Projection bolt welding method
10646952 ยท 2020-05-12
Assignee
Inventors
Cpc classification
F16B37/061
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B23K11/0053
PERFORMING OPERATIONS; TRANSPORTING
B23K11/16
PERFORMING OPERATIONS; TRANSPORTING
International classification
B23K11/00
PERFORMING OPERATIONS; TRANSPORTING
B23K11/16
PERFORMING OPERATIONS; TRANSPORTING
Abstract
Provided is a projection bolt welding method, which involves welding a projection bolt to a steel sheet component by electric resistance welding. The projection bolt includes a shank, a circular enlarged diameter portion, and a welding projection including an initial fusion portion with a tapered portion and a main fusion portion. A ratio of a volume of the initial fusion portion to a volume of a portion of the steel sheet component having the same diameter as a diameter of the initial fusion portion is selected, or a ratio of a circular area of the initial fusion portion to a sheet thickness of the steel sheet component is selected.
Claims
1. A projection bolt welding method comprising: preparing a projection bolt comprising a shank having an external thread formed therein, a circular enlarged diameter portion being formed integrally with the shank and having a diameter larger than a diameter of the shank, and a circular welding projection arranged at a center of the circular enlarged diameter portion on a side opposite to the shank, wherein the circular enlarged diameter portion has a surface surrounding the circular welding projection on the side opposite to the shank, and the circular welding projection comprises a main fusion portion formed on the circular enlarged diameter portion on the side opposite to the shank, and a circular initial fusion portion continuous with the main fusion portion and having a tapered portion that is reduced in height as approaching to an outer peripheral side of the circular initial fusion portion at an inclination angle; preparing a pair of electrodes comprising an electrode for holding the projection bolt and an electrode on which a steel sheet component is to be placed, the pair of electrodes being arranged coaxially with each other; welding the projection bolt to the steel sheet component by electric resistance welding while pressurizing the circular welding projection of the projection bolt against the steel sheet component between the pair of electrodes such that, upon completion of the welding at which welding energization and the pressurizing of the circular welding projection of the projection bolt against the steel sheet component are stopped, a portion of the main fusion portion remains unfused and forms a clearance between the surface of the circular enlarged diameter portion surrounding the circular welding projection and a surface of the steel sheet component facing the surface of the circular enlarged diameter portion, wherein the preparing of the projection bolt comprises setting a rate of a circular area of the circular initial fusion portion to a sheet thickness of the steel sheet component of 45 to 105.
2. The projection bolt welding method of claim 1, wherein the surface of the circular enlarged diameter portion surrounding the circular welding projection is perpendicular to a central axis of the projection bolt.
3. The projection bolt welding method of claim 1, wherein the clearance is 0.4 mm-0.6 mm.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
DESCRIPTION OF EMBODIMENTS
(23) Next, description is made of a projection bolt welding method according to embodiments of the present invention.
First Embodiment
(24)
(25) First, dimensions and a shape of a projection bolt are described.
(26) A shape of an iron projection bolt 1 is illustrated in
(27) As illustrated in
(28) For easy understanding of a dimensional condition of this embodiment, dimensions of components and an inclination angle are illustrated in
(29) Next, a welding state of the bolt 1 is described.
(30)
(31) The shank 2 is inserted into the reception hole 10 of the movable electrode 9 by an operator or a feeding rod, and the shank 2 is attracted by the permanent magnet 11 so that the bolt 1 is held in the movable electrode 9. At this time, an end surface 13 of the movable electrode 9 is held in close contact with a back surface of the enlarged diameter portion 3.
(32) Next, a relationship between the initial fusion portion and the steel sheet component is described.
(33) A relationship of a volume of a partially shaped portion of the projection bolt 1 to a volume of a predetermined portion of the steel sheet component 8 closely relates to a fusion state of the steel sheet component 8. That is, the above-mentioned relationship refers to a relationship between a volume of a portion of the steel sheet component 8 having the same diameter as that of the circular initial fusion portion 4A and a volume of the initial fusion portion 4A. The steel sheet component 8 having the same diameter as that of the circular initial fusion portion 4A corresponds to a circular sheet portion 8A, and a volume of the circular sheet portion 8A corresponds to the above-mentioned steel sheet volume. In this case, the steel sheet component 8 has a sheet thickness of 0.65 mm.
