Gas filling method
10465849 ยท 2019-11-05
Assignee
Inventors
Cpc classification
F17C13/084
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2225/0123
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2205/0329
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2205/0335
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2223/0123
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2265/065
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2221/012
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2205/0394
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2250/032
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2260/025
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2270/0184
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02P90/45
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F17C2250/075
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2250/0439
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2270/0763
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C5/007
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2225/035
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2260/023
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2201/056
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2250/0443
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C5/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2223/035
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2250/043
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2227/047
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2250/0434
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C1/005
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F17C5/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C5/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C1/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A hydrogen gas filling method includes: a step for acquiring a pre-supply upstream pressure that is a pressure in a station side of a piping at time t0, a step for starting the supply of hydrogen gas from the station at time t1 that is after the pre-supply upstream pressure is acquired, a step for acquiring a post-supply upstream pressure at time t2 that is immediate after the supply of hydrogen gas starts, a step for acquiring a start-time flowrate that is a flowrate of hydrogen gas at the same period as the step for starting, a step for estimating the pressure loss generated in the piping at the time of the supply by using the pre-supply upstream pressure, post-supply upstream pressure, and the start-time flowrate, and a step for stopping the supply of hydrogen gas so that a tank pressure conforms with a predetermined target pressure.
Claims
1. A gas filling method for connecting a tank that stores gas and a supply source that supplies gas by a piping, and filling gas in the tank, the method comprising: acquiring a pre-start upstream pressure that is a pressure in the supply source side of the piping before the start of the supply of gas; starting the supply of gas from the supply source after the pre-start upstream pressure is acquired; acquiring a post-start upstream pressure that is a pressure in the supply source side of the piping after the start of the supply of gas; acquiring a post-start flowrate that is a flowrate of gas in the same period as a period in which the post-start upstream pressure is acquired; estimating the pressure loss generated in the piping at the time of the supply of gas by using the pre-start upstream pressure, the post-start upstream pressure, and the post-start flowrate; and stopping the supply of gas so that a tank pressure that is the pressure in the tank becomes a predetermined target pressure by using the pressure loss, wherein the post-start upstream pressure is acquired in two or more different acquisition periods defined between a time when the flowrate of gas is 0 and a time when the flowrate of the gas reaches a predetermined target flowrate, and the post-start flowrate is acquired in the same period as each of the acquisition periods, and the pressure loss generated in the piping at the time of the supply of gas in the piping is estimated by using the pre-start upstream pressure, and the post-start upstream pressure and the post-start flowrate acquired in each of the acquisition periods.
2. The gas filling method according to claim 1, further comprising: estimating a tank pressure that is a pressure in the tank during the supply of gas by using the pressure loss; and estimating a volume of the tank after the supply of the gas is stopped.
3. The gas filling method according to claim 2, wherein stopping the supply of gas is performed after the gas has been continuously supplied for a predetermined time while the upstream pressure is maintained to be the target pressure.
4. The gas filling method according to claim 2, wherein stopping the supply of gas is performed so that the estimated tank pressure reaches the target pressure.
5. The gas filling method according to claim 4, further comprising: a pre-stop upstream pressure acquisition step for acquiring a pre-stop upstream pressure that is a pressure in the supply source side of the piping before the supply of gas is stopped; a post-stop upstream pressure acquisition step for acquiring a post-stop upstream pressure that is a pressure in the supply source side of the piping after the supply of gas is stopped; a pre-stop flowrate acquisition step for acquiring a pre-stop flowrate that is a flowrate of gas at the same period as the acquisition period of the pre-stop upstream pressure; and a stop-time pressure loss estimation step for estimating the pressure loss generated in the piping at the time of the supply of gas by using the pre-stop upstream pressure, the post-stop upstream pressure, and the pre-stop flowrate.
6. The gas filling method according to claim 2, further comprising: receiving volume information of the tank from a vehicle equipped with the tank, wherein the flowrate of gas is controlled by using the volume information received from the vehicle between starting of the supply of gas and temporarily stopping the supply of gas, and wherein the flowrate of gas is controlled by using the estimated volume information after the supply of gas is started again after the supply of gas is temporarily stopped. estimated by using the pre-start upstream pressure, and the post-start upstream pressure and the post-start flowrate acquired in each of the acquisition periods.
