creates required planning documents for the technical system to be newly designed. By way of example, the planning documents may comprise circuit diagrams, parameter lists or software structures.
[0044] Suitable templates may for example be provided for creating the planning documents in the planning device 40. These templates may for example be provided in an internal memory of the planning device 40 or by an external database. In order to create an electrical installation, such a template may for example comprise a circuit diagram or at least a basic structure of a circuit diagram. The planning device 40 may then automatically determine suitable component parts for the individual components of the circuit diagram on the basis of the configuration provided by the configuration device 30. The required component parts may possibly be dimensioned accordingly on the basis of the provided configuration. By way of example, a required number of redundant component parts may also be determined on the basis of the provided configuration. Any other steps for automatically planning the technical system to be newly designed are furthermore of course also possible.
[0045]
[0046] As is able to be seen in
[0047] The recording device 10 may furthermore comprise a processing device 12. The processing device 12 may for example process the operating parameters recorded by the reception device 11 before transmitting them to the storage device 20. By way of example, the data of the received operating parameters may be compressed. The amount of data that needs to be transmitted from the recording device 10 to the storage device 20 is thereby able to be minimized. By way of example, the compression may comprise filtering irrelevant and/or redundant data. Any other temporal compression or a compression of the resolution of the information may furthermore also be performed. It is furthermore possible for example to record and/or to transmit only operating parameters that correspond to a predetermined trigger event. Operating parameters may thus for example be recorded and/or transmitted only when a predefined threshold value is exceeded or fallen below. Any other pre-processing of the recorded operating parameters prior to transmission to the storage device 20 is furthermore also possible.
[0048] In order to transmit the operating parameters from the recording device 10 to the storage device 20, the recording device 10 may for example have a suitable interface 13. By way of example, the interface 13 may be a network interface. The transmission from the recording device 10, in particular the interface 13, to the storage device 20 may for example take place via a wired connection. As an alternative, the transmission may also take place at least partly via a wireless connection, in particular a mobile radio connection or the like. In this case, the interface 13 may for example comprise a corresponding radio interface.
[0049] The storage device 20 may comprise a reception interface 21 that receives data of the operating parameters from the recording devices of the existing technical systems 100. In the same way as the interface 13 of the recording device 10, the reception interface 21 may implement a wired communication connection or a wireless radio connection.
[0050] As already mentioned above, in addition to the operating parameters from the existing technical system 100, such as the abovementioned values of the control device 101 and the sensors 102, further, in particular external data may also be recorded. These data may for example be provided by an external data source 200. The external data source 200 may transmit the corresponding data to the storage device 20 via a wired or wireless interface.
[0051] The external data source 200 may be any data source that provides information, in particular information in connection with the operation of the existing technical system 100. By way of example, the external data source may be a weather station that provides data regarding temperature, air pressure, air humidity, wind direction or wind speed, etc. The external data source 200 may furthermore also be a measurement point on a body of water that provides for example information about a water level, water temperature, flow speed or the like. Any other data sources are of course also possible depending on the application case. By way of example, data may also be provided by an external computer center, in particular a cloud or the like.
[0052] In the case of a power plant, such as for example a wind power plant or a solar power plant, information about wind speed, wind direction, solar insolation, etc. is thereby for example also able to be taken into consideration.
[0053] The storage device 20 may furthermore for example comprise a classification device 22. This classification device 22 may for example (pre)-process the received operating parameters. By way of example, the classification device 22 may group or classify the received operating parameters according to predetermined properties. The classification may for example be performed according to the properties of the operating parameters. By way of example, the operating parameters may be classified according to a spatial position of the respective existing technical system 100, a frequency of faults in the existing technical system, a fault cause, a usage rate of the respective existing technical system or an operating state of the respective technical system. Any other classifications of the received operating parameters are of course also possible. By way of example, in the received operating parameters, it may also be distinguished whether the operating parameters belong to a normal operating state or whether the operating parameters were recorded during a fault case. Operating parameters regarding particular operating states, for example a critical operating state, overloading of the respective technical system, idling of the technical system or the like may furthermore also be grouped.
