Charging facility and energy management method for charging facility
10464441 ยท 2019-11-05
Assignee
Inventors
Cpc classification
H02J3/46
ELECTRICITY
Y02E10/56
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E60/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02T90/14
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S10/126
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02T10/70
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E10/76
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02T10/92
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B60L53/30
PERFORMING OPERATIONS; TRANSPORTING
H02J7/34
ELECTRICITY
B60L53/67
PERFORMING OPERATIONS; TRANSPORTING
Y02T10/72
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B60L53/22
PERFORMING OPERATIONS; TRANSPORTING
B60L53/20
PERFORMING OPERATIONS; TRANSPORTING
H02J3/32
ELECTRICITY
H02J7/0068
ELECTRICITY
Y02T90/12
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02J2207/20
ELECTRICITY
Y02T10/7072
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
B60L53/20
PERFORMING OPERATIONS; TRANSPORTING
H02J7/00
ELECTRICITY
H02J7/34
ELECTRICITY
H02J3/38
ELECTRICITY
B60L53/22
PERFORMING OPERATIONS; TRANSPORTING
B60L53/30
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A charging facility collects DC power supplied from a plurality of power supply devices in a DC bus, and then uses the DC power to charge an on-board rechargeable battery for an electric vehicle. In an energy management method for a charging facility, each power supply device operates under independent automatic control according to a change in voltage in the DC bus. An upper-level control unit which collectively controls a plurality of power supply sources is not required, and a plurality of power supply devices can be combined with a simple configuration achieved by merely connecting respective output terminals to the DC bus. In addition, the entire charging facility can be operated flexibly. Thus, it is possible to achieve a simple configuration and to allow flexible operation while a plurality of power converters are combined with a system power supply.
Claims
1. A charging facility comprising: a direct current (DC) bus; a plurality of power converters configured to supply DC power to the DC bus; and a charging device configured to charge a vehicle-mounted rechargeable battery with the DC power supplied to the DC bus, wherein each of the plurality of power converters comprises: a DC power generator configured to generate the DC power; and a power controller configured to monitor a DC voltage in the DC bus, determine a priority of operation of the plurality of the power converters based on the comparison result of the monitored DC voltage and a predetermined set voltage, and independently control operation of each of the DC power generators based on the priority of operation, and the charging device comprises: a DC/DC converter configured to convert the DC power supplied to the DC bus to DC power for charging; and a charging controller configured to control the operation of the DC/DC converter.
2. The charging facility according to claim 1, wherein the DC power generator is configured to start supply of the DC power to the DC bus in response to the monitored DC voltage being lower than the predetermined set voltage.
3. The charging facility according to claim 2, wherein the plurality of power converters comprises: a system power supply converter configured to convert alternating current (AC) power received from a system to DC power and supply the DC power to the DC bus, and a storage system configured to supply DC power discharged from a storage battery charged in advance to the DC bus.
4. The charging facility according to claim 3, wherein the system power supply converter comprises: an AC/DC converter for a system power supply configured to function as the DC power generator and to convert the AC power to the DC power and supply the DC power to the DC bus; and a system power supply controller configured to function as the power controller which is configured to monitor a DC voltage in the DC bus and to control the operation of the AC/DC converter for a system power supply to start supply of the DC power to the DC bus in response to the monitored DC voltage being lower than a set voltage for a system power supply.
5. The charging facility according to claim 4, wherein the storage system comprises: the storage battery; a DC/DC converter for a storage device configured to function as the DC power generator which is configured to convert DC power discharged from the storage battery to different DC power and supply the DC power to the DC bus at the time of discharging the storage battery; and a storage device controller configured to function as the power control unit which is configured to monitor a DC voltage in the DC bus and to control the operation of the DC/DC converter for a storage device to start supply of the DC power to the DC bus in response to the monitored DC voltage being lower than a set voltage for a storage device.
6. The charging facility according to claim 5, wherein the plurality of power converters comprises: a power generation system configured to supply DC power generated by power generation to the DC bus.
7. The charging facility according to claim 6, wherein the power generation system comprises: a power generation module configured to generate DC power by power generation; a DC/DC converter for a power generation device configured to function as the DC power generator and to convert the generated DC power to the DC power and supply the DC power to the DC bus; and a power generation device controller configured to function as the power control unit which is configured to monitor a DC voltage in the DC bus and to control the operation of the DC/DC converter for a power generation device to start supply of the DC power to the DC bus in response to the monitored DC voltage being lower than a set voltage for a power generation device.
8. The charging facility according to claim 7, wherein the power generation module comprises a solar power generation module or a wind power generation module.
9. The charging facility according to claim 7, wherein the DC/DC converter for a power generation device is configured to operate on a priority basis and the generated power generated by the power generation is supplied to the DC bus and the power supply to the vehicle-mounted rechargeable battery is started.
