Fuel Loading Method and Reactor Core
20200194132 ยท 2020-06-18
Inventors
Cpc classification
Y02E30/30
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
G21C5/18
PHYSICS
International classification
G21C3/326
PHYSICS
Abstract
When all fuel assemblies loaded in a region excluding an outermost periphery of the reactor core in an Nth operation cycle belong to the first fuel assembly, and all fuel assemblies loaded in the region excluding the outermost periphery of the reactor core in a (N+m) th (m>1) operation cycle belong to the second fuel assembly, the number of new loaded second fuel assemblies in the (N+m) th operation cycle is greater than the number of new loaded second fuel assemblies in a (N+m1) th operation cycle which is one operation cycle before the (N+m) th operation cycle, and a cycle burnup in the (N+m) th operation cycle is greater than a cycle burnup in the (N+m1) th operation cycle.
Claims
1. A fuel loading method for a transition reactor core when transitioning from a first fuel assembly to a second fuel assembly in which at least one of an average uranium enrichment, an average fissile plutonium enrichment, and a fuel rod arrangement is different from that of the first fuel assembly, wherein when all fuel assemblies loaded in a region excluding an outermost periphery of the reactor core in an Nth operation cycle belong to the first fuel assembly, and all fuel assemblies loaded in the region excluding the outermost periphery of the reactor core in a (N+m)th (m>1) operation cycle belong to the second fuel assembly, the number of new loaded second fuel assemblies in the (N+m) th operation cycle is greater than the number of new loaded second fuel assemblies in a (N+m1)th operation cycle which is one operation cycle before the (N+m)th operation cycle, and a cycle burnup in the (N+m)th operation cycle is greater than a cycle burnup in the (N+m1)th operation cycle.
2. The fuel loading method according to claim 1, wherein all the fuel assemblies in the reactor core in the Nth operation cycle belong to the first fuel assembly, and all the fuel assemblies in the reactor core in the (N+m) th operation cycle belong to the second fuel assembly.
3. The fuel loading method according to claim 1, wherein the first fuel assembly is a square grid fuel rod array of 9 rows and 9 columns, and the second fuel assembly is a square grid fuel rod array of 10 rows and 10 columns.
4. The fuel loading method according to claim 2, wherein the first fuel assembly is a square grid fuel rod array of 9 rows and 9 columns, and the second fuel assembly is a square grid fuel rod array of 10 rows and 10 columns.
5. The fuel loading method according to claim 1, wherein the first fuel assembly is a square grid fuel rod array of 10 rows and 10 columns, and the second fuel assembly is a square grid fuel rod array of 11 rows and 11 columns.
6. The fuel loading method according to claim 2, wherein the first fuel assembly is a square grid fuel rod array of 10 rows and 10 columns, and the second fuel assembly is a square grid fuel rod array of 11 rows and 11 columns.
7. The fuel loading method according to claim 1, wherein the average uranium enrichment of the second fuel assembly is higher than the average uranium enrichment of the first fuel assembly.
8. The fuel loading method according to claim 2, wherein the average uranium enrichment of the second fuel assembly is higher than the average uranium enrichment of the first fuel assembly.
9. The fuel loading method according to claim 1, wherein the average fissile plutonium enrichment of the second fuel assembly is higher than the average fissile plutonium enrichment of the first fuel assembly.
10. The fuel loading method according to claim 2, wherein the average fissile plutonium enrichment of the second fuel assembly is higher than the average fissile plutonium enrichment of the first fuel assembly.
11. A reactor core when transitioning from a first fuel assembly to a second fuel assembly in which at least one of an average uranium enrichment, an average fissile plutonium enrichment, and a fuel rod arrangement is different from that of the first fuel assembly, wherein when all fuel assemblies loaded in a region excluding an outermost periphery of the reactor core in an Nth operation cycle belong to the first fuel assembly, and all the fuel assemblies loaded in the region excluding the outermost periphery of the reactor core in a (N+m)th (m>1) operation cycle belong to the second fuel assembly, the number of new loaded second fuel assemblies in the (N+m) th operation cycle is greater than the number of new loaded second fuel assemblies in a (N+m1)th operation cycle which is one operation cycle before the (N+m)th operation cycle, and a cycle burnup in the (N+m)th operation cycle is greater than a cycle burnup in the (N+m1)th operation cycle.