[0054] The received and possibly further-processed operating parameters may then be stored in a memory 23 of the storage device 20.
[0055] In order to design a new technical system, the configuration device 30 may resort to the data stored in the memory 23 of the storage device 20. The technical system to be newly designed may furthermore for example be characterized by specifying individual requirements 31 for the technical system to be newly designed, as well as technical parameters 32 for the technical system to be designed and modules of the technical system. The configuration device 30 then compares the requirements 31, the technical parameters 32 and the recorded operating parameters of existing technical systems 100 with one another and then creates suitable configuration parameters 33 for the technical system to be newly designed. For this purpose, the probability of failure of components in existing technical systems, loading limits of modules in existing technical systems, and further information able to be derived from the operating parameters may for example be compared with the requirements of the technical system to be newly designed, as has already been described above.
[0056] By way of example, the configuration parameters 33 for the technical system to be newly designed may be determined by way of a neural network 35. In this case, the requirements 31 and the technical specifications 32 may for example be provided to the neural network 35 in the form of input variables. The neural network 35 may in this case be trained beforehand, for example by way of the recorded operating parameters of the existing technical systems 100.
[0057] It is furthermore possible for example to dynamically adjust the recording of the operating parameters in the existing technical systems 100. The operating parameters of the existing technical systems 100 may thereby also be recorded appropriately when the requirements for the design of a new technical system change over time. By way of example, requirements or specifications that require further operating parameters to be recorded in existing technical systems 100 may exist for the design of new technical systems. In the same way, it is also possible for the recording of operating parameters that were recorded originally to become superfluous over time. For this purpose, the recording of the operating parameters in the recording devices 10 may be adjusted, for example based on the configuration device 30. In this case, a time interval for the recording of the operating parameters, an accuracy for the recording of the operating parameters or a trigger event for the recording of the operating parameters may in particular also be adjusted.
[0058] The configuration parameters 33 generated by the configuration devices 30 may be forwarded to a planning device 40 in order to generate the required engineering documents. The planning device 40 may for example comprise a first device 41 for generating a system architecture and a second device 42 for generating the required engineering documents on the basis of the system architecture. The system architecture and/or the engineering documents may in this case be created fully or at least partly automatically based on the provided configuration parameters 33.
[0059]
[0060] A recording device 10 that monitors the function of the switching elements 111 is therefore provided in each case in existing voltage converters 110. The occurrence of a malfunction in a switching element 111 and the boundary conditions linked thereto may furthermore be recorded and logged. The information thereby recorded may be provided in the storage device 20. If the intention is now to design a new voltage converter, then the requirements for this new voltage converter may be compared with the operating parameters, stored in the storage device 20, of pre-existing voltage converters. It is thereby possible to estimate the probability of a malfunction occurring in semiconductor switches of the voltage converter to be newly designed. A suitable number of redundant switching elements to be provided in the voltage converter to be newly designed may accordingly be determined. By automatically recording the operating parameters in existing voltage converters and comparing the recorded operating parameters with the requirements for a voltage converter to be newly designed, it is thus possible to achieve an optimum implementation of the configuration for the voltage converter to be newly designed.
[0061]
[0062] The method may in particular comprise a step of calculating a probability of failure for predetermined resources of the technical system to be newly designed. The probability of failure may be calculated using the stored operating parameters.
[0063] In summary, embodiments of the present invention relate to an optimized and automated design of technical installations to be planned individually. For this purpose, operating parameters are first of all recorded in pre-existing technical installations and stored centrally. If the intention is to plan a new technical installation, then the specifications for the new installation may be compared with the previously recorded operating parameters in order to efficiently generate an optimum configuration of the new technical installation.
[0064] Although the present invention has been disclosed in the form of preferred embodiments and variations thereon, it will be understood that numerous additional modifications and variations could be made thereto without departing from the scope of the invention.
[0065] For the sake of clarity, it is to be understood that the use of a or an throughout this application does not exclude a plurality, and comprising does not exclude other steps or elements.