10. The charging facility according to claim 9, wherein in response to the charge of the vehicle-mounted rechargeable battery by the power supply based on the generated power falling below a threshold value, the AC/DC converter for a system power supply is configured to operate on a priority basis and the received power received from the system is supplied to the DC bus and the power supply to the vehicle-mounted rechargeable battery is continued.
11. The charging facility according to claim 10, wherein in response to the charge of the vehicle-mounted rechargeable battery by the power supply based on the generated power and the received power falling below the threshold value, the DC/DC converter motor circuit for a storage device is configured to operate and the discharged power discharged from the storage device is supplied to the DC bus and the power supply to the vehicle-mounted rechargeable battery is continued.
12. The charging facility according to claim 11, wherein in response to the amount of charge of the storage device decreasing by the discharge of the discharged power, the DC/DC converter motor circuit for a storage device is configured to stop the operation and the generated power and the received power are supplied to the storage device to recover the amount of charge.
13. The charging facility according to claim 2, wherein the plurality of power converters comprises: a system power supply converter configured to convert AC power received from a system to DC power and supplies the DC power to the DC bus, a storage system configured to supply DC power discharged from a storage battery charged in advance to the DC bus, and a power generation system configured to supply DC power generated by power generation to the DC bus.
14. The charging facility according to claim 13, wherein the system power supply converter comprises: an AC/DC converter for a system power supply configured to function as the DC power generation unit and to convert the AC power to the DC power and supply the DC power to the DC bus; and a system power supply controller configured to function as the power control unit which is configured to monitor a DC voltage in the DC bus and to control the operation of the AC/DC converter for a system power supply to start supply of the DC power to the DC bus in response to the monitored DC voltage being lower than a set voltage for a system power supply.
15. The charging facility according to claim 14, wherein the storage system comprises: the storage battery; a DC/DC converter for a storage device configured to function as the DC power generation unit which is configured to convert DC power discharged from the storage battery to different DC power and supply the DC power to the DC bus at the time of discharging the storage battery; and a storage device controller configured to function as the power control unit which is configured to monitor a DC voltage in the DC bus and to control the operation of the DC/DC converter for a storage device to start supply of the DC power to the DC bus in response to the monitored DC voltage being lower than a set voltage for a storage device.
16. The charging facility according to claim 15, wherein the power generation system comprises: a power generation module configured to generate DC power by power generation; a DC/DC converter for a power generation device configured to function as the DC power generation unit and is configured to convert the generated DC power to the DC power and supply the DC power to the DC bus; and a power generation device controller configured to function as the power control unit which is configured to monitor a DC voltage in the DC bus and to control the operation of the DC/DC converter for a power generation device to start supply of the DC power to the DC bus in response to the monitored DC voltage being lower than a set voltage for a power generation device.
17. The charging facility according to claim 16, wherein the power generation module comprises a solar power generation module or a wind power generation module.
18. The charging facility according to claim 16, wherein the DC/DC converter for a power generation device is configured to operate on a priority basis and the generated power generated by the power generation is supplied to the DC bus and the power supply to the vehicle-mounted rechargeable battery is started.
19. The charging facility according to claim 18, wherein in response to the charge of the vehicle-mounted rechargeable battery by the power supply based on the generated power falling below a threshold value, the AC/DC converter for a system power supply is configured to operate on a priority basis and the received power received from the system is supplied to the DC bus and the power supply to the vehicle-mounted rechargeable battery is continued.
20. The charging facility according to claim 19, wherein in response to the charge of the vehicle-mounted rechargeable battery by the power supply based on the generated power and the received power falling below the threshold value, the DC/DC converter motor circuit for a storage device is configured to operate and the discharged power discharged from the storage device is supplied to the DC bus and the power supply to the vehicle-mounted rechargeable battery is continued.
21. The charging facility according to claim 20, wherein in response to the amount of charge of the storage device decreasing by the discharge of the discharged power, the DC/DC converter motor circuit for a storage device is configured to stop the operation and the generated power and the received power are supplied to the storage device to recover the amount of charge.
22. An energy management method for a charging facility comprising the steps of: supplying direct current (DC) power to a DC bus; and charging a vehicle-mounted rechargeable battery with the DC power supplied to the DC bus, wherein the supplying of the DC power comprises: in a plurality of power converters, generating the DC power by a DC power generation unit; monitoring the DC voltage in the DC bus by a power control unit; and determining priority of operation of the plurality of the power converters based on the comparison result of the monitored DC voltage and a predetermined set voltage, and independently controlling each operation of the DC power generation units based on the priority by the power control unit, and the charging of the vehicle-mounted rechargeable battery comprises: converting the DC power supplied to the DC bus to DC power for charging by a DC/DC converter for a charging device; and controlling the operation of the DC/DC converter for a charging device.