7. A gas filling method for connecting a tank that stores gas and a supply source that supplies gas by a piping, and filling gas in the tank, the method comprising: starting the supply of gas from the supply source; acquiring a pre-stop upstream pressure that is a pressure in the supply source side of the piping before the stop of the supply of gas; acquiring a pre-stop flowrate that is a flowrate of gas in the same period as a period in which the pre-stop upstream pressure is acquired; temporarily stopping the supply of gas from the supply source after the pre-stop upstream pressure is acquired; acquiring a post-stop upstream pressure that is a pressure in the supply source side of the piping after the supply of gas is temporarily stopped; estimating the pressure loss generated in the piping at the time of the supply of gas by using the pre-stop upstream pressure, the post-stop upstream pressure, and the pre-stop flowrate; and stopping the supply of gas so that a tank pressure that is a pressure in the tank becomes a predetermined target pressure by using the pressure loss, wherein the post-start upstream pressure is acquired in two or more different acquisition periods defined between a time when the flowrate of gas is 0 and a time when the flowrate of the gas reaches a predetermined target flowrate, and the post-start flowrate is acquired in the same period as each of the acquisition periods, and the pressure loss generated in the piping at the time of the supply of gas in the piping is estimated by using the pre-start upstream pressure, and the post-start upstream pressure and the post-start flowrate acquired in each of the acquisition periods.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
DETAILED DESCRIPTION OF THE INVENTION
(16) <First Embodiment>
(17) A first embodiment of the present invention will be explained hereinafter while referencing the drawings.
(18) <Configuration of Fuel Cell Vehicle V>
(19) The fuel cell vehicle V includes a hydrogen tank system 3 that stores hydrogen gas supplied from the hydrogen station 9, a filling operation ECU 6 that generates data signals including information related to the hydrogen tank system 3, and an infrared transmitter 5 that sends the data signals generated by the filling operation ECU 6 to the hydrogen station 9. It should be noted that illustrations for the configurations of the vehicle body and the fuel cell system that generates electricity using the hydrogen gas stored in the hydrogen tank system 3, and configurations such as the drive system that causes the vehicle body to move using the electric power generated by the fuel cell system are omitted in the vehicle V in
(20) The hydrogen tank system 3 includes a plurality of (e.g., three) hydrogen tanks 31, 32 and 33 that store hydrogen gas, a receptacle 34 to which the nozzle of the hydrogen station 9 is connected during filling of hydrogen gas, and vehicle piping 35 that connects this receptacle 34 and each of the hydrogen tanks 31 to 33, temperature sensors 36, 37 and 38 that detect the temperatures inside the respective hydrogen tanks 31 to 33, and a pressure sensor 39 that detects the pressure inside the hydrogen tanks 31 to 33. The hydrogen gas pressure fed from the hydrogen station 9 during the filling is filled into each of the hydrogen tanks 31 to 33 via this vehicle piping 35.
(21) In addition, master valves 31a, 32a and 33a are provided to these hydrogen tanks 31, 32 and 33, respectively. For example, in the case of being during travel of the vehicle V, since hydrogen gas stored inside of the hydrogen tanks 31 to 33 is supplied to the fuel cell system that is not illustrated, these master valves 31a to 33a are open. In addition, these master valves 31a to 33a are each made so as to be able to open and close manually by an operator, in consideration of maintenance time of the vehicle V. Herein, there may be cases where hydrogen gas is filled from the hydrogen station 9 while the master valve remains closed due to some reasons, but in such cases, a gap between a volume transmitted value V.sub.IR described later transmitted from the vehicle V to the hydrogen station 9 and the volume of the actual hydrogen tank, is generated.
(22) It should be noted that, hereinafter, for a configuration including a plurality of hydrogen tanks 31 to 33 as in the vehicle V of
(23) Each of the temperature sensors 36 to 38 detects the temperature of hydrogen gas in the respective hydrogen tanks 31 to 33, and sends a signal corresponding to the detected value to the filling operation ECU 6. In addition, the pressure sensor 39 detects the pressure in the hydrogen tank 31 in the vehicle piping 35, and sends a signal corresponding to the detected value to the filling operation ECU 6.
(24) The filling operation ECU 6 is a microcomputer configured by an interface that performs A/D conversion on the detection signals of the above-mentioned sensors 36 to 39, a CPU that executes the signal generation processing described later, a drive circuit that drives the infrared transmitter 5 in a state determined under the above-mentioned processing, a storage device that stores various data, and the like.
