APPARATUS FOR AND METHOD OF FIBRE PLACEMENT FOR THE FORMATION OF FIBRE PREFORMS
20200047435 ยท 2020-02-13
Assignee
Inventors
- Thomas JAMES (London, GB)
- Arthur Lewis SWARBRICK (Loughborough, GB)
- Ian HAYTO (Duxford, GB)
- Dimitrios KARANATSIS (Duxford, GB)
- Ian JONES (Duxford, GB)
- Tim JONES (Duxford, GB)
- Christopher BEARD (Duxford, GB)
Cpc classification
B29C70/542
PERFORMING OPERATIONS; TRANSPORTING
B29B11/16
PERFORMING OPERATIONS; TRANSPORTING
B29C70/56
PERFORMING OPERATIONS; TRANSPORTING
B29C31/08
PERFORMING OPERATIONS; TRANSPORTING
International classification
B29C70/56
PERFORMING OPERATIONS; TRANSPORTING
B29B11/16
PERFORMING OPERATIONS; TRANSPORTING
B29C70/38
PERFORMING OPERATIONS; TRANSPORTING
B29C31/08
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A manufacturing apparatus for constructing a 3D preform from carbon fibre tow (10), in which the tow is deposited by an AFP head (2400) onto a membrane (2204) which is conveyed to a forming cell (114) for diaphragm forming. Active tension control is provided with an offwind (102) combined with an accumulator (106) and compensator (108). The invention also provides a method of manufacture.
Claims
1-93. (canceled)
94. A method of manufacture of a preform for a composite moulding operation, comprising the steps of: providing a preform having deformable surface in a first shape; providing a fibre placement head; depositing a fibre onto the deformable surface of the preform, said deformable surface being a flexible membrane in a first shape; moving at least one of the fibre placement head and deformable surface relative to one another whilst depositing the fibre from the head onto the deformable surface to form the preform in the first shape; and deforming the deformable surface, whereby the preform is formed into a second shape, different to the first shape.
95. The method according to claim 94, in which the deformable surface is rotationally moveable about an axis intersecting the deformable surface relative to the head.
96. The method according to claim 95, comprising the step of: depositing two or more layers of fibre onto the deformable surface.
97. The method according to claim 96, further comprising the steps of: providing a material configured to bind adjacent layers of fibre material; applying the material to the fibre.
98. The method according to claim 97, wherein the binder material is a resin.
99. The method according to claim 98, wherein the binder material is in the form of a resin film or resin layer and the fibre is bound by resin tack.
100. The method according to claim 99, in which the binder material is applied to the fibre after it is deposited onto the flexible surface.
101. The method according to claim 100, further comprising the steps of: applying the binder material between at least two of two or more layers of fibres.
102. The method according to claim 101, in which the binder material is in the form of a sheet.
103. The method according to any claim 102, further comprising the step of: controlling the tack of the binder material by regulating the temperature of the binder material.
104. The method according to claim 103, in which the deformable surface is a flexible membrane.
105. The method according to claim 104, further comprising the steps of: providing a second deformable surface; after the step of depositing the fibre, enclosing the deposited fibre between the deformable surface and the further deformable surface to form a fibre cavity; deforming the fibre to form a 3D preform by deforming the deformable surface and the further deformable surface.
106. The method according to claim 105, further comprising the steps of: providing a fibre deposition cell at which the step of depositing the fibre takes place; providing a separate forming cell at which the step of deforming takes place; conveying the deformable surface between the fibre deposition cell and the forming cell.
107. An apparatus for the manufacture of a fibre preform for a composite moulding operation, the apparatus comprising: a fibre placement head; a deformable form; a three-dimensional mould shape; in which at least one of the fibre placement head and deformable surface is moveable to deposit fibres onto the deformable surface to form a preform in a first shape; and, in which at least one of the deformable surface and three-dimensional mould form is movable relative to the other such that the preform in the first shape on the deformable surface is deformed into a second shape different to the first shape.
Description
SPECIFIC DESCRIPTION
[0123] An example apparatus and method according to the present invention will now be described with reference to the accompanying Figures, in which:
[0124]
[0125]
[0126]
[0127]
[0128]
[0129]
[0130]
[0131]
[0132]
[0133]
[0134]
[0135] Referring to
[0144] It will be understood that although each of the sub-assemblies works synergistically with the others to achieve the desired result, they can operate as independent modules as required. Each of the sub-assemblies will be described in detail below.
