Method for detecting fluid influx or fluid loss in a well and detecting changes in fluid pump efficiency
11566480 · 2023-01-31
Assignee
Inventors
Cpc classification
E21B21/01
FIXED CONSTRUCTIONS
International classification
E21B21/01
FIXED CONSTRUCTIONS
Abstract
A method for identifying anomalous mud flow includes determining an operating rate of a mud pump discharging to a pipe string in a wellbore. Mud returned from the wellbore is moved to a first metering tank. Mud is moved from the first transfer tank to a mud storage tank using a first pump having a flow rate directly related to an operating rate thereof. A first parameter related to volume of mud in the first metering tank is measured. Anomalous mud flow is identified by detecting changes in the operating rate of the first pump wherein the operating rate is adjusted to maintain the first parameter substantially constant.
Claims
1. A method for identifying anomalous mud flow comprising: determining an operating rate of a mud pump having an output thereof connected to a pipe string in a wellbore; moving mud returned from the wellbore displaced by the mud pump through the pipe string to a first metering tank; moving the returned mud from the first metering tank to a mud storage tank using a first transfer pump having a volumetric flow rate directly related to an operating speed of the first transfer pump; measuring a first parameter related to volume of mud in the first metering tank; moving mud from the mud storage tank to a second metering tank using a second transfer pump, the second transfer pump having a volumetric flow rate directly related to an operating speed of the second transfer pump, the second metering tank in fluid communication with an inlet to an inlet of the mud pump; measuring a second parameter related to volume of mud in the second metering tank; and identifying anomalous mud flow by detecting changes in the measured operating rate of the first transfer pump wherein the first transfer pump operating rate is adjusted to maintain the first parameter substantially constant.
2. The method of claim 1 wherein the anomalous flow comprises fluid influx into the wellbore determined by detecting an increase in the operating speed of the first transfer pump.
3. The method of claim 1 wherein the anomalous flow comprises fluid loss to the wellbore determined by detecting a decrease in the operating speed of the first transfer pump.
4. The method of claim 1 wherein the first parameter comprises a measured fluid level in the first transfer tank.
5. The method of claim 1 wherein the first parameter comprises a weight of the first transfer tank.
6. The method of claim 1 further comprising determining a change in density of mud in the first transfer tank by detecting reduction in the weight while the measured fluid level remains constant.
7. The method of claim 6 further comprising identifying a fluid influx by determining the change in density.
8. The method of claim 1 further comprising detecting anomalous flow by detecting changes in the measured operating speed of the second transfer pump wherein the second transfer pump operating speed is adjusted to maintain the second parameter substantially constant.
9. The method of claim 8 wherein the anomalous flow comprises reduction in efficiency of the mud pump determined by detecting a reduction in operating speed of the second mud pump.
10. The method of claim 8 wherein the second parameter comprises a measured fluid level in the second transfer tank.
11. The method of claim 8 wherein the second parameter comprises a weight of the second transfer tank.
12. The method of claim 1 wherein the first transfer tank comprises a trip tank.
13. The method of claim 1 wherein the operating rate of the mud pump is determined by measuring a pump stroke rate with respect to time.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION
(8)
(9) During any drilling unit operation which includes active circulation of mud through all or part of a wellbore 10, the main rig mud pump(s) 30 accept(s) mud from the rotary pump 36 at an inlet of the main rig mud pump(s) 30. The main rig mud pump(s) 30 discharge(s) the mud at a selected flow rate and pressure to a standpipe and hose (shown collectively at 32) in hydraulic communication with the interior of a pipe string 12 disposed in the wellbore 10, the pipe string 12 being disposed in the wellbore 12 to a selected depth. The selected depth will depend on the particular operation taking place, e.g., drilling, reaming, washing, circulating, hole cleaning, etc. Mud is discharged proximate the lower end of the pipe string 12, for example, through a drill bit (not shown), subsequently enters the wellbore 10 and is returned to the surface through a return conduit 14 such as a drilling riser. The return conduit 14 may have a flow diverter 16 below the drilling deck of a drilling unit (omitted for clarity of the illustration) wherein mud returning from the wellbore 10 may be passed through a “gumbo box” 18 and then moved through a flow line 20 to solids separation devices such as shakers 28. After the mud passes through the shakers 28 it may be returned to the treatment tank 1 for further processing and eventual return to the active volume mud tank 2.
