Power lift
11896535 ยท 2024-02-13
Inventors
Cpc classification
A61G1/06
HUMAN NECESSITIES
A61G3/0254
HUMAN NECESSITIES
A61G1/0212
HUMAN NECESSITIES
A61G3/0236
HUMAN NECESSITIES
A61G1/0237
HUMAN NECESSITIES
International classification
Abstract
A deployable gurney lift assembly 12 having a carriage assembly 14 composed of a carriage assembly plate 20 with two pivot carriage arms 38 disposed opposite one another to engage the sides of a gurney G, at least one safety bar holder 16 to accommodate a safety bar B of the gurney G, the safety bar holders 16 with at least one bar latch 18 to receive and secure a gurney bar B therein. At least one lift actuator 88 lifts and lowers the arms 38.
Claims
1. A carriage assembly (14) for a deployable gurney lift assembly (12) to lift a gurney (G) using a deployment assembly (29) having at least one deployment rail (28) extending from front to rear ends, in which the gurney (G) has sides and an undercarriage including wheels, a safety bar (B) and an apparatus for raising and lowering the gurney (G), the carriage assembly (14) comprising: a carriage assembly plate (20) with a top side (100), an underside (102), and two opposing edges (104); two pivot carriage arms (38) disposed opposite one another on opposing edges (104) of the carriage assembly plate (20) to engage the sides of the gurney (G); and at least one safety bar holder (16) to accommodate the safety bar (B) of the gurney (G); at least one of the at least one safety bar holders (16) having at least one safety bar latch (18) to receive and secure the safety bar (B) therebetween; at least one lift actuator (88) for lifting and lowering the pivot carriage arms (38); wherein, the at least one lift actuator (88) is electric, pneumatic, or hydraulic; at least one retraction bearing bracket (50) on an underside (102) of a motor box (128), disposed adjacent the carriage assembly plate (20), to engage the at least one deployment rail (28) for slidably moving the carriage assembly (14) along the length thereof to deploy or stow the carriage assembly (14); and a carriage hinge plate (111) disposed to facilitate changing an angle of the carriage assembly plate (20) and the two pivot carriage arms (38) relative to the at least one retraction bearing bracket (50) to facilitate lifting and lowering of the two pivot carriage arms (38) while each of the at least one retraction bearing bracket (50) remains in contact with the at least one deployment rail (28).
2. The carriage assembly (14) of claim 1, wherein: the at least one retraction bearing bracket (50) has corresponding first and second retraction bearing brackets (50) slidably engaged along the length of the deployment assembly (29), which deployment assembly (29) has a pair of opposing first and second deployment rails (28); and the at least one retraction bearing bracket (50) extends from the underside (102) of the motor box (128); each of the at least one retraction bearing bracket (50) having a wheel bearing (52) extending therefrom to engage one of the opposing first and second deployment rails (28) to support movement of the carriage assembly (14) along the opposing first and second deployment rails (28).
3. The carriage assembly (14) of claim 1, wherein: the at least one lift actuator (88) is taken from the group consisting of a telescoping ram, hydraulic jack, or vertical lifting column; or the at least one lift actuator (88) comprises two lift apparatuses (88) fixed on the carriage assembly (14) to lift and lower each pivot carriage arm (38); or each of the at least one lift actuator (88) comprises one hydraulic jack (88) which is supplied by a lifting hydraulic supply unit (90) with a corresponding pump (91) to lower and lift each pivot carriage arm (38); or combinations thereof.
4. The carriage assembly (14) of claim 1, wherein: each pivot carriage arm (38) has an idler frame bracket (30), a rotating pickup (32) to engage the undercarriage of the gurney (G), and a locking bracket pin (36) to secure the gurney (G) in place on each pivot carriage arm (38); and the locking bracket pin (36) being disposed under the idler frame bracket (30) to further restrict movement of the gurney (G) engaged on the carriage assembly (14).
5. The carriage assembly (14) of claim 4, wherein: the rotating pickup (32) has a pick up body (39) rotatably held in place on the each pivot carriage arm (38) by a carriage pickup pin shaft (33) mated with a mating pickup shaft (35), and a retention pin (41); the carriage pickup pin shaft (33) having a keyway cot (45), and the mating pickup shaft (35) has an internal keyway that fits the keyway (47) of carriage pickup pin shaft (33), and a spring (37) to keep tension between the carriage pickup pin shaft (33) and the mating pickup shaft (35), and the retention pin (41) provides secure attachment between the pick up body (39) of the rotating pickup (32) and each pivot carriage arm (38).
6. The carriage assembly (14) of claim 1, further comprising: a hydraulic jack (22) affixed to the carriage assembly plate (20); wherein the hydraulic jack (22) has an actuation arm (26) affixed to the at least one safety bar holder (16) and the at least one safety bar latch (18) to bias the at least one safety bar latch (18) from an open position to a closed position.