(34) The diameter of the circular sheet portion 8A is 9.0 mm as described above, and hence the volume of the circular sheet portion 8A, namely, the steel sheet volume is 41.33 mm.sup.3. Further, the initial fusion portion 4A has the height of 0.32 mm and the diameter of 9.0 mm as described above, and hence the initial fusion portion 4A has a volume of 6.79 mm.sup.3. Therefore, a ratio of the volume of the initial fusion portion 4A to the volume of the circular sheet portion 8A, namely, to the steel sheet volume is 0.16.
(35) Next, pressurization and energization conditions are described.
(36) A pressurization force exerted by the movable electrode 9, namely, a force of pressurizing the welding projection 4 onto the steel sheet component 8 is 2,300 N, a welding current is 14,000 A, and an energization time period is eight cycles. The energization time period of eight cycles corresponds to a time period from start of energization to finish of fusion of the main fusion portion 4B subsequent to start of fusion of the initial fusion portion 4A after an elapse of a predetermined time period since the start of the energization. Note that, one cycle is 1/60 second.
(37) Satisfactory welding can be attained under the above-mentioned conditions, and satisfactory setting ranges of the respective conditions are as follows. The pressurization force is from 2,000 N to 3,000 N, the welding current is from 10,000 A to 15,000 A, and the energization time period is from five to ten cycles.
(38) Next, a fusion bonding process in a case of the volume ratio of 0.16 is described.
(39)
(40) When pressurization and energization are further continued, along the inclination angle of the tapered portion 6, the fused portion 14 is enlarged into a circular fusion range extending in a diameter direction in a radial and substantially planar manner. A transient state of the enlargement is illustrated in
(41) Then, when pressurization and energization are still further continued, subsequently to fusion of the entire initial fusion portion 4A, fusion of the main fusion portion 4B is started simultaneously. As illustrated in
(42) As is apparent from
(43) Before fusion, the shape of the initial fusion portion 4A is a flat conical shape as illustrated in the drawings. However, at the initial stage of fusion, the conical shape disappears and transforms into a flat fused region integrated with the fused portion of the surface portion of the steel sheet component 8. The above-mentioned phenomenon in which fusion heat of the main fusion portion 4B is added to the steel sheet component 8, or fusion heat of the main fusion portion 4B is transferred to the steel sheet component 8 via the initial fusion portion 4A means that fusion heat of the main fusion portion 4B is transferred to the above-mentioned flat fused region and then transferred to an unfused region (solid phase) of the steel sheet component 8, thereby enlarging a fusion range of the steel sheet component 8.
(44)
(45) Reference numeral 16 denotes an unfused portion of the circular sheet portion 8A. The unfused portion is formed of the structure transformed portion 15 and a base material 17 of the steel sheet that is not subjected to a thermal effect, and a thickness of the unfused portion is denoted by T1. Further, a thickness of the base material 17 alone is denoted by T2.
(46) The above-mentioned fusion process proceeds as a composite fusion phenomenon of the initial fusion portion 4A and the main fusion portion 4B. This point is observed in detail. The fusion of the surface of the steel sheet component 8 is started simultaneously with the fusion of the voluminal portion of the initial fusion portion 4A. At the same time, the fusion of the main fusion portion 4B is also progressed. At this time, when the volume of the initial fusion portion 4A is large, an amount of fusion heat of the initial fusion portion 4A itself is large. Accordingly, in proportion to the amount of fusion heat, the fusion amount on the steel sheet component 8 side is also increased. In addition to the increase of the fusion amount on the steel sheet component 8 side, a larger amount of the fusion heat of the main fusion portion 4B is applied to the steel sheet component 8 via the initial fusion portion 4A having the large volume. As described above, when the fusion heat of the initial fusion portion 4A having the large volume and the fusion heat of the main fusion portion 4B are synergistically applied to the steel sheet component 8, the steel sheet component 8 is fused in the entire region of the sheet thickness thereof. That is, it is essential to avoid setting the volume of the initial fusion portion 4A to an extremely large volume with respect to that of the steel sheet component 8.
