DEVICE FOR COATING CONTAINERS BY MEANS OF A COATING PROCESS AND METHOD FOR OPERATING SUCH A DEVICE
20200207554 ยท 2020-07-02
Assignee
Inventors
Cpc classification
B65G47/907
PERFORMING OPERATIONS; TRANSPORTING
C23C16/045
CHEMISTRY; METALLURGY
C23C16/54
CHEMISTRY; METALLURGY
International classification
B65G47/90
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A device for coating containers using a coating process with a main supporting frame, which includes: a container conveying device, a treatment station for coating the containers, and a transfer device, which moves the containers between the conveying device and the treatment station. The transfer device has a gripper unit, which is mounted pivotably along a pivot axis aligned parallel to the conveying device on a gripper frame, which is arranged fixed in place in relation to the main supporting frame during operation. The gripper unit is mounted on a carriage connected to the gripper frame. Thee carriage performs linear movements in three mutually perpendicular directions. The gripper unit is movable between a first position, in which it can grip the containers in the region of the conveying device, and a second position, in which it can insert the containers into the treatment station and fetch them from it.
Claims
1. A device for coating containers by means of a coating process, with a main carrier frame, wherein the following units are present inside the main carrier frame: a treatment station for coating the containers, a transfer device, which moves the containers between at least one conveying device and treatment station, wherein the units also comprise the at least one conveying device or can be connected to the at least one conveying device, wherein the transfer device comprises a gripper unit, which is located such as to be able to pivot along a pivot axis aligned parallel to the conveying device on a gripper frame, which during operation of the device is arranged secured to the main carrier frame and/or is part of the main carrier frame, wherein the gripper unit can be moved between a first position, in which it can grip the containers in the region of the conveying device, and a second position, in which it can place the containers into the treatment station and fetch them out of it.
2. The device according to claim 1, wherein the gripper unit is located on a carriage connected to the gripper frame, and the carriage can carry out linear movements in three directions running perpendicular to one another.
3. The device according to claim 1, wherein the conveying device comprises two parts, an inlet conveying device and an outlet conveying device, and/or the treatment station comprises two separate part stations, a first part station and a second part station.
4. The device according to claim 1, wherein, when not in operation, the gripper frame and the transfer device attached to it can be lowered in relation to the main carrier frame.
5. The device according to claim 1, wherein the gripper unit comprises a group of grippers which can be moved towards one another, in particular a group of 2 to 12 grippers.
6. The device according to claim 4, wherein the spacing interval between adjacent grippers can be changed axially to the pivot axis.
7. The device according to claim 4, wherein the grippers can be moved along their longitudinal axis.
8. The device according to claim 1, wherein, inside the main carrier frame of the devices there is also at least one conveying device present with at least one part section.
9. The device according to claim 1, wherein the conveying device has a railing, with which at least the part arranged on its side facing towards the treatment station can be lowered or pivoted away.
10. A method for operating a device according to any one of the preceding claims, with the following steps: input conveying of the containers by the conveying device; gripping of the containers by the gripper unit (2) on the conveying device; raising of the gripper unit together with the containers; pivoting the gripper unit about the pivot axis; linear moving of the gripper unit until the containers are located in the treatment station; releasing the containers by the gripper unit; carrying out the coating; gripping the containers by the gripper unit in the treatment station; linear movement and pivoting of the gripper unit until the containers are located above the conveying device; placing the containers on the conveying device and releasing them by the gripper unit; outlet conveying of the containers by the conveying device.
11. The method according to claim 10, wherein, during steps d and/or e, a change takes place in the spacing intervals between adjacent grippers axially to the pivot axis, and this change is made reversible during steps i and/or j.
12. The method according to claim 11, wherein the gripper unit comprises four grippers, and the change in spacing interval of the two outer grippers is carried out twice as rapidly and twice as far as that of the two inner grippers.
13. The method according to claim 10, wherein, during steps d and/or e, a different change in the spacing interval of the grippers from the pivot axis, and this change is made reversible during steps i and/or j.
14. The method according to claim 10, wherein the pivoting of the gripper unit about the pivot axis takes place through 180.
15. The method according to any one of claims 10, wherein the treatment station comprises two separate part stations, a first part station and a second part station, and the conveying device comprises two parts, an inlet conveying device and an outlet conveying device, wherein the gripper unit always takes the containers from the inlet conveying device and always sets them down on the outlet conveying device, and the gripper unit carries out the steps b to for h to j, related to the part station, whereby step g is specifically not carried out.