(25) Programs related to the execution of the data signal generation processing described later, and characteristic information including the capacity values of the hydrogen tanks 31 to 33 equipped at the time at which the vehicle V is manufactured are recorded in the storage device of the filling operation ECU 6. The hydrogen tank system 3 as mentioned above is configured by combining a plurality of the hydrogen tanks 31 to 33. Therefore, capacity value included in this characteristic information is the total value of the capacity values of the hydrogen tanks 31 to 33 at the time of manufacture. It should be noted that, in addition to the capacity value of the hydrogen tank, for example, information related to the hydrogen tank that can be specified at the time of manufacture such as the volume derived by a known conversion law from the capacity value and the material of the hydrogen tank is included in this characteristic information.
(26) The CPU of the filling operation ECU 6 starts signal generation processing to generate signals to be transmitted from the transmitter 5 to the hydrogen station 9, with the event of a fuel lid protecting the receptacle 34 being opened. In addition, the CPU of the filling operation ECU 6 ends the signal generation processing, with the event of entering a state in which filling of hydrogen gas becomes impossible by the above-mentioned nozzle being removed from the receptacle 34, or the fuel lid being closed, for example.
(27) In the signal generation processing, a temperature transmitted value T.sub.IR corresponding to the current value of the temperature in the hydrogen tank, a pressure transmitted value P.sub.IR corresponding to the current value of the pressure in the hydrogen tank, and a volume transmitted value V.sub.IR corresponding to the current value of the volume of the hydrogen tank are acquired every predetermined period, and a data signal according to these values (T.sub.IR, P.sub.IR, and V.sub.IR) is generated. For the temperature transmitted value T.sub.IR, for example, the average value for the detection values of the above-mentioned three temperature sensors 36 to 38, or a detection value of a representative one decided in advance among the three temperature sensors 36 to 38 is used. For the pressure transmitted value P.sub.IR, for example, the detection value of the pressure sensor 39 at this time is used. In addition, for the volume transmitted value V.sub.IR, a value recorded in the aforementioned storage device is used. It should be noted that, among these sending values T.sub.IR, P.sub.IR and V.sub.IR, the T.sub.IR and P.sub.IR are values that successively vary during the filling; however, V.sub.IR is a fixed value that does not vary during the filling.
(28) In addition, in the signal generation processing, the temperature transmitted value T.sub.IR and the pressure transmitted value P.sub.IR acquired periodically as mentioned above and abort thresholds decided in advance for each sending value are compared, and in the case of either of these sending values exceeding the abort threshold during the filling, an abort signal for requesting ending of filling to the hydrogen station 9 is generated.
(29) The drive circuit of the filling operation ECU 6 causes the infrared transmitter 5 to be driven (flash) according to the data signals and abort signal generated by the above-mentioned signal generation processing. Thereby, data signals including state information related to the state inside the hydrogen tank (i.e. temperature transmitted value T.sub.IR, pressure transmitted value P.sub.IR, and the like) as well as characteristic information (i.e. volume transmitted value V.sub.IR, and the like) and abort signals are thereby sent to the hydrogen station 9.
(30) <Configuration of Hydrogen Station 9>
(31) The hydrogen station 9 includes a pressure accumulator 91 in which hydrogen gas to be supplied to the vehicle V is stored at high pressure, a station piping 93 from the pressure accumulator 91 leading to a filling nozzle 92 which is directly operated by the operator, a flowrate control valve 94 provided in the station piping 93, and a station ECU that opens and closes the flowrate control valve 94 in order to control the flowrate of hydrogen gas (hereinafter also referred to as filling flowrate) flowing in the station piping 93.
(32) A precooler 96 that cools the hydrogen gas is provided in the station piping 93 between the flowrate control valve 94 and the filling nozzle 92. By cooling the hydrogen gas at a position ahead of filling to the hydrogen tank of the vehicle V by such a precooler 96, a temperature rise of the hydrogen gas in the hydrogen tank is suppressed, and thus rapid filling becomes possible.
(33) A plurality of sensors 97a, 97b and 97c for detecting various physical quantities related to the filling of hydrogen gas is provided to the hydrogen station 9.
(34) A mass flow meter 97a is provided in the station piping 93 between the flowrate control valve 94 and the precooler 96, detects the mass flowrate of hydrogen gas flowing in the station piping 93, and sends a signal corresponding to the detection value to the station ECU 95.