(47) On the other hand, as described above, the fusion of the surface of the steel sheet component 8 is started simultaneously with the fusion of the voluminal portion of the initial fusion portion 4A. At the same time, the fusion of the main fusion portion 4B is also progressed. At this time, when the volume of the initial fusion portion 4A is small, the amount of fusion heat of the initial fusion portion 4A itself is small. Accordingly, in proportion to the amount of fusion heat, the fusion amount on the steel sheet component 8 side is also decreased. In addition to the decrease of the fusion amount on the steel sheet component 8 side, a smaller amount of the fusion heat of the main fusion portion 4B is applied to the steel sheet component 8 via the initial fusion portion 4A having the small volume. As described above, when the fusion heat of the initial fusion portion 4A having the small volume and the fusion heat of the main fusion portion 4B are synergistically applied to the steel sheet component 8, the amount of heat applied to the steel sheet component 8 is excessively small, and the steel sheet component 8 is only slightly fused in the sheet thickness direction. That is, it is essential to avoid setting the volume of the initial fusion portion 4A to an extremely small volume with respect to that of the steel sheet component 8.
(48) The fusion amount of the steel sheet component 8 depends on the above-mentioned heat flow process, and hence the volume ratio of the initial fusion portion 4A to the circular sheet portion 8A serves as an important factor. The volume ratio is set to 0.16 as in this embodiment. Thus, the amount of fusion heat of the initial fusion portion 4A itself and the amount of heat supplied from the main fusion portion 4B are properly converged, with the result that the fusion amount on the steel sheet component 8 side is set as illustrated in
(49) The above-mentioned phenomenon is described inclusively. The above-mentioned volume of the initial fusion portion 4A is extremely large or small with respect to the volume of the steel sheet component 8. Accordingly, the volume of the initial fusion portion 4A is set within a predetermined range in consideration of a correlation with the volume on the steel sheet component 8 side, and an insufficient amount of heat for proper fusion of the steel sheet component is complementarily supplied from the main fusion portion 4B. In other words, the volume of the initial fusion portion 4A is set in consideration of a correlation with the steel sheet volume within a range causing no actual harm to initial fusion of the steel sheet component 8, and the insufficient amount of heat for proper fusion of the steel sheet component 8 is complemented by the main fusion portion 4B.
(50) Fusion heat of the above-mentioned main fusion portion 4B is complementarily applied to the steel sheet component 8 via the initial fusion portion 4A, and hence it is necessary to adjust the fusion amount of the main fusion portion 4B. That is, when an excessive amount of heat is added from the main fusion portion 4B, the steel sheet component 8 is fused excessively. Further, when an extremely small amount of heat is added from the main fusion portion 4B, the steel sheet component 8 is fused to an extremely small degree.
(51) In this case, the volume of the main fusion portion 4B having the dimensions illustrated in
(52) The bolt having the above-mentioned volume ratio of 0.16 was welded under the above-mentioned welding conditions, specifically, the pressurization force of 2,300 N, the welding current of 14,000 A, and the energization time period of eight cycles. As a result, the thickness T1 of the unfused portion 16 was 0.4 mm, and the thickness T2 of the base material 17 was 0.3 mm.
(53) Next, specific values of the thicknesses T1 and T2 are described.
(54)
(55) Simultaneously with ensuring of the above-mentioned values of the thicknesses T1 and T2, after completion of the welding, a clearance C having a size large enough to prevent air bubbles from being sealed therein due to a coating liquid is secured between a vicinity of an outer periphery of the enlarged diameter portion 3 and the surface of the steel sheet component 8. The size of the clearance C is 0.5 mm. Further, the welding conditions such as the pressurization force, the current value, and the energization time period are changed, thereby being capable of adjusting the size of the clearance C to 0.4 mm, 0.6 mm, or the like.
