Foundation Construction Device and Its Construction Method
20200095747 ยท 2020-03-26
Inventors
Cpc classification
E02F3/146
FIXED CONSTRUCTIONS
E02D5/50
FIXED CONSTRUCTIONS
E02D15/08
FIXED CONSTRUCTIONS
E02D17/13
FIXED CONSTRUCTIONS
E02F5/06
FIXED CONSTRUCTIONS
E02D15/04
FIXED CONSTRUCTIONS
International classification
E02F3/14
FIXED CONSTRUCTIONS
Abstract
A foundation construction device for use in a construction device of a foundation (4) provided with a chain cutters (3) at the bottom during construction, comprising a fixed guiding device (1) and a composite device (2). The fixed guiding device (1) is composed of a fixed rack (1-1) and a guiding device (1-2). The composite device (2) comprises a chain cutter power transmission device (2-1), a spoil treatment device (2-2), and a rack (2-3). Also disclosed is a construction method for the foundation construction device.
Claims
1. A foundation construction device is characterized in that foundation construction device includes fixed guide (1) and combined device (2), which is used for the construction of foundation (4) with chain blade (3) at the bottom. Device (1) consists of fixed frame (1-1) and guide (1-2). Device (2) includes chain blade power transmission device (2-1), spoil treatment device (2-2), and rack (2-3). Device (2-1) and device (2-2) are installed on rack (2-3). Device (2-1), foundation (4), and chain blade (3) constitute chain excavating device (5). Foundation (4) is the rack of chain excavating device (5), while chain blade (3) only excavates the rock and soil at the bottom of foundation (4). Chain blade (3) is composed of chain (3-1) and cutter (3-2) fixed on chain (3-1) for rock and soil excavation. Device (1) guides foundation (4) and/or device (2) to make foundation (4) in a straight state. During construction, device (2) is connected with the top of foundation (4), and device (2-1) drives chain blade (3) to run along the track of foundation (4). Chain blade (3) excavates the rock and soil at the bottom of foundation (4), and transports the excavated rock and soil to the top. Device (2-2) separates the rock and soil transported from the bottom of foundation (4) by chain blade (3) from chain blade (3), and device (2) and foundation (4) descend synchronously.
2. As claim 1, the present foundation construction device is characterized in that the device (2-1) is composed of chain blade drive device (2-1-1), chain blade tension device (2-1-2), and chain wheel (2-1-3).
3. As claim 1, the present foundation construction device is characterized in that the frame (2-3) moves within guide (1-2).
4. As claim 1, the present foundation construction device is characterized in that the foundation (4) moves within guide (1-2).
5. As claim 1, the present foundation construction device is characterized in that the fixed frame (1-1) is a machinery/construction vehicle or machinery/construction ship.
6. As claim 1, the present foundation construction device is characterized in that the foundation (4) is slot-type foundation (4A). During construction, slot-type foundation (4A) is equipped with chain excavating device (5A) that excavates the rock and soil at the bottom of foundation (4A), that is, frame (2A-3) of device (2A) is equipped with a device (2A-1).
7. As claim 1, the present foundation construction device is characterized in that the foundation is combined foundation (4B) composed of several slot-type foundations (4A). Each slot-type foundation (4A) is equipped with chain excavating device (5A) that excavates the rock and soil at the bottom of respective foundation (4A) only, that is, the frame of device (2B) is equipped with several devices (2A-1).
8. As claim 1, the present foundation construction device is characterized in that the frame (2-3) in the device (2) includes slurry pipeline device 6, and slurry pipeline (6-1) is connected with slurry nozzle (6-2) at the bottom of the foundation.
9. As claim 1, the present foundation construction device is characterized in that the fixed frame (1-1) is the construction platform of foundation (4), with a lifting device installed at the top.
