Abstract
A downhole tool deployment system including a tool string for insertion into a well, a deployment line configured for attachment to the tool string to lower the tools string into the well, and a line extension configured for attachment to the deployment line and the tool string for insertion between the deployment line and the tool string, the line extension having properties different from or similar to the deployment line.
Claims
1. A downhole tool deployment system, the system comprising: a tool string for insertion into a well; a deployment line configured for attachment to the tool string to lower the tools string into the well; a line extension configured for attachment to the deployment line and the tool string for insertion between the deployment line and the tool string, the line extension having the same or different properties from the deployment line.
2. The system of claim 1, further comprising: an interconnecting tool for insertion between the line extension and the deployment line.
3. The system of claim 2, wherein the interconnecting tool is an adapter configured to connect the line extension and the deployment line.
4. The system of claim 2, wherein the interconnecting tool comprises at least one logging tool.
5. The system of claim 2, wherein the interconnecting tool comprises at least one well intervention tool.
6. The system of claim 1, further comprising: at least one standoff built-in or mounted on the line extension.
7. The system of claim 1, wherein the line extension is designed to operate in high-temperature environments up to 600 F.
8. The system of claim 1, wherein the line extension is made using corrosion resistant alloy.
9. The system of claim 1, wherein the line extension comprises at least one electrical conductor made of nickel-plated wires.
10. A method of deploying a tool string into a well, the method comprising: attaching a deployment line to a line extension at a rig floor, the line extension having the same or different properties than the deployment line; attaching the line extension to the tool string at the rig floor; and inserting the tool string into a well using the deployment line and the line extension.
11. The method of claim 10, wherein the tool string, line extension, and deployment line are connected with tool connections.
12. The method of claim 10 further comprising: attaching at least one stand-off to the line extension.
13. The method of claim 10, further comprising: inserting an interconnecting tool between the line extension and the deployment line.
14. The method of claim 13, wherein the interconnecting tool is an adapter configured to connect the line extension and the deployment line.
15. The method of claim 13, wherein the interconnecting tool comprises at least one logging or intervention tool.
16. A method of logging a well with problematic intervals, the method comprising: lowering a deployment line, a line extension, and a tool string into a well, the line extension having different properties than the deployment line, the properties of the line extension configured to allow the line extension to resist conditions in the problematic intervals; passing only the tool string and the line extension into the problematic intervals of the well; and performing logging operations at desired locations in the well.
17. The method of claim 16, wherein the problematic intervals are high temperature.
18. The method of claim 16, wherein the problematic intervals are corrosive.
19. The method of claim 16, wherein the problematic intervals are of a high-pressure differential.
20. The method of claim 16, wherein the deployment line remains above the problematic intervals in the well during logging operations.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The present technology will be better understood on reading the following detailed description of non-limiting embodiments thereof, and on examining the accompanying drawings, in which:
[0025] FIG. 1 is a representative system overview of the major components required to deploy a tool string in a well using a deployment line.
[0026] FIG. 2A shows a single strand (slick line) wire that can be used to service oil and gas wells.
[0027] FIG. 2B shows a braided line that can be used to service oil and gas wells.
[0028] FIG. 2C shows a single-conductor wireline cable that can be used to service oil and gas wells.
[0029] FIG. 2D shows a seven-conductor wireline cable that can be used to service oil and gas wells.
[0030] FIG. 2E shows an alternate single-conductor wireline cable that can be used to service oil and gas wells.
[0031] FIG. 2F shows another single-conductor wireline cable that can be used to service oil and gas wells.
[0032] FIG. 2G shows a smooth two-conductor wireline that can be used to service oil and gas wells.
[0033] FIG. 2H shows a flexible rod with a 2-conductor coaxial package that can be used to service oil and gas wells.
[0034] FIG. 3A is a schematic diagram showing the rigging setup to connect a deployment line to a tool string.
[0035] FIG. 3B shows a schematic diagram of the deployment line and tool deployed in a well.
[0036] FIG. 4A is a schematic diagram showing the rigging setup for a deployment system according to an embodiment of the present technology.
[0037] FIG. 4B is a schematic diagram of the deployment system deployed in a well according to an embodiment of the present technology.
[0038] FIG. 5A is a schematic diagram of a tool and line extension connection according to an embodiment of the present technology.
[0039] FIG. 5B is a schematic diagram of an interconnection tool and line extension connection according to an embodiment of the present technology.
[0040] FIG. 5C is a schematic diagram of a deployment line and interconnection tool connection according to an embodiment of the present technology.
[0041] FIG. 5D is a schematic diagram of deployment system that is ready to be deployed to a well according to an embodiment of the present technology.