(56) As illustrated in
(57) Further, there was conducted a bending test of inclining the shank 2 repeatedly. As a result, a fracture did not occur at a boundary portion between the fused portion 14 and the structure transformed portion 15, at the structure transformed portion 15 itself, or at a boundary portion between the structure transformed portion 15 and the base material. Based on those results, it is determined that sufficient welding strength is obtained when the bolt 1 having this size is welded to the steel sheet component 8 having an extremely small thickness of 0.65 mm.
(58) As is apparent from
(59) The welding conditions such as the pressurization force, the current value, and the energization time period are changed within the above-mentioned range under the condition that the volume ratio is 0.16. Thus, for example, the thickness T1=0.4 mm is adjustable to the thickness T1=0.28 mm, and the thickness T2=0.3 mm is adjustable to the thickness T2=0.18 mm.
(60) Next, a lower limit predetermined value and an upper limit predetermined value of the volume ratio are described.
(61) As described above, the values of the thicknesses T1 and T2 can be set to various values through change of the volume ratio. However, when the volume ratio is smaller than 0.08, the thickness T1 is extremely large, that is, the penetration amount of the fused portion 14 in the sheet thickness direction may be insufficient, or only the center portion of the initial fusion portion 4A may be fused so that the initial fusion portion is not entirely fused. Therefore, predetermined welding strength cannot be ensured. That is, the volume ratio of 0.08 corresponds to the lower limit predetermined value. Further, when the volume ratio exceeds 0.20, the thickness T1 is extremely small, and hence the thickness of the base material 17 is extremely small or the thickness T1 is substantially zero. As a result, predetermined welding strength cannot be ensured. That is, the volume ratio of 0.20 corresponds to the upper limit predetermined value.
(62) The thickness T1 of 0.62 mm and the thickness T2 of 0.56=correspond to the above-mentioned lower limit predetermined value of 0.08. The thickness T1 of 0.18 mm and the thickness T2 of 0.11=correspond to the above-mentioned upper limit predetermined value of 0.20.
(63) Next, a case of changing the sheet thickness of the steel sheet component is described.
(64) In the above-mentioned embodiment, the sheet thickness is 0.65 mm. However, as a result of various experiments, it was confirmed that the thickness T1 and the thickness T2 were able to be properly ensured in a thin sheet having a thickness of from 0.6 mm to 1 mm through change of the welding conditions within a volume ratio range of from 0.08 to 0.20.
(65) Note that, the initial fusion portion 4A has the volume of 6.79 mm.sup.3, whereas the main fusion portion 4B has the volume of about 58.54 mm.sup.3. From such a viewpoint that the fusion heat of the main fusion portion 4B is complementarily supplied to the steel sheet component 8 via the initial fusion portion 4A, it is preferred that the volume of the initial fusion portion 4A be set within a range of from 10% to 20% of the volume of the main fusion portion 4B. When the volume of the initial fusion portion 4A is 10% of the volume of the main fusion portion 4B, the fusion heat can be sufficiently supplied, and strength and rigidity of a root portion of the shank 2 can be sufficiently maintained. On the other hand, when the volume of the initial fusion portion 4A exceeds 20% of the volume of the main fusion portion 4B, there are fears in that the fusion heat is supplied excessively, and in that a material of the root portion of the shank 2 is extremely large, which is disadvantageous in cost.
(66) In the first embodiment, the shape of the initial fusion portion 4A is a conical shape including the tapered portion 6 and the vertex 7, but a spherical shape may be employed instead of the conical shape. In a case of the spherical shape, a portion corresponding to the vertex 7 is pressurized against the steel sheet component 8, and fusion is started from the pressurized portion. The other fusion bonding process is performed similarly to the case of the conical shape.
(67) Operations and effects of the first embodiment obtained based on the fusion heat addition described above are as follows.