(35) The gas temperature sensor 97b is provided in the station piping 93 between the precooler 96 and the filling nozzle 92, detects the temperature of hydrogen gas in the station piping 93, and sends a signal corresponding to the detection value to the station ECU 95.
(36) The station pressure sensor 97c is provided in the station piping 93 between the precooler 96 and the filling nozzle 92, detects the pressure of hydrogen gas inside the station piping 93, and sends a signal corresponding to the detection value to the station ECU 95.
(37) An infrared receiver 98 for receiving data signals sent from the vehicle V is provided to the filling nozzle 92. The infrared receiver 98, when connecting the filling nozzle 92 to the receptacle 34, faces the infrared transmitter 5 of the vehicle V, whereby sending and receiving of data signals and abort signals (hereinafter referred to as data signals, and the like) via infrared rays becomes possible between this transmitter 5 and receiver 98. When receiving data signals, etc. transmitted from the infrared transmitter 5, the infrared receiver 98 sends these to the station ECU 95. The sending and receiving of data signals, and the like is thereby realized between the filling operation ECU 6 and the station ECU 95. The sending and receiving of data signals, and the like via infrared rays between this transmitter 5 and receiver 98 is hereinafter also referred to as IR communication.
(38) The station ECU 95 fills hydrogen gas according to the sequence explained as follows by using the output of the sensors 97a to 97c provided on the station side and the data signals by IR communication, in response to the filling of hydrogen gas and IR communication becoming possible by the filling nozzle 92 being connected to the receptacle 34 of the vehicle V.
(39)
(40)
(41) First, in S1, after forming pre-shot filling for a predetermined time, the hydrogen station acquires the value of the initial tank pressure Pi by using the output of the station pressure sensor, and then the processing advances to S2. Herein, the pre-shot filling is processing that equalizes pressure in the station piping and the hydrogen tank by experimentally filling hydrogen gas of an amount on the order of several tens to hundreds of grams over a few seconds. After such pre-shot filling is performed, since the station pressure and the tank pressure are equal, the tank pressure can be acquired by using the station pressure sensor. Hereinafter, filling after this pre-shot filling ends is defined as main filling. In addition, hereinafter, the initial tank pressure Pi acquired in S1 is defined as a tank pressure immediately before the main filling starts.
(42) In S2, the hydrogen station starts the main filling by opening the flowrate control valve and estimates the pressure loss generated in the piping that connects the hydrogen station and the hydrogen tank at the time of the supply of hydrogen gas by utilizing the step-like rise of the station pressure associated with the start of the main filling.
(43)
(44) As shown in
(45) Herein, in a case of assuming the pressure accumulator and the hydrogen tank are connected by only a cylindrical piping, the pressure difference (P=PstationPtank) generated between the station pressure Pstation and the tank pressure Ptank due to the pressure loss when hydrogen gas is supplied from the pressure accumulator to the hydrogen tank with the mass flowrate dm, is represented by the following simplified formula (1).
(46)
(47) In the above formula (1), is an average gas density in the piping and the value thereof can be calculated by searching a predetermined arithmetic expression and map with the temperature Tgas of hydrogen gas and the pressure difference P as arguments. In addition, in the above formula (1), k is the energy loss generated due to flowing of hydrogen gas through the piping, i.e., the pressure loss coefficient that represents the magnitude of the pressure loss. Since the specific value of the pressure loss coefficient k is derived from the shape, structure, or the like of the piping, it differs depending on the model of the vehicle connected to the hydrogen station. In addition, by varying the above formula (1), following formula (2) for calculating the value of unknown pressure loss coefficient k is derived.
(48)
(49) In the right side of the above formula (2), the value of any of the mass flowrate dm of hydrogen gas, the station pressure Pstation, the temperature Tgas of hydrogen gas, and the function form of the average gas density p, can be acquired in the station side at any time. In other words, the value of the mass flowrate dm of hydrogen gas can be acquired by using the mass flow meter provided in the hydrogen station, the value of the station pressure Pstation can be acquired by using the station pressure sensor provided in the hydrogen station, and the value of the temperature Tgas of hydrogen gas can be acquired by using the gas temperature sensor provided in the hydrogen station, respectively. In addition, the function form of the average gas density p can be specified by performing an experiment beforehand.
