Control method of shape measuring apparatus
10724840 ยท 2020-07-28
Assignee
Inventors
Cpc classification
G05B19/401
PHYSICS
International classification
G05B19/401
PHYSICS
Abstract
A scanning path is divided after every predetermined number of segments and a set of measurement commands is defined for each of the predetermined number of segments. While executing the measurement command, a speed pattern plan is created for the following measurement command. At this time, planning is conducted such that a final speed of a speed pattern plan of the measurement command is the same as an initial speed of the speed pattern plan of the following measurement command. While executing the measurement command, a gap time (from a current time to an estimated end time of the measurement command) is calculated continuously. When the gap time is longer than a planning calculation time, the initial speed of the speed pattern plan of the following measurement command is kept the same as the final speed of the speed pattern plan of the measurement command.
Claims
1. A control method of a shape measuring apparatus having a probe with a stylus tip at a distal end, and further having a displacement mechanism that displaces the probe, the apparatus detecting contact between the stylus tip and a surface of a work piece and measuring a shape of the work piece, the method comprising: based on design data of the work piece: locating, via a host computer, a scanning path over which to displace the stylus tip; and receiving a command from the host computer to a motion controller; and based on the received command from the host computer, displacing, via the motion controller, the stylus tip along the scanning path while controlling a deflection amount of the probe toward the work piece to remain at a standard deflection amount, during which the following processes are executed by the motion controller: dividing the scanning path after every predetermined number of segments, and defining a set of measurement commands Ci, where i is an integer from 1 to n+1 and n is an integer greater than or equal to one, for each of the predetermined number of segments; averaging the number of segments included in the measurement command Cn and the number of segments included in the measurement command Cn+1; creating a speed pattern plan for the following measurement command Ci+1, while executing the measurement command Ci; thereafter performing planning such that a final speed of a speed pattern plan Pvi of the measurement command Ci is the same as an initial speed of a speed pattern plan Pvi+1 of the measurement command Ci+1; connecting the end of the measurement command Ci and the beginning of the measurement command Ci+1; and displacing the probe without stopping, wherein the final speed of the speed pattern plan Pvi of the measurement command Ci and the initial speed of the speed pattern plan Pvi+1 of the measurement command Ci+1 are not 0 mm/sec.
2. The control method of the shape measuring apparatus according to claim 1, further comprising: setting, via the motion controller, the final speed of the speed pattern plan Pvi of the measurement command Ci at a low speed of 1 mm/sec to 5 mm/sec.
3. The control method of the shape measuring apparatus according to claim 2, wherein when a time required to generate the speed pattern plan corresponding to one measurement command Ci is designated as a planning calculation time Tp: continuously calculating a gap time, from a current time to an estimated end time of the one measurement command Ci, while executing the measurement command Ci; generating a connecting speed plan to keep the initial speed of the speed pattern plan Pvi+1 of the measurement command Ci+1 the same as the final speed of the speed pattern plan Pvi of the measurement command Ci, when the gap time is longer than the planning calculation time Tp; and creating an individual speed plan to keep the initial speed of the speed pattern plan Pvi+1 of the measurement command Ci+1 at zero, when the gap time is shorter than the planning calculation time Tp.
4. The control method of the shape measuring apparatus according to claim 1, wherein when a time required to generate the speed pattern plan corresponding to one measurement command Ci is designated as a planning calculation time Tp: continuously calculating a gap time, from a current time to an estimated end time of the one measurement command Ci, while executing the measurement command Ci; generating a connecting speed plan to keep the initial speed of the speed pattern plan Pvi+1 of the measurement command Ci+1 the same as the final speed of the speed pattern plan Pvi of the measurement command Ci, when the gap time is longer than the planning calculation time Tp; and creating an individual speed plan to keep the initial speed of the speed pattern plan Pvi+1 of the measurement command Ci+1 at zero, when the gap time is shorter than the planning calculation time Tp.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The present invention is further described in the detailed description which follows, in reference to the noted plurality of drawings by way of non-limiting examples of exemplary embodiments of the present invention, in which like reference numerals represent similar parts throughout the several views of the drawings, and wherein:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
DETAILED DESCRIPTION OF THE INVENTION
(24) The particulars shown herein are by way of example and for purposes of illustrative discussion of the embodiments of the present invention only and are presented in the cause of providing what is believed to be the most useful and readily understood description of the principles and conceptual aspects of the present invention. In this regard, no attempt is made to show structural details of the present invention in more detail than is necessary for the fundamental understanding of the present invention, the description taken with the drawings making apparent to those skilled in the art how the forms of the present invention may be embodied in practice.