(68) In the first embodiment, importance is placed on such a point that the volume of the initial fusion portion 4A is matched to a volume of which portion of the steel sheet component 8. In the first embodiment, the volume of the portion the steel sheet component 8 having the same diameter as that of the circular initial fusion portion 4A is matched to the volume of the initial fusion portion 4A. The volume of the portion the steel sheet component 8 having the same diameter as that of the circular initial fusion portion 4A is most directly and thermally affected at the time of start of fusion of the initial fusion portion 4A. The steel sheet component 8 is matched to the initial fusion portion 4A and marked off into a circular portion in this manner. Thus, a thermal effect from the initial fusion portion 4A side can be quantitatively specified. In other words, the volume of the initial fusion portion 4A itself, which is matched to the volume of the portion of the steel sheet component 8 having the same diameter as that of the circular initial fusion portion 4A, directly affects a fused region of the steel sheet component 8, and a satisfactory fusion state of the steel sheet component 8 is ensured.
(69) Before the fusion, the shape of the initial fusion portion 4A is the flat conical shape. However, at the initial stage of the fusion, the conical shape disappears and transforms into the flat fused region integrated with the fused portion of the surface portion of the steel sheet component 8 (see
(70) As described above, welding is performed under a condition that the ratio of the volume of the initial fusion portion 4A to the steel sheet volume is set to from 0.08, which corresponds to the lower limit predetermined value of the fusion amount of the steel sheet component 8 in the sheet thickness direction obtained by addition of fusion heat of the main fusion portion 4B, to 0.20, which corresponds to a value not exceeding the upper limit predetermined value of the fusion amount of the steel sheet component 8 in the sheet thickness direction obtained by addition of fusion heat of the main fusion portion 4B. Accordingly, the fused portion 14 and the structure transformed portion 15 present near the fused portion 14 are not formed in the entire region of the sheet thickness, and the unfused base material portion 17 is secured between the surface of the steel sheet and the structure transformed portion 15 present near the fused portion 14. Therefore, the base material portion 17 functions to maintain strength of the steel sheet component 8, and hence weld joining strength of the bolt 1 can be ensured sufficiently. Further, a boundary area between the structure transformed portion 15 and the base material portion 17 can be ensured over a wide region, and hence joining strength of the boundary area portion can be kept high. Thus, even when an external force is applied to bend the bolt 1, a fracture or the like does not occur easily.
(71) In addition to setting the volume ratio of the initial fusion portion 4A to the steel sheet volume to from 0.08 to 0.20, the volume ratio of the initial fusion portion 4A to the main fusion portion 4B is specified, thereby being capable of attaining a satisfactory result. That is, the volume of the initial fusion portion 4A is set to the range of from 10% to 20% of the volume of the main fusion portion 4B. When the volume of the initial fusion portion 4A is 10% of the volume of the main fusion portion 4B, the fusion heat can be sufficiently supplied from the main fusion portion 4B to the steel sheet component 8, and strength and rigidity of the root portion of the shank 2 can be sufficiently maintained. On the other hand, when the volume of the initial fusion portion 4A exceeds 20% of the volume of the main fusion portion 4B, there are fears in that the fusion heat is supplied excessively from the main fusion portion 4B to the steel sheet component 8, and in that the material of the root portion of the shank 2 is extremely large, which is disadvantageous in cost. Therefore, the volume of the initial fusion portion 4A is set to 20% or less of the volume of the main fusion portion 4B, thereby being capable of avoiding those fears.
(72) After completion of welding, the clearance is secured between the vicinity of the outer periphery of the enlarged diameter portion and the surface of the steel sheet component. Thus, the air in the clearance is discharged so that the coating liquid can adhere to a lower surface of the enlarged diameter portion, an outer peripheral surface of the main fusion portion, an exposed portion of the fused portion, the surface of the steel sheet component, and the like, which define the clearance.
(73) When the clearance C between the vicinity of the outer periphery of the enlarged diameter portion 3 and the surface of the steel sheet component is extremely narrow, fluidity of the coating liquid in the clearance C cannot be obtained due to viscosity of the coating liquid. Accordingly, the air stagnating in the clearance C is not discharged so that the air is sealed due to the coating liquid. Consequently, there arises a problem in that the sealed air causes rust.