23. The energy management method for a charging facility according to claim 22, wherein in each of the plurality of power converters, the DC power generation unit operates to start supply of the DC power to the DC bus in response to the DC monitored voltage being lower than the predetermined set voltage.
24. The energy management method for a charging facility according to claim 23, wherein the supplying the DC power comprises: in the plurality of power converters, converting alternating current (AC) power received from a system to DC power and supplies the DC power to the DC bus; and supplying DC power discharged from a storage battery charged in advance to the DC bus.
25. The energy management method for a charging facility according to claim 24, wherein the generating of the DC power comprises: receiving AC power from the system; and converting the AC power to the DC power with an AC/DC converter for a system power supply, and the independently controlling comprises: controlling the operation of the AC/DC converter for a system power supply according to the monitored DC voltage.
26. The energy management method for a charging facility according to claim 25, the energy management method further comprising: receiving DC power from the DC bus and converting the received DC power to the DC power to charge a storage battery, wherein the generating of the DC power comprises: discharging DC power charged in advance in the storage battery; and converting the discharged DC power to the DC power and supplying the DC power to the DC bus by a DC/DC converter for a storage device, and the independently controlling comprises: controlling power supply to the DC bus or the storage battery of the DC/DC converter for a storage device according to the result of monitoring.
27. The energy management method for a charging facility according to claim 26, wherein the supplying the DC power comprises: in the plurality of power converters, supplying DC power generated by power generation to the DC bus.
28. The energy management method for a charging facility according to claim 27, wherein the generating of the DC power comprises: generating DC power with a power generation module; and converting the generated DC power to the DC power by a DC/DC converter for a power generation device, and the independently controlling comprises: controlling the operation of the DC/DC converter for a power generation device according to the result of monitoring.
29. The energy management method for a charging facility according to claim 27, wherein the generating comprises: solar power generating or wind power generating.
30. The energy management method for a charging facility according to claim 23, wherein the supplying the DC power comprises: in the plurality of power converters, converting AC power received from a system to DC power and supplies the DC power to the DC bus; supplying DC power discharged from a storage battery charged in advance to the DC bus; and supplying DC power generated by power generation to the DC bus.
31. The energy management method for a charging facility according to claim 30, wherein the generating of the DC power comprises: receiving AC power from the system; and converting the AC power to the DC power with an AC/DC converter for a system power supply, and the independently controlling comprises: controlling the operation of the AC/DC converter for a system power supply according to the monitored DC voltage.
32. The energy management method for a charging facility according to claim 31, the energy management method further comprising: receiving DC power from the DC bus and converting the received DC power to the DC power to charge a storage battery, wherein the generating of the DC power comprises: discharging DC power charged in advance in the storage battery; and converting the discharged DC power to the DC power and supplying the DC power to the DC bus by a DC/DC converter for a storage device, and the independently controlling comprises: controlling power supply to the DC bus or the storage battery of the DC/DC converter for a storage device according to the result of monitoring.
33. The energy management method for a charging facility according to claim 32, wherein the generating of the DC power comprises: generating DC power with a power generation module; and converting the generated DC power to the DC power by a DC/DC converter for a power generation device, and the independently controlling comprises: controlling the operation of the DC/DC converter for a power generation device according to the result of monitoring.
34. The energy management method for a charging facility according to claim 33, wherein the generating comprises: solar power generating or wind power generating.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
DESCRIPTION OF EMBODIMENTS
(4) A mode for carrying out a charging facility and an energy management method for a charging facility according to the invention will be described below referring to the accompanying drawings.
Embodiment
(5) In an embodiment of the invention, one configuration example of a charging facility in which a plurality of power converters are connected to a DC bus will be described.
(6) Each of a plurality of power converters can be broadly classified into three types. The power converters included in the first classification convert AC power supplied from the outside, such as a system power supply, to DC power and supply the DC power to the DC bus. The power converter included in the second classification supply power generated by a power generation device, such as a solar power generation module, to the DC bus. The power converters included in the third classification receive power from the DC bus to charge the storage device. The power converters included in the third classification also discharge power charged in the storage device and supply power to the DC bus.
(7) The charging facility described herein is connected to a system power supply, and has one power generation device and one storage device. However, the number of devices is just an example, and is not intended to limit the invention. the details will be described below, the presence or absence of connection to the system power supply, or the number of connected power generation devices or storage devices is not particularly limited, and in some cases, even if any one of the system power supply, the power generation device, and the storage device is not linked, operation can be continued by a combination of the remaining devices.