(50) In the right side of the above formula (2), the one that cannot be acquired in the hydrogen station at any time is only the tank pressure Ptank. In the hydrogen station, unknown tank pressure is estimated by utilizing the station pressure rises in a step-like manner from a state of being substantially equal to the tank pressure before and after starting of the supply of hydrogen gas. In other words, it is appropriate that, as shown in
(51) In S2, the specific sequence of calculating the value of the pressure loss coefficient k is as follows. The hydrogen station acquires the value of the station pressure Pstation at time t0 immediately before the start of the supply of hydrogen gas (hereinafter, this is noted as P0), first. Next, at time t1, the hydrogen station opens the flowrate control valve and starts the supply of hydrogen gas. Next, the hydrogen station acquires the value of the station pressure Pstation at time t2 immediately after the start of the supply of hydrogen gas and the hydrogen gas temperature Tgas and the mass flowrate dm at the same time t2, and substitutes these for the following formula (3) to calculate the value of the pressure loss coefficient k.
(52)
(53) Referring back to
(54) In S4, the hydrogen station estimates the tank pressure Ptank during the supply of hydrogen gas by using the pressure loss coefficient k acquired in S2. In other words, the value of the tank pressure Ptank during the supply of hydrogen gas at the mass flowrate dm can be calculated by the following formula (4) that can be acquired by varying the formula (1) by using the value of the station pressure Ps at the time and the value of the pressure coefficient k acquired in S2.
(55)
(56) In S5, the hydrogen station determines whether or not an increase pressure P that is acquired by subtracting the initial tank pressure Pi acquired in S1, from the tank pressure Ptank at current time point estimated in S4, reaches the vicinity of a predetermined upper limit pressure Pmax (for example, 5 MPa) determined for measuring the timing to start the first-time leak check (PPmax?). In the case of the determination of S5 being NO, the hydrogen station returns to S3 and continues filling. In the case of the determination of S5 being YES, the hydrogen station temporarily stops filling of hydrogen gas to perform the first-time leak check (refer to S6).
(57) In the hydrogen station of the present embodiment as above, by estimating the pressure loss at the time of the start of main filling, estimating the tank pressure Ptank and the increase pressure P due to the filling during the filling of hydrogen gas by using the pressure loss, and further, stopping the filling when the increase pressure P reaches the vicinity of the upper limit pressure Pmax, the filling of hydrogen gas can be stopped so that the tank pressure Ptank that cannot be directly acquired in the hydrogen station side, conforms with the target pressure (Pmax+Pi) that is determined by the upper limit pressure Pmax.
(58) In S7, the hydrogen station estimates the volume V [m.sup.3] of the hydrogen tank currently connected by using the following formula (5-1).
(59)
(60) In the right side of the estimation formula (5-1), m [kg] is hydrogen amount [kg] that has been filled in the hydrogen tank during a time since the main filling is started (i.e., from when the initial tank pressure Pi is measured in S1) until filling is temporarily stopped in S6, and the value thereof is calculated by integrating the output of the mass flow meter provided in the hydrogen station. In addition, the d [kg/m.sup.3] is a hydrogen gas density variation amount [kg/m.sup.3] in the hydrogen tank during the time since the main filling is started in S2 until the filling is temporarily stopped in S6, and the value thereof is calculated by subtracting the hydrogen gas density ((Pi,Ti)) in the hydrogen tank at the time when the main filling is started from the hydrogen gas density ((Pe,Te)) in the hydrogen tank at the time when the filling is temporarily stopped, as shown in the formula (5-2).
(61) In addition, the hydrogen gas density in the hydrogen tank at each time can be calculated by searching a predetermined map on the basis of the tank pressure and the tank temperature at each time. Herein, as the value of the tank temperature Ti at the time when the filling is started, the temperature transmitted value T.sub.IR transmitted from the vehicle and received in the hydrogen station before the pre-shot filling is performed in S1 is used, for example. In addition, as the value of the tank pressure Pi at the time when the filling is started, the value acquired in S1 is used. As the value of the tank temperature Te at the time when the filling is stopped, the temperature transmitted value T.sub.IR transmitted from the vehicle and received in the hydrogen station in S6, is used, for example. In addition, as the value of the tank pressure Pe at the time when the filling is stopped, the value acquired by using the output of the station pressure sensor under the condition where the pressure in the station piping and the hydrogen tank are equalized after the filling of hydrogen gas is temporarily stopped in S6, is used, for example.