12. The reactor core according to claim 11, wherein all the fuel assemblies in the reactor core in the Nth operation cycle belong to the first fuel assembly, and all the fuel assemblies in the reactor core in the (N+m) th operation cycle belong to the second fuel assembly.
13. The reactor core according to claim 11, wherein the first fuel assembly is a square grid fuel rod array of 9 rows and 9 columns, and the second fuel assembly is a square grid fuel rod array of 10 rows and 10 columns.
14. The reactor core according to claim 12, wherein the first fuel assembly is a square grid fuel rod array of 9 rows and 9 columns, and the second fuel assembly is a square grid fuel rod array of 10 rows and 10 columns.
15. The reactor core according to claim 11, wherein the first fuel assembly is a square grid fuel rod array of 10 rows and 10 columns, and the second fuel assembly is a square grid fuel rod array of 11 rows and 11 columns.
16. The reactor core according to claim 12, wherein the first fuel assembly is a square grid fuel rod array of 10 rows and 10 columns, and the second fuel assembly is a square grid fuel rod array of 11 rows and 11 columns.
17. The reactor core according to claim 11, wherein the average uranium enrichment of the second fuel assembly is higher than the average uranium enrichment of the first fuel assembly.
18. The reactor core according to claim 12, wherein the average uranium enrichment of the second fuel assembly is higher than the average uranium enrichment of the first fuel assembly.
19. The reactor core according to claim 11, wherein the average fissile plutonium enrichment of the second fuel assembly is higher than the average fissile plutonium enrichment of the first fuel assembly.
20. The reactor core according to claim 12, wherein the average fissile plutonium enrichment of the second fuel assembly is higher than the average fissile plutonium enrichment of the first fuel assembly.
Description
BRIEF DESCRIPTION OF DRAWINGS
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
DESCRIPTION OF EMBODIMENTS
[0036] Hereinafter, embodiments of the invention will be described with reference to the drawings. In the drawings, the same components are denoted by the same reference numerals, and a detailed description of the repeated parts will be omitted.
[0037] The present inventors have conducted various studies and find a new method of increasing economical efficiency of a transition reactor core within an authorization limit range. Results of the study and a newly found fuel loading method will be described below.
First Embodiment
[0038] A fuel loading (replacing) method according to a first embodiment of the invention will be described with reference to
[0039] It is assumed that in a transition reactor core, a new fuel assembly newly loaded has a uranium or plutonium fuel loading amount (inventory) per fuel assembly larger than that of the old fuel assembly. In this case, the new fuel assembly is more economical than the old fuel assembly. Further, even when a fuel loading amount of the new fuel assembly is equal to or less than that of the old fuel assembly, an infinite multiplication factor of the new fuel assembly may be higher than that of the old fuel assembly. For example, the new fuel assembly may have an average uranium enrichment higher than that of the old fuel assembly. If the new fuel assembly is larger in the fuel loading amount than the old fuel assembly, and the infinite multiplication factors at the same burnup are the same, the replacement number of fuel assemblies in the reactor core is reduced by an increase in the fuel loading amount as compared to the old fuel assembly.
[0040] In general, since a fuel assembly cost is not only a raw material expense or a uranium enrichment expense, an increase in the fuel assembly cost is less than an increase in the fuel loading amount. Therefore, the fuel economical efficiency is improved when the number of the new fuel assembly loaded is reduced. When the number of the new fuel assembly loaded is reduced, the number of the fuel assembly for replacement is also reduced. That is, by reducing the number of fuel assemblies to be removed in the old fuel assembly, an in-reactor stay period of the remaining old fuel assembly is extended. Even when the in-reactor stay period is extended, an increase in a burnup can be prevented by loading on an outer peripheral portion of the reactor core where the fuel assemblies slightly burn due to lower assembly power. In the reactor core in which the new fuel assemblies are loaded for several cycles and the old fuel assemblies remain, the old fuel assemblies in which the in-reactor stay period is extended increase.
