A process system and a fluid transfer system comprising such a process system
20200189692 ยท 2020-06-18
Inventors
- Magnus Eikens (Oslo, NO)
- John Randolph Holland (Schwanewede, DE)
- Stian Tunestveit Magnusson (Oslo, NO)
- Bjornar Danielsen (Asker, NO)
Cpc classification
F17C2205/0323
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B22/021
PERFORMING OPERATIONS; TRANSPORTING
F17C2223/0161
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C9/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B67D9/00
PERFORMING OPERATIONS; TRANSPORTING
F17C2270/0118
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
Abstract
A process system (15) for transfer of a fluid between a floating or non-floating facility (11) and a receiving structure (21) via a support unit (12) is disclosed, where the process system (15) comprises:a first pipe element (58) for transport of fluid on the support unit (12),a second pipe element (68) for transport of fluid on the support unit (12),a first cross over pipe (22) that is fluidly connected to the first pipe element (58) and the second pipe element (68),a second cross over pipe (26) that is fluidly connected to the first pipe element (58) and the second pipe element (68),a first valve device (30) arranged in the first cross over pipe (22),a second valve device (31) arranged in the second cross over pipe (26)a first cargo valve device (39) that is provided in the first pipe element (58),a second cargo valve device (40) that is provided in the second pipe element (68). A fluid transfer system (10) comprising such a process system (15) is also disclosed.
Claims
1. A fluid transfer system, comprising a process system and a support unit where the process system is arranged on the support unit, and for transfer of a fluid between a floating facility and a receiving structure via the support unit, wherein the process system comprises: a first pipe element for transport of fluid on the support unit, a second pipe element for transport of fluid on the support unit, a first cross over pipe that is fluidly connected to the first pipe element and the second pipe element, a second cross over pipe that is fluidly connected to the first pipe element and the second pipe element, a first valve device arranged in the first cross over pipe, a second valve device arranged in the second cross over pipe a first cargo valve device that is provided in the first pipe element, and a second cargo valve device that is provided in the second pipe element.
2. Fluid transfer system according to claim 1, wherein the first cargo valve device is provided in the first pipe element between a first cross pipe connection, where the first cross over pipe is fluidly connected to the first pipe element, and a third cross pipe connection, where the second cross over pipe is fluidly connected to the first pipe element, and wherein the second cargo valve device is provided in the second pipe element between a second cross pipe connection, where the first cross over pipe is fluidly connected to the second pipe element, and a fourth cross pipe connection where the second cross over pipe is fluidly connected to the second pipe element.
3. Fluid transfer system according to claim 1, wherein the first pipe element of the process system is adapted to be connected to a first transfer pipe and the second pipe element of the process system is adapted to be connected to a second transfer pipe.
4. Fluid transfer system according to claim 1, wherein the process system comprises a first aerial hose that is fluidly connected to the first pipe element and a second aerial hose that is fluidly connected to the second pipe element, the first and second aerial hoses being adapted to be connected to the floating or non-floating facility.
5. Fluid transfer system according to claim 4, wherein the first and second aerial hoses are fluidly connected to the first pipe element and the second pipe element with a first break away coupling and a second break away coupling respectively.
6. Fluid transfer system according to claim 1, wherein a first emergency shut down valve is provided in the first pipe element and a second emergency shut down valve is provided in the second pipe element.
7. Fluid transfer system according to claim 6, wherein the first emergency shut down valve is provided in the first pipe element between a first cross pipe connection where the first cross over pipe is fluidly connected to the first pipe element and a third cross pipe connection where the second cross over pipe is fluidly connected to the first pipe element, and wherein the second emergency shut down valve is provided in the second pipe element between a second cross pipe connection where the first cross over pipe is fluidly connected to the second pipe element and a fourth cross pipe connection where the second cross over pipe is fluidly connected to the second pipe element.
8. Fluid transfer system according to claim 6, wherein the process system comprises a vent mast that is fluidly connected to the first pipe element between the first cargo valve device and the first emergency shut down valve, and to the second pipe element between the second cargo valve device and the second emergency shut down valve.
9. Fluid transfer system according to claim 1, wherein the process system comprises a vent mast that is fluidly connected to the first pipe element on either side of the one of the first cargo valve device and the first emergency shut down valve that is arranged closest to the floating or non-floating facility, and to the second pipe element on either side of the one of the second cargo valve device and the second emergency shut down valve that is arranged closest to the floating or non-floating facility.
