Abstract
In a method for renewing a track (2) and cleaning a ballast bed (3), the old track (2) is lifted off the ballast bed in sections as a track panel (15), transported forward in a working direction (4) and deposited on track panel wagons (8). The exposed ballast bed (3), forming a renewal gap (17), is cleaned by a cleaning machine (11), spoil (32) accruing in the process is transported forward underneath the track panels (15) deposited on the track panel wagons (8), and stored in hopper cars (10). New rails (29), pre-deposited underneath new sleepers (27) positioned on sleeper wagons (14), are pulled forward into the renewal gap (17) by the cleaning machine (11) and deposited on the cleaned ballast bed (3). The new sleepers (27) are laid down on the cleaned ballast bed and connected to the new rails (29) lifted off the ballast bed (3).
Claims
1. A method for renewing a track (2) and cleaning a ballast bed (3), comprising the following features: a) the old track (2) is lifted off the ballast bed (3) in sections as a track panel (15), transported forward in a working direction (4) and deposited on track panel wagons (8), b) the exposed ballast bed (3), forming a renewal gap (17), is cleaned by a cleaning machine (11), spoil (32) accruing in the process is transported forward underneath the track panels (15) deposited on the track panel wagons (8), and stored in hopper cars (10), c) new rails (29), pre-deposited underneath new sleepers (27) positioned on sleeper wagons (14), are pulled forward into the renewal gap (17) by the cleaning machine (11) and deposited on the cleaned ballast bed (3), and d) the new sleepers (27) are laid down on the cleaned ballast bed (3) and connected to the new rails (29) lifted off the ballast bed (3).
2. The method according to claim 1, wherein, by means of a gantry crane (28) provided for transport of the new sleepers (27) in the working direction (4), the new rails (29) are pulled in pairs into a front transfer position (31) for being received by the cleaning machine (11).
Description
[0008] The invention will be described in more detail below with reference to an embodiment represented in the drawing in which
[0009] An installation 1, visible in the drawings, serves for renewal of a track 2 and for cleaning of a ballast bed 3 and consists essentially of a number of track maintenance vehicles, arranged one following the other in the longitudinal direction of the track, which are mobile in a working direction 4 on on-track undercarriages 5 and, in part, additionally on crawler tracks 6. The front section of the installation 1, shown in
[0010] The rear section of the installation 1, visible in
[0011] The method of track renewal according to the invention starts with the removal of the old track 2 in sections, in which a track panel 15 is in each case lifted off the ballast bed 3 by means of the panel removing machine 7, thus creating a renewal gap 17, and is transported towards the front in the working direction 4 with the aid of a gantry crane 16 (
[0012] The cleaning machine 11, following in the renewal gap 17 and also moving on lowered crawler tracks 6, takes up the ballast bed 3 by means of a clearing chain 18 and cleans it in a screening plant 19. The cleaned ballast 20 is discharged right away again via a chute 21 and graded behind the rear crawler track 6. Additionally, there is also the alternative possibility to introduce new ballast, as needed, by way of a conveyor belt 22 via the chute 21 into the renewal gap 17, and to grade the same.
[0013] As can be seen in
[0014] The forward motions of the panel removing machine 7 and the trailing cleaning machine 11 must be coordinated with one another in such a manner that a continuous transfer of the spoil 32 to a rear end 33 of the conveyor belt road 23 is possible.
[0015] In the rear section of the installation 1, shown in
[0016] On the sleeper wagons 14, these new rails 29 are gripped in pairs by means of a gripping device 30 with the aid of the gantry crane 28 and transported forward in the working direction 4 up to a front transfer position 31. In this position, the free ends of the new rails 29 are received by suitable rail tongs 34—fastened to the cleaning machine 11—and pulled forward into the renewal gap 17 and then temporarily deposited on the cleaned ballast 20 of the ballast bed 3. After the new sleepers have been placed, the pre-deposited new rails 29 are lifted from the ballast bed 3, spread onto the new sleepers 27 and connected to the same to form the renewed track 2.