Sea Vessel Docking Station
20230219665 · 2023-07-13
Inventors
- Keith K. Millheim (The Woodlands, TX, US)
- Eric E. Maidla (Sugar Land, TX, US)
- Charles H. King (Austin, TX, US)
Cpc classification
International classification
Abstract
A system and method in which a buoyant central docking station captures, lifts and couples one or more other sea vessels is disclosed, wherein a flexible, modularized production system is quickly realized on a cost effective basis. The capabilities of a number of older, less expensive, readily available vessels are combined to achieve an effective FPSO substitute that allows lower producing fields to be explored and produced in a profitable manner. The time horizon between initiation and consummation of field operations is reduced, and older vessels that might otherwise be scrapped or retired are again made useful and seaworthy in a safe and profitable exploration and production environment.
Claims
1. A wet docking station for exploring and producing offshore energy sites, the wet docking station comprising: a buoyant central docking station; an adjustable buoyancy chamber for adjusting the buoyancy of said buoyant central docking station; and at least one subordinate docking station for capturing and lifting at least one sea vessel; wherein said wet docking station is equipped with at least one of a helicopter pad; a crew quarters; a ship control room; an oil separating unit; a gas separating unit; a water separating unit; a sand separating unit; a gas treatment unit; a gas injection unit; and a power generating unit.
2. The wet docking station of claim 1, wherein said adjustable buoyancy chamber further comprises a chamber that is externally disposed relative to said central docking station.
3. The wet docking station of claim 1, wherein said adjustable buoyancy chamber further comprises a chamber that is internally disposed relative to said central docking station.
4. The wet docking station of claim 1, wherein said adjustable buoyancy chamber further comprises a plurality of discrete inner chambers.
5. The wet docking station of claim 1, wherein said adjustable buoyancy chamber further comprises at least one fluid intake port and at least one fluid evacuation port.
6. The wet docking station of claim 1, further comprising a coupling member used to couple said at least one sea vessel to said central docking station.
7. The wet docking station of claim 1, further comprising a coupling member used to couple a plurality of captured sea vessels to one another.
8. The wet docking station of claim 7, wherein said coupling member further comprises an intermediate deck surface.
9. The wet docking station of claim 1, wherein said at least one sea vessel further comprises an offshore energy exploration equipment package.
10. The wet docking station of claim 1, wherein said at least one sea vessel further comprises an offshore energy production equipment package.
11. (canceled)
12. A method of exploring and producing offshore energy sites using a wet docking station, the method comprising: disposing a buoyant central docking station in communication with an adjustable buoyancy chamber, wherein said adjustable buoyancy chamber is used to adjust the buoyancy of said buoyant central docking station; disposing said buoyant central docking station in communication with at least one subordinate docking station, wherein said at least one subordinate docking station is used to capture and lift at least one sea vessel; and equipping said wet docking station with at least one of a helicopter pad; a crew quarters; a ship control room; an oil separating unit; a gas separating unit; a water separating unit; a sand separating unit; a gas treatment unit; a gas injection unit; and a power generating unit.
13. The method of claim 12, further comprising disposing an adjustable buoyancy chamber that is externally disposed relative to said central docking station.
14. The method of claim 12, further comprising disposing an adjustable buoyancy chamber that is internally disposed relative to said central docking station.
15. The method of claim 12, further comprising disposing an adjustable buoyancy chamber having a plurality of discrete inner chambers.
16. The method of claim 12, further comprising disposing an adjustable buoyancy chamber having at least one fluid intake port and at least one fluid evacuation port.
17. The method of claim 12, further comprising disposing an adjustably buoyant central docking station having a coupling member used to couple said at least one sea vessel to said central docking station.
18. The wet docking station of claim 12, further comprising disposing a buoyant central docking station having a coupling member used to couple a plurality of captured sea vessels to one another.
19. The method of claim 18, further comprising disposing a buoyant central docking station having an intermediate deck surface.
20. The method of claim 12, further comprising equipping said at least one sea vessel with an offshore energy exploration equipment package.
21. The method of claim 12, further comprising equipping said at least one sea vessel with an offshore energy production equipment package.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
DETAILED DESCRIPTION
[0033] The present invention is directed to an offshore docking system in which a number of multifunctional sea vessels are captured, lifted and coupled in a central “wet” dock using one or more adjustable buoyancy chambers. For the purposes of this application, a wet docking station is defined as a docking station capable of rising up from beneath sea level to capture and couple one or more vessels, so that greater deck and storage space, and a more flexible combination of facilities and equipment packages, is achieved.
[0034] The buoyancy chambers are generally disposed beneath the hulls of either the wet docking station or the vessels captured within the dock (or both), so that the buoyancy chambers are capable of transmitting a significant, lifting force toward the bottom of the hulls; however, in some embodiments the adjustable buoyancy chambers are disposed within the hull of the docking station itself, with external buoyancy chambers being added to the system on an as-needed basis.