10. A fluid transfer system according to claim 1, wherein the process system is movably supported on the support unit.
11. Fluid transfer system according to claim 10, wherein the fluid transfer system comprises at least one process system support device that is securely mounted to the support unit and/or the process system, the at least one process system support device being adapted to allow the process system to move relative to the support unit in response to external forces acting on the process system.
12. Fluid transfer system according to claim 11, wherein the at least one process system support device comprises a slide bearing.
13. Fluid transfer system according to claim 10, wherein the fluid transfer system comprises at least one limit stop that limits the movements of the at least one pipe element of the process system relative to the support unit in at least one direction.
14. Fluid transfer system according to claim 10, wherein the first pipe element of the process system is connected to a first transfer pipe and the second pipe element of the process system is connected to a second transfer pipe.
15. Fluid transfer system according to claim 10, wherein the fluid transfer system comprises: a first spool piece that in one end is connected to the first transfer pipe and in the other end is attached to the first pipe element, a second spool piece that in one end is connected to the second transfer pipe and in the other end is attached to the second pipe element, a first chute device that is attached to the support unit, the first transfer pipe being accommodated in the first chute device such that the first chute device supports the first transfer pipe and takes up vertical and transverse forces acting on the first transfer pipe, a second chute device that is securely attached to the support unit, the second transfer pipe being accommodated in the second chute device such that the second chute device supports the second transfer pipe and takes up vertical and transverse forces acting on the second transfer pipe, a first tie-in device that is connected to a first spool piece tie-in member that is arranged on the first spool piece and to a first tie-in member arranged on a tie-in support that is securely attached to the support unit and a second tie-in device that is connected to a second spool piece tie-in member that is arranged on the first spool piece and to a second tie-in member arranged on the tie-in device, whereby the tension loads are transferred from the first transfer pipe to the support unit, a first tie-in device that is connected to a first spool piece tie-in member that is arranged on the second spool piece and to a first tie-in member arranged on a tie-in support that is securely attached to the support unit and a second tie-in device that is connected to a second spool piece tie-in member that is arranged on the second spool piece and to a second tie-in member arranged on the tie-in device, whereby the tension loads are transferred from the second transfer pipe to the support unit.
16. Fluid transfer system according to claim 15, wherein the first pipe element of the process system is connected to the first transfer pipe with a first spool piece and the second pipe element of the process system is connected to a second transfer pipe with a second spool piece.
Description
[0078] Other features and advantages of the present invention will appear from the following description of a preferred, non-limiting embodiment of the invention, with reference to the figures where:
[0079]
[0080]
[0081]
[0082]
[0083]
[0084]
[0085]
[0086]
[0087]
[0088]
[0089] It should be mentioned that the same reference numbers are used for the same features of the present invention throughout in the figures.
[0090] In
[0091] In
[0092] As mentioned, in
[0093] The support unit 12 may be a floating unit such as a semi-submersible platform, a non-gravity based non-floating unit, a gravity based non-floating unit, a ship, or other types of offshore or onshore units and terminals.
[0094] The receiving structure 21 can be a structure receiving fluid or bulk material that is transported from the support unit 12 through the transfer pipe 13, 14 or a structure that feeds or supplies fluid to the transfer pipe 13, 14 which is subsequently transported to the support unit 12 through the transfer pipes 13, 14. The receiving structure 21 may therefore be a floating or non-floating offshore or onshore terminal or any other type of floating or non-floating structure that is designed to receive fluid or bulk material that is transported through the transport pipe 13, 14 from the support unit 12 to the receiving structure 21. The receiving structure 21 may also be a floating or non-floating offshore or onshore terminal or any other type of floating or non-floating structure that is designed to supply fluid or bulk material for transport through the transport pipe 13, 14 from the receiving structure 21 to the support unit 12. It should also be mentioned that one or more tie-in systems 47, 48 may be installed on the support unit 12 and/or the receiving unit 21 as required in each instance.
[0095] A fluid transfer system 10 that comprises one or more tie-in systems 47, 48 for the at least one transfer pipe 13, 14, is also provided. Further, a process system 15 is arranged preferably on a deck 57 of the support unit 12, as indicated in
[0096] The tie-in system 47, 48 shown in detail in
[0097] The support unit 12 is provided with at least one, but preferably two or more chute supports 62, 72 that are securely fastened to the support unit 12, for example by welding or with bolts, screws or any other suitable fastening devices. Consequently, the chute device 59, 69 is adapted to be securely attached to the chute supports 62, 72, for example by welding or with bolts, screws or any other suitable fastening devices.
