Construction method of reclaiming land from the sea based on basement utilization
11566390 ยท 2023-01-31
Assignee
Inventors
- JUN WANG (WENZHOU, CN)
- Yuanqiang Cai (Wenzhou, CN)
- Linzhu Sun (Wenzhou, CN)
- Peng Wang (Wenzhou, CN)
- Chuan Gu (Wenzhou, CN)
- Lin Guo (Wenzhou, CN)
- Hongtao Fu (Wenzhou, CN)
- Shihu Gao (Wenzhou, CN)
- Quanyang Dong (Wenzhou, CN)
- Qi Sun (Wenzhou, CN)
- Guohui Yuan (Wenzhou, CN)
- JUNFENG NI (WENZHOU, CN)
- ZIYANG GAO (WENZHOU, CN)
Cpc classification
Y02A10/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
E02D29/06
FIXED CONSTRUCTIONS
International classification
Abstract
A construction method of reclaiming land from the sea based on the basement utilization, which implementation steps are as follows: a. installing a dike along the coastline, enclosing a central reclamation area by the dike and the coastline; b. installing crisscross enclosures in the central reclamation area, dividing the central reclamation area into a mesh area by the enclosure and the dike; c, pumping drainage of seawater in a block area in the mesh area, forming land in the block area; d. constructing the enclosure in the mesh reclamation area, using the enclosure and subsidiary roads to form road arteriality; the block area being lower than the height of the enclosure, constituting a grid-like high-road/low-land land supply mode; e. developing the block area into an underground space area.
Claims
1. A construction method of reclaiming land from the sea based on the basement utilization, comprising the steps of: installing a dike along the coastline, enclosing a central reclamation area by the dike and the coastline; the central reclamation area having crisscross enclosures; install dividing the central reclamation area into a block area by the enclosure and the dike; pumping drainage of seawater in a block area in the block area, forming land in the block area; using enclosure and subsidiary roads to form road arteriality; the block area being lower than the height of the enclosure, constituting a grid-like high-road/low-land land supply mode; developing the block area into an underground space area; wherein a green space and building area are planned in the block area surrounded by the enclosure; cement-soil mixing pile is constructed around the green space to form a gravity wall; the upper end of the gravity wall is a retaining wall formed by pouring concrete, and the area forming the green space is surrounded by the gravity wall to form an operation pit; the thickness of the gravity wall adjacent to the building area is formed by a large-diameter cement-soil mixing pile, forming an outside gravity wall, and the thickness of the gravity wall adjacent to the enclosure area is formed by a small-diameter cement-soil mixing pile, forming an inside gravity wall; the diameter of the small-diameter cement-soil mixing pile is 300-500 mm, and the diameter of the large-diameter cement-soil mixing pile is 800-1200 mm; the operation pit is filled with dredged sludge, construction waste and sand, wherein the dredged sludge can provide nutrients for green plants and is buried in a sand drain; a sealing cloth is laid over the filling material in the operation pit; the sand drain is connected to a pump drainage system at the upper end to pump out the water in the operation pit through a vacuum preloading.
2. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 1, wherein several rows of piles are arranged in the dike and the enclosure.
3. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 2, wherein the block area is built with an independent building and the bottom part of the block area is a basement space.
4. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 2, wherein the adjacent block areas are reserved a passage; independent building is built on each block area, and the basement spaces at the bottom part of the block area are connected through the reserved passage.
5. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 2, wherein the basement spaces of multiple adjacent block areas are connected to each other, independent building is built on each block area, and the basement spaces of multiple adjacent block areas form an integrated composite underground space, constituting a building complex; the composite underground spaces of the adjacent building complex are connected through the reserved passage.
6. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 2, wherein the green space and building area are planned in the block area surrounded by the enclosure; cement-soil mixing pile is constructed around the green space to form a gravity wall; the upper end of the gravity wall is a retaining wall formed by pouring concrete, and the area forming the green space is surrounded by the gravity wall to form an operation pit; the thickness of the gravity wall adjacent to the building area is formed by the large-diameter cement-soil mixing pile, forming an outside gravity wall, and the thickness of the gravity wall adjacent to the enclosure area is formed by the small-diameter cement-soil mixing pile, forming an inside gravity wall; the diameter of the small-diameter cement-soil mixing pile is 300-500 mm, and the diameter of the large-diameter cement-soil mixing pile is 800-1200 mm; the operation pit is filled with dredged sludge, construction waste and sand, wherein the dredged sludge can provide nutrients for green plants and is buried in a sand drain; a sealing cloth is laid over the filling material in the operation pit; the sand drain is connected to a pump drainage system at the upper end to pump out the water in the operation pit through a vacuum preloading.
7. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 6, wherein if the basement of the building area is more than two floors, pipe piles are installed at the outer side of the outside gravity wall for support.
8. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 7, wherein pipe piles are constructed in the construction area planned for the building land, and an annular water-permeable area is provided on the side wall of the pipe pile; the pipe pile is provided with an internal through hole, and the annular water-permeable area is covered with a steel wire mesh; a drainage pipe is laid in the construction area, and a sealing cloth is laid on the upper surface of the soil in the construction area; the drainage pipe is connected to a hose that penetrates into the internal through hole of the pipe pile; the upper end of the pipe pile is sealed with a plug, and the hose passes through the plug and enters the internal through hole; the upper end of the drainage pipe is connected to the vacuum equipment through the sealing cloth, and the vacuum equipment is used to perform vacuum preloading drainage; when vacuum pumping is completed, the sealing cloth is removed; conduit pipe and the hose are drained; a reinforcing cage is hoisted into the pipe pile and concrete is poured to form an engineering pile.
9. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 8, wherein the pipe pile is made of reinforced concrete, and the pipe wall of the pipe pile is installed with a banded ring-shaped reinforcing cage.
10. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 9, wherein the upper part of the pipe pile in the area where the basement is designed as the supporting column and the side wall is reserved, and the height of the reserved part is adapted to the design height of the basement; in constructing the basement space, the pipe pile is inserted into the reinforcing cage and poured with concrete and modified into a basement supporting column, forming a portion of the basement.
11. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 1, wherein the block area is built with an independent building and the bottom part of the block area is a basement space.
12. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 1, wherein adjacent block areas are reserved a passage; independent building is built on each block area, and basement spaces at the bottom part of the block area are connected through a reserved passage.
13. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 1, wherein the basement spaces of multiple adjacent block areas are connected to each other; independent building is built on each block area, and the basement spaces of multiple adjacent block areas form an integrated composite underground space, constituting a building complex; the composite underground spaces of the adjacent building complex are connected through the reserved passage.
14. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 1, wherein if the basement of the building area is more than two floors, pipe piles are installed at the outer side of the outside gravity wall for support.
15. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 14, wherein pipe piles are constructed in the construction area planned for a building land, and an annular water-permeable area is provided on the side wall of the pipe pile; the pipe pile is provided with an internal through hole, and the annular water-permeable area is covered with a steel wire mesh; a drainage pipe is laid in the construction area, and a sealing cloth is laid on the upper surface of the soil in the construction area; the drainage pipe is connected to a hose that penetrates into the internal through hole of the pipe pile; the upper end of the pipe pile is sealed with a plug, and the hose passes through the plug and enters the internal through hole; the upper end of the drainage pipe is connected to the vacuum equipment through the sealing cloth, and the vacuum equipment is used to perform vacuum preloading drainage; when vacuum pumping is completed, the sealing cloth is removed; conduit pipe and the hose are drained; a reinforcing cage is hoisted into the pipe pile and concrete is poured to form an engineering pile.
16. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 15, wherein the pipe pile is made of reinforced concrete, and the pipe wall of the pipe pile is installed with a banded ring-shaped reinforcing cage.
17. The construction method of reclaiming land from the sea based on the basement utilization defined in claim 16, wherein the upper part of the pipe pile in the area where the basement is designed as the supporting column and the side wall is reserved, and the height of a reserved part is adapted to the design height of the basement; in constructing the basement space, the pipe pile is inserted into the reinforcing cage and poured with concrete and modified into a basement supporting column, forming a portion of the basement.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
DETAILED DESCRIPTION OF THE INVENTION
(9) With reference to the embodiments of the accompanying drawings, details and working principles are described in detail in the following.
(10) Referring to
(11) a. installing a dike 1 along the coastline, installing several rows of piles in the dike 1, enclosing a central reclamation area by the dike 1 and the coastline;
(12) b. installing crisscross enclosures 2 in the central reclamation area, dividing the central reclamation area into a mesh area by the enclosure 2 and the dike, installing several rows of piles in the enclosure 2;
(13) c. pumping drainage of seawater in a block area 3 in the mesh area, forming land in the block area;
(14) d. constructing the enclosure 2 in the mesh reclamation area, using the enclosure and subsidiary roads to form road arteriality, the block area 3 being lower than the height of the enclosure 2, constituting a grid-like high-road/low-land land supply mode;
(15) e. developing the block area into an underground space area.
(16) Referring to
(17) Referring to and
(18) Referring to
(19) In the present invention, the block area 3 in the mesh area is subject to sea water pumping drainage to allow the block area 3 to form land. Buildings are built on the block area 3, and the bottom part is used as an underground space area which does not require hydraulic fill, thereby not only greatly reducing the cost but also constructing underground space area at the same time. Construction of the basement not only avoids or reduces the excavation and support, but also is the best way to make full use of the elevation for best utilization of the basement space, which is conducive to the realization of sustainable development of the city and is a new development mode of reclaiming land from the sea.