Fibre Offwind 102
[0145] It will be understood that fibre offwind systems in general are known in the art. The fibre offwind 102 incorporated into the apparatus 100 comprises a frame on which a plurality (in this embodiment, eight) individual shafts are mounted for rotation about parallel axes driven by individual motors 1024. A bobbin is mounted on each shaft. Each bobbin comprises a length of wound carbon fibre tow 10. The tow comprises flat strips of carbon material formed from parallel fibres. In this embodiment, each bobbin 1028 comprises approximately 12 kg of wound carbon fibre tow. The tow used in the present embodiment is drythat is to say that it is provided without a heat-responsive coating such as a powder binder.
[0146] The rotation of each shaft is influenced by a motor which has the ability to brake the shaft and thereby influence the tension in the fibre tow. The motors of the offwind are controlled by the controller 116.
[0147] At one side of the frame there is provided an exit feed which guides the tow from the bobbins towards the guide frame 104 as is wound off.
Guide Frame 104
[0148] The guide frame 104 is positioned downstream of the offwind and receives tow therefrom. It is also upstream of the accumulator 106 (to be described below). Before feeding to the accumulator, it is desirable that the individual tows are aligned, co-planar and spaced apart by a predetermined distance. The primary purpose of the guide frame is to accept the tow from the off-wind (which will feed in to the guide frame 104 at varying positions) and to prepare it for the accumulator.
[0149] The guide frame 104 therefore comprises several sets of rollers and fairleads to guide the tow to the accumulator.
Accumulator 106
[0150] Referring to
[0151] An entry shaft 1064 having a horizontal axis S1 is mounted to the frame 1060 at a first vertical position. The entry shaft 1064 is fixed in the vertical sense. A plurality of sheaves 1066 are mounted for free rotation on the entry shaft 1064 via low friction roller bearings (not visible). In this embodiment, there are eight sheaves 1066 each having a shaft portion and opposed end flanges to retain a respective strip of tow 10 on the shaft portion.
[0152] A first fixed shaft 1068 having a horizontal axis S2 is mounted to the frame 1060 at a second vertical position. The first fixed shaft 1068 is fixed in the vertical sense. A plurality of sheaves 1070 are mounted for free rotation on the first fixed shaft 1068 via low friction roller bearings (not visible). In this embodiment, there are eight sheaves 1070 each having a shaft portion and opposed end flanges to retain a respective strip of tow on the shaft portion.
[0153] A displaceable shaft 1072 having a horizontal axis S3 is mounted to the frame 1060 for vertical movement. The displaceable shaft 1072 is supported on a carriage 1074 which is vertically displaceable via a linear actuator 1076. A plurality of sheaves 1078 are mounted for free rotation on the displaceable shaft 1072 via low friction roller bearings (not visible). In this embodiment, there are eight sheaves 1078 each having a shaft portion and opposed end flanges to retain a respective strip of tow on the shaft portion.
[0154] A second fixed shaft 1080 having a horizontal axis S4 is mounted to the frame 1060 at the same vertical position as the first fixed shaft 1068. The second fixed shaft 1080 is fixed in the vertical sense. A plurality of sheaves 1082 are mounted for free rotation on the second fixed shaft 1080 via low friction roller bearings (not visible). In this embodiment, there are eight sheaves 1082 each having a shaft portion and opposed end flanges to retain a respective strip of tow on the shaft portion.
[0155] The rows of sheaves 1066, 1070, 1078, 1082 are aligned in the axial sense. Each of the tow strips 10 from the guide frame 104 enters in direction X. It is fed over a sheave 1066 on the entry shaft 1064, passing through 90 degrees to a downward direction Z. Each tow is then fed under a sheave of the first fixed shaft 1068, turning through 180 degrees to direction Z before passing over a sheave of the displaceable shaft 1072 through 180 degrees to direction Z to a sheave of the second fixed shaft 1080. The tow passes through another 180 degree turn back to +Z towards the compensator 108.
[0156] Therefore, the tow forms an inverted U shape in the XZ plane passing between the first fixed shaft 1068, the displaceable shaft 1072 and the second fixed shaft 1080.
[0157] The role of the accumulator is to keep tension substantially constant in the tow as the AFP head 2400 moves (to be described in more detail below). For the purposes of the present description, it will be understood that a non-negative (>0 Newton) tension should be retained in the tow 10 at all times. Because the AFP head moves (notwithstanding the deposition of tow from the head), tension would otherwise vary significantly. For example, if the AFP head moves towards the direction from which the tow is fed, the tension would quickly reduce, perhaps below zero (i.e. causing slack tow). Similarly, if the AFP head moves away from the direction from which the tow is fed, the tension would quickly increase, perhaps excessively.