[0098] The chute device 59, 69 comprises an inboard section 94 with an inner end portion 95 that will be arranged on the support unit, and an outboard section 96 that at least partly extends outside the outer edges of the support unit 12 and has an outer end portion 97. The chute device 59, 69 comprises a bottom member 88 and two side members 87 that are securely fastened to the bottom member 88 such that the chute device 59, 69 is funnel shaped and supports the transport pipe 13, 14 when it is arranged in the chute device 59, 69.
[0099] In the outboard section 96 of the chute device 59, 69 the bottom member 88 is preferably curved downwards in a direction from the inboard section 94 towards the outer end portion 97 of the chute device 59, 69 as indicated in the figures. The bottom member 88 preferably also gradually widens in a direction from the inboard section 94 towards the outer end portion 97 of the chute device 59, 69 as indicated in the figures. This shape of the chute device 59, 69 will allow the transfer pipe 13, 14 to bend vertically and transversally as the transfer pipe 13, 14 enters the support unit 12.
[0100] The funnel-shaped chute device 59, 69 is further designed so that no damage to the transfer pipe 13, 14 occurs due to too much bending of the transfer pipe 13, 14 as it enters the support unit 12. The bottom member 88 and the side members 87 of the outboard section 96 are preferably provided with a radius of curvature that is at least as large as, but preferably larger than the radius of curvature of the transfer pipe 13, 14 when it has reached its maximum bending radius without getting damaged. It is therefore ensured that the bending of the transfer pipe 13, 14 will be kept within the maximum bending limit of the transfer pipe as it enters the support unit 12.
[0101] The tie-in system 47, 48 further comprises a spool piece 61, 71 that may be adapted to be securely attached to the end of the transfer pipe 13, 14. The spool piece 61, 71 may be attached to the transfer pipe 13, 14 in a conventional way, for example with bolts, welding or any other suitable fastening means. Alternatively the spool piece can be disconnectably/releasably attached to the transfer pipe with a QCDC device (Quick Connection DisConnection) with hydraulic and/or mechanical brackets gripping the flange of the transfer pipe. It would also be possible to make the spool piece 61, 71 an integral part of the transfer pipe 13, 14 when the transfer pipe is fabricated. Alternatively, the spool piece 61, 71 may be integrally formed with the transfer pipe 13, 14 or securely connected to the transfer pipe 13, 14 as the transfer pipe 13, 14 is manufactured.
[0102] The spool piece 61, 71 is preferably made of steel and may be provided with a spool piece connector 81 for the attachment of the spool piece 61, 71 to the transfer pipe. The spool piece connector 81 can be a flange element that is an integral part of the spool piece 61, 71 or is securely attached to the spool piece 61, 71 with fastening means such as bolts, screw or other suitable fastening means.
[0103] The spool piece 61, 71 is preferably connected to the pipe element 58, 68 of the process system with a flange connection 73, 74. The spool piece 61, 71 is provided with a spool piece flange 82 that is adapted to be attached to a corresponding flange element 80 that is arranged on a pipe element 58, 68 of the process system 15 that is arranged on the support unit 12. The spool piece flange 82 can be attached to the flange element 80 to form the flange connection 73, 74 by welding or with a suitable number of conventional bolts (not shown in the figures), but any other suitable fastening means may be used.
[0104] Under the flange connection 73, 74 comprising the spool piece flange 82 and the flange element 80, a fluid collector 85 may be arranged as indicated in
[0105] The pipe element 58, 68 may be provided with a layer of insulation 51 as shown in
[0106] The spool piece 61, 71 is further provided with at least one spool piece tie-in member but preferably two or more spool piece tie-in members 83, 84. The spool piece tie-in members 83, 84 may be an integral part of the spool piece 61, 71. Alternatively, the spool piece tie-in members 83, 84 can be securely attached to the spool piece 61, 71 with bolts, screw or any other suitable fastening means.
[0107] The spool piece tie-in members 83, 84 are adapted so that a tie-in device 77, 79 can be securely attached to the spool piece tie-in members 83, 84. The spool piece tie-in members 83, 84 may, for example, be provided with a bolt hole so that the tie-in devices 77, 79 can be attached to the spool piece tie-in members 83, 84 with respective tie-in bolts 64 as indicated in
[0108] The support unit 12 are further provided with one or more tie-in supports 75. The tie-in supports 75 are securely attached to the support unit 12, typically to a deck of the support unit 12, for example with bolts or screw or any other suitable fastening means, or by welding the tie-in supports 75 to the support unit 12.