(62) Herein, factors of the error of the volume V of the hydrogen tank estimated by the formula (5-1) are considered. When the volume V is estimated by the formula (5-1), the output of the pressure sensor after stopping of the filling of hydrogen gas is used as above. However, as explained referencing
(63) After that, the hydrogen station performs the first-time leak check (refer to S8) and restarts filling of hydrogen gas when confirmed that there is no leak. It should be noted that after the first-time leak check is finished, it is preferable that by using the volume V of the hydrogen tank estimated in S7, the flowrate of hydrogen gas is controlled and the timing to finish the filling is determined, in a manner suitable for the volume V.
(64) Although a hydrogen gas filling method according to a first embodiment of the present invention has been explained above, the present invention is not to be limited thereto. The configurations of the detailed parts may be modified as appropriate within the scope of the gist of the present invention. Specifically, Modifications 1 to 4 as follows and combining of the Modifications 1 to 4 are considered.
(65) <Modification 1>
(66) In the above-mentioned hydrogen gas filling method of a first embodiment, the value of the pressure loss coefficient k is calculated by using the value of the station pressure Pstation and the value of the mass flowrate dm in the acquisition time t2 that is one point immediately after the start of the supply of hydrogen gas, as explained referencing
(67) As shown in
(68) Due to the specification of the flowrate control valve provided in the hydrogen station, there are ones that cannot increase the mass flowrate of hydrogen gas quickly to a predetermined target flowrate as shown in
(69) <Modification 2>
(70) In the above-mentioned hydrogen gas filling method of a first embodiment, the filling of hydrogen gas is temporarily stopped when the increase pressure P that is estimated by using the pressure loss reaches the vicinity of the upper limit pressure Pmax, so that the tank pressure Ptank conforms with the target pressure (Pmax+Pi), as explained referencing
(71) As shown in
(72) Herein, when continuing the filling while maintaining the station pressure Pstation constant, the pressure difference between the station pressure Pstation and the tank pressure Ptank gradually becomes small, and therefore the mass flowrate of hydrogen gas also gradually becomes small. Therefore, there is a disadvantage that, when the station pressure fixed filling of
(73) In the piping that connects the pressure accumulating and the hydrogen tank of the vehicle, check valves are provided but there is variation in the operating pressure of the check valves. For this reason, even when flow control valves in the hydrogen station are fully closed at an appropriate timing so that the tank pressure conforms with the target, the actual tank pressure may be shifted from the actual tank pressure due to the variation in the operating pressure of the check valves. In this regard, the station pressure fixed filling shown in
(74) <Modification 3>
(75) In the hydrogen gas filling method of the above described first embodiment, as explained referencing
(76)
(77) In this case, the hydrogen station acquires the value of the station pressure Pstation at time t0 immediate before the stop of the supply of hydrogen gas and the value of the hydrogen gas temperature Tgas and the mass flowrate dm at the same time t0, first. Next, at time t1, the hydrogen station closes the flowrate control valve and stops the supply of the hydrogen gas. Next, the hydrogen station acquires the value of the station pressure Pstation at time t2 immediately after the stop of the supply of hydrogen gas (noted as P0 in the present Modification). Next, the hydrogen station calculates the value of the pressure loss coefficient k by substituting the value of the station pressure, mass flowrate, and the like acquired herein for the estimation formula (3) above.
(78) It should be noted that, by the hydrogen gas filling method of the present Modification 3, since the pressure loss is estimated in stopping the supply of hydrogen gas for performing the first-time leak check, the timing for stopping the supply of hydrogen gas cannot be determined by estimating the increase pressure P by using the estimation result. However, the estimation accuracy can be further improved by calculating again the value of the pressure loss coefficient by calculating the average value of the result acquired at the time of supply start of hydrogen gas and the result acquired at the time of supply stop of hydrogen gas, for example. It should be noted that, in restarting the filling of hydrogen gas after the first-time leak check is finished, the determination accuracy of the tank pressure in completing the filling can be improved by using the value of the pressure loss coefficient calculated again in this way.