Description
BRIEF DESCRIPTION OF THE DRAWINGS:
[0035] The Figures show:
[0036]
[0037]
[0038]
[0039]
[0040]
DETAILED DESCRIPTION OF THE EMBODIMENTS:
[0041]
[0042] The grippers 3a, 3b, 3c, 3d can be pivoted about a pivot axis 5 in relation to the remainder of the gripper unit 2. Further details of this are provided hereinafter in connection with the description of
[0043] At the takeover the containers 17 are delivered standing upright, which are guided on both sides by a railing 14, the grippers 3a, 3b, 3c, 3d or, respectively, the gripper group, must as a rule run through the following movement steps: To bridge the inner guide railing, a lifting movement, a horizontal return movement, a vertical pivoting into the overhead position of the container 17, a horizontal advance movement, if necessary a vertical lowering movement in order to set the container 17 into the treatment station, and a gripper opening and withdrawal of the empty gripper 3a, 3b, 3c, 3d, in order for the treatment station to be closed. The withdrawal of the containers 17 from the treatment station takes place in an analogous manner.
[0044] Also to be seen are a first longitudinal adjustment spindle 6.1 and a second longitudinal adjustment spindle 6.2, which serve to change the spacing intervals between the individual grippers 3a, 3b, 3c, 3d. For this purpose, the first longitudinal adjustment spindle 6.1 is driven by a toothed belt. By means of a gear arrangement, not shown, with a ratio of 1:2 between the first longitudinal adjustment spindle 6.1 and the second longitudinal adjustment spindle 6.2, the second longitudinal adjustment spindle 6.2 is driven at twice the speed. More details are provided in this respect hereinafter, in connection with the description of
[0045] Represented in
[0046] The pivot movement of the second gripper 3b takes place about the pivot axis 5 represented in
[0047] Formed to the right of the pivot sleeve 6 is a region which allows for a change in the spacing interval of the grippers 3a, 3b, 3c, 3d, in the axial in relation to the pivot axis 5. For this purpose, a second opening 6a and a second thread 6 are provided. Through the first opening 6a the second longitudinal adjustment spindle 6.2 engages, and through the second thread 6 the first longitudinal adjustment spindle 6.1 (both longitudinal adjustment spindles 6.1, 6.2 are represented in
[0048] The third gripper 3c is essentially configured in the same way as the second gripper 3b represented in
[0049] Represented in
[0050] The pivot movement of the first gripper 3a takes place about the pivot axis 5, represented in
[0051] The first gripper 3a exhibits two significant differences in relation to the second gripper 3b.
[0052] The first difference consists of the fact that the arrangement of opening and thread is exchanged in relation to the second gripper 3b. Where the second opening 6a was with the second gripper 3b, with the first gripper 3a there is a first thread 6, and where the second thread 6 was, there is a first opening 6a. This means that the first longitudinal adjustment spindle 6.1 does not interact with the first gripper 3a, but instead engages through this with a degree of play. The second longitudinal adjustment spindle 6.2, however, interacts with the first gripper 3a by way of the first thread 6, in such a way that the first gripper 3a in
[0053] For the fourth gripper 3d, it essentially applies that it exhibits the same change from the first gripper 3a as the third gripper 3c from the second gripper 3b: Its fourth thread, which is formed on it instead of the first thread, is configured in such a way that a movement of the fourth gripper 3d takes place in the opposite direction to that of the first gripper 3a, i.e. in
[0054] As a result of this simple, synchronised spacing interval change, it is possible on the one hand to avoid the possibility of the containers 17 striking against one another during the pivot movement, and, on the other, it is possible, as a result of this, for containers 17 of substantially different sizes to be processed without the need for modifications to be made to the conveying device 13 or to the treatment station. The change in the spacing interval is necessary in particular with the processing of containers 17 of different sizes, since the spacing interval of the treatment positions in the treatment station could only be changed with very great effort, but the spacing interval between the containers 17, which are regularly of very different sizes when entering on the conveying device 13, is also very different. This difference in size is compensated by the movement of the conveying device 13 to the treatment station; the same applies to the return path.
[0055] A further significant difference between the first gripper 3a and the second gripper 3b consists of the fact that it can be changed in length along its longitudinal axis; this is shown in
[0056] The fourth gripper 3d comprises essentially the same device for changing length along its longitudinal axis as that of the first gripper 4a. Accordingly, the gripper tongs 4a, 4b, 4c, 4d are located not in a straight line but on a circular line segment. Accordingly, treatment stations can be easily be loaded with containers 17 of which the treatment positions are not located in a straight line in relation to one another, but on a circular line segment.
[0057] Represented in
[0058] The gripper frame 7 comprises two U-shaped carrier arrangements, which are aligned horizontally and arranged vertically above one another. These are connected securely to one another by means of vertical braces.