[0109] The tie-in supports 75 may be provided with at least one tie-in member, but preferably two or more tie-in members 76, 78. The tie-in members 76, 78 are securely attached to the tie-in supports 75 by welding or with bolts or any other suitable fastening means. The tie-in members 76, 78 may be formed as an integral part of the tie-in support 75. The tie-in members 76, 78 are adapted so that the tie-in devices 77, 79 can be securely attached to respective tie-in members 76, 78 with bolts, welding or any other suitable fastening means. The tie-in members 76, 78 may, for example, each comprise a bolt hole so that the tie-in devices 77, 79 can be attached to the tie-in members 76, 78 with respective tie-in bolts 65 as indicated in
[0110] If the tie-in members 76, 78 is formed as an integral part of the tie-in supports 75, the tie-in devices will be adapted for the tie-in devices 77, 79 to be directly attached to the tie-in supports 75. The tie-in supports 75 may, for example, be provided with respective bolt holes so that the tie-in devices can be attached to the tie-in supports 75 with tie-in bolts, preferably of the same type as shown in
[0111] As indicated above, the tie-in system 47, 48 further comprises at least one tie-in device, but preferably two or more tie-in devices 77, 79. The tie-in devices 77, 79 are in one end adapted to be disconnectably connected to respective spool piece tie-in members 83, 84, for example with a bolt connection 64 as indicated above and shown in the figures. In the other end the tie-in devices 77, 79 are adapted to be disconnectably connected to respective tie-in members 76, 78, or directly to respective tie-in supports 75, for example with a bolt connection 65 as indicated above and shown in the figures.
[0112] When in use and the tie-in devices are attached to respective spool piece tie-in members 83, 84 and respective tie-in members 76, 78, the tie-in devices 77, 79 will transfer tension loads from the transfer pipe 13, 14 to the support unit 12. Thereby the flange connection 73, 74 connecting the transfer pipe 13, 14 to the pipe element 58, 68 will not need to take up any substantial tension loads from the transfer pipe 13, 14. The tie-in devices 77, 79 can be a mechanical holding device such as for example a turnbuckle, a rigging screw, a hydraulic tensioner, a fixed rod of a predetermined length or any other suitable device that is capable of transferring tension loads from the transfer pipe 13, 14 to the support unit 12. Typically two tie-in devices 77, 79 are arranged on opposite sides of both the spool piece 61, 71 and the pipe element 58, 68 as indicated in the figures, are used to take up the tension loads from the transfer pipe 13, 14, but obviously any other number of tie-in devices 76, 78 may be employed to take up the tension loads.
[0113] Although the forces of the transfer pipe 13, 14 are taken by the chute device 59, 69 and the tie-in supports 75, it is preferable that such loads are not transmitted to the fixed flange connection 73, 74 and the pipe element 58, 68 due to misalignment of the pipe element 58, 68 and the spool piece 61, 71, thermal expansion or contraction, difference in strain between the tie-in device 77, 79 and the pipe element 58, 68 or by other means. Therefore, the pipe element 58, 68 may be adapted to be able to move to a limited extent in the longitudinal/axial direction as indicated by arrows X.sub.1 and X.sub.2 in
[0114] The pipe element 58, 68 of the process system 15 is preferably supported on at least one support device 90, but preferably on a plurality of process system support devices 90 that comprises a lower support element 93 and an upper support element 92 as shown in
[0115] In order to limit the extent of the movement of the pipe element 58, 68 in a substantially horizontal direction, at least one limit stop 98, 99, 100 may be provided that will limit the movement of the pipe element 58, 68 in a longitudinal direction of the pipe element, i.e. the axial direction of the pipe element 58, 68 at the point where the pipe element 58, 68 is connected to the spool piece 61, 71, and/or a transverse direction, i.e. a direction that is substantially perpendicular to the longitudinal direction of the pipe element 58, 68.