[0041] As a result, the number of the fuel assemblies that can be loaded into the outer peripheral portion of the reactor core exceeds the number of the old fuel assemblies in which the in-reactor stay period is extended, and a maximum burnup of the old fuel assembly increases. In general, the maximum burnup is defined as one of authorization conditions for the fuel assembly, and a discharged burnup with a margin for the maximum burnup is set in the reactor core design.
[0042] However, when a difference in the economical efficiency between the old fuel assembly and the new fuel assembly is large (for example, when a difference in fuel loading amount is large), a margin for the maximum burnup is reduced since the number of older fuel assemblies in which the in-reactor stay period is extended increases. When the margin for the burnup decreases or disappears, an operation of the transition reactor core may not be continued.
[0043] Further, when the operation of the transition reactor core is stopped, all the old fuel assemblies reaching the maximum burnup are removed, and when the new fuel assemblies are loaded, the fuel cost increases. Since the new fuel assembly generates energy in the reactor core after several cycles, a recovery of the fuel cost requires several cycles.
[0044] Therefore, the present inventors have devised a method of loading a new fuel assembly while preventing such an increase in cost. When the new fuel assembly is loaded into the transition reactor core, the maximum burnup of the old fuel assembly increases after several cycles. In a case where the next cycle is the same fuel replacing procedure, the old fuel assembly is replaced with the new fuel assembly when the maximum burnup of the old fuel assembly is expected to exceed the limit range.
[0045]
[0046] Next, the present inventors have devised a cost recovery method for a large number of newly loaded fuel assemblies. As described above, even when a large number of new fuel assemblies are loaded, the fuel cost is recovered after several cycles, but it takes time until the cost is recovered. In order to early recover a cost increase due to such an increase in the number of fuel assemblies for replacement, in a cycle in which the fuel loading method for avoiding a limit of the maximum burnup of the old fuel assembly is performed by loading a large number of new fuel assemblies, it is considered to perform a long-term cycle operation or an power uprate operation by making good use of the fact that the number of loaded fuel assemblies for the new fuel assembly is large.
[0047] In these operations, a cycle burnup is larger compared to previous cycles. In the long-term cycle operation or the power uprate operation, since the energy generation amount of the cycle increases, the cost can be easily recovered. As another comparative example,
[0048] Thus, in order to improve the economical efficiency within an authorization range of the maximum burnup of the old fuel assembly in the transition reaction core in which a transition to the new fuel assembly is performed, the long-term cycle operation or the power uprate operation is devised in a cycle where the transition is completed. Although almost all of the fuel assemblies are the new fuel assemblies in the reactor core where the transition is completed, the old fuel assembly may be loaded in an outermost peripheral region of the reactor core which is not easily affected by a long-term operation cycle (cycle burnup extension) or power uprate (fuel assembly power increase).
[0049] The fuel loading (replacing) method according to the present embodiment is a fuel loading method for a transition reactor core when transitioning from an old fuel assembly (first fuel assembly) to a new fuel assembly (second fuel assembly) in which at least one of an average uranium enrichment, an average fissile plutonium enrichment, and a fuel rod arrangement is different from that of the old fuel assembly, in which, when all fuel assemblies loaded in a region excluding an outermost periphery of the reactor core in an Nth operation cycle belong to the old fuel assembly (first fuel assembly), and all the fuel assemblies loaded in the region excluding the outermost periphery of the reactor core in a (N+m) th (m>1) operation cycle belong to the new fuel assembly (second fuel assembly), the number of new loaded new fuel assemblies (second fuel assemblies) in the (N+m)th operation cycle is greater than the number of new loaded new fuel assemblies (second fuel assemblies) in a (N+m1) th operation cycle which is one operation cycle before the (N+m) th operation cycle, and a cycle burnup in the (N+m) th operation cycle is greater than a cycle burnup in the (N+m1) th operation cycle.