(8)
(9) The charging facility shown in
(10) The AC/DC conversion circuit 10 for a system power supply which receives power from the system power supply 60 and converts power to a DC voltage includes an AC/DC converter control circuit 13 for a system power supply and an AC/DC converter motor circuit 14 for a system power supply. The DC/DC conversion circuit 22 for a power generation device includes a DC/DC converter control circuit 23 for a power generation device and a DC/DC converter motor circuit 24 for a power generation device. The DC/DC conversion circuit 22 for a power generation device and the solar power generation module 21 may be collectively referred to as a power generation system. The DC/DC conversion circuit 32 for a storage device includes a DC/DC converter control circuit 33 for a storage device and a DC/DC converter motor circuit 34 for a storage device. The fixed storage battery 31 includes a storage battery cell 35 and a storage battery state monitoring device 36. The DC/DC conversion circuit 32 for a storage device and the fixed storage battery 31 may be collectively referred to as a storage system. The DC/DC conversion circuit 42 for a charging device includes a DC/DC converter control circuit 43 for a charging device and a DC/DC converter motor circuit 44 for a charging device. The DC/DC conversion circuit 42 for a charging device and the rechargeable battery 41 may be collectively referred to as a charging system. The motor circuit of each conversion circuit functions as a DC power generation device which generates DC power.
(11)
(12) Though not shown in
(13) The functions of the components of the charging facility shown in
(14) The power generation system transforms (DC/DC conversion) power generated by the solar power generation module 21 with the DC/DC conversion circuit 22 for a power generation device, and supplies power to the DC bus 1.
(15) In regard to the storage system, charging power is supplied from the DC bus 1 to the fixed storage battery 31 by the DC/DC conversion circuit 32 for a storage device, and discharging power is supplied from the fixed storage battery 31 to the DC bus 1.
(16) In regard to the charging system, power requested by the on-board charging circuit 51 is supplied from the DC bus 1 according to the remaining amount of the on-board rechargeable battery 52 of the electric vehicle 50, thereby charging the on-board rechargeable battery 52.
(17) The operation of the charging facility according to the embodiment of the invention, that is, the energy management method for a charging facility according to the embodiment of the invention will be described in more detail.
(18) The charging facility and the energy management method for a charging facility according to the embodiment of the invention have the following three features. The first feature is that peak cutting of received power from the system power supply 60 can be performed without limiting charging power to the electric vehicle 50. Peak cutting of received power is performed, whereby it is possible to reduce a basic charge of electricity charges. The second feature is that the most of renewable energy, such as power by solar power generation, is usable. The third feature is that power loss in the power converters can be reduced.
(19) Accordingly, in the embodiment of the invention, charging of the on-board rechargeable battery 52 is performed with the following priority. That is, first, power supplied from the power generation system is used. If power supplied from the power generation system is insufficient, power supplied from the system power supply 60 is additionally used. In order to realize peak cutting of system received power, an upper limit value is set for power received from the system power supply 60. For this reason, if power supplied from the power generation system and the system power supply 60 is yet insufficient, power supplied by discharging of the storage system is additionally used.
(20) In the embodiment of the invention, charging of the storage system is performed using the following priority. That is, in a case where the remaining amount of charge of the fixed storage battery 31 has some margin, charging of the fixed storage battery 31 is performed only using power supplied from the power generation system. In a case where the remaining amount of charge of the fixed storage battery 31 is smaller than a predetermined reference value, charging of the fixed storage battery 31 is performed in a short period of time using power supplied from the system power supply 60 in combination with power supplied from the power generation system.
(21) The above control is performed by the respective power converters of the system power supply 60, the power generation system, the storage system, and the charging system individually, that is, independently from other power converters. Specifically, for example, the AC/DC converter control circuit 13 for a system power supply monitors the voltage of the DC bus 1, and the AC/DC converter control circuit 13 for a system power supply controls the operation of the AC/DC converter motor circuit 14 for a system power supply based on the result of monitoring, whereby the operation of the AC/DC conversion circuit 10 for a system power supply connected to the system power supply 60 is performed. At this time, control which is performed by the AC/DC converter control circuit 13 for a system power supply has no relation to the power generation system, the storage system, and the charging system. The same applies to the operation of the power generation system, the storage system, and the charging system.
(22) In other words, the charging facility according to the invention collects power supplied from the AC/DC conversion circuit 10 for a system power supply, the power generation system, and the storage system in the DC bus 1 in the form of DC power, and charges the on-board rechargeable battery 52 of the electric vehicle 50 with DC power collected in the DC bus 1. In the charging facility according to the invention, controlling fixing the DC voltage in the DC bus 1 is not performed, and fluctuation of the DC voltage in the DC bus 1 is used as a trigger on which the AC/DC conversion circuit 10 for a system power supply, the power generation system, the storage system, and the charging system perform automatic control individually.