(25) A description of an embodiment of the present invention is given with reference to the drawings and to the reference numerals assigned to each component in the drawings.
First Embodiment
(26)
(27) The coordinate measuring machine 200 includes a stage 210, a displacement mechanism 220, and a probe 230.
(28) The displacement mechanism 220 includes a gate-shaped Y slider 221 provided so as to be capable of sliding above the stage 210 in a Y direction, an X slider 222 sliding along a beam of the Y slider 221 that lies in an X direction, a Z axis column 223 fixated to the X slider 222, and a Z spindle 224 rising and lowering inside the Z axis column 223 in a Z direction.
(29) A drive motor (not shown in the drawings) and an encoder (not shown in the drawings) are attached to each of the Y slider 221, X slider 222, and Z spindle 224. Each drive motor is drive controlled by a drive control signal from the motion controller 300. The encoders detect a displacement amount of the Y slider 221, X slider 222, and Z spindle 224 respectively and output detection values to the motion controller 300. The probe 230 is attached to a bottom end of the Z spindle 224.
(30) The probe 230 includes a stylus 231 having a stylus tip 232 on a forefront end (Z axis direction side) and a supporter 233 supporting a base end (+Z axis direction side) of the stylus 231. The stylus tip 232 is spherical and comes in contact with a measured object W.
(31) When an outside force is applied to the stylus 231 (in other words, when the stylus tip 232 is in direct contact with the measured object), the supporter 233 supports the stylus 231 so as to enable displacement of the stylus 231 within a fixed range in each of the X, Y, and Z axis directions. Further, the supporter 233 includes a probe sensor (not shown in the drawings) detecting a position of the stylus 231 in each axis direction. The probe sensor outputs the detection value to the motion controller 300.
(32) Configuration of Motion Controller 300
(33)
(34) The measurement command obtainer 310 obtains PCC curve data from the host computer 500.
(35) A small number is used merely to facilitate understanding of the present embodiment. For example, when the total capacity of the measurement command obtainer 310 can store eight segments' worth of measurement commands, the first buffer and the second buffer can each store four segments' worth of measurement commands by distributing the measurement commands between the first buffer and the second buffer. For ease of the description that follows, the maximum value for the number of segments which can be stored in one buffer is defined as P.
(36) The memory flag information storage portion 312 is attached to the measurement command obtainer 310. A buffer identification flag B and buffer status flags SB(1) and SB(2) are stored in the memory flag information storage portion 312. The buffer identification flag B uses the first buffer 321 and the second buffer 322 alternately and indicates the next buffer to be used, and therefore, the value alternately switches between 1 and 2.
(37) A first status flag SB(1) which is a status flag for the first buffer 321 and a second status flag SB(2) which is a status flag for the second buffer 322 are provided as the buffer status flags SB(1) and SB(2). The value of both the first status flag SB(1) and the second status flag SB(2) alternately switches between 0 and 1. In the present embodiment, 0 indicates a writable state and 1 indicates a non-writable state.
(38) The counter 330 counts detection signals output from the encoders and measures an amount of displacement for each slider. In addition, the counter 330 counts the detection signals output from the probe sensor and measures an amount of displacement of the probe 230 (stylus 231). From the measured displacement of the sliders and the probe 230, a coordinate position PP of the stylus tip 232 (hereafter, probe position PP) is obtained. In addition, from the displacement of the stylus 231 measured by the counter 330 (detection values (Px, Py, and Pz) of the probe sensor), an amount of depression (absolute value of a vector Ep) of the stylus tip 232 is obtained.
(39) The displacement command generator 340 calculates a displacement path of the probe 230 (stylus tip 232) for measuring the surface of the measured object with the probe 230 (stylus tip 232) and calculates a speed vector along the displacement path.
(40) The drive controller 350 controls activation of each slider based on the displacement vector calculated by the displacement command generator 340.
(41) Further, a manual controller 400 is connected to the motion controller 300.
(42) The manual controller 400 includes a joystick and a variety of buttons, receives a manual input operation from a user, and sends an operation instruction from the user to the motion controller 300. In this case, the motion controller 300 (drive controller 350) controls activation of each slider based on the operation instruction from the user.