(79) <Modification 4>
(80) In the hydrogen gas filling method of the first embodiment above, as explained referencing
(81) Therefore, assuming that the volume of the hydrogen tank may be too small, it is considered that the volume of the tank is estimated before the tank pressure reaches the target pressure (Pmax+Pi) and the mass flowrate of hydrogen gas is inhibited until the accurate volume is determined in S7. However, since the error becomes large in the former case, the estimation accuracy of the volume of the hydrogen tank decreases. In addition, time required for filling becomes longer in the latter case. Therefore, it is reasonable that, before processing S2 to S8 is performed, the volume is roughly estimated, and when the connected hydrogen tank is determined to be the small tank that is too small, processing S2 to S7 is not performed for such small tank. Herein, the small tank is assumed specifically to be a hydrogen tank equipped in a two-wheeled fuel cell vehicle, for example.
(82)
(83) After the pre-shot filling of S1 is finished, the hydrogen station determines whether or not the hydrogen tank currently connected is the small tank having a predetermined volume or less (refer to S11). In the case of the determination of S11 being YES, i.e., the hydrogen tank is determined to be the small tank, the filling of hydrogen gas is aborted by not performing processing of S2 to S8 or filling of hydrogen gas is continued by switching to another filling method suitable for the small tank. In the case of the determination of S11 being NO, i.e., the hydrogen tank is determined to be not the small tank, processing of S2 to S8 is performed.
(84) Herein, the method of determining whether or not it is the small tank in S11 is explained. First, using the volume transmitted value V.sub.IR transmitted from the vehicle and received in the hydrogen station is considered. In this case, the hydrogen station determines that the hydrogen tank is the small tank when the volume transmitted value V.sub.IR is a predetermined threshold or less, and determines that the hydrogen tank is not the small tank when the volume transmitted value V.sub.IR is larger than the threshold value.
(85) Second, using the rise width of the station pressure at the time of supply of hydrogen gas for a predetermined time is considered. In this case, the hydrogen station acquires the rise width of the station pressure at the time when filling is performed in the constant mass or constant mass flow rate over a predetermined time (time t91 to t92), and determines that the hydrogen tank is the small tank when the rise width is a predetermined width or less and determines that the hydrogen tank is not the small tank when the rise width is larger than a predetermined width.
(86) <Modification 5>
(87) In the Modification 4 above, whether or not it is the small tank is determined before the main filling is started and the pressure loss is estimated, but in this case, it takes certain time as shown in time t91 to 92 in
(88)
(89) In S2, after the value of the pressure loss coefficient k is calculated along with starting the main filling, the hydrogen station estimates the volume of the currently connected hydrogen tank while continuing filling by using the pressure loss coefficient k acquired in S2 and the estimation formula of the formulae (5-1) and (5-2) above (refer to S41). Herein, the specific value of the hydrogen amount m in the formula (5-1) is calculated by integrating the output of the mass flow meter during a time since the main filling is started until the current time point. In addition, the specific value of the hydrogen gas density variation amount d in the formulae (5-1) and (5-2) is calculated by subtracting the hydrogen gas density ((Pi,Ti)) at the time of the start of the main filling from the hydrogen gas density ((Pe,Te)) in the hydrogen tank at current time point in which filling is continuing. The hydrogen gas density in each time can be calculated by searching a map on the basis of the tank pressure and the tank temperature, similarly to the processing of S7. In that time, as the tank pressure and the tank temperature at current time in which filling is continuing, the tank pressure estimated by the formula (4) by using the pressure loss coefficient k acquired in S2 and the temperature transmitted value transmitted from the vehicle at current point are used respectively.
(90) In S42, whether or not the currently connected hydrogen tank is the small tank is determined by using the volume estimated in S41. In the case of the determination of S42 being YES, i.e., the hydrogen tank is determined to be the small tank, the filling of hydrogen gas is aborted by not performing processing of S3 to S8 or filling of hydrogen gas is continued by switching to another filling method suitable for the small tank. In the case of the determination of S42 being NO, i.e., the hydrogen tank is determined to be not the small tank, processing of S3 to S8 is performed. It should be noted that, in S41, although the estimation accuracy becomes lower compared with the processing of S7 since the volume is estimated while filling is continued in a state where the pressure in the tank is low, it is enough to determine roughly whether or not the currently connected tank is the small tank.
(91) <Second Embodiment>
(92) A second embodiment of the present invention will be explained hereinafter while referencing the drawings.
