Lifting arrangement for lifting a wind turbine component
10577224 ยท 2020-03-03
Assignee
Inventors
Cpc classification
B66C1/12
PERFORMING OPERATIONS; TRANSPORTING
F05B2240/912
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02P70/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
E04H12/342
FIXED CONSTRUCTIONS
B66C1/108
PERFORMING OPERATIONS; TRANSPORTING
Y02E10/728
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F05B2230/61
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F03D13/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/72
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
F03D13/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04H12/34
FIXED CONSTRUCTIONS
Abstract
A lifting arrangement (1) for lifting a wind turbine tower segment (2), the lifting arrangement (1) comprising at least two component pulley arrangements (3) connected to a flange (5) of the tower segment, and at least one hoisting pulley arrangement (4), arranged to be connected to a hoisting apparatus. A rope (8) interconnects the component pulley arrangements (3) and the hoisting pulley arrangements (4), in such a manner that each component pulley arrangement (3) is connected to two hoisting pulley arrangements (4), or to one hoisting pulley arrangement (4) and a rope end attachment point (9), via the rope (8), and each hoisting pulley arrangement (4) is connected to two component pulley arrangements (3), via the rope (8), the rope (8) being arranged movably in each pulley arrangement (3, 4). The tower segment (2) is automatically rotated from a first orientation into a second orientation during the lifting process. Load distribution among various parts of the rope (8) is ensured.
Claims
1. A lifting arrangement for lifting a wind turbine tower segment, the lifting arrangement comprising: at least two component pulley arrangements, connected to a flange of the tower segment, at least one hoisting pulley arrangement, arranged to be connected to a hoisting apparatus, and a first rope interconnecting the component pulley arrangements and the hoisting pulley arrangements, in such a manner that each component pulley arrangement is connected to two hoisting pulley arrangements, or to one hoisting pulley arrangement and a rope end attachment point, via the first rope, and each hoisting pulley arrangement is connected to two component pulley arrangements, via the first rope, the first rope being arranged movably in each pulley arrangement, wherein each hoisting pulley arrangement is movable in a direction to and from adjacent hoisting pulley arrangements.
2. The lifting arrangement according to claim 1, wherein the attachment points are joined.
3. The lifting arrangement according to claim 1, wherein the attachment points are joined at a single lifting point of the hoisting apparatus.
4. The lifting arrangement according to claim 3, wherein the single lifting point is attached to one single lifting hook of the hoisting apparatus.
5. The lifting arrangement according to claim 1, wherein the first rope, from each attachment point to the nearest component pulley, forms an angle of at least 10 degrees from vertical.
6. The lifting arrangement according to claim 1, wherein each hoisting pulley arrangement is movable in the direction to and from adjacent hoisting pulley arrangements to an extent where adjacent hoisting pulley arrangements touch each other.
7. The lifting arrangement according to claim 1, wherein each component pulley arrangement is attached to attaching points on the flange by means of a second rope attached to the flange.
8. The lifting arrangement according to claim 7, where the second ropes form the same distance from each component pulley arrangement to the corresponding attaching points on the flange.
9. The lifting arrangement according to claim 7, where the second ropes attach each component pulley to at least two attaching points.
10. The lifting arrangement according to claim 1, comprising at least three component pulley arrangements attached to the flange such that the distances between attachment point(s) of each component pulley arrangement and attachment point(s) of an adjacent component pulley arrangement are essentially the same.
11. The lifting arrangement according to claim 1, wherein each of the hoisting pulley arrangements are connected to a single connecting point by a third rope, and wherein each third rope extends from the single connecting point towards the corresponding hoisting pulley arrangement such that they form a cone shape symmetrically with respect to a vertical axis through the single connecting point.
12. The lifting arrangement according to claim 1, wherein the tower segment has a diameter D, wherein the rope has a length L, and wherein L is at least 2 times D.