[0042] FIG. 5E is a schematic diagram of a deployment system according to an embodiment of the present technology that is deployed into a well.
[0043] FIG. 6A is a schematic diagram of a tool and line extension connection according to an embodiment of the present technology.
[0044] FIG. 6B is a schematic diagram of a deployment line and line extension connection according to an embodiment of the present technology.
[0045] FIG. 6C is a schematic diagram of a deployment system according to an embodiment of the present technology that is deployed into a well.
[0046] FIG. 6D is a schematic diagram of a deployment system deployed into problematic intervals within a well according to an embodiment of the present technology.
DETAILED DESCRIPTION OF THE INVENTION
[0047] The foregoing aspects, features and advantages of the present technology will be further appreciated when considered with reference to the following description of preferred embodiments and accompanying drawings, wherein like reference numerals represent like elements. In describing the preferred embodiments of the technology illustrated in the appended drawings, specific terminology will be used for the sake of clarity. The invention, however, is not intended to be limited to the specific terms used, and it is to be understood that each specific term includes equivalents that operate in a similar manner to accomplish a similar purpose.
[0048] When introducing elements of various embodiments of the present invention, the articles “a,” “an,” “the,” and “said” are intended to mean that there are one or more of the elements. The terms “comprising,” “including,” and “having” are intended to be inclusive and mean that there may be additional elements other than the listed elements. Any examples of operating parameters and/or environmental conditions are not exclusive of other parameters/conditions of the disclosed embodiments. Additionally, it should be understood that references to “one embodiment”, “an embodiment”, “certain embodiments,” or “other embodiments” of the present invention are not intended to be interpreted as excluding the existence of additional embodiments that also incorporate the recited features. Furthermore, reference to terms such as “above,” “below,” “upper”, “lower”, “side”, “front,” “back,” or other terms regarding orientation are made with reference to the illustrated embodiments and are not intended to be limiting or exclude other orientations.
[0049] The generic deployment configuration included in FIG. 1 illustrates how a wireline cable, or deployment line 102, originally stored in a cable drum part of a deployment unit 104, can be rigged up using sheave wheels 106. In the example shown, one sheave wheel 106 is attached to the drill floor and the other sheave wheel 106 is attached to the traveling blocks of the deployment rig 108. Also shown is how a tool string 110 can already be lowered into a well 112 while attached to the deployment line 102 to a depth within the open hole section 114 of the well 112. In this deployment configuration, the cable length adjacent the tool string 110 may be exposed to higher temperatures, higher pressures, corrosive fluids, and different types of rock surfaces than the cable length that remains within the shallow cased hole section of the well during the execution of the operation. In addition, the cable length at the surface going through the sheave wheels can support higher tensions that the cable length closer to the tool string 110 during the deployment and extraction phases of the operation.
[0050] The cross sections and images included in FIG. 2 depict geometries and distributions of the load bearing and electrical conductor elements of a variety of deployment lines. For example, FIG. 2a shows a single strand wire (slick line) covered with an electrical insulating jacket. This configuration is referred to as a slick-e-line. FIG. 2b depicts a braided line made of 19 solid steel strand wires of the same diameter wrapped in a 1, 6 and 12 wire layers configuration. FIG. 2c shows a single-conductor wireline cable made with two layers of 12 and 18 solid steel strand wires of the same diameter wrapped over a single electrical conductor made of 21 copper strands and a plastic insulation jacket. FIG. 2d shows a seven-conductor wireline cable made with two layers of 15 and 24 solid steel strand wires of different diameters wrapped over a hard-plastic enclosure containing seven electrical conductors, each made of 7 copper strands and a plastic insulation jacket. FIG. 2e shows a single-conductor wireline cable made with two layers of 12 and 18 solid strand wires of the same diameter made of a corrosion resistant alloy. These wires are wrapped over a single electrical conductor made of 21 copper strands and a plastic insulation jacket. FIG. 2f shows a single-conductor wireline cable made with two layers of 12 and 18 solid steel strand wires of the same diameter wrapped over a single electrical conductor made of 21 copper strands and a high-temperature plastic insulation jacket. FIG. 2g shows a smooth two-conductor wireline cable fully embedded within a polymer enclosure that includes an outer layer of 13 3-strand wires, an inner layer of 21 solid strand wires, and a 2-conductor coaxial package where the center conductor is made of 7 copper strands and the outer conductor is a circular screen made of multiple copper threads. The outer conductor, inner and outer steel strand wires are kept electrically isolated by the enclosure polymer material. FIG. 2h shows a flexible rod including a 2-conductor coaxial package where the center conductor is made of 7 copper strands and the outer conductor is a circular screen made of multiple copper threads.