(74) However, as in this embodiment, the clearance C having a size large enough to prevent air bubbles from being sealed therein due to the coating liquid is secured between the vicinity of the outer periphery of the enlarged diameter portion 3 and the surface of the steel sheet component, thereby solving the above-mentioned problem of occurrence of rust. That is, the clearance C defined between the vicinity of the outer periphery of the enlarged diameter portion 3 and the surface of the steel sheet component can be ensured as a sufficient space C owing to a height dimension of 0.9 mm of the main fusion portion 4B in the sheet thickness direction of the steel sheet component 8, and hence the coating liquid flows into the clearance C actively. This flow causes discharge of the air from the clearance C, and the coating liquid adheres to the lower surface of the enlarged diameter portion 3, the outer peripheral surface of the main fusion portion 4B, the exposed portion of the fused portion 14, the surface of the steel sheet component 8, and the like (see
Second Embodiment
(75)
(76) First, dimensions and a shape of a projection bolt are described.
(77) A shape of an iron projection bolt 1 is illustrated in
(78) As illustrated in
(79) For easy understanding of a dimensional condition of this embodiment, dimensions of components and an inclination angle are illustrated in
(80) Next, a welding state of the bolt 1 is described.
(81)
(82) The shank 2 is inserted into the reception hole 10 of the movable electrode 9 by an operator or a feeding rod, and the shank 2 is attracted by the permanent magnet 11 so that the bolt 1 is held in the movable electrode 9. At this time, an end surface 13 of the movable electrode 9 is held in close contact with a back surface of the enlarged diameter portion 3.
(83) Next, pressurization and energization conditions are described.
(84) A pressurization force exerted by the movable electrode 9, namely, a force of pressurization the welding projection 4 onto the steel sheet component 8 is 2,300 N, a welding current is 14,000 A, and an energization time period is eight cycles. The energization time period of eight cycles corresponds to a time period from start of energization to finish of fusion of the main fusion portion 4B subsequent to start of fusion of the initial fusion portion 4A after an elapse of a predetermined time period since the start of the energization. Note that, one cycle is 1/60 second.
(85) Satisfactory welding can be attained under the above-mentioned conditions, and satisfactory setting ranges of the respective conditions are as follows. The pressurization force is from 2,000 N to 3,000 N, the welding current is from 10,000 A to 15,000 A, and the energization time period is from five to ten cycles.
(86) Next, a fusion bonding process is described.
(87)
(88) When pressurization and energization are further continued, along the inclination angle of the tapered portion 6, the fused portion 14 is enlarged into a circular fusion range extending in a diameter direction in a radial and substantially planar manner. A transient state of the enlargement is illustrated in
(89) Then, when pressurization and energization are still further continued, subsequently to fusion of the entire initial fusion portion 4A, fusion of the main fusion portion 4B is started simultaneously. As illustrated in
(90) As is apparent from
(91) Before fusion, the shape of the initial fusion portion 4A is a flat conical shape as illustrated in the drawings. However, at the initial stage of fusion, the conical shape disappears and transforms into a flat fused region 14 integrated with the fused portion of the surface portion of the steel sheet component 8.
(92)
(93) Reference numeral 16 denotes an unfused portion of the circular sheet portion 8A. The unfused portion is formed of the structure transformed portion 15 and a base material 17 of the steel sheet that is not subjected to a thermal effect, and a thickness of the unfused portion is denoted by T1. Further, a thickness of the base material 17 alone is denoted by T2.
(94) Next, a relationship between the circular area of the initial fusion portion and the steel sheet component is described.