[0116] As indicated in
[0117] The first longitudinal limit stop 98 shown in
[0118] In a similar way, the second longitudinal limit stop 99 comprises a substantially vertical, structural element that is securely attached to the upper support element 92 projecting downwards from the upper support element 92 such that the second longitudinal limit stop 99 will abut the lower support element 93 when the pipe element 58, 68 is pushed in the direction of arrow X.sub.2 in
[0119] As further indicated in
[0120] The first transverse limit stop 100 shown in
[0121] In a similar way, the second transverse limit stop on the opposite side of the pipe element 58, 68 as compared to the first transverse limit stop (not visible in
[0122] The distance that the pipe element 58, 68 is allowed to move in the longitudinal direction is indicated by the Greek letter in
[0123] In
[0124] As described above, the first tie-in system 47 comprises a first chute device 59 in which the first transfer pipe 13 is arranged while the second tie-in system 48 comprises a second chute device 69 in which the second transfer pipe 14 is arranged. The first chute device 59 and the second chute device 69 are both preferably designed and securely attached to the support unit 12 as shown in
[0125] The first tie-in system 47 comprises a first spool piece 61 that is securely attached to the first transfer pipe 13 in one end thereof. In the other end the first spool piece 61 is connectable to a first pipe element 58 of a process system 15 with a flange connection 73. The second tie-in system 48 comprises a second spool piece 71 that is securely attached to the second transfer pipe 14 in one end thereof. In the other end the second spool piece 71 is connectable to a second pipe element 68 of a process system 15 with a flange connection 74. The first flange connection 73 and the second flange connection 74 preferably have the same design as shown in
[0126] The first tie-in system 47 further comprises at least one tie-in device, but preferably two tie-in devices 77, 79 that are connected to respective spool piece tie-in members 83, 84 arranged on the first spool piece 61 and to respective tie-in members 76, 78 on tie-in supports 75 where the tie-in supports 75 are securely attached to the support unit 12. The second tie-in system 48 also comprises at least one tie-in device, but preferably two tie-in devices 77, 79 that are connected to respective spool piece tie-in members 83, 84 arranged on the second spool piece 71 and to respective tie-in members 76, 78 on tie-in supports 75 where the tie-in supports 75 are securely attached to the support unit 12. Generally, the tie-in devices 77, 79 of the first tie-in system 47 and the second tie-in system 48 are all preferably designed and attached to respective spool piece tie-in members 83, 84 and respective tie-in members 76, 78 as shown in
[0127] Further, as described above, the tie-in devices 77, 79 of the first tie-in system 47 and the second tie-in system 48 can be mechanical holding devices such as turnbuckles, rigging screws, hydraulic tensioners, fixed rods of a predetermined length or any other suitable devices that are capable of transferring tension loads from the first and second transfer pipes 13, 14 to the support unit 12. Typically two tie-in devices 76, 78 arranged on opposite sides of the first spool piece 61 and the first pipe element 58 as indicated in the figures are used to take up the tension loads from the transfer pipe 13 and two tie-in devices 76, 78 arranged on opposite sides of the second spool piece 71 and the second pipe element 68 as indicated in the figures are used to take up the tension loads from the transfer pipe 14, but obviously any other number of tie-in devices 76, 78 may be employed to take up the tension loads from both the first transfer pipe 13 and the second transfer pipe 14.
[0128] The process system 15 shown in
[0129] In
[0130]
[0131] The first transfer pipe 13 is tied in to the support unit 12 with a first tie-in system 47 as indicated in
[0132] The first transfer pipe 13 and the second transfer pipe are further connected to a receiving structure 21. As indicated in
[0133] It should be noted that although two transport pipes 13, 14 are shown in
[0134] The receiving structure 21 can be a structure receiving fluid that is transported from the support unit 12 through the first and second transfer pipes 13, 14 or a structure that feeds or supplies fluid to the first and second transfer pipes 13, 14 which is subsequently transported to the support unit 12. The receiving structure 21 may therefore be a floating or non-floating offshore or onshore terminal or any other type of floating or non-floating structure that is designed to receive fluid that is transported through the first and second transfer pipes 13, 14 from the support unit 12 to the receiving structure 21. The receiving structure 21 may also be a floating or non-floating offshore or onshore terminal or any other type of floating or non-floating structure that is designed to supply fluid for transport through the first and second transfer pipes 13, 14 from the receiving structure 21 to the support unit 12. It should also be mentioned that one or more tie-in systems 47, 48 may be installed on the support unit 12 and/or the receiving unit 21 as required in each case.