[0050] The average uranium enrichment of the new fuel assemblies (second fuel assemblies) is also higher than the average uranium enrichment of the old fuel assemblies (first fuel assemblies). Alternatively, the average fissile plutonium enrichment of the new fuel assemblies (second fuel assemblies) is higher than the average fissile plutonium enrichment of the old fuel assemblies (first fuel assemblies).
[0051] A specific fuel loading example according to the invention reflecting the above study results will be described in second and subsequent embodiments with reference to the drawings.
[0052] Hereinafter, an advanced boiling water reactor (ABWR) will be described as an example of an application target of the invention, but the invention is not limited thereto. For example, the fuel loading method can be similarly applied to other reactors such as a normal boiling water reactor (BWR) that includes a recirculation pump and circulates a coolant (which also functions as a neutron moderator) by flowing the coolant out of a reactor pressure vessel and flowing the coolant back into a downcomer inside the reactor pressure vessel or an economic simplified boiling water reactor (ESBWR) that eliminates a need for the recirculation pump in the BWR and an internal pump in the ABWR by using a natural circulation method of cooling water by chimney.
Second Embodiment
[0053] A fuel loading (replacing) method according to a second embodiment of the invention and a reactor core using the same will be described with reference to
[0054]
[0055] As shown in
[0056] In addition, a steam and water separator 106 extending above the reactor core 105 and a steam dryer 107 disposed above the steam and water separator 106 are provided in the reactor pressure vessel (hereinafter also referred to as RPV) 103. An annular downcomer 104 is formed between the RPV 103 and the reactor core shroud 102. An internal pump 115 is disposed in the downcomer 104.
[0057] Cooling water discharged from the internal pump 115 is supplied to the reactor core 105 via a lower plenum 122. The cooling water is heated when passing through the reactor core 105 to form a gas-liquid two-phase flow containing water and steam. The steam and water separator 106 separates the gas-liquid two-phase flow into steam and water. The separated steam is further dehumidified by the steam dryer 107 and guided to a main steam pipe 108.
[0058] The dehumidified steam is guided to a steam turbine (not shown) to rotate the steam turbine. A generator connected to the steam turbine rotates to generate power. The steam discharged from the steam turbine is condensed into water by a condenser (not shown). The condensed water is supplied as cooling water into the RPV 103 by a water supply pipe 109. The water separated by the steam-water separator 106 and the steam dryer 107 falls down and reaches the downcomer 104 as cooling water.
[0059] Although not shown in
[0060]
[0061] The lower tie plate 6 supports lower end portions of the fuel rods 2 and the partial length fuel rods 3, and the upper tie plate 5 holds upper end portions of the fuel rods 2. Lower end portions of the water rods WR are supported by the lower tie plate 6, and upper end portions of the water rods WR are held by the upper tie plate 5. The plurality of fuel spacers 8 are arranged at predetermined intervals in an axial direction of the fuel assembly 1, and hold the fuel rods 2 and the water rods WR so as to form a flow path through which cooling water flows between the fuel rods 2 (including the partial length fuel rod 3) and between the fuel rod 2 and the water rod WR.
[0062] The channel box 7, which is a square tube having a square cross section, is attached to the upper tie plate 5 and extends downward. The fuel rods 2 bundled by the fuel spacers 8 are disposed in the channel box 7. A handle is fastened to an upper end portion of the upper tie plate 5, and when the handle is lifted, the overall fuel assembly 1 can be pulled up.
[0063]
[0064] When the fuel assembly 1 is loaded into the reactor core 105 of the advanced boiling water reactor (ABWR), one corner is disposed to face a control rod CR (not shown) with a cruciform cross section inserted into the reactor core 105. The channel box 7 is attached to the upper tie plate 5 by a channel fastener (not shown). The channel fastener has a function of holding a gap having a necessary width between the fuel assemblies 1 such that the control rod CR (not shown) can be inserted between the fuel assemblies 1 when the fuel assembly 1 is loaded into the reactor core 105. Therefore, the channel fastener (not shown) is attached to the upper tie plate 5 so as to be located at the corner facing the control rod CR (not shown).