(43) Configuration of Host Computer 500
(44) The host computer 500 is configured to include a CPU (central processing unit) 511, a memory, and the like, and controls the coordinate measurement machine 200 via the motion controller 300. The host computer 500 further includes a memory portion 520 and a shape analyzer 530. The memory portion 520 stores design data (such as CAD data and NURBS data) related to a shape of the measured object (work piece) W, measurement data obtained from the measurements, and a measurement control program controlling overall measurement operations.
(45) The shape analyzer 530 calculates surface shape data of the measured object based on measurement data output from the motion controller 300 and performs shape analysis to find errors, distortions, and the like in the calculated surface shape data of the measured object. In addition, the shape analyzer 530 also performs a computation such as conversion from the design data (CAD data, NURBS data, and the like) to a PCC curve.
(46) The measurement operations of the present embodiment are realized by running the measurement control program using the CPU (central processing unit) 511.
(47) An output device (a display or a printer) and an input device (a keyboard or a mouse) are connected to the host computer 500 as required.
(48) The control method for the shape measuring apparatus according to the present embodiment is described with reference to the flow charts. The operations of the host computer 500 are described with reference to
(49)
(50) The measurement command obtainer 310 of the motion controller 300 includes the first buffer 321 and the second buffer 322 and the maximum value for the number of segments each buffer can receive is designated as P. Accordingly, if the total number of segments M of the PCC curve is equal to or less than P (ST130: NO), coefficient information of all segments included in the continuous PCC curve can be received, as one measurement command, by the measurement command obtainer 310. In this case, the shape analyzer 530 generates the coefficient information of all segments as one measurement command C1 (ST131), and sends the measurement command C1 to the measurement command obtainer 310 of the motion controller 300 (ST132). The operation itself is the same as that in the prior art.
(51) However, when the total number of segments M of the PCC curve exceeds P (ST130: YES), coefficient information of all segments cannot be received by the measurement command obtainer 310 as one measurement command. In the present embodiment, the measurement command obtainer 310 is divided into two buffers intentionally so that the number of segments (P) that can be received at once is small, and therefore, the total number of segments M is likely to exceed P.
(52) In this case, the shape analyzer 530 generates divided measurement commands Ci (ST140). Basically, as in the conventional case, the number of segments included in one measurement command is set to be equal to or less than the capacity of the buffer. Additionally, in the present embodiment, the number of segments included in each measurement command is averaged, and therefore, this procedure is described in sequence using
(53)
(54) It is possible to generate (n+1) measurement commands by simply dividing the PCC curve every P segments. However, the number of segments included in each measurement command Ci is averaged, with a little consideration paid to the final remainder m. In other words, when the remainder m is less than (P/4) (ST142: YES), only the last measurement command Cn+1 has extremely low information. For the measurement commands C1 to Cn1, the number of segments is set, as conventionally, to P in accordance with the maximum value of the buffer capacity. However, the last measurement commands Cn and Cn+1 are averaged using {(P+m)/2} (ST143).
(55)
(56) The measurement command Ci (i=1 n+1) is generated in this way.
(57) Returning to
(58) Next, the operations of the motion controller 300 are described.
(59) First, the memory controller 311 checks the status of the buffer identification flag B (ST210). The value of the buffer identification flag B switches alternately between 1 and 2. The timing at which the value switches is described later (ST402 in
(60) When the value of the buffer identification flag B is 1 (ST210: YES), this indicates it is time to use the first buffer 321, and the first status flag SB(1) indicating the status of the first buffer 321 is checked (ST211). The status flags SB(1) and SB(2) show 0 to indicate a status where the buffer is writable and show 1 to indicate a status where the buffer is not writable. (The timing at which the status flags SB(1) and SB(2) are updated to 0 is described later (ST214 and ST224 in
(61) When the status flag SB(1) of the first buffer 321 is 0 (=writable state) (ST211: YES), the first buffer 321 is writable (ST212).
(62) When the first buffer 321 is writable (ST212), the measurement command Ci can be transmitted from the host computer 500 to the measurement command obtainer 310 (ST160 in
(63) However, in ST210, when the buffer identification flag B is 2, this indicates it is time to use the second buffer 322, and therefore, the memory controller 311 proceeds to check the second status flag SB(2) indicating the status of the second buffer 322 (ST221). The operations thereafter correspond to the operation of writing data to the first buffer 321, so a lengthy description thereof is omitted.