(23) An example of the overall operation of the charging facility shown in
(24)
(25) The first graph (A) indicates the relationship between power supplied from the AC/DC conversion circuit 10 for a system power supply to the DC bus 1 and the voltage of the DC bus 1. The second graph (B) indicates the relationship between power supplied from the DC/DC conversion circuit 22 for a power generation device to the DC bus 1 and the voltage of the DC bus 1. The third graph (C) indicates the relationship between power supplied from the DC/DC conversion circuit 32 for a storage device to the DC bus 1 and the voltage of the DC bus 1. The fourth graph (D) indicates the relationship between a load applied from the DC/DC conversion circuit 42 for a charging device to the DC bus 1 to the voltage of the DC bus 1.
(26) In the vertical axis of the graph shown in
(27) In the horizontal axis of the graph shown in
(28) Specifically, for example, in the AC/DC conversion circuit 10 for a system power supply, the AC/DC converter control circuit 13 for a system power supply continuously monitors the voltage of the DC bus 1, and if the voltage of the DC bus 1 exceeds the set voltage VA for a system power supply, the AC/DC converter control circuit 13 for a system power supply controls the AC/DC converter motor circuit 14 for a system power supply and stops power supply from the AC/DC conversion circuit 10 for a system power supply to the DC bus 1. On the contrary, if the voltage of the DC bus 1 falls below the set voltage VA for a system power supply, the AC/DC converter control circuit 13 for a system power supply controls the AC/DC converter motor circuit 14 for a system power supply and supplies power from the system power supply 60 to the DC bus 1.
(29) Similarly, in the power generation system, the DC/DC converter control circuit 23 for a power generation device continuously monitors the voltage of the DC bus 1, and if the voltage of the DC bus 1 exceeds the first set voltage VB1 for a power generation device, the DC/DC converter control circuit 23 for a power generation device controlling stopping power supply to the DC bus 1 of the DC/DC converter motor circuit 24 for a power generation device. On the contrary, if the voltage of the DC bus 1 falls below the first set voltage VB1 for a power generation device, the DC/DC converter control circuit 23 for a power generation device controlling starting of the operation of the DC/DC converter motor circuit 24 for a power generation device. When the voltage of the DC bus 1 decreases from VB1, power supplied from the power generation system to the DC bus 1 increases, and maximum generated power is supplied at a voltage equal to or lower than VB2. In the storage system, the DC/DC converter control circuit 33 for a storage device continuously monitors the voltage of the DC bus 1, and if the voltage of the DC bus 1 exceeds the set voltage VC for a storage device, the DC/DC converter control circuit 33 for a storage device controlling stopping of the power supply to the DC bus 1 of the DC/DC converter motor circuit 34 for a storage device. On the contrary, if the voltage of the DC bus 1 falls below the set voltage VC for a storage device, the DC/DC converter control circuit 33 for a storage device controlling starting of the discharging operation of the DC/DC converter motor circuit 34 for a storage device.
(30) In the example of
(31) Next, the on-board rechargeable battery 52 of the electric vehicle 50 is connected to the rechargeable battery 41 through the on-board charging circuit 51, and if charging of the fixed storage battery 31 starts, a load applied to the DC bus 1 increases, and when the load increases, the voltage of the DC bus 1 decreases.
(32) If the voltage of the DC bus 1 falls below the first set voltage VB1 for a power generation device, the DC/DC converter control circuit 23 for a power generation device which monitors the voltage of the DC bus 1 detects this state, and performs control such that the DC/DC converter motor circuit 24 for a power generation device starts to operate.
(33) If the operation starts, the DC/DC converter motor circuit 24 for a power generation device receives DC power generated by solar power generation of the solar power generation module 21, converts the DC voltage of power, and supplies power to the DC bus 1. Since the presence or absence of supply or the supply amount of generated power to the DC bus 1 is determined by the DC/DC conversion circuit 22 for a power generation device based on the voltage of the DC bus 1, the solar power generation module 21 may continuously continue solar power generation without particular control.
(34) Hereinafter, until the voltage of the DC bus 1 reaches the set voltage VA for a system power supply, charging of the on-board rechargeable battery 52 is performed with power supplied from the power generation system to the DC bus 1.
(35) Generated power supplied from the power generation system to the DC bus 1 increases when the voltage of the DC bus 1 decreases. Generated power of the power generation system reaches maximum generated power of the power generation device when the voltage of the DC bus 1 decreases and reaches the second set voltage VB2 for a power generation device.
(36) If the voltage of the DC bus 1 decreases and reaches the set voltage VA for a system power supply, the AC/DC converter control circuit 13 for a system power supply which monitors the voltage of the DC bus 1 detects this state, and the AC/DC converter motor circuit 14 for a system power supply starts power supply to the DC bus 1.
(37) The AC/DC converter motor circuit 14 for a system power supply receives AC power of a system from the system power supply 60. The AC/DC converter motor circuit 14 for a system power supply converts input AC power to DC power and supplies DC power to the DC bus 1.