10. As claim 1, the present construction method of the foundation construction device is characterized in that the construction method is divided into the following steps: 1) Pre-fabricate foundation (4) by sections or integrally at the factory; 2) Install and fix frame (1-1) on the spot; 3) Transport the first section (i.e. bottom section) of foundation (4-1) to the site, load it into fixed frame (1-1), and install chain blade (3); 4) Connect the bottom of frame (2-3) in device (2) with the top of the first section of foundation (4-1), connect chain blade (3) at the bottom of device (2) with the chain blade (3) at the top of the first section of foundation (4-1) to constitute chain excavating device (5), and connect slurry pipeline (6-1) at the bottom of device (2) with slurry pipeline (6-1) at the top of the first section of foundation (4-1); 5) Start device (2-1-1), so that device (2-1-1) drives chain blade (3) to move along the track of foundation (4-1), chain blade (3) excavates the rock and soil at the bottom of the first section of foundation (4-1) and transports the excavated rock and soil to the top, and device (2-2) separates the rock and soil transported by chain blade (3) from the bottom of foundation (4-1) from chain blade (3); 6) Device (2) and the first section of foundation (4-1) descend synchronously to the set position; 7) Separate and remove device (2) from the first section of foundation (4-1); 8) Load the second section of foundation (4-2) into frame (1-1); 9) Connect the bottom of the second section of foundation (4-2) with the top of the first section of foundation (4-1), connect chain blade (3) at the bottom of the second section of foundation (4-2) with chain blade (3) at the top of the first section of foundation (4-1), and connect slurry pipeline (6-1) at the bottom of the second section of foundation (4-2) with slurry pipeline (6-1) at the top of the first section of foundation (4-1); 10) Connect the bottom of frame (2-3) in device (2) with the top of the second section of foundation (4-2), connect chain blade (3) at the bottom of device (2) with chain blade (3) at the top of the second section of foundation (4-2) to constitute chain excavating device (4), and connect slurry pipeline (6-1) at the bottom of device (2) with slurry pipeline (6-1) at the top of the second section of foundation (4-2); 11) Start device (2-1-1), so that device (2-1-1) drives chain blade (3) to move along the track of foundation (4), chain blade (3) excavates the rock and soil at the bottom of the first section of foundation (4-1) and transports the excavated rock and soil to the top, and device (2-2) separates the rock and soil transported by chain blade (3) from the bottom of foundation (4) from chain blade (3); 12) Device (2), first section of foundation (4-1), and second section of foundation (4-2) descend synchronously to the set position; 13) Separate and remove device (2) from the second section of foundation (4-2); Repeat the above steps 7), 8), 9), 10), 11), and 12) to complete the connection of each section of the foundation and descend to the set position, and then pull out chain blade (3) for concrete pouring.
Description
DESCRIPTION OF THE DRAWINGS
[0007]
[0008]
[0009]
[0010]
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0027] The foundation construction device includes fixed guide 1 and combined device 2, which is used for the construction of foundation 4 with chain blade 3 at the bottom. Device 1 consists of fixed frame 1-1 and guide 1-2. Device 2 includes chain blade power transmission device 2-1, spoil treatment device 2-2, and rack 2-3. Device 2-1 and device 2-2 are installed on rack 2-3. Device 2-1, foundation 4 and chain blade 3 constitute chain excavating device 5. Foundation 4 is the rack of chain excavating device 5, while chain blade 3 only excavates the rock and soil at the bottom of foundation 4. Chain blade 3 is composed of chain 3-1 and cutter 3-2 fixed on chain 3-1 for rock and soil excavation. Device 1 guides foundation 4 and/or device 2 to make foundation 4 in a straight state. During construction, device 2 is connected with the top of device 2 and foundation 4, and device 2-1 drives chain blade 3 to run along the track of foundation 4. Chain blade 3 excavates the rock and soil at the bottom of foundation 4, and transports the excavated rock and soil to the top. Device 2-2 separates the rock and soil transported from the bottom of foundation 4 by chain blade 3 from chain blade 3, and device 2 and foundation 4 descend synchronously.
[0028] Device 2-1 is composed of chain blade drive device 2-1-1, chain blade tension device 2-1-2, and chain wheel 2-1-3.
[0029] Frame 2-3 moves within guide 1-2.
[0030] Foundation 4 moves within guide 1-2.
[0031] Fixed frame 1-1 is a machinery/construction vehicle or machinery/construction ship.
[0032] Foundation 4 is slot-type foundation 4A. During construction, slot-type foundation 4A is equipped with chain excavating device 5A for excavating the rock and soil at the bottom of foundation 4A, that is, frame 2A-3 of device 2A is equipped with a device 2A-1.
[0033] The foundation is combined foundation 4B composed of several slot-type foundations 4A. Each slot-type foundation 4A is equipped with chain excavating device 5A that excavates the rock and soil at the bottom of respective foundation 4A only, that is, the frame of device 2B is equipped with several devices 2A-1.
[0034] Frame 2-3 in device 2 includes slurry pipeline device 6, and slurry pipeline 6-1 is connected with slurry nozzle 6-2 at the bottom of the foundation.
[0035] Fixed frame 1-1 is the construction platform of foundation 4, with a lifting device installed at the top.