13. A method for lifting a wind turbine tower segment using a lifting arrangement according to claim 1, the method comprising the steps of: attaching the component pulley arrangements to the connecting flange of the tower segment, the tower segment being arranged in a first orientation, and at least two component pulley arrangements being attached to the tower segment at attaching points which are displaced relative to each other along a vertical direction, connecting the hoisting pulley arrangement(s) to the hoisting apparatus, mounting the first rope in the component pulley arrangements and the hoisting pulley arrangements, in such a manner that each component pulley arrangement is connected to two hoisting pulley arrangements, or to one hoisting pulley arrangement and the rope end attachment point, via the first rope, and each hoisting pulley arrangement is connected to two component pulley arrangements, via the first rope, and lifting the hoisting pulley arrangements by means of the hoisting apparatus, thereby causing a relative movement between the first rope and the pulley arrangements, said relative movement causing the tower segment to rotate into a second orientation, while the tower segment is lifted by means of the hoisting apparatus and via the lifting arrangement.
14. The method according to claim 13, wherein the step of connecting the component pulley arrangements to the tower segment comprises connecting the component pulley arrangements at attaching points arranged substantially equidistantly along a circumference of the flange.
15. The method according to claim 14, wherein the attaching points are arranged offset at most 120 degrees relative to each other along the circumference of the flange.
16. The method according to claim 13, wherein the relative movement between the first rope and the pulley arrangements, caused by lifting the hoisting pulley arrangements, causes the distance between interconnected pulley arrangements to be changed, thereby causing the rotation of the tower segment.
17. The method according to claim 13, comprising the step of connecting opposite ends of the first rope to a mutual rope attachment point.
18. A lifting arrangement for lifting a wind turbine tower segment, the lifting arrangement comprising: at least two component pulley arrangements, connected to a flange of the tower segment, at least one hoisting pulley arrangement, arranged to be connected to a hoisting apparatus, and a first rope interconnecting the component pulley arrangements and the hoisting pulley arrangements, in such a manner that each component pulley arrangement is connected to two hoisting pulley arrangements, or to one hoisting pulley arrangement and a rope end attachment point, via the first rope, and each hoisting pulley arrangement is connected to two component pulley arrangements, via the first rope, the first rope being arranged movably in each pulley arrangement, wherein the attachment points are joined at a single lifting point of the hoisting apparatus.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention will now be described in further detail with reference to the accompanying drawings in which
(2)
(3)
(4)
(5)
DETAILED DESCRIPTION OF THE DRAWINGS
(6)
(7) The lifting arrangement 1 comprises three component pulley arrangements 3 and two hoisting pulley arrangements 4. Each of the component pulley arrangements 3 is connected to a connecting flange 5 of the tower segment 2 at two attaching points 6, via a rope 7. Each of the hoisting pulley arrangements 4 is connected to a single point of a hoisting apparatus (not shown), e.g. in the form of a crane.
(8) A rope 8 interconnects the component pulley arrangements 3 and the hoisting pulley arrangement 4 in an alternating manner, as described above. The ends of the rope 8 are connected to a rope end attachment point 9, which is also connected to the hoisting apparatus thereby joining the attachment points. Thus, the rope 8 runs from the rope end attachment point 9, through a first component pulley arrangement 3, a first hoisting pulley arrangement 4, a second component pulley arrangement 3, a second hoisting pulley arrangement 4, a third component pulley arrangement 3, and is finally received at the rope end attachment point 9. This is illustrated by the arrows shown at the rope 8.
(9) Since the rope 8 passes through pulleys of the pulley arrangements 3, 4, it is allowed to move relative to the pulley arrangements 3, 4. Accordingly, the distances between neighbouring pulley arrangements 3, 4, defined by the part of the rope 8 which interconnects the pulley arrangements 3, 4, can be changed. This will be described in further detail below. In
(10)
(11)
(12) In
(13) In
(14)
NUMBERED EMBODIMENTS
(15) In a third aspect, the invention may provide a lifting arrangement for lifting a wind turbine component in general, e.g. with the following numbered embodiments.