(64) In this way, the measurement commands are stored in order, alternating between the first buffer 321 and the second buffer 322 (see
(65)
(66) The speed pattern planner 341 constantly monitors the buffer status flags SB(1) and SB(2) (ST310). B in SB(B) means the value of the buffer identification flag B (1 or 2) at that point in time. Accordingly, specifically, the speed pattern planner 341 first checks the value of the buffer identification flag B (1 or 2) and then checks the status (SB(B)) of the buffer 321 or 322 indicated by the buffer identification flag B.
(67) The speed pattern planner 341 waits until the buffer status flag SB(B) turns to 1 (ST310: NO). When the buffer status flag SB(B) turns to 1 (ST310: YES), the speed pattern planner 341 reads out the measurement command Ci stored in the B buffer (321 or 322) (ST320). The timing at which the buffer status flag SB(B) turns to 1 is as described in
(68) When the speed pattern planner 341 newly reads out the measurement command Ci (ST320), the speed pattern planner 341 proceeds to check a connection determination flag LF (ST330). The connection determination flag LF is a flag LF stored in the connection determination flag storage portion 346 and indicates whether the in-progress the measurement command Ci1 and the following measurement command Ci can be performed continuously. The connection determination flag LF is regularly updated based on the determination made by the connection determiner 345. How the connection determiner 345 determines the value of the connection determination flag LF (1 or 0) is described later in detail with reference to the flow chart in
(69) When the speed pattern planner 341 checks the connection determination flag LF (ST330), the value of the connection determination flag LF is 0 (ST340: NO). In other words, it is determined that the in-progress measurement command Ci1 and the following measurement command Ci cannot be connected. In this case, the speed pattern planner 341 creates an individual speed plan based on the measurement command Ci. The individual speed plan is the same as the conventional speed plan except in one aspect.
(70) As exemplified in
(71) However, as a feature of the present embodiment, at the last end portion of the speed pattern, rather than dropping the displacement speed to zero, a displacement area (low speed displacement area L) of extremely low speed (such as 3 mm/sec) is set. The length (LL) of the low speed displacement area is defined at about 3 mm, for example. If the last segment of the measurement command Ci is less than 3 mm, the low speed displacement area is secured by sequentially retracing the previous segments. If the total length of the measurement command Ci is less than 3 mm, the low speed displacement area is not applied.
(72) Therefore, when generating the individual speed plan corresponding to the measurement command Ci, the length LL of the low speed displacement area is subtracted from the last portion of the measurement command Ci and the speed pattern for the remainder is generated having an initial speed at 0 mm/sec and a final speed at 3 mm/sec. The last portion is constantly maintained at 3 mm/sec in the low speed displacement area. The created speed pattern plan PVi is stored in a speed pattern storage portion 343 (ST370).
(73) When the speed pattern plan for the measurement command Ci is generated, an (estimated) start time tsi and (estimated) end time tei to perform the measurement command Ci are automatically determined. For ease of the description that follows, based on the speed pattern plan PVi, the start time to perform the measurement command Ci is expressed by tsi and the end time is expressed by tei.
(74) Further, the number of segments included in one measurement command Ci is known, and therefore, the time required to generate the speed pattern plan corresponding to one measurement command is substantially constant. For ease of the description that follows, the time required to generate the speed pattern plan corresponding to one measurement command is expressed by a planning calculation time Tp. The planning calculation time Tp may be set at a net time required to generate the speed pattern plan, however, the planning calculation time Tp may be better set at around the 1.3 times the net time to allow a slight margin.
(75) Returning to ST340 in
(76) The connecting speed plan only has one difference from the individual speed plan. When generating the connecting speed plan corresponding to the measurement command Ci, the initial speed is set at 3 mm/sec (see
(77) Even when the one-prior speed plan for the measurement command Ci is an individual speed plan or a connecting speed plan, the last portion of the speed plan should be at 3 mm/sec in the low speed displacement area. During the execution process of the measurement command Ci, when the initial speed of the probe is set at 3 mm/sec, the displacement speed of the probe is the same at the last portion of the one-prior measurement command Ci1 and the first portion of the following measurement command Ci. Therefore, when the probe is displaced to the beginning of the measurement command Ci immediately after the last portion of the measurement command Ci1, the probe 230 can be displaced continuously without stopping. When the connecting speed plan is created (in other words, the value of the connection determination flag LF is 1 (ST340: YES)), the probe can always be displaced to the beginning of the measurement command Ci after the last portion of the measurement command Ci1. The reason for this is clearly described in the flow chart in
(78) The created speed pattern plan Pvi is stored in the speed pattern storage portion 343 (ST370).