[0059] The carriage 8 is located on this very stable gripper frame 7 in such a way that it can be moved inside the gripper frame 7. This allows for movements of the transfer device 1 after installation along the X-axis 9, a Y-axis 10 extending likewise horizontally to this, and, perpendicular to this and running vertically, a Z-axis 11. Added to this is the possibility of the transfer device 1 being pivoted about the pivot axis 5, which is aligned parallel to the X-axis 9. Furthermore, the two outer grippers 3a, 3d, are also changeable in length along their respective longitudinal axes. Finally, the spacing intervals of the grippers 3a, 3b, 3c, 3d, between one another can also be changed along the pivot axis 5.
[0060] Due to this wide range of possible movements, containers 17 which are taken up by the transfer device 1 from the conveying device 13 are brought rapidly, reliably, and flexibly to a treatment station, coated there, and then set back on the conveying device 13 again. The method steps referred to heretofore in the part with the general description and the claims can be carried out very well with such a device. The treatment station, not represented in
[0061] Represented in
[0062] This conveying device 13 is of two parts. It is divided into an inlet conveying device 13a with a first conveyor belt 16a, and an outlet conveying device 13b with a second conveyor belt 16b, wherein the two conveyor belts 16a, 16b, can be moved independently of one another. Over each conveyor belt 16a, 16b, is in each case a channel 15, which is formed in each case by two railings 14 standing upright. The spacing intervals between the railings 14 can be changed, such that the width of the channel 14 can be varied, and can be adjusted to the size of the containers 17 which are to be treated, such that their forwards movement takes place with only a little play between the railings 14. This prevents the containers 17 from falling over.
[0063] In another embodiment, the railing 14 facing towards the transfer device 1 can be lowered or folded away. This means that, after the taking up of the containers 17 by the gripper unit 2, it is only minimally necessary for the transfer device 1 to be moved upwards (along the Z-axis 11); any further movement upwards in order to raise it out of the channel 15 is not necessary, which saves time.
[0064] After the containers 17 have been treated and are intended to be advanced further in the production line, they must be set down on the second conveyor belt 16b of the outlet conveyor device 13b. During the setting down procedure, the second conveyor belt 16b can be stopped, although the first conveyor belt 16a continues running and conveys further containers 17 into the system. The stopping prevents the possibility of containers 17 falling over when being set down on a running second conveyor belt 16b.
[0065] The drive variant described heretofore of the grippers 3a, 3b, 3c, 3d, is very economical and effective. As an alternative, for each gripper 3a 3b, 3, 3d, an individual drive with a suitable control arrangement can be provided on each gripper 3a, 3b, 3c, 3d, for transverse adjustment in relation to one another, such that each gripper 3a, 3b, 3c, 3d, can be moved transversely independently of the others.
[0066] These can be, for example, servomotors which are configured as external-rotor motors, and which, for example, run on a common spindle. As an alternative, an electromagnetic direct drive can be provided, with which each gripper 3a, 3b, 3c, 3d, is carried on a movement carriage and is moved with this, wherein each movement carriage can be controlled and regulated independently of the others, wherein ideally the carrier running transversely also forms the stator and drive.
[0067] Furthermore, the number of four grippers of a group is naturally only an embodiment variant. Advantageously, groups with two to 12 grippers are provided, depending on the number of the treatment stations or wide range of formats of the containers which are to be treated.
REFERENCE NUMBER LIST
[0068] 1 Transfer device [0069] 2 Gripper unit [0070] 3a First gripper [0071] 3b Second gripper [0072] 3c Third gripper [0073] 3d Fourth gripper [0074] 4a First gripper tongs [0075] 4b Second gripper tongs [0076] 4c Third gripper tongs [0077] 4d Fourth gripper tongs [0078] 5 Pivot axis [0079] 5,5 Pivot axis sleeve [0080] 6.1 First longitudinal adjustment spindle [0081] 6.2 Second longitudinal adjustment spindle [0082] 6 First thread for longitudinal adjustment spindle [0083] 6 Second thread for longitudinal adjustment spindle [0084] 6a First opening for longitudinal adjustment spindle [0085] 6a Second opening for longitudinal adjustment spindle [0086] 7 Gripper frame [0087] 8 Carriage [0088] 9 X-axis [0089] 10 Y-axis [0090] 11 Z-axis [0091] 12 Drawbar [0092] 13 Conveying device [0093] 13a Inlet conveying device [0094] 13b Outlet conveying device [0095] 14 Railing [0096] 15 Channel [0097] 16a First conveyor belt [0098] 16b Second conveyor belt [0099] 17 Container [0100] 18 Holder [0101] 19 Carrier