[0035] Once the captured vessels are lifted and secured within the central docking station, their deck surfaces are then coupled to one another, so that equipment packages, technical facilities, etc., can be quickly transferred between the vessels in a safe and controlled manner, thereby reducing the risk of accidents and collisions, as well as establishing a large combined deck surface from which operations can be carried out. Consequently, project time horizons are reduced, and a flexible, modularized exploration and production system is achieved on a cost effective basis.
[0036] In the specific, non-limiting embodiment of the invention depicted in
[0037] In practice, adjustable buoyancy chamber 201 and the vessel capturing stations 203 rise up from beneath the hull of a vessel and apply a significant lifting force, thereby lifting, supporting and pinching the vessel together in the arms of the docking station 200, so that a mutual deck surface can be established between the newly captured vessel and other, previously captured vessels in a safe and reliable manner.
[0038] In the depicted embodiment, the depth at which adjustable buoyancy chamber 201 is disposed beneath the wave surface is controlled by an adjustable control means 202, though in other embodiments adjustable buoyancy chamber 201 is disposed in direct communication with support hull 200. In still other embodiments, either (or both) of adjustable buoyancy chamber 201 and adjustment control means 202 are withheld from the system, and support hull 200 is instead equipped with one or more buoyancy chambers (such as an internal ballast system), so that the depth of the docking station is controlled by either flooding or evacuating the buoyancy chambers disposed in support hull 200 with a fluid, such as sea water, pneumatic pressure supplied from an outside source, etc.
[0039] During this process, the central docking station can be dynamically positioned with respect to surrounding vessels and buoys (not shown), fixed to a turret so that the station revolves around a mooring, or simply tied off to suction anchors 204 or the like using one or more sets of mooring lines 205.
[0040] As seen in the example embodiment depicted in
[0041] In a further embodiment, captured vessels are lifted and held in place against the ship bumpers 303 by means of an adjustable buoyancy chamber 304. In cases where the captured vessels are of significantly different sizes, an adjustable buoyancy chamber 304 disposed in the capturing station can be used to lift the decks of the vessels to a similar elevation, so that a mutual deck surface can be established between them, and equipment packages and the like can be transferred from ship to ship.
[0042] As seen in the example embodiments depicted in
[0043] Turning now to the detailed, non-limiting embodiment depicted in
[0044] A principle advantage of the system is that the total deck surface area of a smaller vessel 601 can effectively be increased by adding the deck surface area of a second, adjoining vessel 602 that has been captured, lifted and coupled to the first vessel 601. For example, if first captured vessel 601 has a working deck space of about 150 in length and about 50 feet wide, then the total available workspace on that vessel is about 7,500 square feet. Likewise, if second captured vessel 602 has a working deck space of about 200 feet in length and 70 feet wide, then the total available workspace is about 14,000 square feet. By lifting and coupling the two vessels together, however, a total available working deck space of about 21,500 square feet (7,500 plus 14,000) is achieved.
[0045] In this particular example embodiment, first captured vessel 601 is equipped with one or more of a power generator 603; a water treatment facility 604; a water injection package 605 with attendant water injection lines 617; and a crew housing and control unit 606. Those of ordinary skill in the art will appreciate, however, that virtually any number of other packages, production and storage units, stacks of riser or drilling equipment, etc., can instead be disposed on the first vessel.
[0046] While such a vessel would be helpful for supporting an existing exploration and production project, it lacks many of the structures and technical packages necessary to initiate and complete an ongoing operation. For example, first captured vessel 601 lacks an oil and gas separator, gas compression and injection units, an oil treatment unit, and many other facilities and packages customarily found on floating storage and offtake vessels that might prove useful during operations. According to the invention, therefore, a second vessel 602 is captured, raised to an essentially equal deck height as the first vessel, and then coupled to either the first vessel or the docking station so that personnel can safely and reliably enjoy the advantages of both vessels simultaneously, even as the two coupled vessels and the docking station proceed as a single, unitary whole.
[0047] In the depicted embodiment, for example, captured second vessel 602 further comprises a helicopter pad 607; a gas compressor 608 having attendant gas injection lines 616; oil, gas and/or water separators 609; a gas treatment unit 618; an oil treatment unit 610; a gas flare boom 611; and a plurality of oil production lines 615. In one embodiment, the vessel is controlled by ballasting at least part of the docking station down into the sea, and then floating the vessel over the docking station 600 so that it can be captured and raised to the deck height of the first vessel. Alternatively, at least part of the docking station 600 is ballasted down into the sea, moved beneath the hull of the vessel intended for capture, and then raised, so that the vessel is now securely held in the dock, and the facilities and packages disposed thereupon can be used by operators in conjunction with the facilities and packages disposed on the first captured vessel 601.
[0048] In this particular embodiment, since all of the technical facilities and equipment packages necessary to carry out operations in a typical exploration and production project are provided, it might not be necessary for any other vessels to be brought in with additional equipment in order to complete the operation. However, should it turn out that additional facilities or packages are in fact required, one (or both) of the vessels presently captured in the station can be released, and a third ship, a fourth ship, and so on, can be captured and employed to achieve the advantages of their technical configurations.
