Method of manufacturing a multiple axle railcar having a span bolster
10766507 ยท 2020-09-08
Assignee
Inventors
Cpc classification
B61F3/125
PERFORMING OPERATIONS; TRANSPORTING
International classification
B61F3/12
PERFORMING OPERATIONS; TRANSPORTING
B61D3/16
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A method for making a railcar having a span bolster is disclosed. The method involves fabricating and joining the components of the span bolster in a manner such that a camber is built into span bolster. A camber is cut into longitudinal supports that span the length of the bolster. A jig is used to shape top and bottom plates prior to attaching the plates to the longitudinal supports, thus forming the bolster. Truck assemblies are attached to the bolster and a railcar body mounted to the combined unit.
Claims
1. A method for manufacturing a railcar having a span bolster, comprising: fabricating a span bolster having a camber; creating an attachment point for a railcar body at a raised peak of the camber in the span bolster, wherein the raised peak is positioned above a horizontal plane of the span bolster to counteract load-induced sag from the weight of the railcar body; attaching at least two trucks to the span bolster; and mounting the railcar body to the span bolster.
2. The method of claim 1, wherein fabricating a span bolster having a camber comprises: cutting a longitudinal stringer in an arc shape; forcing a top plate against a first jig to elastically deform the top plate, wherein a contour of the first jig is shaped to substantially match a profile of a top surface of the longitudinal stringer; attaching the top plate to the top surface of the longitudinal stringer, wherein the top plate is retained in the first jig under force until attached to the longitudinal stringer; forcing a bottom plate against a second jig to elastically deform the bottom plate, wherein a contour of the second jig is shaped to substantially match a profile of a bottom surface of the longitudinal stringer; and attaching the bottom plate to the bottom surface of the longitudinal stringer, wherein the bottom plate is retained in the second jig under force until attached to the longitudinal stringer.
3. The method of claim 2, wherein forcing the top plate comprises: placing a topside of the top plate against the first jig, wherein the first jig is concave; placing the longitudinal stringer on an underside of the top plate; applying a downward force on the longitudinal stringer, wherein the longitudinal stringer transfers the force onto the top plate, thereby pressing the top plate to conform to the contour of the first jig.
4. The method of claim 2, wherein forcing the bottom plate comprises: placing an underside of the bottom plate against the second jig, wherein the second jig is convex; placing the longitudinal stringer on a top side of the bottom plate; applying a downward force on the longitudinal stringer, wherein the longitudinal stringer transfers the force onto the bottom plate, thereby pressing the bottom plate to conform to the contour of the second jig.
5. The method of claim 2, wherein the top plate is substantially flat prior to forcing the top plate against a first jig, wherein the bottom plate is substantially flat prior to forcing the bottom plate against a second jig.
6. The method of claim 1, wherein the raised peak is located at the midpoint of the span bolster.
7. The method of claim 1, wherein the at least two trucks are spaced symmetrically about the raised peak.
8. The method of claim 1, further comprising: determining the camber based on an expected load carrying capacity of the railcar.
9. The method of claim 2, wherein cutting the longitudinal stringer in an arc shape comprises: using a computer-numerically-controller device to cut the arc shape of the longitudinal stringer.
10. The method of claim 1, wherein attaching the at least two truck assemblies to the span bolster comprises: performing a truck load adjustment calibration; and attaching the at least two truck assemblies based on the results of the truck load adjustment calibration.
11. A method of manufacturing a span bolster having a camber, comprising: providing a top plate, wherein the top plate is substantially flat; providing a bottom plate, wherein the bottom plate is substantially flat; providing a longitudinal support structure in an arc shape; positioning the top plate against a first jig, wherein a profile of the first jig matches the arc shape of the longitudinal stringer; forcing the top plate into the first jig, wherein the top plate is deformed to match the profile of the first jig; attaching the top plate to a top side of the longitudinal support; positioning the bottom plate against a second jig, wherein a profile of the second jig matches the arc shape of the longitudinal stringer; forcing the bottom plate into the second jig, wherein the bottom plate is deformed to match the profile of the second jig; attaching the bottom plate to the longitudinal support; and creating an attachment point at a raised peak of the camber in the span bolster, wherein the raised peak is positioned above a horizontal plane of the span bolster to counteract load-induced sag.
12. The method of claim 11, wherein the first jig is concave, wherein the second jig is convex.
13. The method of claim 12, wherein at least one of the profile of the first jig and the profile of the second jig is adjustable.
14. The method of claim 13, further comprising: determining an expected load capacity of the span bolster; calculating the camber required for the expected load capacity; and adjusting at least one of the profile of the first jig and the profile of the second jig to set the camber.
