Cover for a Segmented Biogas Reservoir
20190344957 ยท 2019-11-14
Assignee
Inventors
Cpc classification
B65D88/38
PERFORMING OPERATIONS; TRANSPORTING
C02F11/04
CHEMISTRY; METALLURGY
A01C3/028
HUMAN NECESSITIES
Y02E50/30
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B29C65/7832
PERFORMING OPERATIONS; TRANSPORTING
Y02W30/30
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
B65D88/38
PERFORMING OPERATIONS; TRANSPORTING
B29C65/78
PERFORMING OPERATIONS; TRANSPORTING
Abstract
The segmented cover is made of juxtaposed cover segments mounted over a wastewater reservoir. Floating beams define each of these cover segments, and a floating membrane is removably mounted to the floating beams over each of the cover segments. The floating beams are enclosed in a common sealed tubular envelope, which is connected to gas-impermeable connections joining the floating beams to a wall-covering skirt and to the perimeter walls of the reservoir. Because of the sealed continuous tubular envelope enclosing the floating beams, the wall-covering skirt and the gas-impermeable connections, each segment of the cover is independently sealed from outside environment and from an adjoining segment. Biogas collection from the wastewater reservoir can be maintained even when one segment of the cover is open.
Claims
1. A segmented cover for a wastewater reservoir comprising: perimeter walls and a gas-impermeable wall-covering skirt covering inside surfaces of said perimeter walls; juxtaposed cover segments defined inside said perimeter walls; floating beams defining each of said cover segments, and a floating membrane removably mounted to said floating beams over each of said cover segments; said floating beams being enclosed in a common sealed tubular envelope; said tubular envelope being connected to gas-impermeable connections joining said floating beams to said wall-covering skirt and to said perimeter walls.
2. A segmented cover for a wastewater reservoir comprising: juxtaposed cover segments; floating beams defining each of said cover segments, and a floating membrane removably mounted to said floating beams over each of said cover segments; each of said floating beams comprising floating boxes mounted end to end; each of said floating beams being wrapped in a sealed tubular envelope and all of said tubular envelopes being joined together defining a sealed gas-passage network; and said gas passage network being ballasted with wastewater from said wastewater reservoir, and being open to a gas accumulation region under one of said floating membranes.
3. A wastewater reservoir having floating scum at the surface thereof and a segmented cover mounted there-over, said segmented cover comprising: juxtaposed cover segments; floating beams defining each of said cover segments, and a floating membrane removably mounted to said floating beams over each of said cover segments; said floating beams defining each of said cover segments comprising a pair of short beams and a pair of long beams; each of said long beams having a keel thereunder; said long beams being held laterally firm in a parallel relationship with each other by an engagement of said keels in said scum.
4. The wastewater reservoir as claimed in claim 3, further comprising a pair of oppositely horizontally arcuate floating beams joined together by one of said floating membranes, and one of said short beams defining each of said cover segments is comprised in one of said arcuate floating beams.
5. The wastewater reservoir as claimed in claim 3, wherein each of said floating beams comprises a plurality of floating boxes joined together end-to-end.
6. The wastewater reservoir as claimed in claim 5, wherein said floating beams comprises a cable mounted thereto for firmly holding said floating boxes end-to-end.
7. The wastewater reservoir as claimed in claim 5, wherein said floating boxes in each of said floating beams are wrapped in a flexible, smooth-surfaced, impermeable sheet defining a sealed tubular envelope around said each of said floating beams, and all of said envelopes being joined together.
8. The wastewater reservoir as claimed in claim 5, further comprising a concrete wall extending there-around, and each of said long beams being connected to one of said concrete walls by a steel box bolted to said concrete wall and partly enclosing one of said floating boxes.
9. The wastewater reservoir as claimed in claim 8, wherein each of said long beams being connected to one of said arcuate beams by a metal box partly enclosing one of said floating boxes in said long beam and partly enclosing two of said floating boxes in said arcuate beam.
10. The wastewater reservoir as claimed in claim 9, wherein each of said floating boxes comprises threaded studs extending upward, and each of said floating membranes is removably affixed to said threaded studs.