(95) As described above, the sheet thickness of the steel sheet component 8 is 0.65 mm. On the other hand, the circular area of the initial fusion portion 4A is calculated as 63.59 mm.sup.2 based on the diameter dimension of 9 mm illustrated in
(96) The bolt having the above-mentioned sheet thickness-area ratio of 77.83 was welded under the above-mentioned welding conditions, specifically, the pressurization force of 2,300 N, the welding current of 14,000 A, and the energization time period of eight cycles. As a result, the thickness T1 of the unfused portion 16 was 0.62 mm, and the thickness T2 of the base material 17 was 0.55 mm. Further, the bolt having the sheet thickness-area ratio of 90.81 was welded to the steel sheet component having the sheet thickness of 0.7 mm under the same conditions as the above-mentioned welding conditions. As a result, the thickness T1 of the unfused portion 16 was 0.55 mm, and the thickness T2 of the base material 17 was 0.48 mm. Those values can be read from a graph shown in
(97) Next, specific values of the thicknesses T1 and T2 are described.
(98)
(99) Simultaneously with ensuring of the above-mentioned values of the thicknesses T1 and T2, after completion of the welding, a clearance C having a size large enough to prevent air bubbles from being sealed therein due to a coating liquid is secured between a vicinity of an outer periphery of the enlarged diameter portion 3 and the surface of the steel sheet component 8. The size of the clearance C is 0.5 mm. Further, the welding conditions such as the pressurization force, the current value, and the energization time period are changed, thereby being capable of adjusting the size of the clearance C to 0.4 mm, 0.6 mm, or the like.
(100) Next, a magnitude of the sheet thickness-area ratio and progress of fusion are described.
(101) In
(102) A fusion process from
(103) A fusion process from
(104) Next, a proper range of the sheet thickness-area ratio is described.
(105) As described with reference to
(106) When the sheet thickness-area ratio is smaller than 45, which corresponds to an upper limit predetermined value of the fusion amount of the steel sheet component in the sheet thickness direction obtained depending on the magnitude of the pressure of the fused metal, as described with reference to
(107) On the other hand, when the sheet thickness-area ratio exceeds 105 to be equal to or larger than 106, which corresponds to a lower limit predetermined value of the fusion amount of the steel sheet component in the sheet thickness direction obtained depending on the magnitude of the pressure of the fused metal, as described with reference to
(108) Note that, the focus is placed on the above-mentioned matter that the pressure of the liquefied metal is changed depending on the magnitude of the sheet thickness-area ratio, but the applicant may not measure the pressure of the liquefied metal at the time of welding. Accordingly, operations and effects are described in view of a relationship between the magnitude of the pressure and a degree of progress of the fusion of the steel sheet.
(109) Welding strength tests were conducted on the bolt 1 that was subjected to welding under the above-mentioned condition that the sheet thickness-area ratio was set to 90.81 or 97.83. As illustrated in
(110) Further, there was conducted a bending test of inclining the shank 2 repeatedly. As a result, a fracture did not occur at the boundary portion between the fused portion 14 and the structure transformed portion 15, at the structure transformed portion 15 itself, or at the boundary portion between the structure transformed portion 15 and the base material 17. Based on those results, it is determined that sufficient welding strength is obtained when the bolt 1 having this size is welded to the steel sheet component 8 having an extremely small thickness of 0.65 mm.
(111) Further, the welding strength tests were conducted on the bolt 1 that was subjected to welding under the above-mentioned condition that the sheet thickness-area ratio was set to 47.38. As a result, satisfactory values were able to be obtained both in the tensile test and the repeated bending test.
(112) For example, the welding conditions such as the pressurization force, the current value, and the energization time period are changed within the above-mentioned range under the condition that the sheet thickness-area ratio is 97.83. Thus, for example, the thickness T1=0.62 mm is adjustable to the thickness T1=0.53 mm, and the thickness T2=0.55 mm is adjustable to the thickness T2=0.44 mm.
(113) In the second embodiment, the shape of the initial fusion portion 4A is a conical shape including the tapered portion 6 and the vertex 7, but a spherical shape may be employed instead of the conical shape. In a case of the spherical shape, a portion corresponding to the vertex 7 is pressurized against the steel sheet component 8, and fusion is started from the pressurized portion. The other fusion bonding process is performed similarly to the case of the conical shape.
(114) Operations and effects of the second embodiment obtained based on the pressure use described above are as follows.