7. The carriage assembly (14) of claim 1, further comprising: a drive motor (92) disposed on the motor box (128); a shaft (93) extending from the drive motor (92) and having a drive gear (44) disposed on the shaft opposite the drive motor (92); and the drive gear (44) extending beneath the underside (102) of the carriage assembly plate (20) to engage in track (27) disposed adjacent to, or upon, the at least one rail (28) of the deployment assembly (29).
8. The carriage assembly (14) of claim 1, wherein: the at least one safety bar holder (16) and the at least one latch (18) are pivotably connected by a pivot point pin (120) which permits the at least one latch (18), or both at least one safety bar holder (16) and at least one latch, to be biased together to secure a gurney (G) therebetween; the at least one safety bar holder (16) and at least one latch (18) are actuated by a hydraulic jack (22) which has a piston (26) retractably extending from the hydraulic jack (22) in which the piston (26) is clevis mounted (114) to the at least one latch (18) with a quick release pin (118); the hydraulic jack (22) is pivotably attached by a pivot pin (116) to a safety bar jack bracket (112) affixed to the carriage assembly plate (20); wherein the at least one latch (18) may extend through the carriage assembly plate (20) beneath the at least one safety bar holder (16) when the at least one latch (18) is in an open or unsecured position.
9. The carriage assembly (14) of claim 1, further comprising: a pair of carriage angles (110) disposed between the pivot carriage arms (38) and the carriage assembly plate (20) to connect each of the pivot carriage arms (38) to the adjacent edge (104) of the carriage assembly plate (20); wherein each of the at least one lift actuator (88) is a hydraulic jack (88) affixed to one of the pair of carriage angles (110) at a swivel pin (136), and to one of the at least one retraction bearing bracket (50) to control the angle of the pivot carriage arms (38) and to deploy and stow the carriage assembly (14), and to lift a gurney (G) engaged in the at least one safety bar holder (16) and the at least one safety bar latch (18).
10. The carriage assembly (14) of claim 1, wherein: each of the at least one lift actuator (88) is a hydraulic jack (88) affixed to a motor box base (128), and to the carriage hinge plate (111), to lift and lower the carriage assembly plate (20) with each of the pivot carriage arms (38) attached thereto.
11. A deployable gurney lift assembly (12) for lifting a gurney (G) with sides and an undercarriage including wheels, a safety bar (B), and an apparatus for raising and lowering the gurney (G) that is installed to be deployable on at least one deployment rail (28) extending from front to rear ends, the deployable gurney lift assembly (12) comprising: a carriage assembly (14); and a deployment assembly (29) having the at least one deployment rail (28) for slidably moving the carriage assembly (14) along the length thereof; wherein the carriage assembly (14) comprises a carriage assembly plate (20) with a top side (100), an underside (102), and two opposing edges (104); two pivot carriage arms (38) disposed opposite one another on opposing edges (104) of the carriage assembly plate (20) to engage the sides of the gurney (G), and at least one safety bar holder (16) to accommodate a safety bar (B) of the gurney (G); at least one of the at least one safety bar holder (16) having at least one safety bar latch (18) to receive and secure the gurney safety bar (B) therebetween; at least one lift actuator (88) for lifting and lowering the pivot carriage arms (38); wherein, the lift actuator (88) is electric, pneumatic, or hydraulic; at least one retraction bearing bracket (50) on an underside (102) of a motor box (128) to engage the at least one deployment rail (28) for slidably moving the carriage assembly (14) along the length thereof to deploy or stow the carriage assembly (14); and a carriage hinge plate (111) disposed to facilitate changing an angle of the carriage assembly plate (20) and the pivot carriage arms (38) relative to each of the at least one retraction bearing bracket (50) to facilitate lifting and lowering of the pivot carriage arms (38) while each of the at least one retraction bearing bracket (50) remains in contact with a corresponding rail (28) of the at least one deployment rail.
12. The deployable gurney lift assembly (12) of claim 11, wherein: the front and rear ends of the at least one deployment rail terminate at stops to secure the carriage assembly from advancing off the rail.
13. The deployable gurney lift assembly (12) of claim 11, wherein: the at least one deployment rail (28) comprises opposing first and second deployment rails (28) extending parallel from front ends to rear ends; and the at least one retraction bearing bracket (50) has corresponding first and second retraction bearing brackets (50) slidably engaged along the length of the first and second deployment rails (28); the at least one retraction bearing bracket (50) extends from the underside (102) of the motor box (128); each of the at least one retraction bearing bracket (50) having a wheel bearing (52) extending therefrom to engage the at least one deployment rail (28) to support movement of the carriage assembly plate (20) along the at least one deployment rail (28).
