Method for Calibrating a Filling System and Filling System
20240101408 ยท 2024-03-28
Inventors
Cpc classification
B67C3/007
PERFORMING OPERATIONS; TRANSPORTING
G01F25/00
PHYSICS
B67D7/085
PERFORMING OPERATIONS; TRANSPORTING
B67C3/02
PERFORMING OPERATIONS; TRANSPORTING
International classification
B67D7/08
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A method for calibrating a filling system is disclosed. In a first calibration step, a calibration of a calibration variable of a first flow or level measuring device is performed at a first calibration point. In a first deviation determination step, the first control and evaluation unit of the measuring device determines an average deviation of the calibration variable from a desired value. In a first correction step, the first control and evaluation unit corrects a calibration parameter taking into account the determined deviation. In a first transmission step, the first control and evaluation unit transmits the determined deviation and/or the corrected calibration parameter to the second control and evaluation unit. In a first adaptation step, the second control and evaluation unit corrects a calibration parameter at a first calibration point, taking into account the deviation transmitted by the first control and evaluation unit or the transmitted calibration parameter.
Claims
1. A method for calibrating a filling system having at least one first filling point and at least one second filling point, wherein the first filling point has at least one first factory-calibrated flow or level measuring device having a first control and evaluation unit, and the second filling point has at least one second factory-calibrated flow or level measuring device having a second control and evaluation unit, wherein the number of factory calibration points of the first flow or level measuring device is greater than the number of factory calibration points of the second flow or level measuring device and/or wherein the dwell time in at least one calibration point in the first flow or level measuring device is greater than the dwell time in at least one calibration point in the second flow or level measuring device, and wherein the control and evaluation unit of the at least first flow or level measuring device and the control and evaluation unit of the at least second flow or level measuring device are at least indirectly connected to one another via a communication channel, the method comprising: in a first calibration step, a calibration of a calibration variable of the first flow or level measuring device is performed at a first calibration point under process conditions; in a first deviation determination step, the first control and evaluation unit of the first flow or level measuring device determines an average deviation of the calibration variable measured by the first flow or level measuring device from a desired value of this calibration variable at the first calibration point; in a first correction step, the first control and evaluation unit corrects at least one calibration parameter taking into account the determined deviation; in a first transmission step, the first control and evaluation unit transmits the determined deviation at the first calibration point and/or the at least one corrected calibration parameter to the second control and evaluation unit via the communication channel; and in a first adjustment step, the second control and evaluation unit corrects at least one calibration parameter at a first calibration point, taking into account the deviation transmitted by the first control and evaluation unit or the transmitted calibration parameter.
2. The method according to claim 1, wherein the method steps are performed in at least one further calibration point; wherein the method steps are performed in the factory calibration points of the second flow or level measuring device; or wherein the method steps are performed in the factory calibration points of the first flow or level measuring device.
3. The method according to claim 2, wherein at least the first transmission step and the at least second transmitting step are performed in one overall transmission step.
4. The method according to claim 1, wherein, in the calibration step, a predetermined number of fillings are performed at the first filling point for calibrating the calibration variable; wherein, after each filling, the amount actually filled is determined as a desired value by weighing or by determination with a further flow or level measuring device; and wherein the value of the amount actually filled, namely the desired value, is compared with the value determined by the flow or level measuring device to be calibrated.
5. The method according to claim 1, wherein a standard deviation is determined for determining the deviation in the deviation determining step.
6. The method according to claim 1, wherein in the correction step at least one pair of coordinates of an optimization curve is corrected as a calibration parameter or a transmitter constant is corrected as a calibration parameter.
7. A filling system, comprising: at least one first filling point; and at least one second filling point; wherein the first filling point has at least one first factory-calibrated flow or level measuring device having a first control and evaluation unit, and the second filling point has at least one second factory-calibrated flow or level measuring device having a second control and evaluation unit; wherein the number of factory calibration points of the first flow or level measuring device is greater than the number of factory calibration points of the second flow or level measuring device and/or wherein the dwell time in at least one calibration point in the first flow or level measuring device is greater than the dwell time in at least one calibration point in the second flow or level measuring device; wherein the control and evaluation unit of the at least first flow or level measuring device and the control and evaluation unit of the at least second flow or level measuring device are at least indirectly connected to one another via a communication channel; and wherein the control and evaluation unit of the first flow or level measuring device and the control and evaluation unit of the second flow or level measuring device are designed in such a way that they perform a method during operation of the filling system, the method including: in a first calibration step, a calibration of a calibration variable of the first flow or level measuring device is performed at a first calibration point under process conditions; in a first deviation determination step, the first control and evaluation unit of the first flow or level measuring device determines an average deviation of the calibration variable measured by the first flow or level measuring device from a desired value of this calibration variable at the first calibration point; in a first correction step, the first control and evaluation unit corrects at least one calibration parameter taking into account the determined deviation; in a first transmission step, the first control and evaluation unit transmits the determined deviation at the first calibration point and/or the at least one corrected calibration parameter to the second control and evaluation unit via the communication channel; and in a first adjustment step, the second control and evaluation unit corrects at least one calibration parameter at a first calibration point, taking into account the deviation transmitted by the first control and evaluation unit or the transmitted calibration parameter.
8. The filling system according to claim 7, wherein the first control and evaluation unit and the second control and evaluation unit are further configured in such a way that, during operation of the filling system, at least one of: the method steps are performed in at least one further calibration point, the method steps are performed in the factory calibration points of the second flow or level measuring device, or the method steps are performed in the factory calibration points of the first flow or level measuring device; at least the first transmission step and the at least second transmitting step are performed in one overall transmission step; in the calibration step, a predetermined number of fillings are performed at the first filling point for calibrating the calibration variable, and after each filling, the amount actually filled is determined as a desired value by weighing or by determination with a further flow or level measuring device, and the value of the amount actually filled, namely the desired value, is compared with the value determined by the flow or level measuring device to be calibrated; a standard deviation is determined for determining the deviation in the deviation determining step; and in the correction step at least one pair of coordinates of an optimization curve is corrected as a calibration parameter or a transmitter constant is corrected as a calibration parameter.
9. The filling system according to claim 7, wherein the first control and evaluation unit and the second control and evaluation unit are designed as subunits of a higher-level control and evaluation unit; or wherein a higher-level control and evaluation unit is connected via a first communication channel to the first control and evaluation unit and via a second communication channel to the second control and evaluation unit.
10. The filling system according to claim 7, wherein the communication channel between the first control and evaluation unit and the second control and evaluation unit is designed to be at least partially wired and/or at least partially wireless.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In detail, there is now a large number of possibilities for designing and further developing the method according to the invention and the filling system according to the invention. In this connection, reference is made to the description of preferred embodiments in conjunction with the drawings.
[0030]
[0031]
[0032]
[0033]
DETAILED DESCRIPTION
[0034]
[0035]
[0036]
[0037] In the calibration steps 101 and 105 for calibrating the calibration variable, a predetermined number of fillings are performed at the first filling point 2. After each filling, the quantity actually filled is determined as the desired value by weighing the quantity filled, and the value of the quantity actually filled is compared with the value determined by the first flowmeter 4. The determination of the deviation in the deviation determination steps 102, 107 is performed by determining a standard deviation. In addition, a transducer constant is corrected as a calibration parameter in the correction steps 103, 108.
[0038]
[0039]