11. The wastewater reservoir as claimed in claim 7, wherein said tubular envelopes being partly filed with wastewater.
12. The wastewater reservoir as claimed in claim 7, wherein said tubular envelope comprises a longitudinal sheet overlap and a thermoplastic weld in said sheet overlap; said thermoplastic weld comprising a fused portion and a work-holding margin on each side of said fused portion, and said sheet overlap also comprising a longitudinal flap bordering said thermoplastic weld, and a width of said longitudinal flap being as much as a width of said thermoplastic weld.
13. A method for installing a flexible floating membrane over a wastewater reservoir and for connecting said flexible floating membrane to a biogas outlet pipe mounted fixed above said flexible floating membrane, comprising the steps of: affixing a sealing plate on an opening in said flexible floating membrane; mounting a flange to said outlet pipe; mounting lifting hooks to said sealing plate; hoisting said lifting hooks and said sealing plate to said flange, and bolting said flange to said sealing plate.
14. (canceled)
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0060] A preferred embodiment of the segmented cover is described with the aid of the accompanying drawings, in which like numerals denote like parts throughout the several views:
[0061]
[0062]
[0063]
[0064]
[0065]
[0066]
[0067]
[0068]
[0069]
[0070]
[0071]
[0072]
[0073]
[0074]
[0075]
[0076]
[0077]
[0078]
[0079]
[0080] The drawings presented herein are presented for convenience to explain the functions of all the elements included in the preferred embodiment of the segmented cover. Elements and details that are obvious to the person skilled in the art may not have been illustrated. Conceptual sketches have been used to illustrate elements that would be readily understood in the light of the present disclosure. These drawings are not fabrication drawings, and should not be scaled.
DESCRIPTION OF THE PREFERRED EMBODIMENT
[0081] Referring firstly to
[0082] The covered portion of this reservoir 20 has a length B of 450 meters. Because of the magnitude of the wind-induced stresses on this segmented cover and because every joint in an impermeable cover becomes a potential risk for gas leak, it will be appreciated that any openable segment therein is preferably made using a floating membrane technology. This type of design has a minimum number of joints, no raised edge to catch the wind, it is not complicated to seal, and it is removable in a single piece.
[0083] Referring to
[0084] Referring now to
[0085] As illustrated in
[0086] Each bottom wrap 52 and each top wrap 54 are sealed to outside surfaces of branch connectors 62, and end connectors 64 using similar threaded studs 60 in these connectors and stiff flat bars (not shown) having a same clamping function as the angles 58. The branch connectors 62 and the end connectors 64 are made of stainless steel or aluminum plates. The connectors have dimensions to loosely encapsulate a portion of a hollow box 50.
[0087] Each end connectors 64 has an end plate 66 that is preferably made of a stronger material than the sides, and that end plate 66 has holes 68 therein to receive anchor bolts 70, as illustrated in
[0088] Each piece of floating membrane 26 is fastened to the floating beams 34, to the threaded studs 60, and are retained in a sealed manner to the beams by the sealing strips 56 and structural angles 58, as it can be seen in
[0089] Each piece of floating membrane 26 is also made of flexible High Density Polyethylene (HDPE) plastic sheet material. Each piece of floating membrane 26 is also fastened and sealed to the wall 72 of the reservoir in a similar manner as the beam envelope mentioned before. It will be appreciated that each piece of floating membrane 26 is removable from any one segment 32 by removing the angles 58 and by rolling the piece of membrane 26 toward one end of the segment 32.
[0090] Referring back to
[0091] The prestressed segment 82 extends across the prevailing winds on the cover, to strengthen the segmented cover. Each arcuate beam 84 in the prestressed segment 82 has a cable 86 fastened along its top surface, as can be seen in
[0092] Each floating box 50 has a boss at one end and a socket at the other end, as can be appreciated from
[0093] Referring now to
[0094] The gas openings at arrow 108 communicate with the biogas accumulation region 110 alongside each beam 34. For more certainty, to prevent inflation of the gas-impermeable barrier network 100, one or more gas vents 112 and isolation valves 114 are installed in the top wrap 54 of the tubular envelope. These vents 112 are connected to biogas accumulation regions 110 under the floating membranes 26.