15. The method of claim 11, wherein the profile of the first jig is shaped differently from the profile of the second jig.
16. The method of claim 11, wherein providing the longitudinal support structure in an arc shape comprises: cutting a first longitudinal stringer; cutting a second longitudinal stringer in substantially the same shape as the first longitudinal stringer; arranging the first longitudinal stringer and second longitudinal stringer in a parallel orientation; and partially mounting at least a pair of truck mounting assemblies between the first longitudinal stringer and the second longitudinal stringer.
17. The method of claim 1, wherein fabricating a span bolster having a camber comprises: cutting a longitudinal stringer in an arc shape; attaching a top plate to a top surface of the longitudinal stringer; attaching a bottom plate to a bottom surface of the longitudinal stringer, wherein the top plate and the bottom plate have a matching camber profile.
18. The method of claim 1, wherein the camber is created along the length of the span bolster.
Description
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
DETAILED DESCRIPTION OF THE INVENTION
(14) The method of manufacturing a railcar having a cambered span bolster 502 begins with fabrication of the span bolster 502. Construction of the span bolster 502 begins with fabrication of the longitudinal supports 401 and 402, which are shown in
(15) In the preferred embodiment, as shown in
(16) To evenly distribute the load on each of the six axles, the span bolster 502 is manufactured with a slight camber. More specifically, area of the bolster 502 near its center (the area of the bolster 502 at the receiver 202) is raised compared to the ends of the bolster 502. That is, the span bolster is fabricated with a slight arc which is convex in shape. It is not necessary for the peak of the camber to be located in the center of the bolster 502. Rather, load equalization among the axles is realized when the peak is located near the rail car body receiver 202. Since the load of the railcar is concentrated at the receiver 202, this area of the span bolster 502 experiences the greatest force and, as a result, the greatest deflection from its unloaded shape. As an example, a bolster 502 without a camber would tend to sag under the receiver 202 as the load-induced deflection causes the receiver 202 area to drop below the horizontal plane of the bolster 502.
(17) The amount of camber required for the span bolster 502 is determined based on the specifications of the railcar, such as the length of the bolster 502, the number of axles, trucks, and bolsters 502 being used, the size of material used to create the bolster 502, and the load expected to be carried by the railcar, to name a few. In the preferred embodiment, the camber is inch for a three truck bolster 502 approximately 22 feet long. In this preferred embodiment, the center truck assembly is mounted below the receiver 202 and the two outboard truck assemblies 101 and 301 are mounted towards the end of the bolster 502. As can be seen in
(18) During the fabrication of longitudinal supports 401 and 402, the pre-determined camber is cut into the profile of each support 401 and 402. The longitudinal stringers 401 and 402 are beam-like members spanning substantially the length of the bolster 502, with a height from a few to several inches, depending on the load to be carried. As shown in
(19) Cutting the stringers 401 and 402 can be accomplished by any typical method, such as using a plasma, waterjet, laser, or oxygen fuel cutter. However, in the preferred embodiment, longitudinal supports 401 and 402, as well as the other components, are cut from flat steel using a computer-controlled cutting machine. As will be appreciated by one skilled in the art, a computer-controlled cutter offers a higher level of accuracy and precision. For example, in the preferred embodiment the tolerance for the peak of the camber is plus of an inch and the tolerances for other components are plus or minus 1/16 of an inch for lengths and plus or minus of a degree for angles. Over the span of a bolster 502 having a length of 20 feet or more, of an inch offers very little room for error.
(20) Once longitudinal supports 401 and 402 are complete and within tolerances, truck mounting assemblies 101, 201, and 301 are fabricated. A portion of truck mounting assemblies 101, 201 and 301 are welded in between longitudinal supports 401 and 402, where the supports 401 and 402 are arranged in a parallel orientation and run substantially the length of the span bolster 502. In alternative embodiments, a single longitudinal support or additional supports can be used. The remainder of the truck mounting assemblies is positioned below the longitudinal supports 401 and 402.
(21) As shown in
(22) As shown in
(23) Plates 206 and 304, for the center 201 and outboard 301 truck assemblies, are attached in a similar process. As further shown in
(24) The outboard truck mounting assembly is fabricated in a similar manner and is shown in
(25)
(26) At this stage of the manufacturing process, longitudinal supports 401 and 402 were cut and fabricated. Truck mounting assemblies 101, 201, and 301 were fabricated and attached to supports 401 and 402. The next step of the manufacturing process is to align and weld the combined truck mounting assemblies and longitudinal supports structure to top plate 403 and bottom plate 404.