Embodiment 1
(16) A lifting arrangement (1) for lifting a wind turbine component (2), the lifting arrangement (1) comprising: at least two component pulley arrangements (3), arranged to be connected to the wind turbine component (2), at least one hoisting pulley arrangement (4), arranged to be connected to a hoisting apparatus, and a rope (8) interconnecting the component pulley arrangements (3) and the hoisting pulley arrangements (4), in such a manner that each component pulley arrangement (3) is connected to two hoisting pulley arrangements (4), or to one hoisting pulley arrangement (4) and a rope end attachment point (9), via the rope (8), and each hoisting pulley arrangement (4) is connected to two component pulley arrangements (3), via the rope (8), the rope (8) being arranged movably in each pulley arrangement (3, 4).
Embodiment 2
(17) A lifting arrangement (1) according to embodiment 1, wherein the number of hoisting pulley arrangements (4) is equal to the number of component pulley arrangements (3).
Embodiment 3
(18) A lifting arrangement (1) according to embodiment 1, wherein the number of hoisting pulley arrangements (4) is one less than the number of component pulley arrangements (3).
Embodiment 4
(19) A lifting arrangement (1) according to any of the preceding embodiments, wherein each component pulley arrangement (3) is arranged to be attached to the wind turbine component (2) by means of a rope (7) attached to the wind turbine component (2) at two attaching points (6).
Embodiment 5
(20) A lifting arrangement (1) according to any of the preceding embodiments, wherein the lifting arrangement (1) comprises at least three component pulley arrangements (3) and at least two hoisting pulley arrangements (4).
Embodiment 6
(21) A lifting arrangement (1) according to any of the preceding embodiments, wherein the wind turbine component is a tower segment (2).
Embodiment 7
(22) A lifting arrangement (1) according to any of the preceding embodiments, wherein all of the hoisting pulley arrangements (4) are arranged to be connected to the hoisting apparatus via a single connecting point.
Embodiment 8
(23) A method for lifting a wind turbine component (2) using a lifting arrangement (1) according to any of the preceding embodiments, the method comprising the steps of: connecting the component pulley arrangements (3) to the wind turbine component (2), the wind turbine component (2) being arranged in a first orientation, and at least two component pulley arrangements (3) being attached to the wind turbine component (2) at attaching points (6) which are displaced relative to each other along a vertical direction, connecting the hoisting pulley arrangement(s) (4) to a hoisting apparatus, mounting the rope (8) in the component pulley arrangements (3) and the hoisting pulley arrangements (4), in such a manner that each component pulley arrangement (3) is connected to two hoisting pulley arrangements (4), or to one hoisting pulley arrangement (4) and a rope end attachment point (9), via the rope (8), and each hoisting pulley arrangement (4) is connected to two component pulley arrangements (3), via the rope (8), and lifting the hoisting pulley arrangements (4) by means of the hoisting apparatus, thereby causing a relative movement between the rope (8) and the pulley arrangements (3, 4), said relative movement causing the wind turbine component (2) to rotate into a second orientation, while the wind turbine component (2) is lifted by means of the hoisting apparatus and via the lifting arrangement (1).
Embodiment 9
(24) A method according to embodiment 8, wherein the step of connecting the component pulley arrangements (3) to the wind turbine component (2) comprises connecting the component pulley arrangements (3) at attaching points (6) arranged substantially equidistantly along a circumference of the wind turbine component (2).
Embodiment 10
(25) A method according to embodiment 8 or 9, wherein the step of connecting the hoisting pulley arrangements (4) to a hoisting apparatus comprises connecting all of the hoisting pulley arrangements (4) to a single connecting point.
Embodiment 11
(26) A method according to any of embodiments 8-10, wherein the relative movement between the rope (8) and the pulley arrangements (3, 4), caused by lifting the hoisting pulley arrangements (4), causes lengths of rope (8) arranged between interconnected pulley arrangements (3, 4) to be changed, thereby causing the rotation of the wind turbine component (2).
Embodiment 12
(27) A method according to any of embodiments 8-11, wherein the wind turbine component is a tower segment (2), and wherein the step of connecting the component pulley arrangements (3) to the wind turbine component (2) comprises attaching the component pulley arrangements (3) to a connecting flange (5) of the tower segment (2).