PROCESS FOR PRODUCING AN ORNAMENTAL CHAIN AND ORNAMENTAL CHAIN
20240065392 ยท 2024-02-29
Inventors
Cpc classification
B21C37/045
PERFORMING OPERATIONS; TRANSPORTING
B21L7/00
PERFORMING OPERATIONS; TRANSPORTING
B21C1/20
PERFORMING OPERATIONS; TRANSPORTING
International classification
Abstract
A process for producing an ornamental element, in particular an ornamental chain, comprising the following steps: arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile; cutting and bending the layered tubular profile to form a plurality of shaped chain links; connecting the chain links to form the ornamental chain.
Claims
1. A process for producing an ornamental element, in particular an ornamental chain, comprising the following steps: arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile; cutting and bending the layered tubular profile to form a plurality of shaped chain links; connecting the chain links to form the ornamental chain.
2. A production process according to claim 1, wherein the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile is carried out through the following steps: extruding a tubular polymer core; providing a tubular metal casing, wherein the tubular metal casing has a hollow section; inserting the tubular polymer core into the tubular metal casing to form a layered tubular profile.
3. A production process according to claim 1, wherein the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile is carried out through the following steps: molding at least one portion of the tubular metal casing having a hollow section; over-molding the tubular polymer core inside the partially molded tubular metal casing; completing the molding of the tubular metal casing around the tubular polymer core to form a layered tubular profile.
4. A production process according to claim 1, wherein the tubular polymer core has a full section.
5. A production process according to claim 2, comprising a step of: straightening the tubular polymer core, wherein said straightening step is performed following the step of extruding a tubular polymer core, and before the step of inserting the tubular polymer core into the tubular metal casing to form a layered tubular element.
6. A production process according to claim 1, comprising a step of: drawing the layered tubular profile to reduce or eliminate a clearance between the tubular polymer core and the tubular metal casing of the layered tubular profile, wherein the step of drawing the layered tubular profile is performed following the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile, preferably following the step of inserting the tubular polymer core into the tubular metal casing to form a layered tubular profile, and before the step of cutting and bending the layered tubular profile to form a plurality of shaped chain links.
7. A production process according to claim 6, wherein the step of drawing the layered tubular profile is performed by fixing an end of the layered tubular profile to a winding cylinder and keeping an opposite end of the layered tubular profile under tension, so that during the drawing step the layered tubular profile is subjected to tensile stress, and wherein the winding cylinder is then rotated in order to wind the layered tubular profile onto the winding cylinder, subjecting the layered tubular profile to tensile stress, so that the winding of the layered tubular profile subjected to tensile stress on the winding cylinder causes a narrowing of the layered tubular profile.
8. A production process according to claim 1, comprising a step of: firing the layered tubular profile, wherein the step of firing the layered tubular profile is performed before the step of cutting and bending the layered tubular profile to form a plurality of shaped chain links, and following the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile, preferably following the step of inserting the tubular polymer core into the tubular metal casing to form a layered tubular profile.
9. A production process according to claim 8, wherein the step of firing the layered tubular profile is carried out following the step of drawing the layered tubular profile.
10. A production process according to claim 6, wherein the step of firing the layered tubular profile is carried out following the step of drawing the layered tubular profile.
11. A production process according to claim 1, comprising a step of: tumbling and polishing the chain links or the ornamental chain, wherein the tumbling and polishing step is performed following the step of cutting and bending the layered tubular profile to form a plurality of shaped chain links, and wherein the step of tumbling and polishing the chain links is performed before the step of connecting the chain links to form the ornamental chain, or is performed following the step of connecting the chain links to form the ornamental chain.
12. A production process according to claim 11, wherein the diamond grinding step is performed following the tumbling and polishing step.
13. A production process according to claim 1, comprising a step of: diamond grinding the chain links or the ornamental chain, wherein the diamond grinding step is performed following the step of cutting and bending the layered tubular profile to form a plurality of shaped chain links, and wherein the diamond grinding step is performed following the step of connecting the chain links to form the ornamental chain, or is performed before the step of connecting the chain links to form the ornamental chain.
14. A production process according to claim 13, wherein the diamond grinding step is performed following the tumbling and polishing step.
15. A production process according to claim 1, wherein the step of arranging a tubular polymer core inside a tubular metal casing to form a layered tubular profile, or the step of extruding a tubular polymer core and the step of providing a tubular metal casing are performed so that the ratio of the diameter of the tubular polymer core to the diameter of the tubular metal casing is substantially between 1.00:2.00 and 1.99:2.00.
16. A production process according to claim 6, wherein the step of drawing the layered tubular profile is performed so that, at the end of the drawing step, the ratio of the diameter of the tubular polymer core to the diameter of the tubular metal casing is substantially between 1.00:2.00 and 1.99:2.00.
17. An ornamental chain manufactured according to a production process according to claim 1.
18. An ornamental chain comprising a plurality of chain links or diamond ground chain links connected to one another, wherein at least one of the chain links or diamond ground chain links of the ornamental chain comprises a tubular polymer core positioned inside a tubular metal casing.