(79) At this point, when the connecting speed plan for the measurement command Ci is created, the (estimated) start time tsi and the (estimated) end time tei to perform the measurement command Ci are determined in the same way as in the individual speed plan. However, for the connecting speed plan, the starting time tsi to perform the measurement command Ci is the same as an end time tei1 of the one-prior measurement command Ci1.
(80) Next, displacement control of the probe is described with reference to
(81) After starting up, there is a short wait time, and the speed pattern plan corresponding to the initial measurement command C1 (
(82) First, in ST401, the displacement command generator 340 extracts the value (1 or 2) of the current buffer identification flag B from the buffer flag information storage portion 312 and stores the value in a parameter k. When the value of the current buffer identification flag B is extracted in this way (ST401), the value of the buffer identification flag B is updated (ST402). In other words, the displacement command generator 340 accesses the buffer flag information storage portion 312 and updates the value of the buffer identification flag B (1.fwdarw.2 or 2.fwdarw.1).
(83) The measurement command Ci stored in the buffer (1 or 2) which the displacement command generator 340 now accesses to perform the displacement control of the probe, is to be used after this, and therefore must not be overwritten with the measurement command Ci+1 from the host computer 500. At the same time, the buffer (2 or 1) which the displacement command generator 340 does not access is in a stand-by state. Therefore, the following measurement command Ci+1 is received by the buffer (2 or 1) in the stand-by state and the speed pattern can be generated by the speed pattern planner 341. Given this, the value of the buffer identification flag B is updated (1.fwdarw.2 or 2.fwdarw.1) and the following measurement command Ci+1 is received by the buffer in the stand-by state using the memory control operation (
(84) The displacement command generator 340 reads out the speed plan Pvi stored in the speed pattern storage portion 343 (ST403). From this point, the measurement command Ci is processed in order from the beginning and the scanning displacement control of the probe 230 is performed. However, before starting, the execution starting time tsi of the measurement command Ci is entered in an internal time t of the time measurer 347 (ST404). Hereafter, the time measurer 347 adds a control cycle (t) to the internal time t every control cycle (ST420) and measures the time in real time during the execution of the measurement command Ci.
(85) When the previous steps so far are completed, the displacement command generator 340 performs the scanning displacement control of the probe 230 based on the measurement command Ci (ST410). The composite vector V is generated by the vector command generator 344 and the drive controller 350 drives the motors or the like according to the composite vector V and displaces the probe 230. This is a well-known process. According to the flow chart in
(86) Returning to
(87) When the gap time (teit) continuously calculated in this way is longer than the planning calculation time Tp required for the speed planning process (ST431: YES), that means, in other words, that the speed plan for the following measurement command Ci+1 can be generated by the time the measurement command Ci currently in progress ends. Therefore, in this case, the value of the connection determination flag LF is set at 1 which means connectable.
(88) When the value of the connection determination flag LF is set at1, the speed pattern planner 341 is ready to read the connection determination flag LF (ST310 to ST330). In such a case, when generation of the following speed pattern begins at that point in time, the speed plan for the following measurement command Ci+1 can be generated by the time the measurement command Ci currently in progress ends. When the generation of the speed pattern for the following measurement command Ci is completed, the process can shift to the following measurement command Ci+1 immediately after the measurement command Ci currently in progress is performed. In other words, this means that the measurement command Ci currently in progress and the following measurement command Ci+1 can be connected. Accordingly, the speed pattern planner 341 generates the connecting speed plan.
(89) On the other hand, the process of the measurement command Ci advances and the gap time (teit) gradually shortens, and thus, the gap time becomes shorter than the planning calculation time Tp required for the speed planning process. Even when generation of the speed pattern for the following measurement command Ci+1 begins at that point in time, the speed plan for the following measurement command Ci+1 is not created by the time the measurement command Ci currently in progress ends and is not in time. Therefore, when the gap time (teit) is shorter than the planning calculation time Tp (ST431: NO), the value of the connection determination flag LF is updated to 0. When the value of the connection determination flag LF is set at0, the speed pattern planner 341 proceeds to read the connection determination flag LF (ST310 to ST330), and the speed pattern planner 341 generates the individual speed plan.
(90) Moreover, in ST432, n+1 is a number of the measurement command (that is, the maximum value for i) and i reaching n+1 means that the measurement command Cn+1 is the last command and the final speed of the measurement command Cn+1 is set at 0. Therefore, the connection determination flag LF is set at 0 for convenience so that the individual speed plan is generated (ST432: NO).