(38) Hereinafter, until the voltage of the DC bus 1 reaches the set voltage VC for a storage device, charging of the on-board rechargeable battery 52 is performed with the total sum of power supplied from the power generation system and the AC/DC conversion circuit 10 for a system power supply to the DC bus 1.
(39) Power supplied from the AC/DC conversion circuit 10 for a system power supply to the DC bus 1 increases when the voltage of the DC bus 1 decreases. In this example, when power output from the AC/DC conversion circuit 10 for a system power supply reaches the maximum power P2 which is an upper limit set value of received power, a voltage that the voltage of the DC bus 1 reaches is set in the DC/DC converter control circuit 33 for a storage device as the set voltage VC for a storage device. In other words, the set voltage VC for a storage device is set such that output power from the AC/DC conversion circuit 10 for a system power supply reaches the maximum power P2, and the storage system starts power supply to the DC bus 1.
(40) If the voltage of the DC bus 1 decreases and reaches the set voltage VC for a storage device, the DC/DC converter control circuit 33 for a storage device which monitors the voltage of the DC bus 1 detects this state, and performs control such that the DC/DC converter motor circuit 34 for a storage device starts the discharging operation.
(41) If the discharging operation starts, the DC/DC converter motor circuit 34 for a storage device receives DC power charged in advance in the fixed storage battery 31, changes the voltage of DC power, and supplies DC power to the DC bus 1. That is, DC power discharged from the fixed storage battery 31 is supplied to the DC bus 1 through the DC/DC converter motor circuit 34 for a storage device.
(42) Hereinafter, while the voltage of the DC bus 1 is lower than the set voltage VC for a storage device, charging of the on-board rechargeable battery 52 is performed with the total sum of the maximum power P1 which can be supplied from the power generation system, the maximum power P2 which can be supplied from the AC/DC conversion circuit 10 for a system power supply, and discharging power supplied from the storage system.
(43) The set voltage VA for a system power supply, the first set voltage VB1 for a power generation device, the second set voltage VB2 for a power generation device, and the set voltage VC for a storage device, the inclination of the graph representing the relationship between power and the voltage of the DC bus 1 set in each of the AC/DC conversion circuit 10 for a system power supply, the power generation system, and the storage system, and the like can be adjusted within a predetermined range in the AC/DC converter control circuit 13 for a system power supply, the DC/DC converter control circuit 23 for a power generation device, the DC/DC converter control circuit 33 for a storage device, and the like. The adjustment is appropriately performed, whereby it is possible to freely determine the priority of the respective power converters which supply power to the load applied to the DC bus 1.
(44) A charging operation of the fixed storage battery 31 in the storage system will be described. While the voltage of the DC bus 1 has a value higher than the set voltage VC for a storage device, that is, while the fixed storage battery 31 is not discharging, charging of the fixed storage battery 31 can be performed in parallel with charging of the on-board rechargeable battery 52.
(45) Charging of the fixed storage battery 31 can be performed in two operation modes. First, in a case where the remaining amount of charge of the fixed storage battery 31 is equal to or greater than a predetermined reference amount of charge set in advance, for example, equal to or greater than 50%, charging is performed only with power supplied from the power generation system without using power of the AC/DC conversion circuit 10 for a system power supply. The determination is performed by the storage battery state monitoring device 36 monitoring the remaining amount of charge of the storage battery cell 35.
(46) Next, in a case where it is determined that the remaining amount of charge of the fixed storage battery 31 is smaller than the reference amount of charge, for example, less than 50%, charging is performed in a short period of time using power supplied from the AC/DC conversion circuit 10 for a system power supply as well as power supplied from the power generation system. At this time, power supplied from the system power supply 60 is equal to or less than the upper limit set value of received power.
(47) In a case where the amount of charge of the fixed storage battery 31 reaches the upper limit value and where the voltage of the DC bus 1 is equal to or higher than the set voltage VC for a storage device, the DC/DC converter control circuit 33 for a storage device controlling stopping of the power supply to both of the fixed storage battery 31 and the DC bus 1 of the DC/DC converter motor circuit 34 for a storage device.
(48) Another example of the overall operation of the charging facility shown in
(49) The graph shown in
(50) The first graph (A) indicates an example of variation with time in power supplied from the DC bus 1 to the on-board rechargeable battery 52 of the electric vehicle 50. The second graph (B) indicates an example of variation with time in power supplied from the DC bus 1 to the fixed storage battery 31.
(51) In the horizontal axis of the graph shown in
(52) In the vertical axis of the graph shown in
(53) In the example of
(54) First, from the time t0 to the time t1, charging of the electric vehicle 50 is not performed, and the storage battery cell 35 is charged to an upper limit of capacity. During this period, the voltage of the DC bus 1 is higher than the set voltage VA for a system power supply and equal to or lower than the first set voltage VB1 for a power generation device.