[0051] Referring now to FIG. 3a, there are shown components used to deploy tool string 110 into well 112 using a wireline cable (deployment line 102). Tool string 110 can typically include several tools which have compatible tool connections at both ends that allow them to attach to each other. Connection 300 can be a part of the top tool in the tool string 110. Connection 300 can be any appropriate means to connect between components such as a tool connection or a torpedo splice. The cable head 302, attached to the deployment line 110, can include a compatible connection 300.
[0052] FIG. 3b shows tool string 110 deployed to the bottom of well 112 attached to the deployment line 102. The following sequence of tasks can represent how tool strings 110 are currently rigged up and lowered into wells. The first step can be to lift and lower the tool string 110 into the well 112 using a rig hoist line (not shown). A rig up plate 304 can then be positioned below the connection 300 at the top of the tool string 110 such that the rig up plate 304 with tool string 110 can be attached over the rig floor 306. Additional tool string sections can be vertically added using the rig hoist line to lift the next tool section over the connection 300 of the previous tool string section and connecting the tools together. After removing the rig up plate 304, the now longer tool string 110 can be lowered to the desired depth. The rig up plate 304 can be repositioned at the connection 300 of the upper tool. This process can be repeated for each additional tool.
[0053] The next step is to rig up the deployment line 102 using the rig traveling blocks and sheave wheels 106 (shown in FIG. 1). The cable head 302 can be lowered on top of the connection 300 to securely engage the connection 300. The rig up plate 304 can be removed after lifting the tool string 110 sufficiently clear of the rig up plate 304 by pulling the deployment line 102 using the cable drum-winch system part of the deployment unit 104 (shown in FIG. 1). The tool string 110 can then be lowered to the well interval where the planned operation is to be performed, and subsequently retrieved using the deployment unit 104. Once the tool string 110 is at the surface, the rig up plate 304 can be used to hang the tool string 110 on the rig floor 306. The wireline cable head 302 can then be disconnected from the connection 300 so the deployment line 102, cable head 302, and sheave wheels 106 can be rigged down. To rig down the tool string 110, a rig hoist line can be used to lift the tool string sufficiently clear so the rig up plate 304 can be removed and the tool string 110 can be hoisted out of the well 112.
[0054] As shown in FIG. 3B, the arrangement can result in exposure of the deployment line 102 to the environment of the open hole 114. High temperatures and/or corrosive environments in the open hole 114 may degrade the deployment line 102 in this arrangement. Without stand-offs, the deployment line 102 may also become differentially trapped against the wall of the open hole. Using full deployment lines 102 suitable for these conditions can be expensive, difficult to procure, and may introduce other complications due to lower working tension limits in these specialized deployment lines 102.
[0055] The following descriptions are based on tool string deployments planned with a wireline cable, however equivalent descriptions can be made for operations planned with other types of deployment lines such as slick lines, braided lines, electromechanical lines, and flexible rods.
[0056] FIG. 4a shows one embodiment of the deployment systems according to the present technology, including the components used to deploy tool strings into wells shown in FIGS. 3a and 3b and described above. FIG. 4a shows additional components including a line extension 400, schematically depicted with spherical shapes added along its length, and an interconnecting tool 402.
[0057] The line extension 400 can include a set of specific operational properties not provided by the existing deployment line 102, a cable head 404, and a top connection 406. The line extension 400 can be designed with temperature and corrosion resisting properties not present in the deployment line 102. The line extension 400 may be designed to resist temperatures up to 600 F. For corrosion resistance, the line extension 400 may be made using corrosion resistant alloy steel suitable for moderate H2S and CO2 environments and/or electrical conductors made of nickel-plated wires adhering to ASTMBB355 Class 10 for increase corrosion resistance. This can provide appropriate protection of the deployment line 102 suitable for downhole environments without requiring that the entire cable is made of the same design. The extension cable head 404 can be any appropriate connection configured for attachment to the connection 300. The top connection 406 can be any appropriate connection for attachment to the cable head 302 or interconnecting tool 402.
[0058] The line extension 400 can also be a sacrificial cable. In this configuration, the line extension 400 can be designed with similar or different temperature and corrosion resisting properties present in the deployment line 102. After deployment, the line extension 400 can be disposed of depending on the amount of wear accrued from usage. In this embodiment, only a portion of the cable, the line extension 400, would need to be inspected and potentially disposed of instead of the entire deployment line 102.
[0059] The interconnecting tool 402 is an optional component that can function as an adapter between the top connection 406 of the line extension 400 and the cable head 302 if need be. The interconnecting tool 402 can also be a separate logging or well intervention tool that operates on its own or that requires the use of one or more conductors of the deployment line 102.