[0135] The process system 15 may further comprise a first cross over pipe 22 that is fluidly connected to the first pipe element 58 with a first cross pipe connection 23 and to the second pipe element 68 with a second cross pipe connection 24. A fluid can thereby be flown through the first cross over pipe 22 from the first pipe element 58 to the second pipe element 68 or in the opposite direction. In the first cross over pipe 22 there is preferably provided a first valve device 30 so that the flow of fluid through the first cross over pipe 22 can be controlled.
[0136] The process system 15 may further also comprise a second cross over pipe 26 that is fluidly connected to the first pipe element 58 with a third cross pipe connection 27 and to the second pipe element 68 with a fourth cross pipe connection 28. A fluid can thereby be flown through the second cross over pipe 26 from the first pipe element 58 to the second pipe element 68 or in the opposite direction. In the second cross over pipe 26 there is preferably provided a second valve device 31 so that the flow of fluid through the second cross over pipe 26 can be controlled.
[0137] The first valve device 30 and the second valve device 31 are preferably standard valve devices that are commercially available and is not further described herein. The first, second, third and fourth cross pipe connections 23, 24, 27, 28 may be formed with standard T-junction pipe elements which will allow fluid to flow through the first pipe element 58 and/or the second pipe element 68 and/or the first cross over pipe 22 and/or the second cross over pipe 26 depending on how the first valve device 30, the second valve device 31 and other valve devices that the process system 15 may be provided with, are set.
[0138] The process system 15 is preferably further provided with various valve devices for emergency situations and/or regulation of fluid flow through the process system 15.
[0139] The first pipe element 58 is preferably provided with a first cargo valve device 39 for regulation of fluid flow through the first pipe element 58. The first cargo valve 39 is preferably arranged in the first pipe element 58 between the first cross pipe connection 23 and the third cross pipe connection 27.
[0140] Further, the second pipe element 68 is preferably provided with a second cargo valve device 40 for regulation of fluid flow through the second pipe element 68. The second cargo valve 40 is preferably arranged in the second pipe element 68 between the second cross pipe connection 24 and the fourth cross pipe connection 28.
[0141] The first pipe element 58 may further be disconnectably connected to a first aerial hose 16. Similarly, the second pipe element 68 may be disconnectably connected to a second aerial hose 17.
[0142] With this arrangement of the first and second cargo valve devices 39, 40 and the first and second cross over pipes 22, 26 that each fluidly connects the first pipe element 58 and the second pipe element 68, recirculation of fluid and/or pre-cooling of the first and second transfer pipes 13, 14 is enabled without the presence of the floating or non-floating facility 11. Furthermore, tedious pre-cooling activities with the LNGC present is avoided and it is ensured that the first and second transfer pipes 13, 14 and/or the first and second pipe elements 58, 68 are not shock cooled by quick transfer ramp-up when the fluid that is transferred through the fluid transfer system 10 is a cryogenic fluid like for example LNG.
[0143] As can easily be seen in
[0144] Similarly, by closing the first and second cargo valves 39, 40 and opening the second valve device 31 in the second cross over pipe 26, fluid may be flowed from the floating or non-floating facility 11 through the first aerial hose 16 as indicated with the arrow A, further through the second cross over pipe 26 and back to the floating or non-floating facility 11 through the second aerial hose 17 as indicated with the arrow D. By gradually using cooler fluid, the first and second aerial hoses 16, 17 can be gradually cooled until they reach a temperature that is not going to cause shock cooling of the first and/or second aerial hoses 16, 17 that could happen if a cryogenic fluid is transferred through the first and second aerial hoses 16, 17 without precooling of the first and second aerial hoses. The flow direction may obviously also run in the opposite direction.