[0036] The construction method can be divided into the following steps:
[0037] 1) Pre-fabricate foundation 4 by sections or integrally at the factory;
[0038] 2) Install and fix frame 1-1 on the spot;
[0039] 3) Transport the first section (i.e. bottom section) of foundation 4-1 to the site, load it into fixed frame 1-1, and install chain blade 3;
[0040] 4) Connect the bottom of frame 2-3 in device 2 with the top of the first section of foundation 4-1, connect chain blade 3 at the bottom of device 2 with the chain blade 3 at the top of the first section of foundation 4-1 to constitute chain excavating device 5, and connect slurry pipeline 6-1 at the bottom of device 2 with slurry pipeline 6-1 at the top of the first section of foundation 4-1;
[0041] 5) Start device 2-1-1, so that device 2-1-1 drives chain blade 3 to move along the track of foundation 4-1, chain blade 3 excavates the rock and soil at the bottom of the first section of foundation 4-1 and transports the excavated rock and soil to the top, and device 2-2 separates the rock and soil transported by chain blade 3 from the bottom of foundation 4-1 from chain blade 3;
[0042] 6) Device 2 and the first section of foundation 4-1 descend synchronously to the set position;
[0043] 7) Separate and remove device 2 from the first section of foundation 4-1;
[0044] 8) Load the second section of foundation 4-2 into frame 1-1;
[0045] 9) Connect the bottom of the second section of foundation 4-2 with the top of the first section of foundation 4-1, connect chain blade 3 at the bottom of the second section of foundation 4-2 with chain blade 3 at the top of the first section of foundation 4-1, and connect slurry pipeline 6-1 at the bottom of the second section of foundation 4-2 with slurry pipeline 6-1 at the top of the first section of foundation 4-1;
[0046] 10) Connect the bottom of frame 2-3 in device 2 with the top of the second section of foundation 4-2, connect chain blade 3 at the bottom of device 2 with chain blade 3 at the top of the second section of foundation 4-2 to constitute chain excavating device 4, and connect slurry pipeline 6-1 at the bottom of device 2 with slurry pipeline 6-1 at the top of the second section of foundation 4-2;
[0047] 11) Start device 2-1-1, so that device 2-1-1 drives chain blade 3 to move along the track of foundation 4-1, chain blade 3 excavates the rock and soil at the bottom of the first section of foundation 4-1 and transports the excavated rock and soil to the top, and device 2-2 separates the rock and soil transported by chain blade 3 from the bottom of foundation 4-1 from chain blade 3;
[0048] 12) Device 2, first section of foundation 4-1 and second section of foundation 4-2 descend synchronously to the set position;
[0049] 13) Separate and remove device 2 from the second section of foundation 4-2;
[0050] Repeat the above steps 7), 8), 9), 10), 11), and 12) to complete the connection of each section of the foundation and descend to the set position, and then pull out chain blade 3 for concrete pouring.
The present invention is further described below in conjunction with the drawings attached:
[0051] As shown in
[0052] As shown in
[0053] As shown in
[0054] As shown in
[0055] As shown in
[0056] 1) Pre-fabricate foundation 4B by blocks at the factory;
[0057] 2) Install and fix frame 1-1 on the spot;
[0058] 3) Transport the first section (i.e. bottom section) of foundation 4B-1 to the site, load it into fixed frame 1-1, and install chain blade 3;
[0059] 4) Connect the bottom of frame 2B-3 in device 2B with the top of the first section of foundation 4B-1, connect chain blade 3 at the bottom of device 2B with the chain blade 3 at the top of the first section of foundation 4B-1 to constitute chain excavating device 5B, and connect slurry pipeline 6-1 at the bottom of device 2B with slurry pipeline 6-1 at the top of the first section of foundation 4B-1;
[0060] 5) Start device 2-1-1, so that device 2-1-1 drives chain blade 3 to move along the track of foundation 4B-1, chain blade 3 excavates the rock and soil at the bottom of the first section of foundation 4B-1 and transports the excavated rock and soil to the top, and device 2B-2 separates the rock and soil transported by chain blade 3 from the bottom of foundation 4B-1 from chain blade 3;
[0061] 6) Device 2B and the first section of foundation 4B-1 descend synchronously to the set position;
[0062] 7) Separate and remove device 2B from the first section of foundation 4B-1;
[0063] 8) Load the second section of foundation 4B-2 into frame 1-1;
[0064] 9) Connect the bottom of the second section of foundation 4B-2 with the top of the first section of foundation 4B-1, connect chain blade 3 at the bottom of the second section of foundation 4B-2 with chain blade 3 at the top of the first section of foundation 4B-1, and connect slurry pipeline 6-1 at the bottom of the second section of foundation 4B-2 with slurry pipeline 6-1 at the top of the first section of foundation 4B-1;
[0065] 10) Connect the bottom of frame 2-3 in device 2B with the top of the second section of foundation 4B-2, connect chain blade 3 at the bottom of device 2 with chain blade 3 at the top of the second section of foundation 4B-2 to constitute chain excavating device 5B, and connect slurry pipeline 6-1 at the bottom of device 2B with slurry pipeline 6-1 at the top of the second section of foundation 4B-2;
[0066] 11) Start device 2-1-1, so that device 2-1-1 drives chain blade 3 to move along the track of foundation 4B, chain blade 3 excavates the rock and soil at the bottom of the first section of foundation 4B-1 and transports the excavated rock and soil to the top, and device 2B-2 separates the rock and soil transported by chain blade 3 from the bottom of foundation 4B from chain blade 3;
[0067] 12) Device 2B, first section of foundation 4B-1, and second section of foundation 4B-2 descend synchronously to the set position;
[0068] 13) Separate and remove device 2B from the second section of foundation 4B-2;
[0069] Repeat the above steps 7), 8), 9), 10), 11), and 12) to complete the connection of each section of the foundation and descend to the set position, and then pull out chain blade 3 for concrete pouring.