Process for the manufacture of an impermeable connection between at least two fluid carrying silicone hose components and a fluid carrying assembly manufactured according to said process
10549486 · 2020-02-04
Assignee
Inventors
- Björn Gläsel (Kirchenlamitz, DE)
- Jörg Prescher (Ramsthal, DE)
- Axel Wunderlich (Ebmath, DE)
- Robert Reichenberger (Wunsiedel, DE)
Cpc classification
A61M39/12
HUMAN NECESSITIES
B29C66/322
PERFORMING OPERATIONS; TRANSPORTING
B29L2023/007
PERFORMING OPERATIONS; TRANSPORTING
B29C65/483
PERFORMING OPERATIONS; TRANSPORTING
B29K2683/00
PERFORMING OPERATIONS; TRANSPORTING
B29C66/71
PERFORMING OPERATIONS; TRANSPORTING
B29C66/5221
PERFORMING OPERATIONS; TRANSPORTING
B29C65/4845
PERFORMING OPERATIONS; TRANSPORTING
B29K2083/005
PERFORMING OPERATIONS; TRANSPORTING
B29C66/71
PERFORMING OPERATIONS; TRANSPORTING
B29K2083/005
PERFORMING OPERATIONS; TRANSPORTING
B29C66/1224
PERFORMING OPERATIONS; TRANSPORTING
B29K2083/00
PERFORMING OPERATIONS; TRANSPORTING
B29C66/1222
PERFORMING OPERATIONS; TRANSPORTING
F16L11/005
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16L47/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B29C66/949
PERFORMING OPERATIONS; TRANSPORTING
B29K2083/00
PERFORMING OPERATIONS; TRANSPORTING
B29C66/919
PERFORMING OPERATIONS; TRANSPORTING
B29C65/562
PERFORMING OPERATIONS; TRANSPORTING
International classification
B29C65/00
PERFORMING OPERATIONS; TRANSPORTING
B29C65/56
PERFORMING OPERATIONS; TRANSPORTING
F16L11/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
In a process for the manufacture of an impermeable connection between at least two fluid carrying silicone hose components, the silicone hose components and a silicone connector component are first prepared. Afterwards a fluid silicone mass is applied to at least one connecting area where the silicone hose components abut on the silicone connector components. The at least one connecting area is post cured to harden the silicone mass. In a fluid carrying assembly with at least two fluid carrying silicone hose components and at least one silicone connector component, a fluid carrying connection is manufactured between these components by means of this process. This design results in a connecting technique that is, on the one hand, secure and, on the other hand, enables automation of the manufacture of an impermeable connection and thus of the fluid carrying assembly.
Claims
1. A process for the manufacture of an impermeable connection between at least two fluid carrying hose components comprising: provision of a plurality of fluid carrying silicone hose components and a silicone connector component; application of a fluid silicone mass to at least one connecting area where the silicone hose components abut on the silicone connector component; and polymeric post curing of at least one connecting area to harden the silicone mass; wherein the silicone connector component has a sheath to externally cover a collection zone of the at least one connecting area; and wherein during application of the fluid silicone mass, the fluid silicone mass is applied to the collection zone of the at least one connecting area that is externally covered by the sheath.
2. The process according to claim 1, wherein pre-hardening of the silicone mass takes place prior to post curing.
3. The process according to claim 1, wherein in order to bring at least one of the silicone hose components into contact with the silicone connector component in the connecting area, the at least one of the silicone hose components is pushed inside the silicone connector component.
4. The process according to claim 3, wherein pushing of the at least one of the silicone hose components inside the silicone connector component results in pre-centering of the at least one of the silicone hose components relative to the silicone connector component.
5. The process according to claim 1, wherein the sheath is expanded before being brought into contact with at least one of the silicone hose components.
6. The process according to claim 1, wherein polymeric post curing of the connecting area takes place through annealing.
Description
BRIEF DESCRIPTION OF THE DRAWING
(1)
(2)
DESCRIPTION OF THE PREFERRED EMBODIMENTS
(3)
(4) Apart from at least one silicone connector component, the fluid carrying assembly 1 has 2 further silicone hose components; exactly one of these silicone hose components 3 is shown in
(5) Both the connector components 2, on the one hand, and the hose components 3, on the other hand, may be made of the same silicone material composition.
(6) In the connecting area 4 of the fluid carrying assembly 1, where the hose component 3 is connected to the connector component 2, the connector component 2 has a centering device 5. With reference to a longitudinal axis 6 of the connecting area 4, the centering device forms centered collection of the connector component 2 that the hose component 3 is pushed into. A leading front wall 5a of the connector component 2, facing the hose component 3, is conically designed to taper off to an external circumferential wall of the hose component 3. This favors a tight closing between the connector component 2 and the hose component 3 in the connecting area 4.