[0145] Of course, when the aerial hoses 16, 17 are connected to a floating or non-floating facility 11, for example an LNG-carrier, for transfer of a cryogenic fluid like LNG, the fluid transfer system 10 that will transfer a cryogenic fluid from the floating or non-floating facility 11 to the receiving structure 21 via the support unit 12, may be precooled. Fluid can be flowed through the first aerial hose 16, further through the first pipe element 58 on the support unit 12, further through the first transfer pipe 13 to the receiving structure 21 and then back to the floating or non-floating structure 11 through the second transfer pipe 14, further through the second pipe element 68 on the support unit 12, further through the second aerial hose 17 and back to the floating or non-floating structure. This path is indicated in
[0146] If the receiving structure 21 is storing a cryogenic fluid that is transferred to the floating or non-floating structure 11 via the support unit 12, the fluid transfer system 10 may be precooled in a similar manner. Fluid can for example be flowed through the second transfer pipe 14, further through the second pipe element 68 on the support unit 12, and further through the second aerial hose 17 to the floating or non-floating structure 11, and then back to the receiving structure 21 through the first aerial hose 16, further through the first pipe element 58 on the support unit 12, and further through the first transfer pipe 13 to the receiving structure 21. This path is indicated in
[0147] Finally, it should be noted that the fluid transfer system 10 may be precooled by flowing a fluid through the two paths, i.e. the first path through the first transfer pipe 13the first pipe element 58the first aerial hose 16 and the second path through the second transfer pipe 14the second pipe element 68the second aerial hose 17, in the same direction. Hence, the fluid transfer system 10 may be precooled by flowing a gradually cooler fluid through the two paths in the same direction, either from the receiving structure 21 to the floating or non-floating structure 11 or in the opposite direction from the floating or non-floating structure 11 to the receiving structure 21.
[0148] During a transfer operation, as can easily be seen in
[0149] The first pipe element 58 may further be disconnectably connected to a first aerial hose 16, preferably with a first break away coupling 36. In case of any emergency situation, the first aerial hose 16 may therefore be quickly disconnected from the first pipe element 58. Similarly, the second pipe element 68 may be disconnectably connected to a second aerial hose 17, preferably with a second break away coupling 37. In case of any emergency situation, the second aerial hose 17 may therefore be quickly disconnected from the second pipe element 68. That the first aerial hose 16 and the second aerial hose 17 can be quickly disconnected from the first and second pipe element 58, 68 respectively is important in case a hazardous substance, like for example LNG, is transported through the first and second aerial hoses 16, 17 and an emergency situation may arise.
[0150] The first breakaway coupling 36 is used to separate the first pipe element 58 and the first aerial hose 16, but preferably also to stop the flow of fluid through the first pipe element 58 and the first aerial hose 16. Similarly, the second breakaway coupling 37 is used to separate the second pipe element 68 and the second aerial hose 17, but preferably also to stop the flow of fluid through the second pipe element 68 and the second aerial hose 17. The breakaway couplings 36, 37 are preferably a standard type of breakaway couplings that are commercially available and their design will not be any further described herein.
[0151] The process system 15 shown in
[0152] The process system 15 shown in
[0153] The first and second emergency shut down valve devices 33, 34 are used to stop the flow of fluid through the first pipe element 58 and the second pipe element 68 respectively in case there is an emergency situation, for example a leakage of fluid from the process system 15. The emergency shut down valve devices 33, 34 are preferably a standard type of emergency shut down valve devices that are commercially available and their design will not be any further described herein.
[0154] The process system preferably comprises a vent system 50 that is capable of venting or removing a fluid such as LNG from one, some or all of the first pipe element 58, the second pipe element 68, the first cross over pipe 22, the second cross over pipe and any other pipe element of the process system 15 in which a hazardous fluid could be trapped. The first aerial hose 16 and the second aerial hose 17 are preferably vented from the floating or non-floating structure 11. Similarly, the first transfer pipe 13 and the second transfer pipe 14 are preferably vented from the receiving structure 21. Alternatively, any trapped fluid in the transfer pipes 13, 14 and aerial hoses 16, 17 may be vented by the vent system 50 by connecting additional vent pipes (not shown in the figures) to the vent mast 49.
[0155] The vent system 50 comprises a vent mast 49 and a number of pipes that are connected to the vent mast 49 such that any potentially trapped fluid, such as LNG, may be vented from the pipe elements 58, 68, 22, 23 on the support unit 12 which are not fluidly connected to the receiving structure 21 or the floating or non-floating structure 11. As shown in
[0156] In the first vent pipe 102 there is provided a first pressure relief valve 42, in the second vent pipe 103 there is provided a second pressure relief valve 43, in the third vent pipe 102 there is provided a third pressure relief valve 44 and in the fourth vent pipe 105 there is provided a fourth pressure relief valve 45. If the pressure in the process system 15 increases to a an unacceptably high level, one, some or all of the first, second, third and fourth pressure relief valves 42, 43, 44, 45 will open and let gas flow out through the first, second, third and fourth vent pipes 102, 103, 104, 105 respectively.