19. An ornamental chain according to claim 18, wherein each of said chain links or diamond ground chain links of the ornamental chain comprises a tubular polymer core positioned inside a tubular metal casing.
Description
FIGURES
[0015] In order to better understand the invention and appreciate the advantages thereof, some non-limiting exemplary embodiments thereof will be described below with reference to the accompanying drawings, in which:
[0016]
[0017]
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
DESCRIPTION OF SOME PREFERRED EMBODIMENTS
[0024] With reference to the figures, a process for producing an ornamental chain 1 comprises the following manufacturing steps: [0025] arranging a tubular polymer core 2 inside a tubular metal casing 3 to form a layered tubular profile 4; [0026] cutting and bending the layered tubular profile 4 to form a plurality of shaped chain links 5 (
[0028] Advantageously, a production process thus configured allows producing an ornamental chain 1 having high aesthetic and functional properties, while having a low weight compared to known ornamental chains.
[0029] In fact, by means of the core 2 made of polymer material enclosed by the casing 3 made of metal material, the ornamental chain 1 weighs up to 70% less than ornamental chains made of aluminum having the same volume.
[0030] According to an embodiment, the step of arranging a tubular polymer core 2 inside a tubular metal casing 3 to form a layered tubular profile 4 is carried out through the following steps: [0031] extruding a tubular polymer core 2 (
[0034] According to an embodiment, the step of arranging a tubular polymer core 2 inside a tubular metal casing 3 to form a layered tubular profile 4 is carried out through the following steps: [0035] molding at least one portion of the tubular metal casing 3 having a hollow section; [0036] over-molding the tubular polymer core 2 inside the partially molded tubular metal casing 3; [0037] completing the molding of the tubular metal casing 3 around the tubular polymer core 2 to form a layered tubular profile 4.
[0038] Advantageously, according to this embodiment, the tubular polymer core 2 and the tubular metal casing 3 are co-molded one inside the other to form the layered tubular profile 4.
[0039] According to an embodiment, the step of extruding a tubular polymer core 2 comprises extruding a tubular polymer core 2 having a full section.
[0040] Advantageously, this configuration preserves the structural properties of the ornamental chain 1.
[0041] According to an embodiment, the tubular metal casing 3 is made of aluminum.
[0042] According to an embodiment, the production process comprises a step of straightening the tubular polymer core 2 (
[0043] The straightening step is performed following the step of extruding a tubular polymer core 2.
[0044] Moreover, the straightening step is performed before the step of inserting the tubular polymer core 2 into the tubular metal casing 3, to form a layered tubular element 4.
[0045] Advantageously, by means of the straightening step it is possible to straighten, linearly extend, the tubular polymer core 2 exiting from the extruder, and correct any linearity defects.
[0046] According to an embodiment, the production process comprises a step of drawing the layered tubular profile 4 (
[0047] The step of drawing the layered tubular profile 4 aims to reduce or eliminate the clearance between the tubular polymer core 2 and the tubular metal casing 3 of the layered tubular profile 4.
[0048] Such a clearance between the tubular polymer core 2 and the tubular metal casing 3, being reduceable or eliminable following the drawing step, is necessary to perform the previous step of inserting the tubular polymer core 2 into the tubular metal casing 3 to form a layered tubular profile 4.
[0049] According to an embodiment, the step of drawing the layered tubular profile 4 is performed following the step of arranging a tubular polymer core 2 inside a tubular metal casing 3 to form a layered tubular profile 4. Preferably, the step of drawing the layered tubular profile 4 is performed following the step of inserting the tubular polymer core 2 into the tubular metal casing 3 to form a layered tubular profile 4.
[0050] Moreover, the step of drawing the tubular layered profile 4 is performed before the step of cutting and bending the layered tubular profile 4 to form a plurality of shaped chain links 5.
[0051] According to an embodiment, the step of drawing the tubular layered profile 4 causes the layered tubular profile 4 to narrow.
[0052] The narrowing of the layered tubular profile 4 results in a reduction or elimination of the clearance previously present between the tubular polymer core 2 and the tubular metal casing 3 forming the layered tubular profile 4.
[0053] According to an embodiment, the step of drawing the layered tubular profile 4 is performed by fixing an end of the layered tubular profile 6 to a winding cylinder 4 and keeping an opposite end of the layered tubular profile 4 under tension.
[0054] During the drawing step, the layered tubular profile 4 is thus subjected to tensile stress.
[0055] The winding cylinder 6 is then rotated in order to wind the layered tubular profile 4 onto the winding cylinder 6, thus subjecting the layered tubular profile 4 to tensile stress.
[0056] The winding of the layered tubular profile 4 subjected to tensile stress on the winding cylinder 6 causes the layered tubular profile 4 to narrow.
[0057] Therefore, a reduction or elimination of the clearance previously present between the tubular polymer core 2 and the tubular metal casing 3 forming the layered tubular profile 4 occurs.