(93) First, in the hydrogen gas filling method of the first embodiment above, as explained referencing
(94) After the pre-shot filling is finished in S1, the hydrogen station opens the flow control valve and starts the main filling in S21, and the processing advances to S22. In S22, the hydrogen station determines whether or not a predetermined time has elapsed since the main filling is started. Herein, when a predetermined time has elapsed, the hydrogen station temporarily stops the supply of hydrogen gas in the same sequence as the Modification 3, and calculates the value of the pressure loss coefficient k by using the station pressure Pstation and the mass flowrate dm acquired before and after the supply stop of hydrogen gas (refer to S23).
(95) More specifically, in S23, the hydrogen station first acquires the value of the station pressure Pstation at time t0 that is the immediately before the supply stop of hydrogen gas and the hydrogen gas temperature Tgas and the mass flowrate dm at the same time t0. Next, at time t1, the hydrogen station closes the flow control valves and stops the supply of hydrogen gas. Next, the hydrogen station acquires the value of the station pressure Pstation at time t2 that is immediately after the supply stop of hydrogen gas (noted as P0 in the present embodiment). Next, the hydrogen station substitutes the value of the station pressure, mass flowrate, and the like acquired herein for the estimation formula (3) above to calculate the value of the pressure loss coefficient k. After calculating the value of the pressure loss coefficient k by the sequence above, the hydrogen station estimates the volume V of the hydrogen tank by performing the same processing S3 to S8 as
(96) According to the hydrogen gas filling method of the present embodiment, since it is necessary to open and close the flow control valves too many compared with the hydrogen gas filling method of the first embodiment, it has a disadvantage that filling time gets longer for that, but other than this point, the tank pressure can be conformed with the target accurately similarly as the hydrogen gas filling method of the first embodiment. In addition, the hydrogen gas filling method of the present embodiment has an advantage if the pressure loss could not have been estimated at time point of supply starting of hydrogen gas as the hydrogen gas filling method of the first embodiment, for some reason.
(97) Although a hydrogen gas filling method according to a second embodiment of the present invention has been explained above, the present invention is not to be limited thereto. The configurations of the detailed parts may be modified as appropriate within the scope of the gist of the present invention.
(98) <Third Embodiment>
(99) A third embodiment of the present invention will be explained hereinafter while referencing the drawings.
(100) First, in the hydrogen gas filling method of the first and second embodiments above, the pressure loss is estimated by utilizing that the station pressure changes in a step-like manner in starting and stopping of filling, and the supply of hydrogen gas is stopped at an appropriate timing so that the tank pressure conforms with a predetermined target pressure by using the estimation result. The hydrogen gas filling method of the present embodiment is different from the hydrogen gas filling methods of the first and second embodiments in the feature that the supply of hydrogen gas is stopped at an appropriate timing so that the tank pressure conforms with the target pressure without estimating the pressure loss.
(101) After the pre-shot filling is finished in S1, the hydrogen station opens the flow control valve and starts the main filling in S31, and the processing advances to S32. In S32, the hydrogen station controls the flowrate of hydrogen gas so that the station pressure rises with a predetermined gradient as shown in
(102) In S35, the hydrogen station performs the station pressure fixed filling in which hydrogen gas filling is continued while the station pressure Pstation is maintained to be the target pressure (Pmax+Pi), for a predetermined time. By continuing such station pressure fixed filling, the tank pressure Ptank rises and approaches to the target pressure (Pmax+Pi) asymptotically while the station pressure Pstation is maintained to be the target pressure (Pmax+Pi). In addition, as the tank pressure approaches to the target pressure, the flowrate of hydrogen gas asymptotically approaches to 0. Therefore, in S35, in response to that a predetermined time has elapsed from the station pressure fixed filling is started, more specifically, time that can be determined that the tank pressure approaches to the target pressure to some extent, the hydrogen station ends the station pressure fixed filling and the processing advances to next, S36.
(103) In S36, the hydrogen station performs the minimum pressure loss filling in which hydrogen gas filling is continued while the mass flowrate is maintained to be the minimum flowrate, for a predetermined time. After that, the hydrogen station temporarily stops the filling of hydrogen gas (refer to S6), estimates the volume V of the tank (refer to S7), and performs the first-time leak check (refer to S8), similarly to the flowchart of
(104) Although a hydrogen gas filling method according to the third embodiment of the present invention has been explained above, the present invention is not to be limited thereto. The configurations of the detailed parts may be modified as appropriate within the scope of the gist of the present invention.