[0095] Referring to
[0096] The adapter plate 116 is fitted to the wall 72 of the reservoir with grout for example to provide a seal joint between the adapter plate 116 and the wall 72 of the reservoir.
[0097] The end plate 66 of the end connector 64 is bolted to anchor bolts 118 extending into the wall 72 of the reservoir, for retaining the end connector 64 and the adapter plate 116 tight against the wall 72 of the reservoir. Prior to tightening the anchor bolts 118, the bottom wrap 52 and the top wrap 54 of the tubular envelope are folded over the end connector 64 and clamped in a sealed manner between the end plate 66 and the adapter plate 116. The adapter plate 116 provides a flat surface against which the folds of the bottom wrap 52 and top wrap 54 can be clamped tight and sealed.
[0098] Referring especially to
[0099] Because of the gas-impermeable barrier network 100; the gas-impermeable end joints 122; the wall-covering skirt 120, and the individual floating membranes 26, each segment 32 of the cover is independently sealed. Such gas-impermeable barriers around each segment 32 can be appreciated from the illustration in
[0100] Referring to
[0101] A float line 30 is attached to a piece of floating membrane 26 inside a channel 130 that is welded to the top surface of the floating membrane 26, as illustrated in
[0102] The thermoplastic welds are preferably made using a deep throat welder 140 as illustrated in
[0103] An example of the advantages of this weld placement method may be understood from the illustrations of
[0104] Referring now to
[0105] While the disconnecting of the gas outlet pipe 38 may be done relatively easily, the reinstallation is a challenge. This gas outlet pipe 38 is normally fixed to a rigid structure 154 and cannot be moved down toward the floating membrane 26. The floating membrane 26 must be brought upward to connect to the end of the pipe 38. It is unsafe, unpleasant and unpractical for a worker to go under the cover, in a dinghy, a raft or otherwise, to push the membrane 26 upward and to reconnect the floating membrane 26 to the gas outlet pipe 38.
[0106] In the preferred embodiment, the floating membrane 26 is fitted with a sealing plate 160 having a gas outlet hole 162 there-through. The sealing plate 160 can be installed to the floating membrane 26 by sliding it under the floating membrane 26 from the wall 72 of the reservoir for example. A sealing disc 164 is attached to the top of the sealing plate 160. The sealing disc 164 is installed in such a way as to seal the floating membrane 26 to the top surface of the sealing plate 160.
[0107] A pair of eye bolts 166 are affixed to the sealing plate 160. The sealing plate 160 with the floating membrane 26 is brought up by portable hoists (not shown) engaged to the eye bolts 166. The sealing plate 160 is maneuvered while suspended to the hoists and aligned with the gas outlet pipe 38. A flange 168 on the gas outlet pipe 38 can then be bolted to the sealing plate 160, to secure the floating membrane 26 to the gas outlet pipe 38. It will be appreciated that the edge 170 of the sealing plate 160 along the wall 72 of the reservoir is a straight edge. This straight edge 170 is aligned parallel to the wall 72 of the reservoir so as to prevent the formation of wrinkle in the floating membrane 26. Because of this sealing plate arrangement, the making of a connection or the undoing of that connection is made by personnel standing on the upper side of the floating membrane 26, with minimum exposure to the conditions under the floating membrane.
[0108] In yet another characteristic of the preferred segmented cover 24 is illustrated in
[0109] Opening and cleaning of one segment 32 of the reservoir is generally done when the scum mat 180 reaches the far end of a segment 32. At that time, the layer of scum 180 entraps the floating beams 34 therein, as represented in
[0110] As explained before, each floating beam 34 bordering one segment 32 is attached at one end to the concrete wall 72 of the reservoir, and at the other end to one of the arcuate beams 84, which is by its nature strong and rigid. The side floating beams 34 are keyed to the layer of scum 180. Consequently, the entire perimeter of an open segment 32 is stiff and resistant to lateral deflection. Personnel can safely walk or travel by small vehicle on the cover around the open segment 32 for the purpose of installing a barge and backhoe for example to clean the scum and solid residues out of that open segment of the reservoir.