(55) Next, at the time t1, charging of the electric vehicle 50 starts. Thereafter, at the time t2, until the power supply-side power reaches the power P1, charging of the electric vehicle 50 is performed with power supplied from the DC/DC conversion circuit 22 for a power generation device to the DC bus 1 according to the voltage of the DC bus 1. From the time t1 to the time t2, the voltage of the DC bus 1 is higher than the set voltage VA for a system power supply and equal to or lower than the first set voltage VB1 for a power generation device.
(56) Next, at the time t2, as described above, the supply-side power reaches the power P1. Charging of the electric vehicle 50 continues and is performed by the maximum generated power of the DC/DC conversion circuit 22 for a power generation device and received power from the system power supply 60. The supply-side power continues to increase and reaches power P2 at the time t3. From the time t2 to the time t3 during which the supply-side power is equal to or greater than the power P1 and less than the power P2, the voltage of the DC bus 1 is higher than the set voltage VC for a storage device and equal to or lower than the set voltage VA for a system power supply.
(57) Next, at the time t3, as described above, the supply-side power reaches the power P2. Charging of the electric vehicle 50 continues and is performed with the maximum generated power of the DC/DC conversion circuit 22 for a power generation device, the upper limit value of received power from the system power supply 60, and discharging power of the DC/DC conversion circuit 32 for a storage device. At this time, discharging power of the DC/DC conversion circuit 32 for a storage device is determined according to the voltage of the DC bus 1. The supply-side power continues to increase and reaches power P3 at the time t4. From the time t3 to the time t4 during which the supply-side power is equal to or greater than the power P2 and less than the power P3, the voltage of the DC bus 1 is equal to or lower than the set voltage VC for a storage device.
(58) Next, at the time t4, as described above, the supply-side power reaches the power P3. While charging of the electric vehicle 50 continues and is performed with the maximum generated power of the DC/DC conversion circuit 22 for a power generation device, the upper limit value of received power from the system power supply 60, and discharging power of the DC/DC conversion circuit 32 for a storage device, the amount of charge of the electric vehicle 50 approaches a full charge state, charging power is started to be restricted. Thereafter, at the time t5, the supply-side power reaches the power P2. From the time t4 to the time t5 during which the supply-side power is equal to or less than the power P3 and greater than the power P2, the voltage of the DC bus 1 is equal to or lower than the set voltage VC for a storage device.
(59) Next, at the time t5, as described above, the supply-side power reaches the power P2. While charging of the electric vehicle 50 continues, the amount of charge of the electric vehicle 50 further approaches the full charge state, and charging power is restricted. When the supply-side power is less than the power P2 and equal to or greater than the power P1, the DC/DC conversion circuit 32 for a storage device discharges, and the amount of charge decreases, the electric vehicle 50 and the storage battery cell 35 are charged with the maximum generated power of the DC/DC conversion circuit 22 for a power generation device and received power from the system power supply 60. Thereafter, at the time t6, charging of the electric vehicle 50 ends. From the time t5 to the time t6 during which the supply-side power is less than the power P2, the voltage of the DC bus 1 is equal to the set voltage VC for a storage device. Charging power of the storage battery cell 35 is controlled by the DC/DC converter control circuit 33 for a storage device which monitors the voltage of the DC bus 1 such that the voltage of the DC bus 1 does not fall below the set voltage VC for a storage device.
(60) Next, at the time t6, as described above, charging of the electric vehicle 50 ends. When the storage battery cell 35 is discharged and the amount of charge decreases, the storage battery cell 35 is charged with the maximum generated power of the DC/DC conversion circuit 22 for a power generation device and received power from the system power supply 60. Charging power of the storage battery cell 35 is controlled by the DC/DC converter control circuit 33 for a storage device which monitors the voltage of the DC bus 1 such that the voltage of the DC bus 1 does not fall below the set voltage VC for a storage device.
(61) Next, at the time t7, the amount of charge of the storage battery cell 35 reaches a value set in advance. Thereafter, until the time t8 when the amount of charge of the storage battery cell 35 approaches the full charge state, charging of the storage battery cell 35 is performed only with the maximum generated power of the DC/DC conversion circuit 22 for a power generation device. From the time t7 to the time t8, the voltage of the DC bus 1 is equal to the set voltage VA for a system power supply.
(62) Next, at the time t8, if the amount of charge of the storage battery cell 35 approaches the full charge state, the DC/DC conversion circuit 32 for storage device starts to restrict charging power. For this reason, the voltage of the DC bus 1 increases, and power supply from the DC/DC conversion circuit 22 for a power generation device is restricted. Thereafter, at the time t9, while the amount of charge of the storage battery cell 35 reaches the full charge state, the voltage of the DC bus 1 is higher than the set voltage VA for a system power supply and equal to or lower than the first set voltage VB1 for a power generation device.