[0065] In other words, a corner portion facing the control rod CR (not shown) of the fuel assembly 1 is a corner portion to which the channel fastener (not shown) is attached. Each fuel pellet filled in each fuel rod 2 is manufactured by using uranium dioxide (UO.sub.2) and plutonium. oxide (PuO.sub.2) which are nuclear fuel materials, and contains uranium-235, plutonium-239, plutonium-241, and the like which are fissile materials.
[0066]
[0067]
[0068]
[0069]
[0070] In the fuel loading (replacing) method according to the present embodiment, the old fuel assembly (first fuel assembly) is a square grid fuel rod array of 9 rows and 9 columns, and the new fuel assembly (second fuel assembly) is a square grid fuel rod array of 10 rows and 10 columns.
[0071] The new fuel assembly is loaded into the reactor core excluding a loading position on the outermost periphery thereof, and even when the long-term cycle operation or the power uprate operation is performed in the state, the thermal margin of the old fuel assembly is not impaired. The maximum burnup of the old fuel assembly at this time is as shown in
[0072] As described above, according to the present embodiment, it is possible to increase the economical efficiency of the overall reactor core while using the old fuel assembly within the authorization limit range.
Third Embodiment
[0073] A fuel loading (replacing) method according to a third embodiment of the invention will be described with reference to
[0074]
[0075] As shown in
[0076] In the fuel loading (replacing) method according to the present embodiment, the old fuel assembly (first fuel assembly) is a square grid fuel rod array of 10 rows and 10 columns, and the new fuel assembly (second fuel assembly) is a square grid fuel rod array of 11 rows and 11 columns.
[0077] As described above, according to the present embodiment, in addition to the effects of the second embodiment, by transitioning to a fuel assembly having a square grid of 11 rows and 11 columns (1111 array), the thermal margin is increased and the economical efficiency is improved.
Fourth Embodiment
[0078] A fuel loading (replacing) method according to a fourth embodiment of the invention will be described with reference to
[0079] In the present embodiment, a fuel loading pattern when a large number of new fuel assemblies are loaded is different from that of the second embodiment. The other points are the same as in the second embodiment, and the description repetitive with the second embodiment is omitted below.
[0080] In the present embodiment, a fuel loading pattern in an Nth cycle is the same as that of the second embodiment (
[0081] In the (N+4)th cycle, the reactor core is loaded with all new fuel assemblies by loading 68 new fuel assemblies.
[0082] In the fuel loading (replacing) method according to the present embodiment, all the fuel assemblies in the reactor core in an Nth operation cycle are old fuel assemblies (first fuel assemblies), and all the fuel assemblies in the reactor core in a (N+m)th operation cycle are new fuel assemblies (second fuel assemblies).
[0083] According to the present embodiment, in addition to the effects of the second embodiment, an power distribution can be flattened, and the thermal margin of the reactor core can be improved as compared with the second embodiment since the thermal margin on the outermost periphery of the reactor core is also improved during the power uprate operation.
[0084] The invention is not limited to the embodiments described above, and includes various modifications. For example, the above embodiments are described in detail for easy understanding of the invention, and the invention is not necessarily limited to those including all the configurations described above. A part of the configuration of one embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of one embodiment. In addition, a part of the configuration of each embodiment may be added, deleted, or replaced with another configuration.
REFERENCE SIGN LIST
[0085] 1, 1b, 1c . . . fuel assembly [0086] 2, 2b, 2c . . . fuel rod [0087] 3 . . . partial length fuel rod [0088] 5 . . . upper tie plate [0089] 6 . . . lower tie plate [0090] 7 . . . channel box [0091] 8 . . . (fuel) spacer [0092] WR . . . water rod [0093] 102 . . . reactor core shroud [0094] 103 reactor pressure vessel (reactor vessel, RPV) [0095] 104 . . . downcomer [0096] 105 . . . reactor core [0097] 106 . . . steam and water separator [0098] 107 . . . steam dryer [0099] 108 . . . main steam pipe [0100] 109 . . . water supply pipe [0101] 115 . . . internal pump [0102] 122 . . . lower plenum