14. The deployable gurney lift assembly (12) of claim 11, further comprising: a drive motor (92) with a shaft (93) extending therefrom disposed in the motor box (128) of the carriage assembly (14); a gear rack (27) with teeth disposed parallel to the at least one deployment rail (28); and a drive gear (44) disposed at an end of the shaft (93); wherein the drive gear (44) engages the teeth on the gear rack (27) such that when the drive motor (92) rotates the drive gear (44) to advance the carriage assembly (14) along the teeth of the gear rack (27) to deploy and stow the carriage assembly (14).
15. The deployable gurney lift assembly (12) of claim 14, wherein: the gear rack (27) is disposed above the at least one deployment rail (28).
16. The deployable gurney lift assembly (12) of claim 11, wherein: the at least one retraction bearing bracket (50) has corresponding first and second carriage assembly bearing brackets (50) with bearings (52) slidably engaged in a pair of opposing first and second deployment rails (28) of the at least one deployment rail (28) engaged along the length of the deployment assembly (29); the at least one bearing bracket (50) extends from the underside (102) of the motor box (128) at the back of the carriage assembly plate (20); and wherein each of the at least one retraction bearing bracket's (50) wheel bearing (52) extends therefrom to engage at least one of the at least one deployment rail (28) to support movement of the carriage assembly (14) along the at least one deployment rail (28).
17. The deployable gurney lift assembly (12) of claim 11, wherein: the at least one lift actuator (88) is taken from the group consisting of a telescoping ram, hydraulic jack, or vertical lifting column; or the at least one lift actuator (88) comprises two lift apparatuses (88) fixed on the carriage assembly (14) to lift and lower each pivot carriage arm (38); or each of the at least one lift actuator (88) comprises one hydraulic jack (88) which is supplied by a lifting hydraulic supply unit (90) with a corresponding pump (91) to lower and lift each pivot carriage arm (38); or combinations thereof.
18. The deployable gurney lift assembly (12) of claim 11, wherein: each pivot carriage arm (38) has an idler frame bracket (30), a rotating pickup (32) to engage the undercarriage of the gurney (G), and a locking bracket pin (36) to secure the gurney (G) in place on each pivot carriage arm (14); and the locking bracket pin (36) being disposed under the idler frame bracket (30) to further restrict movement of the gurney (G) engaged on the carriage assembly (14).
19. The deployable gurney lift assembly (12) of claim 18, wherein: the rotating pickup (32) has a pick up body (39) rotatably held in place on each pivot carriage arm (38) by a carriage pickup pin shaft (33) mated with a mating pickup shaft (35), and a retention pin (41); the carriage pickup pin shaft (33) having a keyway cot (45), and the mating pickup shaft (35) has an internal keyway that fits the keyway (47) of carriage pick up shaft (35), and a spring (37) to keep tension between the carriage pickup pin shaft (33) and the mating pickup shaft (35), and the retention pin (41) provides secure attachment between the pick up body (39) of the rotating pickup (32) and each pivot carriage arm (38).
20. The deployable gurney lift assembly (12) of claim 11, further comprising: a hydraulic jack (22) affixed to the carriage assembly plate (20); wherein the hydraulic jack (22) has an actuation arm (26) affixed to the at least one safety bar holder (16) and the at least one safety bar latch (18) to bias the at least one safety bar latch (18) from an open position to a closed position.
21. The deployable gurney lift assembly (12) of claim 11, further comprising: a drive motor (92) disposed on the motor box (128) of the carriage assembly plate (20); a shaft (93) extending from the drive motor (92) and having a drive gear (44) disposed on the shaft opposite the drive motor (92); and the drive gear (44) extending beneath the underside (102) of the carriage assembly plate (12) to engage in a track (27) disposed adjacent to, or upon, the at least one deployment rail (28) of the deployment assembly (29).
22. The deployable gurney lift assembly (12) of claim 11, wherein: the at least one safety bar holder (16) and the at least one safety bar latch (18) are pivotably connected by a pivot point pin (120) which permits the at least one safety bar latch (18), or both at least one safety bar holder (16) and at least one safety bar latch, to be biased together to secure a gurney (G) therebetween; the at least one safety bar holder (16) and the at least one safety bar latch (18) are actuated by a hydraulic jack (22) which has a piston (26) retractably extending from the hydraulic jack (22) in which the piston (26) is clevis mounted (114) to the at least one safety bar latch (18) with a quick release pin (118); the hydraulic jack (22) is pivotably attached by a pivot pin (116) to a safety bar jack bracket (112) affixed to the carriage assembly plate (20); wherein the at least one safety bar latch (18) may extend through the carriage assembly plate (20) beneath the at least one safety bar holder (16) when the at least one safety bar latch (18) is in an open or unsecured position.