(7) A hardened silicone mass 7, previously applied as a raw fluid mass to the connecting area 4, serves for the impermeable connection of the connector component 2 to the hose component 3. In order to harden the silicone mass 7, it was post cured after application to the connecting area 4.
(8) For manufacture of the impermeable connection in the connecting area 4, the hose component 3 may either first be pushed inside the connector component 2 and afterwards transferred to the still fluid silicone mass 7, or the procedure may be reversed, whereby the silicone mass is first prepared for transfer to the connector component 2 and/or the hose component 3 in the connecting area 4, and afterwards the hose component 3 is pushed inside the connector component 2.
(9) In a manufacturing process that is not shown, the hose component may even hold the centering device in which, in this case, the connector component is pushed inside.
(10) In the design shown in
(11) The silicone mass 7 may consist of a high-temperature vulcanized (HTV) silicone, a liquid silicone rubber (LSR), a silicone adhesive or even a different kind of silicone.
(12) For manufacture of the impermeable connection between at least two fluid carrying silicone hose components like hose component 3, the silicone hose component and at least one silicone connector component are first prepared, for example like connector component 2. Afterwards the fluid silicone mass 7 is applied to at least one connecting area 4 where the silicone hose component 3 is lying on the silicone connector component 2. Thus the at least one connecting area 4 is post cured to harden the silicone mass 7.
(13) Prior to application to the connecting area 4, the fluid silicone mass 7 may be prepared. In this process, a raw silicone mass is first rolled so that a preform may be produced from the rolled raw silicone mass, for example a tube of a prescribed diameter. A tube of this kind may be produced through extrusion. Alternatively, instead of a tube, a pre-form may be produced in the form of a strip or profile, particularly through extrusion. What is more, a tube shaped pre-form of the raw silicone mass may be rolled flat between two sheets. These sheets may be fluted or tufted, thus making it easier for the pre-form to be removed from the sheets surrounding it after rolling After removal, the silicone mass rolled between the sheets is ready to be applied to the connecting area 4.
(14) When the fluid silicone mass 7 is applied to the connecting area, it may be stretched. This may be done by exerting tensile stress on the silicone mass during application.
(15) Prior to polymeric post curing, and particularly before annealing, the silicone mass 7 may be pre-hardened. This pre-hardening may be carried out through exposing the applied silicone mass to infrared light radiation. Pre-hardening serves to post cure the silicone mass 7 and/or to pre-position or fix the silicone mass 7 prior to the actual post curing process.
(16) In order to bring the hose component 3 into contact with the connector component 2, which may take place before or after application of the silicone mass 7, according to the design in
(17) In the design in
(18) Further designs of fluid carrying assemblies will now be discussed with reference to
(19) The fluid carrying assembly 8 in
(20) In fluid carrying assembly 11 in
(21) The sheath 12 is designed as a sheath sleeve whose external circumference first corresponds to the external circumference of the connector component 2, whereby the sheath 12 tapers off conically in the area of a free end 14, so that the sheath 12 on the free end 14 abuts directly on an external cladding wall 15 of the hose component 3. The collection zone is thus closed on all sides. In the design in
(22) In the design in
(23) When the fluid silicone mass 7 is applied to the connecting component 2, after being pushed into the hose component 3, the silicone mass 7 is, for example, injected between the free end 14 and the cladding wall 15. Alternatively, injection may also be carried out through an insertion channel (this is not shown in greater detail) constituting a fluid connection between the collection zone and an external surrounding of the fluid carrying assembly 11. The insertion channel may run radially and/or axially in relation to the longitudinal axis 6. Several insertion channels may be available. For example, there may even be two, three, four, five or more insertion channels available. The insertion channels may be positioned, equally distributed in a circumferential direction around the longitudinal axis.
(24) For manufacture of the impermeable connection, the silicone mass 7 is applied to the externally covered collection zone 13 of the connecting area 4.
(25) The at least one insertion channel may be designed in the connector component 2.
(26) Alternatively or additionally, the external connector component 2 may be spread into the connecting area 4 with the aid of a spreading device so that the internal hose component 3, with the previously applied silicone mass 7, may be pushed into the connecting area 7 that was first spread, without the external side of the silicone mass 7 coming into contact with the internal wall of the connector component 2 in the connecting area 4, in the process. After the hose component 3 has been pushed into the connector component, the spreading process may be ended, so that the silicone mass 7 is radially internal to the hose component 5 and radially external from the connector component in the connecting area. Polymeric post curing may then follow to harden the silicone mass 7. During this process the connecting area may, for example, be annealed at 200 C. for a period of two hours.
(27) The design of the fluid carrying assembly 17 in
(28) Before the hose component 3 is brought into contact with the connector component 2, the sheath 12 or sheath 18 may be expanded.
(29)
(30)