(115) When the ratio of the circular area of the initial fusion portion 4A to the sheet thickness of the steel sheet component 8 (sheet thickness-area ratio) is set to, for example, 100, a ratio of the fusion area to the sheet thickness of the steel sheet 8 is large. The fused metal 14 having the wide area and region is pressurized, and hence the internal pressure of the liquefied metal is kept low. Accordingly, an amount of heat transferred from the fused metal 14 to the unfused portion 16 of the steel sheet 8 per unit area is reduced, and the penetration amount in the sheet thickness direction of the unfused portion 16 is small. Further, the fusion range in a surface direction of the steel sheet 8 is large, and hence fusion heat is transferred from a long fusion outer peripheral edge to the wide region. Consequently, the amount of heat transferred in the sheet thickness direction is reduced, and progress of penetration in the sheet thickness direction is slowed down. Therefore, when the above-mentioned ratio of the circular area of the initial fusion portion 4A to the sheet thickness of the steel sheet component 8 is set as large as 100, progress of penetration in the sheet thickness direction is slowed down, and excessive fusion can be prevented. Thus, welding strength of the projection bolt 1 is maintained properly.
(116) When the above-mentioned sheet thickness-area ratio is set to, for example, 50, the ratio of the fusion area to the sheet thickness of the steel sheet 8 is small. The fused metal 14 having the small area and region is pressurized, and hence the internal pressure of the liquefied metal is kept high. Accordingly, the amount of heat transferred from the fused metal 14 to the unfused portion 16 of the steel sheet 8 per unit area is increased, and the penetration amount in the sheet thickness direction of the unfused portion 16 is large. Further, the fusion range in the surface direction of the steel sheet 8 is small, and hence fusion heat is transferred from a short fusion outer peripheral edge to the small region. Consequently, the amount of heat transferred in the sheet thickness direction is increased, and progress of penetration in the sheet thickness direction is accelerated. Therefore, when the above-mentioned sheet thickness-area ratio is set as small as 50, progress of penetration in the sheet thickness direction is accelerated, and a large fusion depth is obtained. Thus, welding strength of the projection bolt 1 is maintained properly.
(117) The above-mentioned phenomena cause a state in which the fused metal 14 is sealed between the initial fusion portion 4A and the unfused portion 16 of the steel sheet 8 at the initial stage of fusion, whereas the fused metal 14 is sealed between the main fusion portion 4B and the unfused portion 16 of the steel sheet at the latter stage of fusion. Accordingly, a pressure condition of the liquefied metal influences progress of fusion in the unfused portion 16. That is, such phenomena are important that heat is actively conducted from the high-pressure fused metal to the unfused portion 16, whereas heat is slowly conducted from the low-pressure fused metal to the unfused portion 16. The phenomena as described above occur as in the case of the above-mentioned examples based on the sheet thickness-area ratio, and hence excessive fusion and extremely insufficient fusion in the sheet thickness direction can be prevented. Thus, proper welding strength can be ensured.
(118) In order to obtain a proper fusion amount of the steel sheet component in the sheet thickness direction, it is practically important to specify the numerical values such as 100 and 50 as the above-mentioned sheet thickness-area ratio. However, the selection of those values is based on the basic phenomenon involving the pressure use.
INDUSTRIAL APPLICABILITY
(119) The method according to the present invention involves the fusion heat addition or the pressure use described above. Accordingly, the excessive fusion and the extremely insufficient fusion of the steel sheet can be prevented, thereby being capable of subjecting the bolt to electric resistance welding in a satisfactory state. Thus, the present invention is applicable in a wide variety of industrial fields such as a process of welding a body of an automobile and a process of welding a metal plate of a home appliance.
REFERENCE SIGNS LIST
(120) 1 projection bolt 2 shank 3 enlarged diameter portion 4 welding projection 4A initial fusion portion 4B main fusion portion 6 tapered portion 7 vertex 8 steel sheet component 8A circular sheet portion 8B cut-out hole 14 fused portion (fused metal or fused region) 15 structure transformed portion (heat affected zone) 16 unfused portion 17 base material portion T1 thickness dimension of unfused portion T2 thickness dimension of base material portion C clearance