[0157] The first vent pipe connection 108 may for example, as shown in
[0158] The second vent pipe connection 109 may for example, as shown in
[0159] As mentioned above, the process system 15 preferably comprises a vent system 50 so that a fluid may be vented from the process system 15 if that is needed. That can be desirable if the fluid transfer system 10 is used to transfer a fluid under pressure and/or a fluid that expands when vaporizing and/or a hazardous fluid such as LNG. Generally, the vent mast 49 is preferably connected to the first pipe element 58 and the second pipe element 68 and any further pipe element of the process system 15 such that any fluid that is trapped in the process system 15 when the cargo valve devices 39, 40 and/or the emergency shut down valve devices 33, 34 and/or the breakaway couplings 36, 37 are closed, can be vented through the vent mast 49 or vented through the receiving structure or floating or non-floating structure.
[0160] Although the forces of the transfer pipes 13, 14 are taken by the first and second chute devices 59, 69 respectively and the respective tie-in supports 75, it is preferable that such loads are not transmitted to the first and second flange connection 73, 74 and the first and second pipe element 58, 68 due to misalignment of the first pipe element 58 and the first spool piece 61 and/or the second pipe element 68 and the second spool piece 71, or due to thermal expansion or contraction, or due to difference in strain between the tie-in device 77, 79 and the pipe element 58, 68, or by other means. Therefore, the first and second pipe element 58, 68 may be adapted to be able to move horizontally to a limited extent in the longitudinal/axial direction, as indicated by the arrows X.sub.1 and X.sub.2 in
[0161] The first and second pipe elements 58, 68 are preferably supported on at least one support device, but preferably a plurality of process system support devices 90 that comprises a lower support element 93 and an upper support element 92 as shown in
[0162] In order to limit the extent of the movement of the first and second pipe elements 58, 68 in a substantially horizontal direction, at least on limit stop 98, 99, 100 may be provided that will limit the movement of the first and second pipe elements 58, 68 in a longitudinal direction of the first and second pipe elements, i.e. the axial direction of the first and second pipe elements 58, 68 at the point where the first and second pipe elements 58, 68 are connected to the first spool piece 61 and the second spool piece 71 respectively, and/or a transverse direction, i.e. a direction that is substantially perpendicular to the longitudinal/axial direction of the first and second pipe elements 58, 68.
[0163] As indicated in
[0164] The first longitudinal limit stop 98 may comprise a substantially vertical, structural element that is securely attached to the upper support element 92 projecting downwards from the upper support element 92 such that first longitudinal limit stop 98 will abut the lower support element 93 when the first and second transfer pipes 13, 14 pushes the first and second pipe elements 58, 68 respectively in the direction of arrow X.sub.1 in
[0165] In a similar way, the second longitudinal limit stop 99 may comprise a substantially vertical, structural element that is securely attached to the upper support element 92 projecting downwards from the upper support element 92 such the that second longitudinal limit stop 99 will abut the lower support element 93 when the first and second pipe elements 58, 68 are pushed in the direction of arrow X.sub.2 in
[0166] As further indicated in
[0167] The first transverse limit stop 100 comprises a substantially vertical, structural element that is securely attached to the lower support element 93 projecting upwards from the lower support element 93 such that the first transverse limit stop 100 will abut the upper support element 92 when the first and second pipe elements 58, 68 are pushed in the direction of arrow Y.sub.1 in
[0168] In a similar way, the second transverse limit stop on the opposite side of the pipe element 58, 68 as compared to the first transverse limit stop (not visible in
[0169] The distance that the first and second pipe elements 58, 68 are allowed to move in the longitudinal direction, and hence the distance that the process system 15 is allowed to move in the longitudinal direction X.sub.1-X.sub.2, is indicated by the Greek letter in
[0170] It should be noted that the design of the embodiment of the longitudinal/axial and transverse limit stops 98, 99, 100 described above and shown in
[0171] In
[0172] In
[0173] In
[0174] Although through most of the description of the figures, the transfer pipe or pipes 13, 14 have been described as transporting a fluid, it should be kept in mind that a bulk material, such as a substance in powder form, can be transported through the transfer pipe or transfer pipes 13, 14 and the process system 15 on the support unit 12.
[0175] The invention has now been explained with reference to non-limiting examples of the invention. Although the present invention and its advantages have been described in detail, it should be understood that various changes, substitutions and alterations can be made to the embodiments disclosed herein. A person skilled in the art will therefore appreciate that modifications and changes may be made to this embodiment which will be within the scope of the invention as defined in the following claims.