(91) Returning to
(92) When the internal time t reaches tei (ST440: YES), the process of the measurement command Ci ends. At this point in time, the measurement command in the k buffer, where the measurement command Ci was stored, completes execution, and therefore, the following measurement command Ci+2 may be further written to the k buffer. Given this, the value of the buffer status flag SB(k) of the k buffer is updated to 0.
(93) When the value of the buffer status flag SB is updated to 0 (ST211 and ST221), as described in
(94) In ST410 in
(95) Conventionally, when the PCC curve (the path for scanning measurement) is long or the PCC curve includes a complicated curvature change, an amount of information in the measurement command C exceeds the buffer capacity. As a result, the probe 230 naturally pauses in the middle of the continuous measurement path to perform retraction and approach. This has been a big negative factor for measurement efficiency and subsequent data processing.
(96) In this respect, in the present embodiment, the PCC curve is intentionally divided into a relatively small number of segments, and the buffer is also divided into two. By using the buffers alternately, even when the measurement command itself is divided, the operation of the probe displacement is continuous rather than split up. In other words, the following measurement command Ci+1 is received by a buffer while the measurement command Ci is in progress, and the following speed pattern plan (connecting speed plan) is created. After that, the measurement command Ci+1 is connected after the measurement command Ci.
(97) However, there is no guarantee that the following speed pattern plan (connecting speed plan) is created in time. In the present embodiment, for the speed pattern plan, the low speed displacement area L is provided at the end portion of each measurement command and the displacement speed of the probe 230 is dropped to an extremely low speed (such as 3 mm/sec). Even if the following speed pattern plan (connecting speed plan) is not created in time, the speed is sufficiently dropped (deceleration is completed before the low speed displacement area L), and therefore, the motor may be stopped and then the retraction and the like may be performed.
(98) In this example, even though the measurement command Ci and the following measurement command Ci+1 can be connected, dropping to low speed (for example 3 mm/sec) each time at a connection portion may seem to be slightly negative in respect of time efficiency. Ideally, taking the last segment of the measurement command Ci and the beginning segment of the following measurement command Ci+1 together, calculating the optimal speed using the end of the measurement command Ci and the beginning of the measurement command Ci+1 and passing through the connection portion at the optimal speed may be better. Although this may be possible using a ring buffer, currently, when generating the speed pattern plan segments cannot be processed little by little and a speed pattern plan is created for every given section grouping (each measurement command Ci). To calculate the optimal speed of the portion connecting the end of the measurement command Ci and the beginning of the measurement command Ci+1 every time, an extensive change is required in a generation method of the speed pattern. In addition, when the calculation is not finished in time, the probe 230 needs to be paused and the retraction and approach have to be inserted. However, in this case, processing the break in the data with later data processing is likely to be difficult. (The place where the probe 230 stopped may be found by tracking a memory address, however, the process is likely to be quite complicated.) In consideration of the circumstances above, in the present embodiment, the buffer is divided and the probe passes at the predetermined low speed (no pausing) through the connection portions between the divided measurement commands. In fact, in the present embodiment, the speed plan of the following measurement command Ci+1 is created while the measurement command Ci is in progress. Therefore, even if the low speed area always appears, it is obvious that the measurement time can be considerably shortened compared to the conventional method, and later data processing can be performed simply and at high speed as the probe does not pause.
(99) Moreover, the present invention is not limited to the embodiment described above, and may be modified as needed without departing from the scope of the present invention. In the above-noted embodiment, active nominal scanning measurement is given as an example, however, passive nominal scanning measurement may of course be used instead.
(100) It is noted that the foregoing examples have been provided merely for the purpose of explanation and are in no way to be construed as limiting of the present invention. While the present invention has been described with reference to exemplary embodiments, it is understood that the words which have been used herein are words of description and illustration, rather than words of limitation. Changes may be made, within the purview of the appended claims, as presently stated and as amended, without departing from the scope and spirit of the present invention in its aspects. Although the present invention has been described herein with reference to particular structures, materials and embodiments, the present invention is not intended to be limited to the particulars disclosed herein; rather, the present invention extends to all functionally equivalent structures, methods and uses, such as are within the scope of the appended claims.
(101) The present invention is not limited to the above described embodiments, and various variations and modifications may be possible without departing from the scope of the present invention.