[0158] Movement of the displaceable shaft 1072 in the vertical Z direction alters the length of tow between the first and second fixed shafts 1068, 1080.
[0159] In this way, control of the linear actuator 1076 can be used to account for movement of the AFP head 2400. If the AFP head moves away from the direction of feed of tow by a distance A, the linear actuator can be moved by A/2 towards the fixed shafts 1068, 1080 to take up the additional tow in the feed. This movement is demonstrated by comparing
[0160] In other words, the accumulator accumulates or takes up the slack in the system. Similarly, if the AFP head moves towards from the direction of feed of tow by a distance B, the linear actuator can be moved by B/2 towards the fixed shafts 1068, 1080 to provide additional tow in the feed. The linear actuator 1076 is controlled by the controller 116 as will be described below.
Compensator 108
[0161] Referring to
[0162] The compensator 108 is downstream of the accumulator 106 and upstream of the AFP cell 110. Whereas the accumulator is configured to account for: [0163] large variations in tow tension/displacement; [0164] across all tows simultaneously,
the compensator is configured to absorb: [0165] smaller variations in tension/displacement; [0166] for each individual tow.
[0167] The compensator 108 comprises a frame 1080. The frame 1080 has a first (upper) end 1082 and a second (lower) end 1084. A plurality of eight pneumatic springs 1086 are attached to the upper end of the frame, each spring 1086 comprising a cylinder 1088 and a piston 1090 linearly movable therein in the Z axis. It will be noted that in
[0168] A plurality of eight sheaves 1094 are mounted on a single shaft for rotation proximate the second end 1084 of the frame 1080. Again, only the end sheave 1094 is visible.
[0169] In use, the tow 10 is passed upwardly (in the +Z direction) from the accumulator and over the rollers 1092. From there, the tow 10 is passed to the sheaves 1094 where it turns through approximately 90 degrees to travel in the X direction towards the AFP cell 110.
[0170] The eight springs 1086 are independenttherefore each piston 1090 can move independently of the others. The result is that any increased tension in any individual tow 10 will act to pull the piston 1090 from the cylinder 1088. Therefore, these small variations in tension which occur between tows are absorbed to provide a near-constant positive tension (note that large variations common to all tows are dealt with by the accumulator). Similarly, any drops in tension which occur between tows are absorbed with the pistons travelling upwardly to maintain the near-constant positive tension.
Automated Fibre Placement (AFP) Cell 110
[0171] A side view of the AFP cell 110 is shown in
[0172] The AFP cell comprises: [0173] a gantry 2000; [0174] a bed 2100; [0175] a membrane assembly 2200; [0176] a gate 2300; [0177] an AFP head 2400; and, [0178] a scrim feeder 2500
[0179] The gantry 2000 comprises a gantry frame 2002. In this embodiment, the gantry is approximately 2.0 m2.0 m in plane. The gantry 2000 is configured to move the AFP head 2400 in the X, Y directions using a pair of motors 2016, 2018 respectively. The plane is shown in a horizontal position but it could be implemented in any desired plane (vertical, horizontal or any other angle).
[0180] The bed 2100 is attached to the gantry 2000, and is configured to rotate about an axis B which is parallel to Z.
[0181] The membrane assembly 2200 comprises a frame 2202 and a membrane 2204. The membrane is constructed from a sheet of deformable, elastic material (silicone in this embodiment). The frame 2202 holds the membrane 2204 under tension. The AFP cell comprises a plurality of actuators (not visible) which lower the membrane assembly 2200 onto the bed 2100. As the membrane is lowered, the bed 2100 fits within the frame 2202 to contact the membrane 2204 (
[0182] A binder feeder in the form of a scrim feeder 2500 is provided as shown in
[0183] The AFP head 2400 receives the 8 strips of tow 10 from the gate 2300 and is configured to deposit them onto the membrane 2204 (specifically onto a layer of scrim 2508 which overlays the previous fibre layer). The tow is fed in the X direction from the gate 2300 and enters the head 2400. The tow 10 exits the AFP head 2400 at the membrane 2204, parallel to the direction of entry (i.e. X).