(10) The mud circulation system may comprise a trip tank 22 supported on a weight sensor 26, whereby an amount of mud in the trip tank 22 may be determinable at all times. In some embodiments, the trip tank 22 may comprise a liquid level sensor (not shown) such as an acoustic or laser range finder. When used in conjunction with the weight sensor 26, a measured liquid level in the trip tank 22 may enable determination of the density of liquid (“mud weight”) in the trip tank 22. Such determined density may be useful in detecting influx of different density fluids into the wellbore 10, for example, water or gas entering from a formation traversed by the wellbore 10. The trip tank 22 may be in fluid communication with an inlet of one or more trip tank transfer pumps 24. Discharge from the one or more trip tank transfer pumps 24 may in some embodiments pass through a flow meter 40, such as a Coriolis flow meter. The discharge of the trip tank transfer pumps 24 may be selectively connected to the wellbore 10 and/or to a discharge at the shakers 28 through a flow line 38. Thus, during operations in which the pipe string 12 is withdrawn from the wellbore 10 or is inserted into the wellbore 10 (“tripping operations”), an elevation level of mud in the wellbore 10 may be maintained. The elevation level may be maintained, for example, to keep the wellbore 10 completely filled.
(11)
(12) Detecting fluid influx into a wellbore, mud loss from the wellbore and identifying changes in main mud pump 30 efficiency may be performed by the following procedure and as illustrated graphically in
(13) At the start of circulating operations, measure (“zero out”) the transfer pumps' 24 and 34 operating speeds at the required operating rate of the main mud pumps 30. During normal drilling, where there is no fluid influx or mud loss, both transfer pump flow rates (and corresponding relative speeds) should be identical and around the “zero out” point. As the wellbore length is increased during drilling, correspondingly increased wellbore volume is filled with additional mud, which may be withdrawn from the active volume mud tank 2. The volume of drill cuttings returned to the surface from the wellbore 10 is replaced with a corresponding volume of additional mud transferred from the active volume mud tank 2.
(14) When a fluid influx (“kick”) develops, the main rig mud pumps 30 are operating to pump the original flow rate of mud into the wellbore 10 through the pipe string 12. However, the trip tank transfer pump 24 speed will increase because of the increased flow of mud from the wellbore 10 and corresponding increase in the measured weight of the trip tank 22 (or corresponding increase in the measured fluid level in the trip tank 22). Detecting the change in trip tank transfer pump 24 speed is fast and does not have any substantial time delays, because the increase in fluid level in the trip tank 22 is substantially instantaneous as volumetric flow rate of fluid leaving the wellbore 10 will directly correspond to the fluid influx flow rate. As stated previously, the volumetric flow rate of the trip tank fluid transfer pump 24 is directly related to the pump speed. Change in the transfer pump speed, and corresponding determinable change in the transfer pump flow rate, is therefore a good indication of the rate of flow of the fluid influx or “kick”. Kick fluid volume will be stored in the active volume mud tank 2, the level or volume measurement of which can be used to estimate the total influx or kick volume. In some embodiments, changes in the fluid level and/or measured weight of the trip tank 22 may be used to estimate the influx or kick volume and kick detection by setting the operating speed of the trip tank transfer pump 24 to a constant value.
(15) Changes in efficiency of the mud pumps 30 may be performed by the following procedure as illustrated in graphically
(16) At start of drilling, zero out both the trip tank transfer pump 24 and the metering tank transfer pump 34 speed at the required volumetric flow rate of the main mud pumps 30. During normal drilling both the trip tank transfer pump 24 and the metering tank transfer pump 34 speed should be identical and around the zero point. Increased wellbore volume produced by lengthening the wellbore during drilling is filled with additional mud from the active volume mud tank 2. Likewise, drill cuttings volume after cuttings removal from the mud is replaced with additional mud from the active volume mud tank 2. As main mud pump 30 efficiency decreases, i.e., lower volume of mud is moved at a constant main mud pump operating speed, the main mud pumps 30 draw mud from the metering tank 3 at a lower rate. Metering tank transfer pump 34 speed will decrease to maintain the measured liquid level and/or measured weight in the metering tank 3. A corresponding pump operating speed decrease will occur at the trip tank transfer pump 24, but at a delayed time from the operating speed change at the metering tank transfer pump 34 related to the volume of the wellbore (e.g., related to well depth and casing internal diameter). Detecting the change in metering tank transfer pump 34 speed is fast and does not have any time delays resulting from intervening equipment between the return conduit 14, metering tank 3 and the metering tank transfer pump 34. As previously explained, volumetric flow rate of the metering tank transfer pump 34 is directly related to its operating speed. Thus, change in the operating speed of the metering tank transfer pump 34 can be used as an indicator of efficiency loss of the main mud pumps 30. Main mud pump efficiency loss has a distinctly different pattern in transfer pumps' (24 and 34) operating speeds compared to the patterns caused by fluid influx and/or mud loss making it easy to differentiate such events from each other.
(17) Referring once again to
(18) Referring to
(19) As shown in
(20) Although only a few examples have been described in detail above, those skilled in the art will readily appreciate that many modifications are possible in the examples. Accordingly, all such modifications are intended to be included within the scope of this disclosure as defined in the following claims.