[0058] According to an embodiment, the production process comprises a step of firing the layered tubular profile 4 (
[0059] Advantageously, the step of firing the tubular layered profile 4 facilitates the subsequent step of cutting and bending the layered tubular profile 4 to form a plurality of shaped chain links 5.
[0060] According to an embodiment, the step of firing the tubular layered profile 4 is performed before the step of cutting and bending the layered tubular profile 4 to form a plurality of shaped chain links 5.
[0061] Moreover, the step of firing the layered tubular profile 4 is performed following the step of arranging a tubular polymer core 2 inside a tubular metal casing 3 to form a layered tubular profile 4. Preferably, the step of firing the layered tubular profile 4 is performed following the step of inserting the tubular polymer core 2 into the tubular metal casing 3 to form a layered tubular profile 4.
[0062] According to an embodiment, the step of firing the layered tubular profile 4 is performed following the step of drawing the layered tubular profile 4.
[0063] According to an embodiment, the production process comprises a step of tumbling and polishing the chain links 5 or the ornamental chain 1.
[0064] The mechanical tumbling process is otherwise referred to as barreling.
[0065] According to an embodiment, the tumbling and polishing step is performed following the step of cutting and bending the layered tubular profile 4 to form a plurality of shaped chain links 5.
[0066] According to an embodiment, the step of tumbling and polishing the chain links 5 is performed before the step of connecting the chain links 5 to form the ornamental chain 1.
[0067] According to an alternative embodiment, the step of tumbling and polishing the ornamental chain 1 is performed following the step of connecting the chain links 5 to form the ornamental chain 1.
[0068] Advantageously, the step of tumbling and polishing the chain links 5 of the ornamental chain 1 aims at superficially finishing the chain links 5 of the ornamental chain 1, and thus increasing the aesthetic value thereof. According to an embodiment, the production process comprises a step of diamond grinding the chain links 5 or the ornamental chain 1 (
[0069] Diamond ground chain links 7 are thus obtained.
[0070] Advantageously, the diamond grinding step aims to engrave the tubular metal casing 3 of the chain links 5 to make the tubular polymer core 2 of the chain links 5 of the ornamental chain 1 emerge.
[0071] The diamond grinding thus increases the aesthetic value of the ornamental chain 1.
[0072] According to an embodiment, the diamond grinding step is performed following the step of cutting and bending the layered tubular profile 4 to form a plurality of shaped chain links 5.
[0073] According to an embodiment, the diamond grinding step is performed following the tumbling and polishing step.
[0074] According to an embodiment, the diamond grinding step is performed following the step of connecting the chain links 5 to form the ornamental chain 1.
[0075] According to an alternative embodiment, the diamond grinding step is performed before the step of connecting the chain links 5 to form the ornamental chain 1.
[0076] Following the diamond grinding step, an ornamental chain 1 consisting of diamond ground chain links 7 connected to one another can thus be made.
[0077] According to an embodiment, the step of arranging a tubular polymer core 2 inside a tubular metal casing 3 to form a layered tubular profile 4, or the step of extruding a tubular polymer core 2 and the step of providing a tubular metal casing 3 are performed so that the ratio of the diameter of the tubular polymer core 2 to the diameter of the tubular metal casing 3 is substantially between 1.00:2.00 and 1.99:2.00.
[0078] Alternatively, the ratio of the diameter of the tubular polymer core 2 to the diameter of the tubular metal casing 3 is substantially between 1.50:2.00 and 1.95:2.00.
[0079] Alternatively, the ratio of the diameter of the tubular polymer core 2 to the diameter the tubular metal casing 3 is substantially between 1.75:2.00 and 1.90:2.00.
[0080] According to an embodiment, the step of drawing the layered tubular profile 4 is performed so that, at the end of the drawing step, the ratio of the diameter of the tubular polymer core 2 to the diameter of the tubular metal casing 3 is substantially between 1.00:2.00 and 1.99:2.00.
[0081] Alternatively, at the end of the drawing step, the ratio of the diameter of the tubular polymer core 2 to the diameter of the tubular metal casing 3 is substantially between 1.50:2.00 and 1.95:2.00.
[0082] Alternatively, at the end of the drawing step, the ratio of the diameter of the tubular polymer core 2 to the diameter of the tubular metal casing 3 is substantially between 1.75:2.00 and 1.90:2.00.
[0083] According to a further aspect of the invention, an ornamental chain 1 comprises a plurality of chain links 5 or diamond ground chain links 7 connected to one another.
[0084] At least one, preferably each, of the chain links 5 or diamond ground chain links 7 of the ornamental chain 1 comprises a tubular polymer core 2 positioned inside a tubular metal casing 3.
[0085] According to a further aspect of the invention, an ornamental chain 1 is made according to the production process previously described.
[0086] Obviously, those skilled in the art will be able to make changes or adaptations to the present invention, without however departing from the scope of the following claims.
LIST OF REFERENCE NUMERALS
[0087] 1. Ornamental chain [0088] 2. Tubular polymer core [0089] 3. Tubular metal casing [0090] 4. Layered tubular profile [0091] 5. Chain link [0092] 6. Winding cylinder [0093] 7. Diamond ground chain link