(27) As previously indicated, the entire bolster is cambered. As such, bottom plate 404 requires a camber to match the arced profile cut into longitudinal supports 401 and 402. Bottom plate 404 can be bent in a press to create the required profile. Alternatively, in the preferred embodiment, bottom plate 404, which is cut from flat stock and still has a flat profile, is placed in a jig 600 that substantially matches the camber of the bottom surface 406 of longitudinal supports 401 and 402. That is, the jig 600 used with the bottom plate 404 will have a convex shape. The jig 600 has an advantage of keeping the parts in proper alignment during the welding process, which can cause distortion as the metal heats and cools.
(28) The jig 600 comprises a series of parallel flat bars that span the width of bottom plate 404. The bars are constructed of plate steel and are spaced every several inches to every few feet along the length of the bolster. Stated differently, a first bar is located near the inboard truck mounting assembly 101, a second bar is placed parallel to the first bar a few inches away from the first bar, and additional bars are positioned along the length to the outboard truck mounting assembly 301. Alternatively, other supports that can support the weight of the components can be used, such as pipes or monolithic forms. In the preferred embodiment, the parallel bars have adjustable heights so that the camber can be adjusted depending on the load rating of the railcar. For a camber of of an inch, the center bar, which aligns with the center truck mounting assembly 201, has a height of inch greater than the bars on each end of the jig 600. Intervening bars are have a height lower than the center bar, but greater than the end bar. With a jig 600 of this configuration, the amount of camber and the degree of taper from the peak to the ends can be adjusted prior to placing the bottom plate 404 in the jig 600.
(29) After the jig 600 is set for the appropriate camber and bottom plate 404 is placed in the jig 600, the combined longitudinal support and truck assembly component is placed on top of bottom plate 404, which is resting on the jig 600. The weight of the steel begins deforming the bottom plate 404 to the shape of the jig 600. However, additional force is often required and can be supplied by additional weight, a press, clamps, or other means. In the preferred embodiment, the jig 600 rests on a table and several chains are positioned across the width of the table. Each chain is anchored to the floor or to the table and a winch tensions the chain. Thus, the chain supplies a downward force to the components. Alternatively, to equalize the pressure of the chain on the components, pulleys are placed at the terminal ends of a bar and the bar is placed across the component. By placing separate chains and winches at several locations along the length of the bolster, the bottom plate 404 is forced into contact with each bar of the jig 600. After the chains are tensioned, the parts are checked for proper positioning. If aligned correctly, the bottom surfaces 406 of longitudinal support 401 and 402, which already have been supplied with the truck mounting assembly components, is welded to bottom plate 404. If the alignment is not correct, shims can be used to force the components into the correct alignment. Typically, welding components together causes heat stress that can lead to warping and other deformations in the components being welded together. However, the method of the present invention alleviates this concern as the components are forced into position and held there until the welding process is complete. By using this method, tight tolerances can be achieved.
(30) A second jig with the same structure as the first jig 600 but having a concave shape is prepared in a similar manner. Alternatively, the components can be removed from the first jig 600 and the bars adjusted to a concave shape, wherein the bar aligned with the center truck mounting assembly 201 has a height of inch lower than the bars at the end of the jig. Top plate 403 is placed on the concave-shaped jig. Next, the previously assembled component is inverted and placed on top of top plate 403. Stated differently, the entire assembly is placed in the jig upside-down, since the longitudinal support structure is attached to the underside of the top plate 403, with the top surface 405 of the longitudinal members 401 and 402 welded to the underside of the top plate 403. As a result, the top side of top plate 403 must rest against the jig.
(31) A clamping process using chains and winches is again performed. Once the parts are aligned within the tolerances, the top plate 403 is welded to the previously assembly components. The top plate 403 and bottom plate 404 are welded to both the longitudinal supports 401 and 402 as well as each individual truck mounting assembly 101, 201, and 301. Additionally, receiver 202 is welded around the circumference of an opening in top plate 403. Alternatively, the sequence in which the top plate 403 and bottom plate 404 are attached to the longitudinal supports can be reversed.
(32) Prior to final assembly and depending on the application, weld inspections may be performed by a mag particle or a dye penetrant test. Inspection of the weld between the longitudinal supports 401 and 402 to top plate 403 and bottom plate 404 are most critical.
(33)
(34) While the method has been described in detail and with reference to specific embodiments and examples thereof, it will be apparent to one skilled in the art that various changes and modifications can be made therein without departing from the spirit and scope of the embodiments. Thus, it is intended that the present disclosure cover the modifications and variations of this disclosure provided they come within the scope of the appended claims and their equivalents.