[0184]
[0185] Step I in
[0186] Moving to step II, the tow is grabbed by the deposition roller (i.e. between the deposition roller and the membrane 2204) which effectively becomes the master drive for the tow feed. The deposition roller is not directly driveninstead it rotates under friction as the head is moved across the membrane with the deposition roller 2406 in contact with the tow, which in turn is in contact with the membrane, scrim or previous layer of tow. As the tow is now being pulled, the nip roller 2402a can freewheel in direction M relative to the motor 2408. The motor 2408 is driven at a slower speed than the deposition roller 2406 to ensure that the sprag clutch can freewheel. Before the tow contacts the membrane 2204, and upstream of the deposition roller 2406, it is heated as it passes through the heater channel 2405. The power delivered to the heaters 2405a, 2405b is selected such that the temperature of the tow as it is deposited is sufficient to slightly melt (i.e. tackify) the scrim 2508. As the AFP head moves across the membrane 2204, the tackified scrim grabs the tow. The tow is under a tension force T as it is deposited. It will be noted that this method is well suited to dry tow being applied to a scrim.
[0187] Moving to step III, after a strip of tow 10 has been deposited, the cutter 2404 is activated to cut the tow 10. The downstream tow 10 continues to be deposited by the roller 2406 because of this the cutter must move at the same rate as the tow, whilst the cut is being made. It is undesirable to continuously feed the tow 10 after the cut is made and the cutter is returning to its starting position, as it would bunch up behind the cutter 2404. As the upstream tow 10 under tension T (previously reacted by the off-wind, accumulator, compensator etc.) is drawn back through the nip rollers 2402a, 2402b, the sprag clutch engages. As such, progress of the tow 10 back through the nip rollers 2402a, 2402b can be controlled by the motor 2408. The motor 2408 is powered in direction M to controllably drive the cut tow feed 10 away from the cutter 2404. In this way, tension can be maintained (the motor 2408 effectively acts as a brake on the tensioned tow).
[0188] Once the tow 10 has been deposited, and the cutter 2404 disengaged, the motor 2408 can be used to feed the tow 10 back to the deposition roller 2406. This is shown in step IV. The cycle can then be repeated for a new strip.
[0189] Operation of the AFP head 2400 in context will be described below as part of the operation of the assembly 100.
Conveyor 112
[0190] With reference to
Diaphragm Forming Cell 114
[0191] The diaphragm forming cell 114 is separate to, and downstream of, the AFP cell 110. The diaphragm forming cell 114, shown in
[0192] The diaphragm forming cell 114 comprises a further membrane assembly 2600. The further membrane assembly 2600 is similar in form to the membrane assembly 2200. It comprises a frame 2602 and a membrane 2604. The frame 2602 defines fluid channels 2603 (
[0193] The diaphragm forming cell 114 comprises a male mould form 1148 positioned underneath the membrane 2204.
[0194] The diaphragm forming cell 114 comprises a heater 2700 configured to direct radiant heat onto the membranes 2204, 2604 from above.
[0195] Both the membrane assembly 2200 and the further membrane assembly 2600 can be moved in the Z direction in use.
[0196] In
[0197] In
[0198] Turning to
[0199] The frames 2202, 2602 are then lowered onto the male mould form 1148 to deform the membranes 2204, 2604 and the fibre and tackified scrim held therebetween into the desired 3D shape.
Controller 116
[0200] The controller 116 is shown schematically in
[0201] In particular, the I/O module has two-way data links to: [0202] the off-wind motors 1024; [0203] the linear actuator 1076 of the accumulator; [0204] the X-Y motors 2016, 2018 controlling the position of the AFP head; [0205] the AFP head 2400 itself; [0206] the motor controlling rotation of the bed 2100; [0207] the actuators controlling the Z position of the membrane assembly 2200 within the AFP cell; [0208] the actuators of the conveyor 112; and, [0209] the diaphragm forming cellspecifically: [0210] the heaters 2700; [0211] the actuators controlling movement of the membrane assembly 2200 and the further membrane assembly 2600; and, [0212] the vacuum pump.
Process Description
[0213] In terms of the forming process, the apparatus functions as follows, with reference to
[0214] At step 3000, the process is initiated in which a 2D shape is generated from a desired 3D preform. This process will not be described in detail here, but it will be understood that such techniques are known in the art.
[0215] At step 3002, the 2D shape is split into strips representing lines of tow required to make the shape. Typically, a plurality of layers is also generated with strips in different directions depending on the requirement of the final part (for example, there may be 4 layers0 degrees/90 degrees/0 degrees/90 degrees).
[0216] At step 3004, the apparatus 100 is initiated. In this state, the membrane 2204 is lowered onto the bed 2100.