23. The deployable gurney lift assembly (12) of claim 11, further comprising: a pair of carriage angles (110) disposed between the carriage arms (38) and the carriage assembly plate (20) to attach each pivot carriage arms (38) to the adjacent edge (104) of the carriage assembly plate (20); wherein each of the at least one lift actuator (88) is a hydraulic jack (88) affixed to one of the carriage angles (110) at the swivel pin (136), and to one of the at least one retraction bearing bracket (50) to control the angle of the pivot carriage arms (38) and to deploy and stow the carriage assembly (14), and to lift a gurney (G) engaged in the at least one safety bar holder (16) and the at least one safety bar latch (18).
24. The deployable gurney lift assembly (12) of claim 11, wherein: at least one hydraulic jack (88) is affixed to the base (124) of the motor box (128), and to the carriage hinge plate (111), to lift and lower the carriage assembly plate (20) with each of the pivot carriage arms (38) attached thereto.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The novel features of the described embodiments are specifically set forth in the appended claims; however, embodiments relating to the structure and process of making the present invention, may best be understood with reference to the following description and accompanying drawings.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19) Similar reference characters denote corresponding features consistently throughout the attached drawings.
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
(20) A deployable gurney lift assembly 12 for lifting a gurney G with sides and an undercarriage including wheels, a safety bar B (also known as, an antler bar or bail bar), and an apparatus for raising and lowering the gurney G. The deployable gurney lift assembly 12 is installed in an ambulance A to be deployable on at least one deployment rail 28. The contents of PCT Application No. PCT/US2018/044894 entitled Power Lift filed on 1 Aug. 2018 are incorporated herein by reference in its entirety; which PCT Application claims the benefit of U.S. Provisional Application Ser. No. 62/539,545 entitled Power Lift filed on 1 Aug. 2017, which is also incorporated herein by reference in its entirety.
(21) Each carriage arm 38 has an idler frame bracket 30, a rotating pickup 32 to engage the undercarriage of the gurney G, and a locking bracket pin 36 to secure the gurney G in place on the carriage arm 38, in which the locking bracket pin 36 is disposed under the idler frame bracket 30 to further restrict movement of the gurney G engaged on the carriage assembly 14. A hydraulic jack 22 may be affixed to the carriage assembly plate 20, in which the hydraulic jack 22 has an actuation arm 26 affixed to the safety bar holder 16 and the safety bar latch 18 to bias the safety bar latch 18 from an open position to a closed position.
(22) The deployable gurney assembly 12 has a carriage assembly 14 that may be used with an existing universal floor mount 29 available from Ferno (trademark) (of Wilmington, Ohio), or a modified universal floor mount 29, provided that the parallel rails 28 are sufficiently robust to support the carriage assembly 14. These Ferno (trademark) universal floor mounts 29 have two (2) notches N that mate with two (2) pins (not shown) extending from underneath the gurneys G corresponding to the notches N when stowed on the universal floor mounts 29.
(23) Alternative, universal floor mounts 29 may be available from other vendors as well. Such universal floor mounts 29 are used to secure gurneys G to the bed of an ambulance A at two (2) anchoring points to prevent the gurney G (and patient) from becoming dislodged. A modified universal mount 29 may be used which has parallel rails 28 for the deployable gurney carriage assembly 14 to ride along. An optional track 27 running along the length of the rails 28 may be provided so that the carriage assembly 14 may be advanced on the rails 28 using a motor 92 to deploy and stow the carriage assembly 14. In the alternative, parallel rails 28 may be used with or without a standalone track 27.
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32) The safety bar holder 16 and the latch 18 may be pivotably connected by a pivot point pin 120 which permits the latch 18, or both safety bar holder 16 and latch 18, to be biased together to secure a gurney G therebetween. The safety bar holder 16 and latch 18 are actuated by a hydraulic jack 22 which has a piston 26 retractably extending from the hydraulic jack 22 in which the piston 26 is clevis mounted 114 to the latch 18 with a quick release pin 118, as shown in
(33)
(34) The power lift 12, which has a carriage assembly 14 that, operates either directly from the ambulance A electrical system, or indirectly through a separate charger system 108 that is recharged using the ambulance A electrical system. The charger system 108 may be recharged by the ambulance A charger system (or battery) as are conventionally understood in the art. The onboard gurney G lift (not shown) may further be charged by the charger system 108.
(35)
(36)
(37)
(38) In an embodiment of the present design, the deployable gurney lift assembly 12 may utilize a single hydraulic jack 88 or two hydraulic jacks 88 to lift the carriage arms 38. The hydraulic jack(s) 88 may be located in the middle section of the floor of the motor box 128, above the motor box cover 124, or on either side of the bearing bracket 50.
(39)
(40)
(41)
(42) In contrast,
(43) It is to be understood that the present invention is not limited to the embodiments described above but encompasses any and all embodiments within the scope of the following claims.