[0049] In this embodiment, the station releases a captured vessel by employing a protocol that is essentially the reverse of the capturing process. For example, if it is desirable to release second captured vessel 602 from the station for some reason, at least part of the station beneath the vessel is ballasted down until the vessel is free of the frictional forces holding the vessel between central stabilizer 613 and side docking ribs 614; the vessel is then moved out of the station under its own power, towed out of the station using a support vessel, or simply held in place using either a tethering system or dynamic positioning techniques while the station is moved out from under the vessel.
[0050] In the example embodiment of
[0051] As mentioned, it may at times be desirable to replace or remove equipment packages disposed on one or more of the vessels captured in the station. Thus,
[0052] As in previous embodiments, an offshore wet dock 800, within which a plurality of vessels 801, 802 are captured, is provided, comprising two or more docking stations formed by a plurality of docking station inner surfaces 807, 808 and a plurality of lockable, pivoting side stabilizers 805, 806. The buoyancy of wet dock 800 is controlled by either an external buoyancy chamber, or by one or more internal ballast chambers used to either improve or retard the dock's buoyancy characteristics, depending on whether water or another fluid is being pumped into or evacuated from the ballast chambers. Those of ordinary skill in the art will appreciate that such ballast chambers satisfy the definition of the term “adjustable buoyancy chamber” within the context of claimed design.
[0053] In such embodiments, the functionality of secondary buoyancy chambers 809, 810 can be replaced by a more conventional, mechanical lifting system (not shown) without departing from the scope of the invention. Other presently contemplated methods of leveling captured vessels' decks include holding the height of one of the deck surfaces in a static position while raising the deck surface of a second vessel, and/or holding one of the deck surfaces at a static height and then lowering the deck surface of the other vessel. Since many ships already include ballast systems that admit to the raising and lowering of a deck surface by raising or lowering the profile of the entire vessel, it is also possible to utilize that functionality and avoid the need for a secondary lifting system contained within the docking station in order to level the deck surfaces of captured vessels.
[0054] In this particular embodiment, wet dock 800 is further equipped with a docking station connecting member 811, comprised of one or more vertical support members 812, a conveyer belt and roller assembly 813, and, in the depicted embodiment, a spool for winding and unwinding cable or chain. etc., in response to winch system 814, 817, which feeds its line over pulley 816 so that cargo or equipment package 815 can be transferred from the deck of captured vessel 802 down onto the surface of conveyer belt and roller assembly 813. The cargo or equipment package can then be moved closer to the deck surface 818 of captured vessel 801, or else moved on board the deck surface 818 of captured vessel 801, so that operators can begin to use the equipment package 815 while captured vessel 802 is allowed to leave the docking station.
[0055] In a detailed example of this embodiment, captured vessel 802 has a testing package aboard that is useful in conjunction with an exploration package stored on vessel 801. By coupling the raised deck surface of vessel 802 with the lower deck surface of the docking station 800, the testing package is transferred down onto the deck surface of the docking station by means of an elevated winch and pulley system, a hoist, or a small crane or the like. Continuing the process, vessel 802 is then removed from the docking station, and a third ship is captured and raised in its place, so that additional equipment can be transferred onto the deck of docking station 800.
[0056] As seen in the example embodiment of
[0057] In the example embodiment depicted in
[0058] In some embodiments, the entire structure is supported by an external adjustable buoyancy chamber (not shown); in other embodiments, however, the structure is not supported by a separate buoyancy chamber, and instead relies on its own ballast and weighting systems to raise and lower the frames beneath desired vessels' hulls prior to capture.
[0059] In still other embodiments (see, for example,
[0060] In practicing the invention, a number of older, less expensive vessels can be used to duplicate the effectiveness of a far more costly, fully equipped. modern FPSO vessel, which in practice is often unavailable on short notice, or infeasible due to financial considerations. A principal advantage of the invention in this respect is that ships of any size, age and hull design can be captured and coupled in the docking station, while the docking station itself proceeds at sea, essentially performing as an integrated, unitary housing within which various ships are serviced. Since the captured ships collectively contain all of the equipment and design packages required to satisfy the many different needs of an exploration and production vessel, piecemeal assembly of the technical packages required for any particular operation is achieved, without the need for a large, expensive, exploration and production vessel that contains all of the equipment that might ever be useful in an operation irrespective of whether it is actually needed in the application at hand.
[0061] In short, the invention disclosed herein provides a unique system and method by which a central docking station can capture, lift and couple a plurality of sea vessels, so that a flexible, modularized production system is achieved on a cost effective basis. The capabilities of a number of older, less expensive vessels can be combined to achieve an effective FPSO substitute that allows lower producing fields to be explored and produced in a profitable manner. Time horizons between initiation and consummation of field operations are reduced, and older vessels that might otherwise be scrapped or retired are again made useful and seaworthy.
[0062] The foregoing specification is provided for illustrative purposes only, and is not intended to describe all possible aspects of the present invention. Moreover, while the invention has been shown and described in detail with respect to several exemplary embodiments, those of ordinary skill in the pertinent arts will appreciate that minor changes to the description, and various other modifications, omissions and additions may also be made without departing from either the spirit or scope thereof.