INSULATED SLAB-ON-GRADE FOUNDATION SYSTEM
20200024819 ยท 2020-01-23
Inventors
Cpc classification
E02D27/02
FIXED CONSTRUCTIONS
E02D2250/0023
FIXED CONSTRUCTIONS
International classification
Abstract
A foundation system (1) and method of installing the foundation system. The system including plurality of modular slabs (3, 3A, 3B) mountable onto a gravel layer (2); and at least one horizontal isolating slab (5A, 5B, 5C) and a vertical edge portion (4) positioned with respect to the modular slabs (3A, 3A, 3B) for creating a receptacle wherein concrete is poured thereon.
Claims
1. A method of installing a foundation system, comprising: arranging a gravel layer (2) on to of a soil layer (1); and disposing at least one horizontal isolating slab (5A, 5B, 5C) and a vertical edge portion (4) with respect to the modular slabs (3A, 3A, 3B) for creating a receptacle wherein concrete is poured thereon.
2. The method of claim 1, further comprising installing reinforced bars (9) in the receptacle.
3. The method of claim 1, further comprising installing a vapor barrier (6) on top of an isolating slab (5A, 5B, 5C).
4. The method of claim 1, further comprising installing a peripheral skirt (8) extending outwardly beyond the receptacle.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Further aspects and advantages of the present invention will become better understood with reference to the description in association with the following Figures, in which similar references used in different Figures denote similar components, wherein:
[0016]
[0017]
[0018]
[0019]
DETAILED DESCRIPTION OF ILLUSTRATIVE EMBODIMENTS
[0020] With reference to the annexed drawings the preferred embodiments of the present invention will be herein described for indicative purpose and by no means as of limitation.
[0021] Referring to
[0022] Referring to
[0023] Referring to
[0024] Referring to
[0025] Preferably, the components of the modular slab 3, 3A or 3B are prepared in the workshop according to the size and the customer's plan.
[0026] Then, one has to prepare the ground before installing the modular slab 3, 3A or 3B. In a first step, one has to remove the top soil or vegetal part of the ground where the modular slabs 3, 3A or 3B are to be installed. One has then to arrange a gravel layer of thickness of preferably about 4 inches to 6 inches so has to provide a suitable drainage. Between the soil layer 1 and gravel layer 2 there may be a geotexile fabric so as to not lose the gravel.
[0027] Then, one determines the four corners where the modular slab 3, 3A or 3B are to be installed. A preferred length size of a modular slab 3 made of EPS is about 4 feet. One then completes with the other modules made of EPS all around the periphery.
[0028] The internal corners are made by crossing cross of two modules 3 (and/or 3a shown in
[0029] One then installs a mechanical link, such as a U-shaped metal plate 4 (1 inches wide) that connects all modules 3 throughout the perimeter thereof 3b. Each U-shape metal plate 4 of may be superimposed and secured by self-taping screws.
[0030] The inner surface of the perimeter modules 3 (an/or 3a) are filled with EPS that is to say the first row insulating panels 5 are installed.
[0031] The assembly of the second part of the top modular part 3b (module a (3b) made of EPSlength of 8 feet) is joined by a junction in a key wayTwo modules (3b) cut 45 degrees in pairs make the outer corners. The perimeter segments must be completed with right modules (modular part A (3b) in EPS-length of 8 feet).
[0032] One then installs a mechanical link, such as a U-shaped edge portion 4b that is made of metal (2 wide) that will make the joint on all modules throughout the perimeter of modules A 3b. Each U-shaped portion 4b of metal is joined by overlay and secured by self-tapping metal screws.
[0033] The junction of the modules A 3a and B 3b is done by the key path which allows an adjustment of the final level of the perimeter of the reference modules for the pouring of the concrete.
[0034] This adjustment of the keyway between the module A and B may be fixed by insulated spray in a can.
[0035] A vapor barrier 6, which is preferably of a minimum 0.39 inch (10 mm), is installed within the entire project area. All attached to the U-shaped metal portion 4 so as to perform jointing of the modules.
[0036] The next step involves installation of a transition module (-312 length of 8) inside MODULE A (at a distance of 24 from the internal top of module A) this module is parallel (24 internal distance) from module A of the project.
[0037] The new inner surface of the transition module is filled with EPS-second row insulation board.
[0038] Some installations require a second transition module after the second row EPS insulation, if it is the case then a third row of insulation made of EPS may be required.
[0039] An EPS insulation board fits into the outer bottom of module B at the outer perimeter to make a frost protection skirt over the entire outer perimeter. (The dimensions of this EPS panel are based on the ground freeze calculation for the project region).
[0040] Although the present invention has been described hereinabove by way of specific embodiments thereof, it can be modified, without departing from the spirit and nature of the subject invention defined in the appended claims.