[0217] At step 3006, the AFP head 2400 is moved into a starting position for the first layer of tow 10 using the gantry motors 2016, 2018. As it does so, the resulting feed through the gate 2300 is taken up by the accumulator. The controller 116 is configured to generate a level of accumulation required by the XY movement of the head 2400, and the accumulator actuator 1076 is adjusted to provide this accumulation. For example, if the head 2400 moves towards the gate 2300, the actuator 1076 moves the shaft 1072 upwards. If the head 2400 moves away from the gate 2300, the actuator 1076 moves the shaft 1072 downwards. It will be noted that the position of the shaft 1072 is entirely dependent on the XY position of the head 2400 such that as far as the offwind is concerned, the head 2400 is not moving.
[0218] At step 3008, the AFP head is engaged and tow 10 is deposited onto the membrane 2204 supported by the bed 2100 in a strip. The off-wind 102 allows tow 10 to be wound from the bobbins 1028, but the controller uses the motors 1024 to retain a tension in the tow 10 as this occurs. The controller 116 therefore simultaneously controls the off-wind 112 and the accumulator 106 to retain tension in the tow 10.
[0219] At step 3010, the tow 10 is cut (the strip is finished).
[0220] At step 3012, the head 2400 is moved to the starting position for the next strip, and step 3008 is repeated.
[0221] Once all the strips in the first layer have been deposited, at step 3014 a layer of scrim 2508 is pulled across the first layer of tow.
[0222] At step 3016, the bed 2100 is rotated by the controller 116 by 90 degrees for deposition of the next layer of tow. It will be noted that the head 2400 can only deposit tow in one direction, and as such rotation of the bed 2100 is necessary for layers having different orientations.
[0223] At step 3018, the AFP head 2400 is moved into a starting position for the second layer of tow 10 using the gantry motors 2016, 2018. As it does so, the resulting feed through the gate 2300 is taken-up by the accumulator.
[0224] At step 3020, the AFP head is engaged and tow 10 is deposited onto the scrim 2018 supported by the bed 2100 in a strip. The off-wind 102 allows tow 10 to be wound from the bobbins 1028, but the controller uses the motors 1024 to retain a tension in the tow 10 as this occurs. The controller 116 therefore simultaneously controls the off-wind 112 and the accumulator 106 to retain tension in the tow 10.
[0225] At step 3022, the tow 10 is cut (the strip is finished).
[0226] At step 3024, the head 2400 is moved to the starting position for the next strip, and step 3020 is repeated.
[0227] Once all the strips in the first layer have been deposited, at step 3026 a further layer of scrim 2508 is pulled across the first layer of tow, and so on until all layers have been deposited.
[0228] The result is a 2D multiaxial fabric preform constructed from alternating layers of unidirectional fibres.
[0229] It will be noted that throughout this process, the compensator 108 is smoothing out high frequency variations in the individual tow tension.
[0230] At step 3028, the membrane assembly 2200 is raised off the bed 2100 and moved by the conveyor 112 to the forming cell 114.
[0231] Once in the forming cell, at step 3030 the further membrane assembly 2600 is lowered onto the membrane assembly 2200 and a vacuum generated to draw the membranes 2204, 2604 together to sandwich the deposited tow and scrim therebetween.
[0232] The membranes are raised and heated in step 3032 (as described above), and lowered in the Z direction at step 3034, to deform the membranes and thereby the deposited tow 10.
[0233] At step 3036, the vacuum is released to expose the pre-form, which due to the scrim will retain its shape for a further resin transfer moulding operation. The scrim also aids permeability of the preform for resin impregnation.
Variations
[0234] The following variations on the above embodiment fall within the scope of the claims.
[0235] The functions of the accumulator and/or compensator may be fulfilled by the off-wind sub-assembly. If a suitably sized motor was provided which had a significant torque and a fast response time, then the need for a separate accumulator and/or compensator could be eliminated, although this would require modification to the controller.
[0236] The membrane need not be 2D upon initial deposition. Although it is easier to control an AFP head in only two dimensions, it is within the scope of this invention to deposit the fibre onto the membrane in a first 3D shape in the AFP cell, and deform to a second 3D shape in the diaphragm forming cell.
[0237] A powder deposition means may be provided within the guide frame 140 to provide the fibre tows with e.g. binder powder which may supplement, or replace, the function of the scrim. The powder deposition means may be assembled with the AFP head for powder deposition immediately following tow deposition.
[0238] Alternatively, there may be an intermediate powder deposition stage between tow deposition and moulding. In this embodiment, a layer of powder tow may be deposited on the top layer of tow. Alternatively, each layer could be powdered after deposition.
[0239] The resin transfer process may be carried out in the forming cell.
[0240] There are thus provided methods and apparatus for manufacturing preforms including any preforms manufactured by the aforesaid methods and apparatus.