(63) The charging facility and the energy management method for a charging facility according to the embodiment of the invention described above have the following features.
(64) First, each of the AC/DC conversion circuit 10 for a system power supply, the DC/DC conversion circuit 22 for a power generation device, and the DC/DC conversion circuit 32 for a storage device autonomously performs an independent operation under automatic control only based on the voltage fluctuating in the DC bus 1. Accordingly, an upper-level control device which manages the entire charging facility is not required, and the configuration as the whole of the charging facility is simplified.
(65) Furthermore, even if a part of power converters fails, operation with the remaining power converters which are operating normally can be continued, and it is easy to remove the failed power converters from the DC bus 1, to additionally connect different power converters to the DC bus 1. That is, the charging facility according to the invention allows very flexible operation.
(66) Although the invention made by the inventors has been concretely described based on the embodiment, the present invention is not limited to the above-described embodiment and can be variously modified without departing from the spirit or scope of the invention. In addition, it is possible to freely combine the features described in the embodiment as long as the technical contradiction does not occur.
(67) This application claims claims priority based on Japanese Patent Application No. 2013-194491, the disclosure of which is incorporated herein by reference.
(68) In connection with the above, the following matters are disclosed.
(69) [1] An energy management method for a charging facility including
(70) detachably connecting an external rechargeable battery to a charging circuit;
(71) supplying DC power to a DC bus; and
(72) charging the external rechargeable battery with the DC power supplied to the DC bus;
(73) wherein the supplying of the DC power includes
(74) generating the DC power with a plurality of power converters,
(75) monitoring the DC voltage in the DC bus in each power converter, and
(76) controlling the operation of each power converter based on the DC voltage monitored by each power converter independently from the remaining power converters of the plurality of power converters; and
(77) the charging of the external rechargeable battery includes
(78) converting the DC power supplied to the DC bus to DC power for charging by a DC/DC converter motor circuit for a charging device,
(79) monitoring the DC voltage in the DC bus, and
(80) controlling the operation of the DC/DC converter motor circuit for a charging device based on a comparison result of the monitored DC voltage and a predetermined set voltage.
(81) [2] The energy management method for a charging facility described in [1],
(82) wherein the generating of the DC power includes
(83) generating DC power with a power generation module, and
(84) converting the generated DC power to the DC power by a DC/DC converter motor circuit for a power generation device; and
(85) the independently controlling includes
(86) controlling the operation of the DC/DC converter motor circuit for a power generation device according to the result of monitoring.
(87) [3] The energy management method for a charging facility described in [1] or [2], the energy management method further including
(88) receiving DC power from the DC bus and converting the received DC power to the DC power to charge a storage battery,
(89) wherein the generating of the DC power includes
(90) discharging DC power charged in advance in the storage battery, and
(91) converting the discharged DC power to the DC power and supplying the DC power to the DC bus by a DC/DC converter motor circuit for a storage device; and
(92) the independently controlling includes
(93) controlling power supply to the DC bus or the storage battery of the DC/DC converter motor circuit for a storage device according to the result of monitoring.
(94) [4] The energy management method for a charging facility described in [2],
(95) wherein the independently controlling includes
(96) starting supply of the DC power to the DC bus of the power generation module if the monitored DC voltage is equal to or lower than a predetermined set voltage for a power generation device, and
(97) stopping supply of the DC power to the DC bus of the power generation module if the monitored DC voltage is equal to or higher than the set voltage for a power generation device.
(98) [5] The energy management method for a charging facility described in [3],
(99) wherein the independently controlling includes
(100) starting supply of the DC power to the DC bus of the DC/DC converter motor circuit for a storage device if the monitored DC voltage is equal to or lower than a predetermined set voltage for a storage device,
(101) starting supply of the DC power to the storage battery of the DC/DC converter motor circuit for a storage device if the monitored DC voltage is equal to or higher than the set voltage for a system power supply,
(102) starting supply of the DC power to the storage battery of the DC/DC converter motor circuit for a storage device if the monitored DC voltage is equal to or higher than the set voltage for a storage device and equal to or lower than the set voltage for a system power supply and if the monitored remaining amount of charge is smaller than a predetermined reference amount of charge, and
(103) stopping power supply to both of the storage battery and the DC bus of the DC/DC converter motor circuit for a storage device if the monitored DC voltage is equal to or higher than the set voltage for a storage device and equal to or lower than the set voltage for a system power supply and if the monitored remaining amount of charge is greater than a predetermined reference amount of charge.
(104) [6] The energy management method for a charging facility described in [5],
(105) wherein the set voltage for a storage device is lower than the set voltage for a system power supply, and
(106) the set voltage for a system power supply is lower than the set voltage for a power generation device.
(107) [7] The energy management method for a charging facility described in [2] or [4],
(108) wherein the generating of power includes
(109) performing solar power generation or performing wind power generation.