[0060] FIG. 4b shows the tool string 110 at the bottom of the well 112 after being deployed using the line extension 400, interconnecting tool 402 and deployment line 102. In this drawing the length of the extension line 400 can be sufficient to cover the complete open hole section 114 or the well 112 when the tool string 110 is at the deepest possible position, while the interconnecting tool 402 can be at the bottom of the cased hole section 408. This configuration can be used when the extension line 400 offers specific operational benefits in the open hole section 114, such as preventing the deployment line 102 from becoming differentially stuck, or when the purpose of the interconnecting tool 402 is to acquire logging data over the cased hole 408 section of the well 112.
[0061] FIGS. 5a through 5e show one embodiment of how to deploy the tool string 110 to the bottom of the well 112 using an extension line 400 and interconnecting tool 402. FIG. 5a shows the tool string 110 hanging from the rig up plate 304 and the extension line 400 lifted above the rig floor 304 with extension cable head 404 ready to be connected to the tool string top connection 300. FIG. 5b shows the tool string 110 and extension line 400 hanging from the rig up plate 304 and the interconnecting tool 402 lifted above the rig floor 306 with its bottom connection 500 ready to be connected to the extension line top connection 406. FIG. 5c shows the tool string 110, the extension line 400, and the interconnecting tool 402 hanging from the rig up plate 304 and the deployment line 102 lifted above the rig floor 306 with its cable head 302 ready to be connected to the interconnecting tool top connection 502. FIG. 5d shows all components connected and attached to the wireline cable 102 with the well mouth cleared before the cable winch-drum system of the deployment unit 104 is used to lower the tool string 110 into the well 112. FIG. 5e shows the tool string 110 at the bottom of the well 112. After the planned operation is completed, the deployment line 102 is pulled out of the well until the interconnecting tool 402 is at the surface, as shown in FIG. 5d. The operational sequence depicted in FIGS. 5a, 5b and 5c can be executed in reverse order to remove the interconnecting tool 402, the extension line 400 and the tool string 110 from the well 112.
[0062] FIGS. 6a through 6d show another embodiment of an extension line 400 used to perform a logging operation in a long open hole section that includes two separate problematic intervals 600 and 602. Both permeable intervals 600 and 602 can include severe pressure over balance, which can present a high risk of the cable and tool string becoming differentially stuck.
[0063] The extension line 400 can have an external profile that includes short prolate ellipsoid shaped stand-offs 604 at pre-defined separation intervals. The stand-offs 604 can result in a significantly smaller area of contact with the borehole wall of the well, which can reduce the pressure differential sticking forces over these intervals. The stand-off 604 can be external stand-off subs which can be mounted and mechanically locked over the extension line 402 at selected intervals. The stand-offs 604 can be built-in subs manufactured with stand-off geometries at selective intervals. The stand-offs 604 can be made of metal or hard plastic segments. The stand-offs 604 can be molded over the extension line 402 with plastic, polymers, or other non-metallic material.
[0064] FIGS. 6a and 6b show one embodiment of the operational sequence to rig up the tool string 110, extension line 400 that has stand-offs 604 mounted over its entire length, and deployment line 102 in a well 112 that can include an open hole section with problematic intervals 600 and 602, known to have high differential pressures that will likely result on the deployment line becoming differentially stuck. FIG. 6c depicts the depth at which the extension line 400 starts going through the problematic interval 600 while running the tool string 110 into the well 112. FIG. 6d shows the tool string 110 at the bottom of the well with the extension line 400 deployed through both problematic intervals 600 and 602. The minimum length of the extension line 400 required in this embodiment is the distance from the top of the problematic interval 600 and the bottom of the well minus the length of the tool string 110. This ensures that no length of the deployment line 102 enters the problematic intervals 600, 602 which can result in the deployment line 102 becoming differentially stuck.
[0065] It is possible to select and use an extension line of this type when no formations pressure data is available, such in new exploration wells. An extension line 400 with a length greater than the difference between the total well depth and the casing depth can ensure that the deployment line 102 cannot enter the open hole section of the well. This can prevent the deployment line 102 from becoming differentially stuck or exposed to high temperatures and/or corrosive environments when well conditions are unknown.
[0066] Although the technology herein has been described with reference to particular embodiments, it is to be understood that these embodiments are merely illustrative of the principles and applications of the present technology. It is therefore to be understood that numerous modifications may be made to the illustrative embodiments and that other arrangements may be devised without departing from the spirit and scope of the present technology as defined by the appended claims.