ELEVATOR SYSTEM
20200216290 ยท 2020-07-09
Inventors
Cpc classification
B66B11/0005
PERFORMING OPERATIONS; TRANSPORTING
B66B9/16
PERFORMING OPERATIONS; TRANSPORTING
International classification
B66B9/16
PERFORMING OPERATIONS; TRANSPORTING
B66B11/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A construction site elevator system temporarily bridges at least part of the distance between the top stop of a jump lift and the top work level on the construction site. The construction site elevator system includes a frame structure and an elevator within the frame structure, the frame structure being configured to be insertable into an elevator shaft and being mountable at different positions in the elevator shaft.
Claims
1-14. (canceled)
15. An elevator system comprising: a first elevator shaft and a second elevator shaft; a jump lift arranged in the first elevator shaft; a construction site elevator system arranged in the second elevator shaft for temporarily bridging at least part of a distance between a top stop of the jump lift in the first elevator shaft and a top work level of the elevator system; wherein the construction site elevator system includes a frame structure and an elevator within the frame structure; and wherein the frame structure is insertable into the second elevator shaft and is selectively mountable at different positions on the second elevator shaft.
16. The elevator system according to claim 15 wherein the frame structure is formed as scaffolding.
17. The elevator system according to claim 16 wherein the scaffolding is steel scaffolding.
18. The elevator system according to claim 15 wherein the elevator includes a car in the frame structure and the frame structure includes at least two cavities formed therein for entering and/or leaving the car.
19. The elevator system according to claim 18 including doors for closing the cavities are provided at the at least two cavities in the frame structure.
20. The elevator system according to claim 19 wherein the at least two cavities are a top cavity and a bottom cavity.
21. The elevator system according to claim 15 wherein the elevator includes a car in the frame structure and the frame structure includes at least three cavities for entering and/or leaving the car.
22. The elevator system according to claim 21 including doors for closing the cavities are provided at at least two of the at least three cavities in the frame structure.
23. The elevator system according to claim 21 including doors for closing the cavities are provided only at a top cavity and a bottom cavity of the at least three cavities.
24. The elevator system according to claim 15 wherein the elevator includes a car, a counterweight, a motor for moving the car and the counterweight, and a suspension means suspending the car and the counterweight.
25. The elevator system according to claim 15 including mounting means mounting the frame structure on the second elevator shaft.
26. The elevator system according to claim 25 wherein the mounting means is adapted to engage in door openings of a shaft wall of the second elevator shaft for mounting the frame structure.
27. The elevator system according to claim 15 including a pivotable beam on the frame structure for at least one of aligning the construction site elevator system relative to the second elevator shaft and mounting the construction site elevator system on the second elevator shaft.
28. The elevator system according to claim 15 including rotatably mounted rollers and/or wheels on an outside of the frame structure.
29. The elevator system according to claim 15 wherein a bottom stop of the construction site elevator system corresponds to the top stop of the jump lift.
30. A method for temporarily bridging at least part of a distance between a top stop of a jump lift and a top work level of an elevator system construction site, the method comprising the steps of: providing a construction site elevator system including a frame structure and an elevator within the frame structure, wherein the frame structure is configured to be insertable into an elevator shaft and mountable at different positions on the elevator shaft; temporarily mounting the construction site elevator system at a first position in an elevator shaft of the construction site with a mounting means to temporarily bridge at least part of the distance between the top stop of the jump lift and the top work level of the construction site; removing the mounting means from the first position; lifting the construction site elevator system to a second position in the elevator shaft; and mounting the construction site elevator system at the second position in the elevator shaft with the mounting means.
31. The method according to claim 30 including performing the lifting by raising the construction site elevator system gradually.
Description
DESCRIPTION OF THE DRAWINGS
[0026] In the drawings:
[0027]
[0028]
DETAILED DESCRIPTION
[0029]
[0030] The jump lift 110 comprises a car 112 which is movable within the first elevator shaft 102, a machine platform 114 on which the machine for moving the car 112 is arranged, a lifting platform 116 and a crash deck 118.
[0031] The machine platform 114, the lifting platform 116 and the crash deck 118 can be gradually raised within the elevator shaft 102 so that the jump lift 110 can grow together with the building.
[0032] At the upper end of the two elevator shafts 102, 104, a casting mold 120 is arranged, by means of which further floors of the elevator shafts 102, 104 are cast gradually.
[0033] The top stop of the jump lift 110 is indicated by the line 122. As can be seen in
[0034] As shown in
[0035] A total of three lateral cavities are provided in the frame structure 12, which cavities coincide with corresponding door openings of three floors arranged one above the other. Furthermore, the frame structure has a door 26, 28 at the top and bottom stops, respectively, of the construction site elevator system 10, by means of which doors these cavities are closed. This has the advantage that no doors need to be installed at the openings of the elevator shaft 104.
[0036] In the example shown in
[0037] When the jump lift 110 has been raised, the construction site elevator system 10 is also raised correspondingly, for example via the crane by means of which it was inserted, and fixed at a new location of the elevator shaft 104. Alternatively, lifting can also take place from below, for example, by pushing by means of a hydraulic arrangement. It is advantageous if a plurality of rotatably mounted rollers and/or wheels 32 are provided on the frame structure 12 on the side facing away from the car 16, i.e. on the outside. This ensures that, when inserted into the shaft 104, the construction site elevator system 10 can slide on the rollers or wheels 32 along the shaft walls without damaging the shaft walls or being damaged itself.
[0038] In accordance with the provisions of the patent statutes, the present invention has been described in what is considered to represent its preferred embodiment. However, it should be noted that the invention can be practiced otherwise than as specifically illustrated and described without departing from its spirit or scope.
LIST OF REFERENCE SIGNS
[0039] 10 Construction site elevator system [0040] 12 Frame structure [0041] 14 Elevator [0042] 16 Car [0043] 18 Suspension means [0044] 20 Counterweight [0045] 22 Motor [0046] 24 Beam [0047] 26, 28 Door [0048] 30 Cavity [0049] 32 Roller or wheels [0050] 100 Elevator system [0051] 102, 104 Elevator shaft [0052] 110 Jump lift [0053] 112 Car [0054] 114 Machine platform [0055] 116 Lifting platform [0056] 118 Crash deck [0057] 120 Casting mold [0058] 122 Level